B JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER

Similar documents
Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2014 through DECEMBER 31, 2014

Heavy/Highway. OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2017 through DECEMBER 31, 2017

BLS Contract Collection Metadata Header

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

SCHEDULE B Building Construction WAGE SCHEDULE: LOCAL 138 INTERNATIONAL UNION OF OPERATING ENGINEERS. EFFECTIVE DATE JUNE 1, 2017 to MAY31, 2018

GREASE TIME RATE SINGULARLY OPERATED MACHINES

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

T.A.T Minimum Wage Scale

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION

FEMA's Schedule of Equipment Rates

NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT PREVAILING WAGE RATE DETERMINATION

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

FEMA's Schedule of Equipment Rates

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

General Decision Number: MN /15/2012 MN10. Superseded General Decision Number: MN State: Minnesota. Construction Type: Highway

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

St. Cloud State University St. Cloud, MN

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

On-the-Job Training Program. Overview of Training Programs

Highway and Heavy Master Job Classifications OLD versus NEW

MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

Appendix H: Construction Impacts H-3 Air Quality

Fleet Replacement Budget Scenarios DPW City of Milwaukee, Fleet Services February, 2010

Addendum No. 1 - Notice to Bidders. Lateral Expansion Construction of Phase VII Development - Cell 13 Gloucester County Solid Waste Complex

Hennepin County Transportation Department ADDENDUM

Fair Wage Office 18 th Floor, West Tower, City Hall FAIR WAGE SCHEDULE * I.C.I. WORK

CONSTRUCTION and OFF ROAD EQUIPMENT

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

Schedule of Equipment Rates

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

ATTACHMENT A. Construction Project Safety Checklist

Defense Logistics Agency Troop Support. Construction and Equipment. Heavy Equipment Procurement Program HEPP. Customer Handbook March 2017

All Users of the City of Denver Prevailing Wage Schedules

2015 FEMA Schedule of Equipment Rates

Kansas Department of Transportation

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

FAIR WAGE SCHEDULE Road Building

Hennepin County Transportation Department ADDENDUM

Capacity or Size. hour $ Automobile to 130 Transporting people. mile $ Automobile to 130 Transporting cargo. hour $14.

Union Pacific Pay Rates July 1, 2018

Union Pacific Pay Rates January 1, 2015

Roadway Erosion Control 2017 CONTRACT NO ADDENDUM NUMBER ONE

SEWER AND WATERMAIN CONSTRUCTION

Appendix D. Noise Calculations

BIDDING REQUIREMENTS Addendum No. 2. June 21, Southern Illinois University School of Medicine Springfield, IL PROSPECTIVE BIDDERS

Auction Ring 1 -Ramp - North Auction Theatre

FEMA s SCHEDULE OF EQUIPMENT RATES

FAIR WAGE SCHEDULE HEAVY CONSTRUCTION

Equipment Rental Costs

FAIR WAGE SCHEDULE Sewer and Watermain

SEWER AND WATERMAIN CONSTRUCTION

ADDENDUM #1 MARCH 20, 2017 COUNTY PROJECT S.A.P

Bev Quinn. Govemor. Acting Director. August 31,2017. Bruce Rauner

KENDALL COUNTY PREVAILING WAGE RATES EFFECTIVE JUNE 5, Base Wage

General Decision Number: AZ /22/2013 AZ8. Superseded General Decision Number: AZ State: Arizona. Construction Type: Highway

ATTACHMENT 13 DAVIS-BACON WAGE DETERMINATION (HIGHWAY) NUEX Bldg Luke AFB Temporary Lodgin Facility. 20 June 2014

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF EAST PEORIA, TAZEWELL COUNTY, ILLINOIS, THAT:

Federal Wage Rate Chart As of March 3, 2006

Meredith Creme, Associate Human Resource Professional

LABOR RELATIONS BULLETIN

Prevailing Wage Rates for Will County effective August 15, 2018

CITY OF MONTICELLO PIATT COUNTY, ILLINOIS AN ORDINANCE ENACTING THE ILLINOIS PREVAILING RATE OF WAGES FOR PUBLIC WORKS NO

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

ACCESS EQUIPMENT 1ST DAY 2ND DAY 5 DAYS

REMU MSU2-300US GRINDER KOEHRING EXCAVATOR MODEL

Auction Ring 1 -Ramp - North Auction Theatre

LABOR COMMISSIONER'S EXHIBITS

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS

Construction Equipment

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

Whatcom County Invitation to Bid Bid #17-09

Transcription:

BULLETIN Associated General Contractors of New Jersey Raritan Center Raritan Plaza II Fieldcrest Avenue Edison, NJ 08837 TELEPHONE: 732-738-9454 / FAX: 732-738-8722 L A B O R U P D A T E DATE: JUNE 11, 2013 TO: FROM: ACTIVE MEMBERS B-53-13 JACK KOCSIS, JR., CHIEF EXECUTIVE OFFICER SUBJECT: OPERATING ENGINEERS, LOCAL NO. 825 WAGES & FRINGE BENEFITS Effective July 1, 2013 through December 31, 2013 Effective July 1, 2013, Operating Engineers, Local No. 825 receives a $1.25 per hour increase. Enclosed is the schedule of Wages & Fringe Benefits for the Operating Engineers, Local No. 825 effective July 1, 2013 through December 31, 2013. Should you have any questions, do not hesitate to contact the Association office. JK:la attachment cc: Tom DiGangi, Jr., Executive Director, AGC of NJ Darlene Regina, Executive Director, BCANJ

Associated General Contractors of New Jersey OPERATING ENGINEERS LOCAL NO. 825 WAGES & FRINGE BENEFITS EFFECTIVE JULY 1, 2013 through DECEMBER 31, 2013 A Frame $41.48 B Asphalt Curbing Machine $39.57 C Asphalt Plant Engineer $39.57 C Asphalt Spreader $39.57 C Assistant Engineer/Oiler $36.23 E Autograde-Combination Subgrader, Base Mtl. Spreader& Base Trimmer (CMI & Similar Types) $43.07 A Autograde Curb Trimmer, and Sidewalk, Shoulder, Slipform (CMI & Similar Types) $39.57 C Autograde Curecrete Machine (CMI & Similar Types) $39.57 C Autograde Placer-Trimmer Spreader-Combination (CMI & Similar Types) $43.07 A Autograde-Slipform Paver (CMI & Similar Types) $43.07 A Autograde Tube Finisher and Texturing Machine (CMI and Similar Types) $39.57 C Backhoe $43.07 A Backhoe (Combination) $41.48 B Batchers, Batching Plant and Crusher on Site $39.57 C Belt Conveyor Systems $39.57 C Boom Attachment on Loaders (Rate based on size of bucket) Not applicable to Pipehook $41.48 B Boom Type Skimmer Machines $39.57 C Boring & Drilling Machines $41.48 B Bridge Deck Finisher $39.57 C Brooms & Sweepers $37.94 D Brush Chopper, Shredder & Tree Shredder $41.48 B Bulldozers (Fine Grade) $41.48 B Bulldozers (Except Fine Grade) $39.57 C Captain (Power Boats) $39.57 C Car Dumpers (Railroad) $39.57 C Carryalls $41.48 B Central Power Plants (All Types) $43.07 A Chief of Party $43.07 A Chippers $37.94 D Compressor (Single) $37.94 D Compressor and Blower Type Units $39.57 C Compressor, (2 or 3 in battery) $39.57 C Concrete Finishing Machines $39.57 C Concrete Paving Machines $43.07 A Concrete Pump $41.48 B Concrete Pumping System, Pump-Concrete & Similar Types $41.48 B 1

Concrete Saws & Cutters Ride on Type $39.57 C Concrete Spreaders, Hetzel, Rexomatic & Similar Types $39.57 C Concrete Spreaders (Small Type) $37.94 D Concrete Vibrators $39.57 C Conveyors (Under 125 ft.) $39.57 C Conveyors (125 ft. and over) $41.48 B Conveyor Loaders (not including elevator graders) $37.94 D Cranes (All Types, including Overhead & Straddle Traveling Type) $43.07 A Cranes, Gantry $43.07 A Crane Signalman $39.57 C Crushing Machine $39.57 C Derricks (Land, Floating or Chicago Boom Type) $43.07 A Directional Boring Machine $39.57 C Ditching Machine, Small (Ditchwitch, Vermeer or Similar Type) $39.57 C Dope Pots (Mechanical with or without pump) $39.57 C Draglines $43.07 A Drill (Bauer, AMI and Similar Types, when operator on machine) $43.07 A Drill Doctor (duties include Dust Collector, Maint.) $41.48 B Drillers Helper $36.23 E Drillmaster, Quarrymaster (Down the Hole Drill, Rotary Drill, Self-Propelled Hydraulic Drill, Self-Powered Drill) $43.07 A Dumpsters $39.57 C Elevator $39.57 C Elevator Graders $43.07 A Engines, Large Diesel (1620 H.P.) & Staging Pump $37.94 D Farm Tractors $37.94 D Fertilizing Equipment (Operation and Maint. of) $37.94 D Fine Grade Machine Small Type $37.94 D Fireman $39.57 C Fork Lifts (Economobile, Lull and similar types of equip.) $39.57 C Form Line Graders (Small Type) $37.94 D Front End Loaders (5 yds. and over) $43.07 A Front End Loaders (2 yds. but less than 5 yds.) $41.48 B Front End Loaders (1 yd. and over but less than 2 yds.) $39.57 C Front End Loader (under 1 yd.) $37.94 D Generators (2 or 3 in Battery) $39.57 C Generator (Single) $37.94 D Giraffe Grinders $39.57 C Gradalls $43.07 A Grader, Rago $43.07 A Graders (Finish) $41.48 B Graders and Motor Patrols $39.57 C Grease, Gas, Fuel & Oil Supply Trucks $37.94 D Groove Cutting Machine (Ride on Type) $41.48 B Gunnite Machines (Excluding Nozzle) $39.57 C 2

Hammer Vibratory (in conjunction with generator) $39.57 C Heaters (Nelson or other type including Propane, Natural Gas or Flowtype Units) $37.94 D Heater Planer $41.48 B Helicopter Pilot / Engineer $44.89 Helicopters, Co-Pilot $43.07 A Helicopters, Communications Engineer $43.07 A Hoists (All Types) $41.48 B Hoists (Roof, Tugger, Aerial Platform Hoist & House Cars) $39.57 C Hoppers $39.57 C Hopper Doors (Power Operated) $39.57 C Hydraulic Cranes 10 Tons and Under $41.48 B Hydro-Axe $41.48 B Hydro-Blaster $41.48 B Hydro-Blaster (Where Required) $39.57 C Jacks, Screw Air Hydraulic Power Operated Unit or Console Type (not Hand Jack or Pile Load Test Type) $41.48 B Juntann Pile Drive (if manned) $43.07 A Ladders (Motorized) $39.57 C Laddervator $39.57 C Lead Engineer, Foreman Engineer, Safety Engineer $43.81 Lights, Portable Generating Light Plants $37.94 D Locomotive, Dinky Type $39.57 C Locomotive, Large $43.07 A Log Skidder $41.48 B Maintenance Apprentice (Deck Hand) $36.23 E Maintenance Apprentice (Oiler) $36.23 E Maintenance, Utility Man $39.57 C Mechanics $39.57 C Mechanics Helper $36.23 E Mixers (excepting Paving Mixers) $39.57 C Mixers, Concrete Small $37.94 D Motor Patrols & Graders $39.57 C Mucking Machines $43.07 A Mulching Equipment (Operation & Maint. of) $37.94 D Off Road Back Dump (Articulating, Marruga & Similar Types) $36.23 E Pans $41.48 B Pavement Breakers, small, self-propelled ride on type (also maintains compressor or hydraulic unit) $39.57 C Pavement Breaker, Truck Mounted $39.57 C Pavement & Concrete Breaker, i.e., Superhammer & Hoe Ram $43.07 A Pavers (All) Concrete $41.48 B Pile Driver, length of boom including length of leads shall determine premium Rate applicable $43.07 A Pipe Bending Machine (Power) $39.57 C Pitch Pump $39.57 C 3

Plaster Pump (Regardless of size) $39.57 C Plate and Frame Filter Press $41.48 B Post Hole Digger (Post Pounder and Auger) $39.57 C Pumpcrete Machines, Squeezecrete and Concrete pumping (regardless of size) $41.48 B Pumps (4 inch suction & over including Submersible Pumps $37.94 D Pumps (Diesel Engine & Hydraulic) immaterial of Power $37.94 D Road Finishing Machines (Small Type) $37.94 D Roadway Surface Grinder $43.07 A Rod / Chainman $33.65 Roller, Black Top $39.57 C Rollers, Grade, Fill or Stone Base $37.94 D Scales (Power) $39.57 C Scrapers $41.48 B Scooper (Loader & Shovel) $43.07 A Seaman Pulverizing Mixer $39.57 C Seeding Equipment (Operation & Maint. of) $37.94 D Shoulder Widener $39.57 C Shovels $43.07 A Side Booms $41.48 B Silos $39.57 C Skimmer Machines (Boom Type) $39.57 C Sprinkler and Water Pump Trucks (used on job site or in conjunction with job site) $37.94 D Steam Jennies & Boilers, irrespective of use $37.94 D Steel Cutting Machines, Services & Maintains $39.57 C Stone Spreader $37.94 D Straddle Carrier, Ross and similar types $41.48 B Sweepers & Brooms $37.94 D Tamping Machines, Vibrating Ride On $37.94 D Temporary Heating Plant (Nelson or other type, including Propane, Natural Gas or Flow Type units) $37.94 D Tire Repair & Maintenance $36.23 E Tractors $39.57 C Transfer Machine $39.57 C Transit/Instrument Man $36.23 E Tree Chopper with Boom $43.07 A Trench Machines (Cable Plow) $43.07 A Tug Master (Power Boats) $39.57 C Water & Sprinkler Trucks (used on job site or in conjunction with job site) $37.94 D Welder & Repair Mechanics $39.57 C Welding Machines (Gas, Diesel and/or Electric Converters of any type, single; 2 or 3 in battery) $37.94 D Welding System, Multiple (rectifier Transformer Type) $37.94 D Wellpoint Systems (including installation by Bull Gang & maintenance of) $37.94 D 4

Winch Trucks (Hoisting) $41.48 B When used for decontamination and remediation purposes: Concrete Cleaning/Decontamination Machine Operator $39.57 C Heavy Equipment Robotics Operator/Tech $39.57 C Master Environmental Maintenance Tech $39.57 C Ultra High Pressure Water Jet Cutting Tool System Operator/Maintenance Tech $39.57 C Vacuum Blasting Machine Operator Maintenance Tech $39.57 C Additional Premiums: $1.00 per hour on rigs with 100-139 foot boom (including jib) $2.00 per hour on rigs with boom over 140 feet (including jib) FRINGE BENEFITS Pension Fund $ 6.50 Welfare Fund $12.75 Savings Fund $ 1.00* Annuity Fund $ 4.25 Apprentice Fund $ 1.25 S.U.B. Fund $ 2.75 Labor/Management Fund $.50 I.A.P. $.08 P.A.C. Fund.5% (deducted) Working Assessment Dues Check Off 3% (deducted) *Taxable to the employee. Therefore, the Savings Fund should be added to the rate, taxed and then deducted. $1.25 Increase effective 1/1/2014 CONTRACT EXPIRES: MARCH 31, 2014 5