Installation Guide. Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

Similar documents
Installation Guide. Flame Ionization Detector on a 6890 GC. Accessories G1561A, G1562A, G1591A, G1598A

Installation Guide. Purged Packed Inlet, Electronic Pneumatics Control on 6890 GC Accessory G1551A

Installation Guide. Auxiliary Pressure Control Manifold on 6890 GC Accessory G1570A

Installation Guide. Heater Interface Cable for Mass Sensitive Detector Accessory G1590A

Installation Guide. Volatiles Interface for 6890 Gas Chromatograph Accessory G2319A

Agilent G1554A On-Column Capillary Inlet with EPC

Installation Guide. Flame Ionization Detector on a 6850 GC Accessory G2621

Installation Guide Thermal Conductivity Detector Accessory 19232E

Installation Guide NPD/ECD Chemical Filters Accessory 19199N

Installation Guide. Thermal Conductivity Detector on a 6850 GC Accessory G2623A

Installing the Flame Ionization Detector EPC Flow Control Manifold

Installing a Purged Packed (PP) Inlet

Nickel Catalyst Tube Accessory 19205A

Installing a Cool On-Column Inlet

Installing an Auxiliary Pressure Control Module

Installing an Auxiliary Pressure Control Module

Installing a PTV Inlet

Installing a PTV Inlet

HP 6890Series Gas Chromatograph. Installation Guide. Flame Ionization Detector. Accessories HP G1561A HP G1562A HP G1591A HP G1598A

Agilent G3510A/G3511A Multimode Inlet

Installing the CO 2 Cryogenic Oven Cooling Kit

Installing a Purged Packed Inlet

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Valve Box and Valve Accessories G4315A, G4316A, G4317A

Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

Agilent G2738A Upstream Capillary Interface

Installing the 6850 Direct Valve Column Connector Kit

Agilent G2333B (Single) and G2334B (Dual) Flame Photometric Detectors

Installation Guide. Agilent 7683 Automatic Liquid Sampler

Model 4430 Photoionization Detector (PID) Operator s Manual

PET UNIT DOSE CABINET

29 Installation Step 1. Unpacking the GC Cable diagrams Step 2. Placing the GC system on the benchtop Step 3. Turning the power on

260 Solvent Vapor Exit Accessory

PET UNIT DOSE TABLE INSTALLATION MANUAL FN: Rev A 1/18

Agilent 6890 Gas Chromatograph

Replacing the Batteries in the Fortress LI 660

Replacing the Battery in the Patriot SPS 250, SPS 300 and SPS 450

Installation Instructions. PowerFlex 700 Drive - Frame 8 Components Replacement

INSTALLATION INSTRUCTIONS

Altivar 61/71 Adjustable Speed Drives Plastic Kits and Power Terminal Kit

N/S= Not Shown Bold = Part available for purchase. Italic = Part not available for purchase, listed and shown for reference only.

Agilent 490 Micro GC Internal and External Mount Genie Filter Brackets

Agilent G3348B Flame Photometric Detector

Agilent G2647A (Single) and G2648A (Dual) Flame Photometric Detector Update Kits

Overview. Chassis Packaging

INSTALLATION INSTRUCTIONS

Installation Instructions

Agilent G4367A Auxiliary Electronic Pressure Control (Aux EPC) Module

HP Modular Cooling System 200/100 Options Installation Guide

2013 IMPCO Technologies, Inc. Page 1 of 20 EPR Repair Kit Instructions (PPI-122, Rev-B)

Alcatel-Lucent 7310 DC Metro Cell AWS (B4) Kit MC-DBR1, MC-DBR2, MC-DBR3, MC-DBR4, MC-DBR5. Installation Manual

Model Fixed Rack-Mount Kit

ST 3000 R300 Smart Meter & R300 Smart Meter with ZS Option Installation Instruction

Installation Note for Solvent Selection Valve Upgrade Kit (G1360A)

Deans Switch Microfluidics

In addition to this instruction sheet, the following are included in this kit (some additional parts are included for future maintenance):

Installation Instructions. PowerFlex 700 Drive - Frame 7 Components Replacement

OPERATION AND MAINTENANCE MANUAL

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Catalyser Introduction. 3. Hazard Information. 2. Area of Application. 3.1 Symbology

401B/1KDB CoolRite/FreezeRite Installation Manual I003

EVO TM 200 AND EVO TM 400 LCD DISPLAY INSTALLATION GUIDE

Siemens Drives & PLCs

Feeder Circuit Breaker Units Secure Support Pan and Change Door Latch

3875 Cypress Drive Petaluma, CA Fax

A g i l e n t A G a s C h r o m a t o g r a p h Service Manual

VHM-P (Non-Locking) Variable Height Arm with VESA Mounting Plate for 75 x 75mm or 100 x 100mm applications

5000TOC Sensor Service Manual

PowerFlex 700 Drive - Frame 8 Components Replacement

CRECOMZR054B00 CRECOMZR055B00. VERTICAL AND HORIZONTAL ECONOMI$ER2 ACCESSORY MEDIUM ROOFTOP UNITS 15 to 27 1/2 TONS WARNING TABLE OF CONTENTS

Installation Guide. Kennedy Technology Group, Inc.

Switching DC Power Supply

User s Manual Power Supply. IM E 2nd Edition. Yokogawa Electric Corporation

ALUMAREEL. Electrical Cord Reel. Model EC6 100 Model EC Operational, Maintenance and Installation Manual

ipatch Ready Upgrade Kit for SYSTIMAX 360 Fiber Shelves Instructions

Agilent G5632 Valve Kit Instructions

Model TC-20. Tube Cut-Off Machine. Operator s Manual REV H

Manifold QF. Contents. Description. Installation & Setup Guide. Safety 3. Introduction 3. Installation Standards 4. Specifications 5.

Altivar 61/71 Adjustable Speed Drives Spare Parts Kits

Radius Cuspidor (for Cascade 1040 or Decade 1011/1021 Chairs)

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS. ITEM QTY DESCRIPTION Usage Chart Service Part Number. 1 1 Mirror Assembly w/ Compass 1

Replacing the Gear Drive Motor Assembly and GFCI Module for Operation with the Chain Drive Motor Assembly

INSTALLATION INSTRUCTIONS

5 Removal and replacement

Model EL8500 Series. Bagless Upright. Assembly/Disassembly Guide 1

INSTALLATION INSTRUCTIONS

Replacing the T320 Cooling System Components. Replacing a T320 Fan Tray. Removing a T320 Front Fan Tray

RMK HANDLEBAR KIT P/N ; ; APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

System 3 ZB1PS Device Chassis. Operator s Manual

* * APPLICABLE MODELS: 2014 > Mazda 3

HP BladeSystem c7000 Carrier-Grade Options Installation Guide

Section 7 - Troubleshooting Guide

* * APPLICABLE MODELS: 2014 > Mazda 6

INSTALLATION INSTRUCTIONS

SITRANS F. Ultrasonic Flowmeters. Hi-Precision Mounts. Operating Instructions. Answers for industry.

Installation Manual TWM Performance Short Shifter Subaru STi 2008+

Owner smanual. Banks Ram-Air Intake System Chevrolet/GMC 8.1L Workhorse Class-A Motorhome. with Installation Instructions

INSTALLATION INSTRUCTIONS FOR PCDE-36VA CONVERSION KIT

2-row and All-row systems included.

Transcription:

Installation Guide Nitrogen-Phosphorus Detector on 6890 GC Accessories G1575A, G1576A, G1594A, G1599A

Agilent Technologies 2001 All Rights Reserved. Reproduction, adaptation, or translation without permission is prohibited, except as allowed under the copyright laws. Part number G1534-90347 First Edition, AUG 2001 Replaces Part No. G1534-90300: Installation Guide, Nitrogen-Phosphorus Detector; Part No. G1534-90305: Update for the Nitrogen- Phosphorus Detector Assembly Installation Guide; and Part No. G1534-90340: Installing the Nitrogen-Phosphorus Detector EPC Flow Control Manifold. Printed in USA Safety Information The Agilent Technologies 6890 Gas Chromatograph meets the following IEC (International Electrotechnical Commission) classifications: Safety Class 1, Transient Overvoltage Category II, and Pollution Degree 2. This unit has been designed and tested in accordance with recognized safety standards and designed for use indoors. If the instrument is used in a manner not specified by the manufacturer, the protection provided by the instrument may be impaired. Whenever the safety protection of the Agilent 6890 has been compromised, disconnect the unit from all power sources and secure the unit against unintended operation. Refer servicing to qualified service personnel. Substituting parts or performing any unauthorized modification to the instrument may result in a safety hazard. Disconnect the AC power cord before removing covers. The customer should not attempt to replace the battery or fuses in this instrument. The battery contained in this instrument is recyclable. Safety Symbols Warnings in the manual or on the instrument must be observed during all phases of operation, service, and repair of this instrument. Failure to comply with these precautions violates safety standards of design and the intended use of the instrument. Agilent Technologies assumes no liability for the customer s failure to comply with these requirements. WARNING A warning calls attention to a condition or possible situation that could cause injury to the user. CAUTION A caution calls attention to a condition or possible situation that could damage or destroy the product or the user s work. # Indicates a hot surface " Indicates earth (ground) terminal Sound Emission Certification for Federal Republic of Germany Sound pressure Lp < 68 db(a) During normal operation At the operator position According to ISO 7779 (Type Test) Schallemission Schalldruckpegel LP < 68 db(a) Am Arbeitsplatz Normaler Betrieb Nach DIN 45635 T. 19 (Typprüfung) Agilent Technologies, Inc. 2850 Centerville Road Wilmington, DE 19808-1610 USA

Overview Overview This section reviews the procedure for installing a nitrogen-phosphorus detector (NPD) on an Agilent 6890 Gas Chromatograph (hereafter referred to as the GC.) Before following this procedure, refer to the safety information on the inside back cover. Parts List EPC NPD assembly: capillary optimized or adaptable Top and bottom insulation Nutwarmer cup and insulation (for adaptable NPD only) NonEPC NPD assembly: capillary optimized or adaptable Top and bottom insulation Nutwarmer cup and insulation (for adaptable NPD only) Makeup gas regulator Two machine screws Required Tools Electrostatic protection such as a grounded wrist strap (part no. 9300-0969, large or part no. 9300-0970, small) T-20 Torx screwdriver Diagonal cutters 7/16-inch wrench (nonepc detectors only) 1

Overview Steps 1. Preparing the GC 2. Installing the flow manifold 3. Installing the makeup gas regulator (nonepc detectors only) 4. Positioning and securing the detector 5. Connecting the detector 6. Routing the tubing 7. Installing the nutwarmer cup (adaptable NPD only) 8. Restoring the GC to operating condition 9. Calibrating your detector (EPC detectors only) 2

Overview Nitrogen-phosphorus detector Makeup gas regulator (nonepc only) Flow manifold (early version) Power switch Printed circuit board 3

Preparing the GC Preparing the GC WARNING Hazardous voltages are present in the mainframe when the GC is plugged in. Avoid a potentially dangerous shock hazard by unplugging the power cord before removing the side panels. 1. Turn off the GC and unplug the power cord. Allow time for all heated zones to cool and then turn off supply gases at their sources. From the back of the GC (see the next figure): 2. Unsnap and lift off the pneumatics top cover. 3. Remove the RFI cover. Remove the screw with a T-20 Torx screwdriver, slide the cover to the left until it disengages from the top rear panel, and remove it. 4. If you are installing a nonepc detector, remove the detector cover plate from the front or back position by loosening the two screws with a T-20 Torx screwdriver and sliding the plate up and off. 4

Preparing the GC 5. Loosen the five captive screws in the top rear panel with a T-20 Torx screwdriver. Grasp the panel at each end and gently lift it up and away from the GC. Be careful not to disrupt the supply tubing. Pneumatics cover RFI cover Makeup gas regulator (nonepc detectors only) Loosen five screws 6. Raise the gray plastic top cover (with the holes and ventilation slots) to the vertical position. Examine the hinge in the right rear corner. Early 6890 models. The hinge is a metal bracket attached to the oven top. Pull the clip at its top toward you to release the hinge pin. Push the pin to the left to release the cover. Raise the right side of the cover and remove it. Current 6890 models. Raise the right side of the cover and remove it. 5

Preparing the GC 7. Remove the electronics side cover. Loosen the two captive screws at the top, slide the panel to the rear, and lift it off. Captive screws 8. Remove the electronics top cover. Push in on the tab underneath the back of the cover and lift it off. Push clip under cover 6

Installing the flow manifold Installing the flow manifold This section describes the installation of the current version of the manifold. For information about the early version, see the Appendix. Caution Always hold the manifold by its support bracket to avoid damaging board components. 1. Route the ribbon cable behind the manifold assembly as shown in Figure 1. Then, slide the manifold and bracket assembly into the slot until the bracket seats flush against the end of the rails. See Figure 2. Back view of manifold Manifold installed with cable routed to left Figure 1. Routing the ribbon cable 7

Installing the flow manifold Bracket is flush with carrier rails Figure 2. Manifold, after installation 2. Route the gas tubing behind the manifold, over the top of the chassis, and through the slots. 3. Connect the ribbon cable to the mating connector on the pneumatics board. Arrange the cable to keep it away from the valves and keep it from being pinched against the manifold. For the back detector, you may want to loosen the manifold and slide it out of the carrier a few centimeters to connect the cable to the pneumatics board. Then, reinstall the manifold. 4. From the front, secure the manifold to the chassis using the Torx T-20 screw. Front captive screw Front detector tubing Slot for rear detector tubing Back captive screw Figure 3. Captive screws and tubing 8

Installing the flow manifold Caution If your current top rear panel is not similar to the one shown in Figure 4, discard it and use the new one supplied with your accessory kit. 5. Using a pair of needle-nosed pliers, remove the appropriate top rear panel detector cutout for the NPD. Also remove any cutouts needed to access other manifolds or accessories installed in the GC. See Figure 4. Insert tip of pliers here Back inlet Front detector Front inlet Auxiliary Left-most screw slot Back detector Figure 4. Top rear panel cutouts 6. Place the top rear panel on its left-most mounting screw. Work from left to right and use the screw as a hinge, slide each manifold ID tag through its cutout in the panel. When all the tags are through the panel, finish installing the panel on the GC. 7. Install the RFI shield, the pneumatics cover, and the detector top cover. 9

Installing the flow manifold 8. Connect the source gas lines to the manifold. Figure 5. Gas line connections 9. Restore gas pressures and leak test the fittings. 10

Installing the makeup gas regulator (nonepc detectors) Installing the makeup gas regulator (nonepc detectors) 1. Install a screw in the front or back position of the pneumatics carrier. Do not tighten the screw. Install a screw in the makeup gas regulator. Do not tighten the screw. Back Front Screw 2. Place the makeup gas regulator in the front or back position of the pneumatics carrier. Tighten the screws with a T-20 Torx screwdriver. 3. Connect the tube on the makeup gas regulator to the fitting labeled MU on the flow manifold. Tighten the nut fingertight, then use the 7/16-inch wrench to tighten it 3/4 of a turn. Follow the same procedure for 11

Installing the makeup gas regulator (nonepc detectors) connecting the air and hydrogen tubing (labeled at the back of the instrument) to the flow manifold. Air Hydrogen Makeup gas regulator 4. Locate the RFI cover that you removed in Preparing the GC. Remove the front or back rectangular cutout on the cover. Use diagonal cutters to cut the metal or work the cutout back and forth until it breaks free from the cover. Cut here Back Front 5. Locate the pneumatics cover that you removed in Preparing the GC. Remove the appropriate oval label from the cover. Back Front 12

Positioning and securing the detector Positioning and securing the detector 1. Remove the round metal cutout on the oven top and the square plastic cutout in the electronics carrier in the front or back detector position, if necessary. Cut the metal circle with diagonal cutters so that the nibs are connected to the piece removed. Cut the plastic in six places with diagonal cutters. Discard the cutouts. Back Front 2. Lift out the die-cut insulation plug from the front or back detector position, if necessary. Caution Be careful to remove only the insulation within the scribed circle. 3. Carefully remove the scribed circle of insulation from the oven top to create an opening into the oven. 13

Positioning and securing the detector Method 1: Use a sharp knife to cut out the insulation using the scribed circle as a guide. Method 2: Pierce the insulation with a screwdriver. Rotate the screwdriver around the scribed circle to remove excess insulation. Clean up any pieces of insulation that fall inside the oven. 4. Lower the detector pallet into the cavity. Be sure that the insulation is in place. Partially tighten the four screws with a T-20 Torx screwdriver. Retighten all the screws to snugness. Captive screws Insulation Pallet 14

Connecting the detector Connecting the detector Caution Board components can be damaged by static electricity; use a properly grounded static control wrist strap when handling the board. 1. Remove the PC board from its static control bag, slide it into the front or back slot on the main circuit board and plug it into the main board. Plugs into main board Front detector slot Back detector slot PC board 15

Connecting the detector 2. Attach the bead and signal cables to the PC board. Bead cable Signal cable PC board Signal connector Bead connector 16

Connecting the detector 3. Connect the heater/sensor cable to the square connector closest to the front or back detector. Heater/sensor cable Heater/sensor connector (front position) Heater/sensor connector (back position) 17

Routing the tubing Routing the tubing Route the tubing from the flow manifold through the slots in the top of the carrier to the detector area. Front detector tubing Back detector tubing 18

Installing the nutwarmer cup (adaptable NPD) Installing the nutwarmer cup (adaptable NPD) 1. Install the insulation in the cup. 2. Push the wire spring lever at the bottom of the cup to the right to uncover the hole. 3. From inside the oven, place the cup over the detector fitting so that the top of the cup touches the top of the oven. 4. Release the spring. Make certain the spring fits in the groove of the detector fitting. 19

Restoring the GC to operating condition Restoring the GC to operating condition 1. Reinstall the electronics side panel. 2. Reinstall the top rear panel 3. Reinstall the detector cover. 4. Reinstall the electronics top cover. 5. Plug in the GC and turn it on. 6. Press [Front Det] or [Back Det]. If the detector has been properly installed, you will see the following display: EPC NonEPC FRONT DET (NPD) Temp 24 Off < H2 flow 0.x Off Air flow 0.x Off Mkup flow 0.x Off Adjust offset Off Output 0.0 Bead voltage Off FRONT DET (NPD) Temp 24 Off < H2 flow Off Air flow Off Mkup (He) Off Adjust offset Off Output 0.0 Bead voltage Off An actual flow value is displayed when the gases are off or not connected. This is not an error. After the gases are connected and the detector is operational, the actual flow values will be equal to the setpoint values. 7. If you have an EPC detector, zero the pressure sensors: a. Make certain that your detector and makeup gases are not connected to your detector. b. Press [Options] and scroll to Calibration Front detector or Back detector. c. Scroll to Oxidizer zero and press [On]. d. Scroll to H2 zero and press [On]. e. Scroll to Makeup zero and press [On]. 8. Turn the GC off and unplug the power cord. Plumb the air, hydrogen, and makeup gases to your detector. See the Site Preparation and Installation Manual for instructions. 20

Restoring the GC to operating condition 9. Reinstall the RFI cover. 10. Replace the pneumatics top cover. 11. Plug in the GC and turn it on. 12. If your GC did not detect the new NPD, check the following connections: Detector card to main board Manifold to pneumatics board Heater-sensor connector Bead cable to detector card Signal cable to detector card If you installed an EPC NPD but you have only temperature control for the detector, check the connection between the flow manifold and the pneumatics board. 21

Appendix: Installing the pneumatics module (early version) Appendix: Installing the pneumatics module (early version) Caution Board components can be damaged by static electricity; use a properly grounded static control wrist strap when removing the electronics covers. 1. From the back of the GC, locate the pneumatics carrier. Pneumatics carrier 2. If you are installing a detector in the front position and an inlet is installed in the back position, unplug the back inlet ribbon cable. Unlock the connector by pushing the tabs away from the center. Connector locations Back detector Front detector Back inlet Front inlet 22

Appendix: Installing the pneumatics module (early version) 3. Locate the troughs in the flow manifold and the ridges in the pneumatics carrier. Slide the flow manifold into the carrier, lining up the ridges and troughs. Back detector Ridges Front detector Troughs Flow manifold 4. Plug the ribbon cable into the front or back connector. Make certain the connector is firmly seated and locked. If the flow manifold is installed and plugged into the correct position, the ribbon cable will retain its fold as shown in the diagram. If you unplugged an inlet ribbon cable in Step 2, replace it. Folded ribbon cable Open connector Locked connector 23

Appendix: Installing the pneumatics module (early version) 5. From the front of the GC, secure the flow manifold to the carrier by tightening the captive screw until snug using a T-20 Torx screwdriver. Front captive screw Back captive screw 24

Printed on recycled paper. This product is recyclable. Agilent Technologies, Inc. Printed in USA AUG 2001 G1534-90347