Ultra harsh environment jack-up

Similar documents
Maersk. Convincer. 375ft jack-up

Maersk Interceptor. Gusto MSC CJ70-X150MD Harsh Environment Jack-up 150 m Water Depth Optimized Drilling Efficiency Subsea Capabilities

Mærsk Gallant. Ultra harsh environment jack-up

Maersk Reacher. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Resolve. Maximised drilling efficiency and uptime. Optimised for concurrent activities

HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment. REV 1c

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System

LOC 400 Drilling Rig

Plug & Abandonment Light Drilling Workover Well Intervention

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

THE OFFSHORE Drilling Solution

Jackup Strategy Richard Roper Sr. Director Capital Projects. April 11, 2012

GustoMSC 375 Ft. Jack Up Drilling Unit. Fitted With NOV Drilling Package RIG 2. Overview

HYDRAULIC WORKOVER SERVICES

The New Generation: ENSCO DS-9 and ENSCO DS-10 Ultra-Deepwater Drillship

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

Super 116E Class. Self-Elevating Drilling Unit (SEDU)

DRILLING BARGE SS AMEQ CASPIAN SEA

Ideco - H25 Information Document

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Land Rigs. The core of drilling innovation

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Offshore Pipe Handling Systems Product Portfolio

West Phoenix. Further information: Tel: seadrill.com GENERAL. WELL CONTROL Cameron /4-15K. Moss CS50 MkII-DP.

McKissick 200mt. Stabbing board

COMMITMENT TO EXCELLENCE

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

NEXT GEN DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE

Section 25 Project Surplus Packages - Sales Item

Land Rigs. The core of drilling innovation

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Land Drilling Packages Integrated, standardized solutions for efficient operations

Modular Rig. archerwell.com

OilRigsNow.com Houston,TX USA (713)

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

JU Operator And Service Provider For Offshore Works

Drillmec HH-300 spec.

Cover graphic should fill and not exceed the defined grey box. Cameron Sense AS. Clement Feng General Manager. Cameron Sense (China) Co. Ltd.

Rig 90. Rig 97. Future Technology From NOV

Rotary Snubbing Technology Option for Long Reach

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

RIG 32. Rig 32. Page 1 of 13

AHEAD Rigs. The core of drilling innovation

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

Deep Drilling Equipment

Schede tecniche Corsair 300 PDB

OUTLINE OF SPECIFICATION FOR 400FT JACK UP RIG (CP400)

NATIONAL 110 UE 1500 HP SCR

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D.

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Rotary Drilling Co. Ltd. Presentation

Oil Rigs Now Houston, Texas

OPIELOK OFFSHORE CARRIERS Operators of modern offshore supply vessels SPECIFICATIONS. DP2 Offshore Wind Farm Vessel OOC CHEETAH

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

KEY FEATURES. DP-3 250T Offshore Crane 1600m 2 Deck Space Moonpool High sea state capability ARIADNE

Launch and Recovery Systems for ROV/Ts

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

300 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

GPA 670 PSV Series DP2 Diesel-Electric Platform Support Vessel Exceptional Maneuverability

Ocean Alliance CRANES. 3 x 64 ton NOV OS-435 HD with 120 ft boom SUBSEA EQUIPMENT

BENTEC DRILLING RIGS PROVEN AROUND THE WORLD

RD20/RD20XC/APL DRILL RIGS. Oil and Gas Drilling atlascopco.com/rd20

A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology.

WALKING PAD TELEMAST RIG

Environmental Services for the Drilling Industry

Fidmash. Coiled Tubing and Pressure Pumping Equipment

GPA 654 PSV Series D-P2 Diesel Electric Platform Support Vessel Low Emissions Crew Safety

LAGO Energy Presents,

Oil Rigs Now Houston, Texas

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

AUTOMATED POWER CATWALK

WORKOVER RIGS. Compared with a normal work over rig, the free standing workover rig has the

APPROVED AROUND THE WORLD BENTEC RIGS

SIDEWINDER DRILLING RIG 219 LA SALLE, TEXAS

REDEFINING WELL COMPLETION TECHNOLOGIES

ALL TERRAIN TRANSPORTERS WORLDWIDE HEAVY TRANSPORTATION AND LIFTING

Pi PK Information Document

* To satisfy our costumers, employees, and society with trust, dedication, and performance

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

Iron Roughnecks DRAFT

BOURBON LIBERTY 150 SERIES. Platform Supply vessels. DP2-1,701 t DWT

19,683 8,

RD20/RD20XC/APL Drill Rigs. Oil and Gas Drilling

M/V Pacific Intrepid

Hydraulic rig for marginal fields: Design and use of the G-125

ConocoPhillips. Bespoke Tension Deck for Judy P-20

Feasibility of Electric Propulsion for Semi-submersible Heavy Lift Vessels

2.0 TECHNICAL SPECIFICATION:!

Transcription:

Ultra harsh environment jack-up

Simple to Be Safe Maersk Drilling truly wants to bring our people Out Of Harm s Way. We are challenging the way we work with safety, not only as a priority but as a commitment. This starts with asking our frontline colleagues what they need to stay safe and efficient. We are thinking out of the box for ways to eliminate risk. Nobody should ever be in doubt as to how to perform a task safely. We are removing complexity and reducing administration so we have more time for safety conversations. We are innovating new solutions to digitise and make our work processes more visible. We want to make it Simple to Be Safe. 2

Contents 8. Rig capabilities A rig s capabilities drive successful operations for our clients. 16. Equipment Fully equipped to deliver safe and efficient operations. 4. Introduction A committed workforce of onand offshore professionals. 10. Experience Strong experience is vital to enable efficient operations. 24. Rig drawings See the full picture with a top and side view of the rig. 6. Strategy Every hour spent on a well counts. We aim to make drilling smarter. 12. Dimensions Get an overview of the rig s dimensions and storage. 3

Delivering operational excellence with innovation Maersk Drilling provides offshore drilling services to oil companies in major oil basins around the world. We are a leader in the harsh environment sector and have a strong track record in deepwater drilling. Our fleet is one of the youngest and most advanced in the industry, comprising advanced drillships, deepwater semi-submersibles and high-end jack-up rigs. For over 40 years, we ve been working closely with our customers to deliver safe and efficient drilling campaigns. Our highly skilled and committed workforce of on- and offshore professionals is recognised for their technical skills, operational excellence and for solving complex problems. Today, we re increasingly providing third-party services and partnering with our customers on innovative technologies and new commercial models. Together, we re reducing the complexity, cost, and risk of drilling campaigns to improve the competitiveness of offshore oil and gas for our customers. Jørn Madsen CEO, Maersk Drilling 4

Our fleet is one of the youngest and most advanced in the industry, comprising advanced drillships, deepwater semi-submersibles and high-end jack-up rigs. 5

Smarter Drilling for Better Value 6

Every hour spent on a well counts there s a lot to play for Offshore oil and gas is in a race to produce the most competitive barrel of oil. With dozens of different suppliers and multiple interfaces involved, the process of delivering a well safely, on time and within budget has become more complex for operators than it needs to be. Smarter Drilling for Better Value is Maersk Drilling s response to this. It combines innovative technologies with new commercial models to reduce waste and inefficiency across all the activities delivered on a well. We provide solutions that plan, orchestrate and integrate the services involved in a drilling campaign. By improving coordination and simplifying Our joint challenge: 60+ suppliers It can take over 60 suppliers and 6,000 invoices to drill an offshore well interfaces across the supply chain, we aim to reduce overall NPT, increase efficiency and improve safety for our customers. We re also building new types of alliances with our customers that take a longer-term time horizon, align incentives and create value for the partners. Together, we re lowering the cost per barrel and improving the competitiveness of offshore oil and gas. 20 25% NPT Non-productive time (NPT) is often 20 25% across all suppliers on a well 7

Rig capabilities The ultra harsh environment jack-up rig is an MSC CJ70-X150-MD, designed for year-round operation on the Norwegian and Continental Shelf, is one of Maersk Drilling s I-class rigs the world s largest and most advanced jack-up drilling rigs. is designed and built to optimise drilling operations at all stages of the process. The rig is able to handle wellheads and Xmas trees offline, through the moon pool or Texas deck. SWL on Texas deck is 150MT, moving and static. Automated pipe handling equipment with offline capabilities enables the rig to build casing stands and drill pipe while drilling. Large deck space minimises crane lifts, as a forklift can be used instead. 8

Main features x3 Three 100MT-rated electro hydraulic deck cranes Production test equipment including burner booms, sprinklers and fixed lines for oil/gas, seawater and air pre-installed at the dedicated testing area SUBSEA Enhanced facilities for handling subsea equipment and operations POB 180 Dual pipe handling system with offline stand building of drill pipe, casing or bottom hole assembly while one string is working at well centre 7,500 psi 21¼ circulating system 5k BOP system Operational drilling envelope of 108ft / 32.9m outreach with a transverse reach of 42ft / 12.85m starboard and 35.6ft / 10.85m port Variable deck load of up to 12,000MT and static hookload capability up to 950MT (2,100,000lbs) 45MT crane lifting capacity to the Texas deck, optimising handling of heavy subsea trees and wellheads Leg length of 675.5ft / 205.9m gives a maximum operating water depth capability up to 492ft / 150m Semiautomatic tubular handling system 5,750 hp drawworks grooved for 2 line 40,000 ft Maximum drilling depth 9,850 bbls liquid mud capacity 9

Experience : world s first jack-up running on shore power In May 2017, the became the world s first harsh environment rig to operate entirely on shore power. This was possible because the rig was built with this purpose in mind from its conception, as part of Maersk Drilling s ambition to conduct sustainable and environmentally responsible operations and ensure a sound and viable business for the future. Running on shore power not only reduces emissions from the rig, but also reduces cost and time for maintenance on diesel engines and generators. Performing P&A safely and efficiently During the 1½-year-long plug and abandonment campaign undertaken by at the Valhall DP platform, the rig performed consistently and efficiently, resulting in no Total Recordable Cases since new build, and saving our client more that 1 billion NOK compared to original budget. During this operation, the rig was also used as a hotel for the Valhall complex, accommodating approximately 85 hotel guests. The rig has a maximum POB of 180, making it a flexible solution for fixed installations and clients. In addition to completing the P&A programme with zero incidents and well ahead of budget, the rig ran on shore power, reducing the yearly NOx emissions by 186MT and the CO 2 emissions by approximately 16,000MT. 10

Norway Built in: 2016 Countries operated in: Norway Customers worked with: Equinor Aker BP Operational experience: Workovers P&A 11

Main dimensions Main dimensions Imperial Metric Hull length overall 291ft 88.75m Hull width overall 344.94ft 105.14m Hull depth 39.4ft 12m Length of legs 675ft 205.9m Cantilever max reach aft of transom 110ft 33.5m Transverse (STB/PS) 41/32ft 12.5m stb & 10m port Equivalent spudcan diameter 72ft 22m 12

Maximum design limits Operational capabilities Imperial Metric Max water depth 492ft 150m Max wind speed (pending location approval) 36m/sec Drilling depth 40,000ft 12,192m Max wave height 82.0ft 25.0m Variable load capacity (incl. drilling loads) Imperial Metric Variable load (jacking condition) 4,000MT Variable load (pending site assessment) 12,000MT 13

Environmental design limits Environment limits (jacking and preload conditions) Imperial Metric Max wave height 9.8ft 3m Max current 0.6m/s Max air gap to bottom of hull 170ft 52m Max air gap to bottom of cantilever 213ft 65m Storage capabilities Storage capabilities Imperial Metric Liquid mud (active) 9,956.7bbls 1,583m 3 Mud storage (tanks) 3,388.95bbls 538.8m 2 Base oil storage 3,261.26bbls 518.5m 3 14

Storage capabilities Imperial Metric Brine storage (heavy brine accepted e.g. bromide) 4,777bbls 792m 3 Drill water 18,468bbls 3,410m 3 Potable water 2,246bbls 357.1m 3 Fuel oil 10,598bbls 1,684.9m 3 Bulk cement 6,674cu/ft 189m 3 Bulk barite/bentonite 8,900cu/ft 252m 2 Maximum operational variable load (depending on location approval) 12,000MT Cantilever pipe rack 5382ft 2 500m 2 Max cantilever load (combined) 3,859klbs 1,750MT Max hook load 2,021klbs 971MT Max setback load 2,290klbs 1,039MT Sack storage 5,000 sacks 5,000 sacks 15

Equipment Well control equipment The Maersk Invicible has a 21¼ 5K NXT Shaffer BOP (which can be converted to a 15K stack). The rig s moon pool and BOP carrier ensure efficient hook-up of the BOP and reduced operational uptime. The BOP can be offline pressure tested to full working pressure. Dril-Quip 491/2 500psi standard bore diverter 21¼ 5K NXT Shaffer BOP 5,000psi spherical annular BOP 2 x double rams with three 5,000psi ram preventers and a blind-shear. Vetco NT-2 connector Various ram sizes ranging from 31/2 to 7 15,000psi choke manifold with 1 x manual and 2 x remote adjustable 31/₁₆ chokes Glycol injection Vetco NT-2 BOP test stump 1 x 150MT SWL BOP transporter system and 2 x 40MT NOV hoist systems to service BOP BOP work platforms Conductor pipe tensioning system consisting of: Horizontal: 4 x 25MT cylinders, 4,500mm stroke Vertical: 4 x 100MT cylinders, 1,200mm stroke 16

Drill floor Equipped with a 971MT hoisting system and automated pipe handling, can drill deep wells, including running heavy casing strings, safely and efficiently. Its 49.5 rotary table ensures flexible solutions for running large OD tools. Drilling control cabin with 3 operator chairs and NOVOS cyberbase control system for automated pipe handling, instrumentation and monitoring The drill floor features Multi Machine Control a fully remote-operated pipe handling system that allows all standard operations such as stand building and tripping to be conducted without personnel on the drill floor, thus ensuring a high level of consistency across crews and an improved efficiency All operational control and monitoring is carried out in control rooms (the central control room located in hull, the cantilever control room and the driller s cabin) Main and auxiliary NOV KT 14,000 iron roughneck with tubular size range: 51/2 14 17

Fluids system All systems are operated from the control rooms and deliver a full overview of the system, including the dual-liquid conveying system for handling LCM material. Large storage volume enables the rig to work with two mud systems. With four 14-P-2,200HP mud pumps, the rig can deliver high volume, with high circulating pressure. 5 x shale shakers provide redundancy, allowing for maintenance work without impacting critical path The large capacity of the liquid mud system allows for storage and handling of different mud systems simultaneously Automated and dust-free mud mixing system ensures a safe work area The system is located in the cantilever to minimise the flow distance from the well centre System capacity of up to 1,800gpm Mud tanks: 8 x 680bbls, 1 x 547bbls, 1 x 465bbls active mud pits All pits have agitators 4 x 118bbls (19m 3 ) slug pits 2 x 1,063bbls (169m 3 ) mud storage pits 4 x mud processing tanks with total capacity 323.2bbls (51m 3 ) 3 x 34bbls and 1 x 9.4bbls (3 x 5.4m 3 and 1 x 1.5m 3 ) trip/ stripping tanks Mud treatment system: 5 x VSM multi sizer triple deck shale shakers (1 dedicated for offline use) 2 x MI SWACO / CD-1400 vacuum degasser 31bbls/min 1 x NOV mud-gas separator (poor boy) with 12 discharge line and 15 MMscf throughput 18

Mud mixing system: Automatic/remote operated mud control system controls the bulk transfer, mud additive, liquid mud, solids control and cuttings handling systems and is integrated with the Drilling Control Network 3 x mixing / transfer pumps with 1,000gpm capacity 4 x 63m 3 capacity bulk mud silos Dust collector / recirculation system for bulk system 2 x surge tanks including cell feeders with a capacity of 3.5m 3 /hr Sack handling / cutting machine with dust extraction, sack compactor and a capacity of up to 360 sacks per hour 2 x mixing hoppers with automatic dosing 1 x big bag mixing hopper with automatic dosing 2 x high-rate mixers each with liquid capacity of 220m 3 /hr and powder capacity of 120MT/hr Automatic dual-liquid additive system with remote control with a capacity of 3m 3 /hr 19

Material handling The rig s automated pipe handling system can build and rack up to 14 casing, while keeping personnel out of harm s way. Drill pipe R2 and R3 can also be handled offline to optimise operations. Top drive has maximum continuous torque of 92,120ft-lbs (and intermittent torque of 13,3607ft-lbs). Texas deck with 150MT SWL vertical load and 150MT moving load enables the rig to handle heavy subsea trees and wellheads. The rig has three 100MT rated electro-hydraulic deck cranes and an operational drilling envelope of 110ft / 33.5m outreach with a transverse reach of 41ft / 12.5m to starboard and 32.8ft / 10m to port. SSBN bolted derrick rated for 2,140klb /1,070MT Dimensions: 210ft x 46ft x 52ft (64m x 14m x 16m) 6.7m x 11m hinged hydraulically powered drive pipe support deck, supporting loads up to 150MT NOV SSGD-1070 model 5,750HP drawworks with 42 diameter drum grooved for 2 drill-line and driven by five 1,150HP GEB 22A closed loop water/air-cooled AC motors Pipe-handling gantry crane (PGC) which can handle tubulars of 3.15MT and up to 20 diameter NOV pipe handling catwalk shuttle (CWM-P20-45HS) with a max transportation capacity of 20MT/50ft length, and can handle up to 36 CSG joints Main and auxiliary NOV Hydraracker IV extended reach (4.8m) three-armed pipe racking machine with 14MT lifting capacity and pipe doping system designed for parallel racking 135ft stands. Tubular capacity: 31/2 14 Main and auxiliary NOV HydraTong ARN-270 with tubular size range: 31/2 10. Both handle drill pipe, HWDP, drill collars, BHA components. Both can handle up to 25 casing if tongs are provided Remote-controlled hydraulic mud bucket installed on main iron roughneck 20

NOV fingerboards to rack 72 stands of 31/2 5 DP, 128 stands of 5⅞ DP, 60 stands of 6⅝ DP, 10 stands of 6¾ 91/2 DC, 80 stands of 7 10 liner/casing and 54 stands of 7 14 liner/casing. The casing section has adjustable latch finger configuration which will allow a variable amount of casing joints depending on size Length of DP stands for racking in derrick: triples of range 3 or quadruples of range 2 Powered mousehole cluster with three tubes each 48ft length and for max 16 diameter tubulars. One of the tubes has a powered rabbit with a max lifting capacity of 15MT. The other tubes function as storage 3 x NOV OC3500LCE lattice boom electro-hydraulic cranes each with a 52.2m max hoisting radius, 20MT capacity whip hoist and a 100MT capacity main hoist (max 60MT capacity to boat) 3 x Toyota battery-driven forklifts rated for 3.5MT load, 5MT load and 8.5MT load 2 x 15MT cargo lifts from main deck to lower deck and tween deck The deck loading rating is rated for 2MT/m 2 and can handle a 10MT forklift The drive pipe support deck enables deployment of subsea equipment The cranes have a high safe working load (SWL) with long reach DP, HWDP and up to 7 casing can be racked in quads four-joint stands (range 2) The powered three-tube mousehole makes picking up pipe more efficient 8.5MT forklift on the main deck as well as the cargo lifts minimise crane lifts 21

Accommodation Accommodation is located in two blocks shaped as a V, wrapped around the forward leg. Port block is a quiet area with cabins starboard block holds all offices, recreation rooms and service facilities. 180 POB 10 x offices 3 x recreation rooms 1 x workout room/gym 1 x video room Power supply Four Wärtsilä 9L26 4030 HP, 2925kW at 900rpm air-start low-emission diesel engines each driving a Siemens 1DC1233-8AM04-Z 3530kVA 3-phase AC generator capable of 6.6kV output 15 x transformers ranging in power from 75kVA to 4,725kVA 60Hz Power management system Fuel efficiency system Set up to take power supply from shore 22

Third-party service stations Cementing unit and associated system: 15,000psi dual pump cement unit with local and remote operation from mud control room Large access hatch in cantilever deck overhead for easy change of unit Cement bulk transfer systems Dust collector with cyclone in the cement room Skids for batch mixer and metering system Well testing equipment: Utility piping to and from well testing area Foundations and platforms for testing equipment Surface test tree, manifolds, heater, steam boiler, separators, pumps, test tanks, downhole test packages and electrical interfaces 2 x 120ft burner booms 15,000bbls/day capacity with water spray and heat shield (burner heads supplied by customer) Mud laboratory Mud lab is complete with HVAC, fume cabinet, steel tables, SS1808 sink and is adjacent to the pit room and pump room Dedicated spaces for the following third-party services are provided: Wireline logging unit and tool house Mud logging unit ROV unit and tool house Coiled tubing unit, power unit and tool house MWD unit Well test areas Each service station is arranged as follows: 690VAC and 440VAC main and emergency power supply 220/240V, 50Hz power supply F&G connection PA/GA system connection Telephone connection LAN connection 23

3. Contents 4. Introduction 6. Strategy Rig drawings Top view 24 8. Rig capabilities 10. Experience 12. Dimensions 16. Equipment 24. Rig drawings

3. Contents 4. Introduction 6. Strategy 8. Rig capabilities 10. Experience 12. Dimensions 16. Equipment 24. Rig drawings Side view 25

Head office: Maersk Drilling Lyngby Hovedgade 85 2800 Kgs. Lyngby Denmark Telephone: +45 63 36 00 00 www.maerskdrilling.com Visiting offices: Denmark Lyngby Hovedgade 85 2800 Kgs. Lyngby Denmark Norway Moseidveien 19 P.O. Box 134 Forus 4065 Stavanger Norway Aberdeen City Wharf Shiprow Aberdeen AB11 5BY United Kingdom Ghana 2nd Floor, One Airport Square Plot 21 Airport City Accra Ghana Singapore 200 Cantonment Road #06-02 Southpoint Singapore 089763 USA 2500 City West Boulevard Suite 1850 Houston Texas 77042 USA Follow us to learn more www.linkedin.com/company/maerskdrilling www.facebook.com/maerskdrilling www.twitter.com/maerskdrilling www.instagram.com/maerskdrilling DISCLAIMER: The content of this brochure is indicative only and does not constitute a legal specification of any kind.