WHATEVER HAPPENED TO DOING THINGS RIGHT? ERA Battery Conference, Solihul, England Glenn Albér, Albércorp, Florida USA

Similar documents
Battery Technology for Data Centers and Network Rooms: Site Planning

Battery Monitoring Why Technology Matters. Mats Karlstrom V.P. Sales & Marketing, Alber

Appendix T: BATTERY REQUIREMENTS FOR INTERCONNECTION TO PG&E SYSTEM

Battery Maintenance Solutions for Critical Facilities

Stationary Batteries: Why they fail and what can be done to prolong battery life

Take a fresh look at solar things you should consider when purchasing a solar system

VEHICLE TOWING SAFETY

DYNAMIC BOOST TM 1 BATTERY CHARGING A New System That Delivers Both Fast Charging & Minimal Risk of Overcharge

SENTINEL BATTERY MONITORING

Hydro Plant Risk Assessment Guide

Bridge Time UPS Batteries: A Scalable Alternative to Flywheels by

REDUCE YOUR OIL CHANGE COSTS BY UP TO 50%

Battery Storage Systems

Valve Regulated Lead Acid (VRLA) Battery Series Designed for UPS Standby Power Applications FEATURES & BENEFITS

BASIC ELECTRICAL MEASUREMENTS By David Navone

Stationary Battery Basics

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

Dynamics of Machines. Prof. Amitabha Ghosh. Department of Mechanical Engineering. Indian Institute of Technology, Kanpur. Module No.

Are Your UPS System Batteries Really Ready to Load Test?

Cost Benefit Analysis of Faster Transmission System Protection Systems

Joslyn Clark Controls, Inc. Simple, Safe, Retrofit Programs to Significantly Extend Life of Existing Circuit Breakers

Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks

LIFE CYCLE COSTING FOR BATTERIES IN STANDBY APPLICATIONS

Battery-Back-Up Power for Amateur Radio

BATTERY RELIABILITY: AN ADVANTAGE OF THE PUREWAVE UPS SYSTEM

Marine Recreational Vehicle Batteries Made Simple

ABB life cycle services Uninterruptible power supplies

What you need to know about Electric Locos

Electronic Paint- Thickness Gauges What They Are, and Why You Need Them

PURE LEAD PLUS UPS APPLICATIONS Valve Regulated Lead Acid Battery Designed for UPS Standby Power Applications Watts per Cell

feature 10 the bimmer pub

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Troubleshooting Guide for Okin Systems

Stationary Battery Testing

Best Practices for Managing Fleet Battery Costs By Zena Johnson, PulseTech Products Corp.

Investigations into methods of measuring the state of health of a nickel-cadmium Industrial Battery

By Renee Changnon, A Brighter Future. TreeHouse Shines Light on Solar Solutions

TAN OEM' TRACTORS. ~GRtCULTURE LIBRARY. Extension Service in Agriculture and Home Economics UNIVERSITY OF ILLINOIS COLLEGE OF AGRICULTURE

IEEE IAS Atlanta Chapter

Don't just Perform Service - Sell It!

ABB FACTS Customer Service. FACTS Care Upgrades

Cellwatch Battery Monitoring Systems

Utility Trailer 5 x 8 Building Notes

7 FAQs ebook SOLAR POWER. 7 FAQs ebook

CHAPTER 6.3: CURRENT ELECTRICITY

Series 120/120VAC Universal Tower/Rack Mount

OSP Battery Training. Craig Paoli Director Strategic Platforms July 13 th Copyright 2010 The Alpha Group. All Rights Reserved.

How to choose correct battery(s).

The Discussion of this exercise covers the following points:

Standby Inverters. Written by Graham Gillett Friday, 23 April :35 - Last Updated Sunday, 25 April :54

PRO/CON: Self-driving cars could take over the road in the near future

Battery Monitoring Systems

Cochran Undersea Technology

Mahindra REVA case study

Integrated Inverter/Battery Monitoring System (IBMS)

LETTER TO PARENTS SCIENCE NEWS. Dear Parents,

Getting a Car J. Folta

Power Quality Luis Vargas Research Engineer 9/18/2008

DYNAMIC DUO. Lab scopes and current

Response to. Ministry of Justice Consultation Paper. Driving Offences and Penalties Relating to Causing Death or Serious Injury

ALTERNATING CURRENT - PART 1

Standard 1000VA, 2000VA & 3000VA Universal Tower/Rack Mount LB Extended Models 900VA, 1700VA & 2500VA

Roehrig Engineering, Inc.

Improving the gearshift feel in an SW20.

Electrical Safety Part I

The aim is the detection of

Troubleshooting Guide for Limoss Systems

Safe, fast HV circuit breaker testing with DualGround technology

KEYS TO RUNNING YOUR GENERATOR EFFICIENTLY

HOW TO MAKE YOUR OWN BATTERIES

Basic voltmeter use. Resources and methods for learning about these subjects (list a few here, in preparation for your research):

ABB Data Center Solutions Day 5 July 2013 by Kelvin Sim Myths or Truths: Achieving 99% Efficiency with Single Conversion Backup Power System

INTELEPOWER CXS SWITCHING SYSTEMS

LIBERTY SERIES 1000 VALVE REGULATED LEAD-CALCIUM BATTERY For standby applications Capacities from 25 to 600 Ampere-hours

Station dc supply voltage. Electrolyte level. Inspect: Verify:

Note: Do NOT mix LED and incandescent lamps in the same circuit!

Copyright Richard A. Alberts All rights reserved

Working Principle of Power Saver as per Manufacture:

BIG BAR SOFT SPRING SET UP SECRETS

Hidden Savings in Modern Manufacturing

Development of Higher-voltage Direct Current Power Feeding System for ICT Equipment

Developing PMs for Hydraulic System

Lithium-ion battery systems for ABB UPS solutions Reliable, lightweight and compact UPS energy storage for critical applications

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations

Fuses still the best form of overload protection

Self-Concept. The total picture a person has of him/herself. It is a combination of:

CHASSIS DYNAMICS TABLE OF CONTENTS A. DRIVER / CREW CHIEF COMMUNICATION I. CREW CHIEF COMMUNICATION RESPONSIBILITIES

THE POWER TO LEAD CAT INDUSTRIAL ENGINES WITH ACERT TECHNOLOGY

BASIC REQUIREMENTS TO BE A DEALER. RV Trade Digest, January 1995

VOLUNTEER DRIVER TRAINING PRESENTATION

PURE LEAD PLUS UPS APPLICATIONS. Valve Regulated Lead Acid Battery Designed for UPS Standby Power Applications Watts per Cell

Ladders. Meeting Objectives. Introduction/Overview. General Hazards. OSHA Regulations and Frequent Violations

I m going to come out and say it so you keep reading. What you were taught about hard start kits decreasing inrush amperage is wrong.

STATIONARY BATTERY SEMINAR

UPS Ratings-Not so Apparent

BUILDER S GUIDE TO AUTOMATIC HOME STANDBY GENERATORS

11.1 CURRENT ELECTRICITY. Electrochemical Cells (the energy source) pg Wet Cell. Dry Cell. Positive. Terminal. Negative.

Electrical Safety Part II

How to build an energy generator with an old oil barrel without oil (Savonius wind generator)

CASE STUDY MODERNIZING THE GRID Blackouts How a utility cured an Ibuprofen plant s biggest headache Commissioned by Siemens

Transcription:

WHATEVER HAPPENED TO DOING THINGS RIGHT? ERA Battery Conference, Solihul, England Glenn Albér, Albércorp, Florida USA AUTHOR BIOGRAPHICAL NOTES Glenn Albér is president and founder of Albércorp. Glenn, a graduate engineer who holds four patents, has been involved in pioneering much of the modern battery test and monitoring equipment. He has published numerous technical papers and has taught battery seminars for the past 15 years. ABSTRACT This presentation deals with the fallacies of letting initial costs be the most important consideration when building a critical backup power system. The high cost of price reductions does not seem to be understood by the people responsible for the purchasing decisions. Cost savings on the front end of a project can lead to reliability and maintainability problems as well as high replacement costs. Some of the major issues affecting backup power systems are discussed, such as: battery quality, maintainability, personnel and equipment safety, and monitoring. The presentation does not provide any detailed cost analysis but, rather, discusses the philosophy of doing things right. The paper concludes with recommended practices that can help guarantee a reliable battery system, and suggests solutions to the problems discussed. 1. INTRODUCTION Modern business depends on fast, accurate, easy-to-access information. Thanks to advances in communication, along with the ongoing improvements in computer hardware and software, our modern data centers and communication systems have grown in sophistication at an incredible rate over the last 20 years. Any unscheduled interruption that results in downtime of these systems can cost several million dollars per minute. That being the case, it would seem logical that every effort would be taken to protect the critical systems from ever having an unscheduled power outage. What is really puzzling or, should I say, frustrating, is that the backup power systems that support today s multi-billion dollar industries have not improved at all. In fact, since the reliability of any system is only as good as its weakest component, it can be argued that the reliability of these systems has actually decreased in the last 15 to 20 years Battery failures, especially VRLA battery failures, are a common occurrence today. The fact that they have not resulted in more expensive system failures has a lot more to do with luck than good preventive practices. UPS users should be thankful for reliable power companies that have kept them from having to find out just how poorly their backup systems would perform if called on. Why would anyone in their right mind spend millions of dollars on the electrical / electronics part of the backup system to guarantee 7x24x365 uptime and then ignore the energy source that powers it? Ignoring or neglecting the batteries is exactly what is happening around the world in critical applications. 2.2.1

2. BATTERY RELIABILITY ISSUES QUALITY Most battery users, specifying engineers included, believe that a battery is a battery, and that it does not make a lot of difference which one is selected as long as it has the right ampere-hour rating. Selecting and sizing a battery for an application is a lengthy process that is outside the scope of this presentation, but some of the important selection criteria are: RELIABILITY It is a proven fact that VRLA batteries, even though they have improved, do not provide as many years of reliable service as the equivalent size vented battery. Pure lead plates last longer than lead alloy plates. TEMPERATURE ENVIRONMENT For extreme temperature applications, Ni-Cad is a better choice than lead-acid. At high temperatures, avoid VRLA. Make sure to size the battery for the coldest operating temperature expected. CYCLING Antimony and Selenium are better choices than Calcium for cycling applications. APPLICATION Short duration UPS or long duration Telecom? They require different plate designs. SPECIFIC GRAVITY High specific gravity yields higher capacity and better high rate performance, but shorter life. A sad commentary on battery quality today is that high quality Plante batteries are no longer manufactured in the United States and are losing popularity in other parts of the world because of high initial cost. If a backup power system is supposed to last 10 to 12 years, does it make sense to buy two or three VRLA batteries installations over that time versus one high quality vented battery? 3. MAINTAINABILITY ISSUES The reliability of a system depends on detecting and correcting problems before they can affect system performance. That means implementing a maintenance / monitoring program that detects problems at an early stage. In order for the maintenance program to be effective, the proper test tools must be used, and maintenance personnel must have easy, safe access to the batteries. Unfortunately, the people who design batteries, design battery rooms, decide on installations, and specify the batteries are not the same people who have to maintain the systems after they are installed. Some common maintainability problems are due to: 1. Battery design 2. Battery installation 3. Battery cabinet design 2.2.2

A lot of battery designs, including recently introduced models, have not allowed for the fact that batteries need to be maintained. Battery manufacturers have been told at various technical conferences that they need to make their terminals more accessible for capacity and internal ohmic testing. Obviously that message never got back to the design department. Figures 1a and 1b below are typical VRLA designs, where access to the terminal posts is impossible because it is covered up by the connecting hardware. Figure 1a Figure 1b Installation problems are sometimes due to lack of user knowledge, but often times are also motivated by misguided cost savings efforts. Cramming batteries in too small a space, building racks of three tiers or higher, not having temperature controls, and not supporting interconnecting cables are just a few examples. One of the worst crimes committed in the interest of saving money is shown in Figure 2. Three parallel strings have been connected in parallel by cells rather than by string. This makes it impossible to isolate one string at a time for test purposes. This practice, which is common in the communications industry, should be outlawed. + + + + + + - - - - - - Cell 1a Cell 1b Cell 1c Figure 2 To Cell Group 2 Does it make sense to save a small amount of money while destroying the ability to detect developing problems? 2.2.3

Both UPS and telecom equipment manufacturers have designed battery cabinets that are impossible to maintain. Figures 3a and 3b below shows a typical UPS cabinet with no access to the battery terminals. Figure 3a: Full Cabinet Figure 3b: Close up The typical UPS cabinet requires that maintenance be performed off-line, which leaves the user vulnerable for that period of time. Because of the physical layout, the proper maintenance, which must include internal ohmic measurements, takes a long time. The only way to live with a cabinet design is to include a full function monitor with it that minimizes human involvement. 4. SAFETY ISSUES In the interest of brevity, this presentation will only deal with the most flagrant safety problem faced by maintenance personnel today. In an effort to save money, UPS systems are being installed without an input isolation transformer. That means that the typical input source of 480 volts ac, 3-phase is applied to the battery through a rectifier control circuit. The result of this is a connecting of high ac voltage, with high current capability, between every battery terminal and earth ground. Figure 4a shows the oscilloscope presentation of the voltage present in a 240 cell system. Note that the peak-to-peak voltage is almost 400 volts. Figure 4b shows the actual rms voltage present. 1> T 1) Ch 1: 50 Volt 2 ms Fig. 4a: Actual voltage waveform (50 volts per division) Fig. 4b: AC voltage to ground 140 v rms 2.2.4

Every time maintenance technicians accidentally touch one of the battery terminals and the rack or cabinet, there is a risk of their getting electrocuted. Also, from a reliability standpoint, the system is in jeopardy every time it is serviced. Should a maintenance technician accidentally drop a tool or a test lead that bridges between any battery connection and the battery rack, the system will shut down abruptly. Saving money is great, but does the average user really understand what has been sacrificed with respect to personnel and system safety? This practice should not be permitted but, if it is, then a permanent full function monitor must be used. 5. WHAT STEPS ARE NECESSARY TO ENSURE A RELIABLE SYSTEM? Here is a brief list and discussion of five important steps to help guarantee that the battery will not be the cause of system failure: 1. Select and size the right battery for the application. 2. Buy the battery using a procurement specification that spells out the minimum acceptable requirements. Do not let the purchasing department make the battery decision. 3. Receive and store the battery per the battery manufacturer's instructions. Many batteries are dead before the arrive at the job site, due to lack of proper storing/charging. 4. Install the battery, using properly trained installers, in a temperature controlled environment and connect it to a low ripple, stable output voltage charger. 5. Maintain and test as follows: General Recommendations - Follow the recommended practices set forth in IEEE Standard 450-1995 for vented batteries and IEEE Standard 1188-1997 for VRLA batteries. Specific recommendations - Capacity test all new battery strings following installation as part of the final acceptance test. Resistance test all flooded cells annually and VRLA cells quarterly. Establish resistance baseline values (value of known good 100% capacity cell) for all battery types used. Equipment manufacturers maintain a database of these numbers. Replace all cells, without any further testing, that have a resistance 50% or greater than baseline value. Single cell capacity test all cells that have resistance between 20% to 50% greater than baseline. If a test program has not been in existence, then load test all flooded batteries over 12 to 15 years of age and VRLA batteries over 4 years, and take action as follows: 1. Replace if less than 80% of capacity. 2. Retest flooded batteries annually and VRLA batteries semi-annually if less than 90% of capacity. 2.2.5

3. Retest flooded batteries in three years and VRLA annually if greater than 90% of capacity. To increase system reliability and save labor time, install a full function battery monitor that includes proactive testing. 6. SO... WHATEVER HAPPENED TO DOING THINGS RIGHT? Why buy the cheapest battery available, especially when it only represents a small fraction of the total power system cost? Why buy batteries that cannot be properly maintained? Why buy battery installations that are unsafe and almost impossible to maintain? Why install a backup system that protects millions of dollars worth of services and not test it properly to make sure it is going to work when needed? Why buy a useless battery monitor, such as a midpoint monitor or a simple voltage monitor? Why not buy a real battery monitor, complete with proactive testing, for those unsafe battery cabinets? The questions could go on and on, but they can all basically be summarized in the following single question: Why do we do things that do not make sense, from either a technical or business standpoint? 6.1 Think about it Is it cost effective to install two sets of lower cost, lower quality batteries instead of one single, high quality, higher initial cost battery? Try factoring in the extra maintenance cost of VRLA batteries over the cost of flooded batteries. According to the standards, the VRLA requires at least four times more maintenance. Why was a backup system installed in the first place? It was to protect against multi-million dollar losses. So why do we want to risk a major loss by saving money on the batteries and the follow up maintenance? 6.2 Who is to blame anyway? It would be very easy to blame the bean counters and the equipment manufacturers for all the problems, but the reality of it is that the user is squarely to blame for all these problems. Equipment manufacturers have the expertise to manufacture much higher quality products but, in order to stay in business, they have to produce what the customer asks for. Unfortunately, the customers are asking for low price at the expense of quality. Low price is what the user's purchasing department is after, and that is their job. What is missing in most purchases is a specification or clear direction from the user, spelling out the minimum acceptable requirements. Is the user's problem a lack of knowledge, a lack of interest, or a matter of being just too busy? Who knows? But it is time for the users to recognize that they are the ones that have to initiate some action. And won't it be great to get back to basics and start doing things right again? 2.2.6