Bachmann 38 Ton Shay

Similar documents
Bachmann. Climax. Phoenix Sound Systems, Inc West Liberty Road Ann Arbor MI

Desire Streetcar Installation Guide

Ride On Locomotive. Installation Guide

Bachmann Digital Sound Decoder Installation Notes

BigSound 2K2 Handbook

BigSound P5 Handbook

BigSound P8 Handbook

Computer Interface. Advanced Users' Guide

INSTALLING RCS INTO THE BACHMANN 3 TRUCK SHAY.

Athearn Pacific Digital Sound Decoder Installation Notes

Phoenix Sound Systems, Inc West Liberty Road Ann Arbor MI

How to Replace the Main Axle Gear on the Bachmann Spectrum GScale using the NWSL # upgrade gear.

These instructions show how to build the Remote Controlled Fart machine Sound Kit.

Digital Command & Control (DCC) has progressed a great deal over recent years and can now provide a myriad of actions which can be made to precisely r

Conversion to Battery Power Del Tapparo

INSTALLATION INSTRUCTIONS

Prius XM Radio Installation Instructions. Eddie Bell

The speaker soundbox improves the performance of the speaker in locos which have no purpose designed speaker cradle.

EMD DD35 Powered & Dummy Units. Assembly Instructions

Revised 10/23/2015 Page 2 of 10

CBR250 Fitment Guide

Norfolk & Western Y6a Mallet

INSTALLATION INSTRUCTIONS FUEL SURGE TANK KIT

Norfolk & Western Y6b Mallet

Instructions: Pullman-Standard PS-3 Coal Hopper Kit Tangent Part Numbers: through /2015

Amp & Speaker Upgrade Install Instructions for Victory Cross Country

Page 1. File: Motolight caliper one-piece Harley Date: 8/15/2006

Sound Install Steam. Presented by Tim s Trains

TCI Trans-Scat

Assembly Instructions

ITEM QTY CHECK PART NUMBER DESCRIPTION

Application Note. Bachmann F40PH Tsunami Digital Sound Decoder Installation Notes

Build your own THUNDERBIRD 2

Subaru Front Mount Intercooler Kit STI Subaru Front Mount Intercooler Kit STI

Flatbed. Complete Kit part # 61 components displayed.

Remove the 3-11mm nuts holding mirror on. Don t drop the nuts!

2015 Copyright Maxspeed-Motorsports.com

Rostra Electronic Cruise Control Install On a Stratoliner or Roadliner

9 Locomotive Compensation

Application Note. Atlas RS-3 Tsunami Digital Sound Decoder Installation Notes

5 Amp Dual Mode Sound Decoder by Frank T.Verrico

Installation Instructions Z-Gate Shifter

Carli Suspension Front Instructions

Page 1. File: Motolight caliper one-piece Date: 8/14/2006

Fitting Instructions. Revo MQB Golf/GTi/Octavia/Leon Intercooler. Recommended Tools. Contents RV581M Dealer installation advised.

MARACANA ASSEMBLY INSTRUCTION .40 ARF LOW WING TRAINER RADIO CONTROL MODEL. Every body can fly

Mid West Model Railroaders Rules and Standards

1/2 Ton Tahoe/Suburban/Yukon/Avalanche 4wd Part #: Rev

G&G GR14 Airsoft Reassembly

Troubleshooting and Repairing Brass Steam Locomotives

Union Pacific Challenger

Installation MKIV Headlight Housings with Fog Lamps (Procedures apply to both MKIV Jetta and Golf)

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

MacBook Unibody Model A1278 LVDS Display Cable Replacement

By Mark Schutzer NMRA National Convention, Sacramento, CA July 2011 Copies of this presentation can be found at

MAZDASPEED3 Intercooler Instructions

X-Type w/ non-premium sound amplifier installation instructions

E8/9A-Unit Locomotive. with Sound & DCC. From Walthers

Yamaha Apex Moto-R Kill w/jacobson Roll-over valve Installation Instructions

INSTRUCTIONS FOR NYC K-11 PACIFIC KIT #100200

Instructions: General American 6,000 Gallon, 3-Compartment Tank Car Kit 11/2013

Memories of a Power Brakes conversion on a 1971 Corvette

Application Note. Athearn RTR SW-1000/SW-1500 Tsunami Digital Sound Decoder Installation Notes

Here we have the old lock on an exterior door (note more than one door was used for this article- taking the best pictures of the group)

J&M Mustang Adjustable Panhard Rod (05-09) - Installation Instructions

Fitment Guide Volkswagen Golf GTI MK V1.0

Return to Instruction Sheet index TCI Installation Instructions for Turbo Hydramatic 350C & 250C

PARTS LIST. REPLACEMENT PARTS and ACCESSORIES PREPARATION VN1600. PREPARATION VN1500D and VN800B

Return to Instruction Sheet index. Installation Instructions For C-4 70 and Later, Except 70 Falcon

The Go Baby Go Build Manual

Standard Duty Oil Filter Relocation Kit (OC-8)

INSTRUCTIONS ASSEMBLY. CONNECT the RESISTOR. The resistor (re-zis-ter) is the tube-shaped piece with two purple legs. Here we go!

SOUND SYSTEM FOR LARGE-SCALE MODEL RAILROADS

THE MOTOR. Page 1 of 9

Part# JL AIR IT UP 4 Tire On Board Air Delivery System. (Requires External Air Source)

2103 NITRO RAIL DRAGSTER KIT

UNIVERSAL SOUND FOR LARGE SCALE, DC, STEAM LOCOMOTIVES

MKVI Jetta Fog Light Kit

Installation Instructions

INSTRUCTIONS. #82028 Diesel Nitrous System. Thank you for choosing ZEX products; we are proud to be your manufacturer of choice.

92-00 Civic/ Integra/ Del Sol/ Accord/ CRX

PAT-4 TOROIDAL TRANSFORMER ASSEMBLY MANUAL

In this installment we will look at a number of things that you can do with LEDs on your layout. These will include:

Classic Light Bar Mustang

Raxiom Factory GPS Rear Back-up Camera Kit (07-17 Wrangler)

LGT-311L Bumper LED Light Kit EZ-Go RXV Installation Instructions

Nissan GTR Alpha Fuel System

DYNACO STEREO 120 C7 REPLACEMENT MANUAL

Steeda Bumpsteer Kit (94-04) - Installation Instructions

1967 (Late) CORVETTE STANDARD (NON-ADJUSTABLE) STEERING COLUMN DISASSEMBLY & REPAIR INSTRUCTIONS PAPER #2

Skidoo XM Etec Installation Instructions

INSTALLATION INSTRUCTIONS

GM TRUCK BACKUP CAMERA INSTALLATION

MOTOALLIANCE WINCH MOUNT

EVANNEX Rear Lighted T for Tesla Model X

GENUINE PARTS INSTALLATION INSTRUCTIONS

Z-Gate Universal Shifter

Walthers/Life-Like USRA Steam Locomotive

Written By: Beerwema

INSTALLATION INSTRUCTIONS

Transcription:

Bachmann 38 Ton Shay Phoenix Sound Systems, Inc. 3514 West Liberty Road Ann Arbor MI 48103 www.phoenixsound.com phone: 800-651-2444 fax: 734-662-0809 e-mail: phoenixsound@phoenixsound.com 2005-2008 Phoenix Sound Systems, Inc.

Overview The Bachmann Shay is an easy sound installation, Bachmann has done the difficult work for you. You will find an intimidating nest of wires when you remove the bunker, but it s not nearly as complicated as it looks. We have already seen several ways to do the installation. We suggest what we feel will work for most folks. Getting Inside The bunker is held on by one screw that is under the water hatch near the center toward the rear of the tender. The only wires that go along with this are for the rear light and they are long enough to allow you to set the bunker aside while you continue with the installation. Speaker installation 1. Remove 3 screws that secure the shay circuit board platform to the chassis. 2. Secure the wires that come from the truck to the speaker grill using a wire tie or some good glue. The wires will clear the speaker cone if fastened down adequately. Wires to secure 3. Install the speaker under the four hold down screws. Reinstall the Shay circuit board and the platform with the three leg screws. There is a slot for a slide switch near the speaker on the engineers side. Enlarge the forward end of this slot to 9/64 and mount the access jack there. - 2 -

Volume Switch The volume switch is mounted to a bracket below one of the water valves on the Bunker. Thread one nut all the way down, put on the lock washer followed by the bracket and finally the other nut. The indexing washer is not needed. You will have to drill out a bit of the inside of the removable water valve to allow it to drop down over the volume switch handle. Whistle & Bell Reed Switches (Optional) Place the shay upside down in the top section of the shipping foam so you can work on the underside of the locomotive. On the rear truck fasten a reed switch to the leading, and another switch to the trailing, cross bar on the truck. A wire tie and silicone adhesive will work admirably. The wires should extend toward the center of the truck and the end of the reed switch with the wires protruding should align with the center line of the truck. The picture shows the reed switch on the forward cross beam pointing to the engineer s side. This will be the whistle switch. The trailing reed points to the fireman side (left going forward). This will be the bell reed switch. Wired end of reed aligns with center of truck. Route wires down under truck and into wiring channel Feed the wires so they will enter into the wiring trough near the bolster. Remove the two small screws holding the lever that goes across on top of the wiring channel. Remove the wiring channel by removing the two screws that secure it. Feed the wires from the reed switches through the floor and reassemble the channel and lever. Take the locomotive out of the foam and set it back on it s feet. - 3 -

Mounting Template Mounting the Sound Board We feel the best place for the sound board is on the engineer s side of the Bachmann board platform sandwiched between the platform and the bunker wall. It is best if the sound board is raised a little off the floor so it won t come in contact with the speaker. Cut a piece of cardboard or thin plastic in the shape of the template and glue the board to that. This will position the board when you slide the bunker back in place. Battery (2K2 / PB9) Sound Board (2K2 Shown) - 4 -

DCC Note (All Systems) Wiring to the sound board If you are installing a DCC decoder, the wires going into Bachmann #11 and #12 should be removed from there and hooked to the decoder motor outputs. BigSound 2K2 Power POSITION SO THAT TERMINALS 1-8 FACE THE LOCOMOTIVE FRONT Run a wire from Phoenix #1 to Bachmann # 13 and a second wire from Phoenix #2 to Bachmann #14. Interchange 1 and 2 if toots do not match the direction of the locomotive. Chuff contacts Run a wire from Bachmann # 9 to Phoenix #15 and one from Bachmann #10 to Phoenix #16. WAIT UNTIL THE NEXT STEP TO SECURE THE WIRE IN TERMINAL 16. Route the wires under the Bachmann board platform to the far end of the board. Red in Phoenix #9, yellow in Phoenix #10. The black goes in Phoenix #16 along with the wire from Bachmann #10. Volume Switch Feed the ribbon cable into Phoenix #4,5,6. If you are using reed switches, also insert one wire from each reed switch into Phoenix #5 (ground). Reed Switches Connect the remaining engineer s side reed switch wire (whistle) into Phoenix #14 and the other remaining wire in Phoenix #13 (bell) Battery Plug in the battery. Testing the 2K2 Put the Shay on a track, set the motor polarity switch to the center position (motor off) and apply power to the track. The sound system should come on when you get to about a quarter throttle. When the battery is charged, the sound system will come on almost immediately. - 5 -

At this point you may want to let the Shay sit and charge the battery so you can hear the idle sounds. You can turn the volume up or down as you prefer, without affecting battery charging. Charging will start at about 5 track volts, and is optimum at 8 volts. FULL THROTTLE WILL ACTUALLY TAKE LONGER TO CHARGE THE BATTERY. If you decide to run the Shay without charging the battery, it will take a few laps before the battery will be able to give you sound when your track voltage falls below 5 volts. BigSound P5 Power POSITION SO THAT C1 FACES TOWARD THE FRONT OF THE LOCOMOTIVE Run one of the green wires from the Phoenix C1 connector to Bachmann #13. Connect the other green lead to Bachmann #14. Chuff contacts Run the blue wire from Phoenix C2 to Bachmann #9. Run the brown wire to Bachmann #10. Route the wires under the Bachmann board platform and to the far end of the board. Plug the connector into the Phoenix board. Volume switch Plug the cable into the Phoenix board. Testing the P5 Put the Shay on a track and apply power to the track. The sound system should come on. Use the function buttons on your DCC controller to trigger various functions and ensure DCC is being received. - 6 -

BigSound PB9 Power POSITION SO THAT TERMINALS 1-6 FACE THE LOCOMOTIVE FRONT Run a wire from Phoenix #1 to Bachmann # 13 and a second wire from Phoenix #2 to Bachmann #14. Interchange 1 and 2 if toots do not match the direction of the locomotive. Chuff contacts Run a wire from Bachmann # 9 to Phoenix #10 and one from Bachmann #10 to Phoenix #11. Route the wires under the Bachmann board platform and to the far end of the board. Plug the connector into the Phoenix board. Volume Switch Feed the ribbon cable into Phoenix #3, 4 & 5. Reed Switches Connect one wire from each reed switch to Phoenix terminal #11, this is the common trigger ground. Connect the remaining engineer s side reed switch wire (whistle) into Phoenix #9 and the other remaining wire in Phoenix #8 (bell) Battery Plug in the battery. Testing the PB9 Put the Shay on a track, set the motor polarity switch to the center position (motor off) and apply power to the track. The sound system should come on when you get to about a quarter throttle. When the battery is charged, the sound system will come on almost immediately. At this point you may want to let the Shay sit and charge the battery so you can hear the idle sounds. You can turn the volume up or down as you prefer, without affecting battery charging. Charging will start at about 5 track volts, and is optimum at 8 volts. FULL THROTTLE WILL ACTUALLY TAKE LONGER TO CHARGE THE BATTERY. If you decide to run the Shay without charging the battery, it will take a few laps before the battery will be able to give you sound when your track voltage falls below 5 volts. - 7 -

Final Assembly It will all fit - with a little nestling and jiggling. The battery needs to poke up into the coal load or oil cover. It sits on an angle on top of all the wires. If you can t quite picture it, do an assembly first with the coal load or the fuel cover removed so you can see how everything fits. Watch for pinched wires at the screw post - easy to do with so many loose wires in there. - 8 -