Other HEMCO Products. HEMCOR Lab Planning Solutions. Installation, Operation, Maintenance Manual UniFlow LE FM Floor Mounted Fume Hood

Similar documents
Other HEMCO Products. HEMCOR Lab Planning Solutions

Other HEMCO Products. Installation, Operation, Maintenance Manual

Installation, Operation, Maintenance Manual Other HEMCO Products. AEE Association of Energy Engineers

Other HEMCO Products. HEMCOR Lab Planning Solutions. Installation, Operation, Maintenance Manual

Other HEMCO Products. HEMCOR Lab Planning Solutions

User s Manual. LabShield. Laboratory Fume Hoods. Air Foil By-Pass Models: 6714, 6716, ADA Models: 8796, 8798, Demonstration Hood 6725G

HEMCO. Laboratory Fume HoodsR

Labconco 48, 60, and 72 Hoods

MODEL MA4210 Installation and Operation Manual Important:

F. VAV hoods shall have a restricted bypass plate.

INSTALLATION VARIABLE FREQUENCY DRIVE THREE PHASE ALX SERIES SPUN ALUMINUM EXHAUSTERS

INSTALLATION INSTRUCTIONS

GE Monogram. Installation. Instructions. Professional Vent Hoods. 48" Models ZV881WSS, ZV891YSS ZV880WSS, ZV890YSS. 36" Models ZV671WSS, ZV681YSS

INSTALLATION INSTRUCTIONS

SECTION LABORATORY FUME HOODS UNIFLOW LE SERIES

LABORATORY FUME HOODS OF 5

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT & DIRECT DRIVE XB, HV, HVA, ADD, DDS, DDP

User s Manual. Protector XL Floor-Mounted (Walk-In) Laboratory Fume Hoods. Models

INSTALLATION, OPERATION AND MAINTENANCE MANUAL WALL EXHAUST FANS BELT DRIVE XBL FANS

Sconce INSTALLATION INSTRUCTIONS P34024W

Advantage Fan 36" and 48"

TXH TOTAL EXHAUST HOOD. Installation and Operations Manual

Electric. PN April Series Electric Oven

Sconce INSTALLATION INSTRUCTIONS P B

User s Manual. Protector Laboratory Fume Hoods

Protector ClassMate Laboratory Fume Hoods. Models Series Series Series Series Series Series

Protector XStream Laboratory Hood is shown with SpillStopper Work Surface , Protector Acid Storage Cabinet and Protector

HEMCOR ISO 9001:2008 Certified Company

MICRO-AIR AIR CLEANER INSTALLATION AND OPERATION MANUAL. MX3510 Includes Installation, Operation, and Service Instructions CAUTION

PERCHLORIC ACID FUME HOOD H25. Fume Hoods. 48"- 60"- 72"- 96" long

Installation, Operation and Maintenance Manual

Requires Ductwork and Blower

Removable Applied Panel Mounting System

AIR CLEANERS. Model MX 6000 OWNER S MANUAL CAUTION. Read complete instructions before operating. Please file for future reference.

INSTRUCTIONS FOR OUTDOOR WALL LANTERN, MODEL LPT-1032

Checker Unload Checkstand Installation Instructions

Tools, Equipment and Supplies Needed:

FUME HOOD SELECTION GUIDE

ECONOMIZER FAN. Receiving and Inspection

Installation Instructions Twill Replace-a-top with Tinted Windows

Laboratory Fume Hood

General Purpose Walk-In Fume Hood

Jet Fans. Instruction Manual READ AND SAVE THESE INSTRUCTIONS WARRANTY

Installation Instructions Cable Top Twill Replace-a-top with Tinted Windows

Section Fume Hoods Specifications 6/1/14 LABORATORY FUME HOODS

Full Flow Drinking Water System Model: 3MFF100

Charcoal Filter Installation NOTE: The charcoal filters are preinstalled if you purchased the range hood with re-circulating kit from us. 1. Remove st

Installation Instructions Twill Replace-a-top with Tinted Windows

Supreme Air Series VENTURI FUME HOOD. Operation Maintenance Technical Manual KEWAUNEE

General Purpose Walk-In Fume Hood

HANGING LANTERN ITEM # MODEL #CP199MBK. Français p. 9. Español p. 17 ATTACH YOUR RECEIPT HERE. Serial Number. Purchase Date

Model ND-2 Specification

PRODUCT NUMBERING SYSTEM SERIES PHASE. 1: Single Phase 3: Three Phase

CORPORATION DURALAB CORPORA

MODELS TSX AND TSX-S SINGLE DUCT ROUND AIR TERMINALS

.1 Special Building Areas 8. Laboratories..3 Laboratory Casework (section ).4 Chemical storage cabinets (section )

INSTALLATION INSTRUCTIONS K-SERIES UNDER CABINET HOOD

Installation Instructions Cable Top Twill Replace-a-top with Tinted Windows

Sconce INSTALLATION INSTRUCTIONS P C

READ AND SAVE THESE INSTRUCTIONS. Air Boss MP600M Vertical Air Flow Mist Precipitator Industrial Applications. TRION

LARGE CAPACITY INCUBATOR Installation, Operation and Maintenance Instructions

AIM LED LIGHT (wall mount)

MODELS SGX AND SSX SINGLE DUCT ROUND AIR TERMINALS

Supreme AirLV- FUME HOODS. KEWAUNEE encouraging new discovery LOW CONSTANT VOLUME

TABLE OF CONTENTS SPECIFICATIONS 3 INSTALLATION 4. Direct Mount 4. Ducted Installations 5. Installing Plenum 5. Machine Mount Stand 5.

Sconce INSTALLATION INSTRUCTIONS P34025

SERIES 100 OWNER'S MANUAL. Installation, Operation & Maintenance TOUGH PORTABLES MODEL S130

F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide

INSTALLATION INSTRUCTIONS K SERIES LINER INSERT

Mirror Solutions Bevel & Pivot Models Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1

RDM. Laboratory Fume Hoods SEFA SCIENTIFIC EQUIPMENT & FURNITURE ASSOCIATION

READ THIS FIRST. Read and Save These Instructions AIR CURTAINS INSTALLATION INSTRUCTIONS S-XHD SERIES. TMI, LLC Managing Environments

USER'S MANUAL and INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

MODEL MC1500 Installation and Operation Manual Important:

Polypropylene Total Exhaust Fume Hoods

INSTALLATION AND MAINTENANCE MANUAL FORM #PM-126 REV A 12/09

User s Manual. Protector Laboratory Fume Hoods. Premier Models. XL Models

SECTION AXIAL HVAC FANS

XA34 Max. Installation and Operation Manual

M-3025CB-AV Fuel Pump

LED Downlight Ceiling Fixtures

INSTRUCTIONS FOR OUTDOOR WALL LANTERN, MODEL LPT-1107

70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing

INSTALLATION INSTRUCTIONS CWUH9 WALL MOUNT HOOD

High Velocity Series Air Curtains

Preparation Advanced Preparations: Be familiar with the controls of the range hood by reading through Range Hood Operations, Page 12. Place the range

Shaver Industries. Assembly Instructions Spring Assist Vertical Vinyl Curtain Door Projection Mount

Installation Instructions Sailcloth Replace-a-top with Tinted Windows

Utility Distribution Systems Installation, Operation, and Maintenance Manual

XA46 Max. Installation and Operation Manual

OPERATOR MANUAL IMPORTANT INFORMATION, KEEP FOR OPERATOR

INSTALLATION INSTRUCTIONS ZTH WALL MOUNT HOOD

Hazardous Location Direct-Drive Exhaust Fans. Operating Instructions & Parts Manual

MODEL H INSTALLATION INSTRUCTIONS

INSTALLATION, OPERATION & MAINTENANCE MANUAL AXIAL UPBLAST FANS RTA, RWTA, RHTA, RB, RD, RTA SH

READ THIS FIRST. Read and Save These Instructions AIR CURTAINS INSTALLATION INSTRUCTIONS S-LP SERIES. TMI, LLC Managing Environments

Parallel Lift Rack MODEL RM

INSTALLATION INSTRUCTIONS UNDER CABINET HOOD

Source Capture Air Purification System

Transcription:

Other HEMCO Products Installation, Operation, Maintenance Manual UniFlow LE FM Floor Mounted Fume Hood Made In The U.S.A. UniFlow CE UniFlow SE AireStream High Performance Energy Efficient Laboratory Fume Hoods UniFlow LE SEFA Scientific Equipment and Furniture Association UniFlow LE FM NSPE Safety Equipment NFPA National Fire Protection Association ASME American Society of Mechanical Engineers AEE Association of Energy Engineers Visit www.hemcocorp.com Call Toll Free: (800) 779-4362 HEMCO Corporation 711 S. Powell Road Independence MO, 64056 MM-LEFM-04.17 HEMCOR Lab Planning Solutions Phone (816) 796-2900 Fax. (816) 796-3333 Email info@hemcocorp.com Visit www.hemcocorp.com Call Toll Free: (800) 779-4362 HEMCO Corporation 711 S. Powell Road Independence MO, 64056 HEMCOR Lab Planning Solutions Phone (816) 796-2900 Fax. (816) 796-3333 Email info@hemcocorp.com

TABLE OF CONTENTS TROUBLE SHOOTING RECEIVING AND INSPECTING SHIPMENTS... 2 UNPACKING INSTRUCTIONS...3 PREPARATION FOR... 3 SUGGESTED TOOL LIST... 3 REQUIRED TOOL AND MATERIAL LIST... 3...4-7 OPERATION / MAINTENANCE... 8-9 SAFETY RECOMMENDATIONS...10 TROUBLE SHOOTING...11 WARRANTY... 12 RECEIVING AND INSPECTING SHIPMENTS Transportation companies are responsible for shipment from the time that it is received by them until it is delivered. All shipments leaving our plant have been carefully inspected and loaded on the carrier s vehicle. If a shipment arrives with the crating or packaging damaged, have the driver note the condition on the bill of lading and inspect the contents immediately for concealed damage. Due to the crate sizes and number of components HEMCO recommends that with any crate damage, even minor, that the bill of lading be signed for noting crate damage pending further inspection for concealed product damage PROBLEM CAUSE CORRECTIVE ACTION Insufficient air fl ow Fume Hood or Blower not operating Contaminates outside fume hood face Sash binding 1) Improperly sized blower 2) Motor (impeller wheel) is running backwards 3) Obstruction in duct system 4) Leaks in duct system 5) Overloaded fi lters 1) Blown fuse or open circuit breaker 2) Defective motor 3) Thermal protector on 4) Motor improperly wired 1) Improper use or procedures 2) External factors 3) Improper face velocity 4) Cable off of pulley Cable Broke Air Flow Monitor 6) 7) Electrical Services not working 8) Circuit Breaker 10)Corroded Contacts 1) Resize blower, change drive package 2) Correct wiring for reverse rotation of motor. 3) Locate and Remove obstruction 4) Trace and repair 5) Clean or replace fi lters 1) Replace fuse or reset circuit breaker 2) Consult factory 3) Check for high or low voltage input or ambient temperatures over 40 degree C ( 104 degree F) 4) Correct wiring for reverse rotation of motor 1) Follow safety guidelines and procedures 2) Check external air fl ow patterns around fume hood 3) Recertify fume hood face velocity and/or duct system 5) Replace Sash / Cable 9) Check Main Load Center 11)Clean or replace If the equipment has been damaged in transit, immediately notify and fi le a claim with the carrier. Do not return to HEMCO. If this procedure is not followed, the carrier will reject the claim and the consignee will suffer the loss. Please notify HEMCO so that we may help you in anyway possible with evaluation, repair, replacement, and valuation of the damage that has occurred. 2 11

SAFETY RECOMMENDATIONS UNPACKING INSTRUCTIONS FOR FM FLOOR MOUNTED FUME HOOD DO - AVOID UNNECESSARY EXPOSURE OF PERSONNEL TO FUMES INSIDE HOOD BY KEEPING SASH CLOSED EXCEPT WHEN LOADING OR UNLOADING HOOD. DO - KEEP MATERIALS 6" OR MORE FROM FRONT EDGE OF SASH PLANE. DO - KEEP THE SASH AT DESIGN OPENING WHILE UTILIZING THE FUME HOOD. DO - CLEAN UP IMMEDIATELY ANY MAJOR SPILLS OCCURRING INSIDE HOOD. DO - USE ONLY GROUNDED ELECTRIC EQUIPMENT. DO - REPORT ANY MALFUNCTION OF THE EXHAUST SYSTEM. DO - ELEVATE CONTAMINATES AND EQUIPMENT ABOVE WORKSURFACE OF HOOD ENABLING AIR FLOW BE NEATH AND AROUND. DO - KEEP MOVEMENTS IN THE HOOD AND IN FRONT OF THE HOOD TO A MINIMUM. DO CHECK FUME HOOD FACE VELOCITY ON A REGULAR SCHEDULE. DO NOT - USE HOOD UNLESS EXHAUST SYSTEM IS IN OPERATION. DO NOT - CHANGE DAMPER OR BAFFLE SETTINGS AFTER INITIALLY SET. DO NOT - USE FUME HOOD FOR STORAGE OF CORROSIVE OR VOLATILE MATERIALS. DO NOT - BLOCK BAFFLE OR GRILL OPENINGS. DO NOT - GENERATE LARGE QUANTITIES OF INFLAMMABLES WITHIN THE FUME HOOD. DO NOT - PERMIT TEMPERATURES OF SASH GLASS TO EXCEED 160 DEGREES FAHRENHEIT. DO NOT - PLACE UPPER BODY OR HEAD INSIDE THE FRONT PLANE OF THE HOOD OPENING. DO NOT - OPEN OR CLOSE SASH SWIFTLY AS THIS MAY CAUSE ADVERSE AIR FLOW CURRENTS. DO NOT - APPROACH OR LEAVE HOOD FACE SWIFTLY AS THIS MAY CAUSE ADVERSE AIR FLOW CURRENTS. The HEMCO Fume Hoods are shipped palletized fully crated, padded and wrapped for maximum protection and ease of handling. If damaged call the adjuster for the delivering carrier promptly and notify HEMCO at 1-800-779-4362. 1. Upon receiving, inspect for crate damage and possible concealed damage that may have occurred in transit. Save all delivery receipts and crating materials. If damaged call the adjuster for the delivering carrier promptly and notify HEMCO at 1-800-779-4362. 2. When uncrating the hood remove the top section of the crate, which is stapled to the top of the side. Then carefully remove the front, two sides and the rear of the crate. 3. When ready to install Fume Hood, carefully lift from pallet and set on work surface in proper location (see Fume Hood Installation). 4. Remove accessory/sash weight box, which may be attached inside the Hood, on the skid or on the top of the hood. Preparation For Installation Read the Complete Manual Gather Required Tools/Equipment Suggested Tool List Floor anchor bolts or materials Cordless screw driver/gun Quick ratchet bar clamps Required Tool and Material List Caulking Gun 100% pure silicone caulk (provided) #2 screwdriver Assortment of open-end wrenches Stepladders Note: All images shown are for demonstration purposes only. However all images are similar in design. CAUTION: DO NOT lift the hood by the airfoil. PREPARATION FOR 10 3

1. Deliver components to erection site and segregate. Note identifi cation markings on each component. 4. Set the Right Side Shell component and fasten to the Rear Panel. Secure with provided #8 or #10 sheet metal screws. ELECTRICAL FUME HOOD OPERATION 2. Set the Left Side Shell component as close as possible to the desired fi nal position of the hood. NOTE: Leave clearance for ladder access completely around the perimeter of the hood. 3. Set the Rear Panel and Secure to Left Side Shell with provided #8 or #10 sheet metal screws. Utilized #8 screws fi rst, however, due to pre-assembly the #8 screw may strip or may not bite then utilize the #10 screw. NOTE: Quick ratchet bar clamps to a stepladder may be used to partially support the components until other panels can be permanently secured. 5. Set the rear of the Ceiling Panel on the fl ange at the top of the Rear Panel. Secure rear edge with provided 1/4 20 carriage bolts. Electrical services supplied with your Hood are factory mounted but not wired. Wiring must be completed by a licensed electrician to comply with local codes. It is also suggested that the main junction box be grounded and that a quick disconnect in the power source be provided. PLUMBING All service fi xtures requiring plumbing are normally installed on the Fume Hood ready for connection to the service outlets. Piping should be copper, however, stainless steel, black PVC or galvanized pipe may be used if required. A certifi ed plumber should be used for all installation. CAUTION: Be sure that plumbing lines do not interfere with movement of the sash weight(s). BLOWERS If your Fume Hood was ordered with an integral blower, it will be mounted on the hood. It will be necessary to wire it per local codes. Depending on the types of fumes being exhausted and the length of the ductwork, rigid PVC, fl exible neoprene, sheet metal or stainless ducting must be attached for fume removal. CAUTION: The maximum length of run of ducting with integral blowers should be 15 or less to minimize static pressure loss. GENERAL Remote mounted blowers and ducting requirements other than as specifi ed are site specifi c and require a qualifi ed engineer or installer CLEAN UP Upon completion of the installation of your Hood it is a good idea to clean thoroughly to eliminate any miscellaneous debris and/or surface soil. 1. For all composite surfaces use a general-purpose nonabrasive household cleaner. 2. For glass surfaces use a formula glass cleaner. (Windex). 3. For the work surface it is recommended that you use soap and water. 4. For metal cabinet painted surfaces use a general purpose nonabrasive cleaner, FM Fume Hood & Floor Mounted Special Instructions The design intention for the FM fl oor mounted fume hoods are that only (1) sash is opened to any point while the other sash remains in the full closed position. If this design intention is not maintained the results can cause a failure of the hood to contain contaminates and an unsafe condition for personnel. Any questions? Call HEMCO customer service at 1-816-796-2900. Front should be supported by bracing or personnel until Ceiling Panel is secured along the left and right sides to both the Side Shells. 4 9

FUME HOOD OPERATION / MAINTENANCE 6. Secure Ceiling Panel to Side Shells with provided #8 or #10 sheet metal screws. 11. Caulk the interior perimeter of the Ceiling Panel joints with provided 100% silicone caulk. 1. Fume Hood must be set on the work surface or a fl at level surface. 2. Once the Hood is in place, service lines can be connected (See Electric and Plumbing). 3. Service panels are provided to allow access for service hookup. Service panels can be taken off by removing plastic caps and attachment screws. Panels may be set aside for later replacement after the installation is complete. The front access panel above the sash is removable to allow access to the top of the Fume Hood (pull out or lower edges and push up to remove). The electrical junction box, light fi xture, outlet collar for duct connection, special plumbing connections, and sash weight can be accessed from this position. 4. Fume Hoods are equipped with a tempered glass sash. Remove shipping tape alongside edges of sash and sash track. The sash counter balance weight(s) are packaged separately as noted in (Uncrating the Hood]. The sash weight should be hung from the sash cable loops located on the left side within the double-wall construction. The sash cables should ride in the pulley groves to ensure smooth operation. 5.The fl uorescent or incandescent light fi xture is factory mounted. NOTE: Fluorescent tubes are provided with the fixture. To install fl uorescent tubes liftoff front access panel. With a Phillips screwdriver remove the 2 screws. The fi xture housing will hinge back and the tubes can be installed. For those hoods with explosion proof lights, the fi xture positions in a fl anged cutout. The top of the fi xture threads off for wiring. For those hoods with vapor-proof incandescent light(s), unscrew the glass globe install bulb and replace globe. Once the fi xture is wired, remove the screw caps and screws from the ceiling inside the Hood and the donut fl ange plate will release. 6. A bead of white silicone sealant should be applied between the work surface and the Hood. 7. Reinstall front access panel and service panels. 8. Finally clean up with Formula Glass Cleaner. NOTE: In those areas where seismic codes are a consideration, it is recommended that qualified engineers be consulted for necessary installation requirements for seismic codes. Additional installation details begin on page 3 7. Move unit into desired location. 8. Uncoil the conduit in left Side Shell and make connections to junction box/light fi xture mounted on the Ceiling Panel. 9. Remove baffles noting the location and orientation of each one. 10. Caulk both Side Shell to Rear Panel joints with provided 100% silicone caulk. 12. Re-install baffl es to previous locations. Resecure with #10 x 3/4 sheet metal screws and PVC caps. 13. Mount Upper Baffle center section to the Ceiling Panel with provided #8 or #10 sheet metal screws. 8 5

14.Confi rm the fi nal location of the fume hood. 18.Re-position the left Side Wall to allow free travel of the sash without binding 22. Attach numbered weights to cables with provided saddle clamps. 26. Pivot the panel toward the sash and slide lower notches into the rubber friction catches. 27. Final wiring, duct connections and plumbing to be done per local codes and standards. 19.Secure the left Side Shell to existing fl oor with a fastener suitable for fl oor material. 15.Secure the right Side Shell to existing fl oor with a fastener suitable for fl oor material. 23. Check for binding and smooth operation of the sashes and adjust cable and clamps to obtain proper operation. 28. Seal hood at the fl oor perimeter with silicone sealant 16.Install the vertical rising sashes into the sash tracks on the right Side Shell, noting the markings directly on the sashes for orientation and location. NOTE: Finger pulls are located at the bottom of each sash. 20.Remove upper sash stop blocks from sash tracks to allow the upper sash to pass to the upper position, raise upper sash and re-install sash stop blocks. 17.Pivot the sashes to align with the sash tracks of the left Side Shell. This can be accomplished by spreading the lower section of the hood slightly to allow sashes to pass by the sash track extrusions and drop into the sash track. 21. Route the sash cables as noted directly on the top of the Side Shells. 24. Install 8 glass panel such that the bottom edge is slightly overlapping the top of the upper sash in it s closed position. 25. Install the front access panel by aligning the angled sides of the access panel with the white hard plastic pivot points of the side shells. 29. General clean up of site, installation of any other equipment, etc 6 7