READ THIS BEFORE PROCEEDING

Similar documents
READ THIS BEFORE PROCEEDING

Stop! Read this important information before proceeding any further.

READ THIS BEFORE PROCEEDING

Sikky Oil Pan Install Guide

2001 Chevrolet Metro LSi ENGINES 1.3L 4-Cylinder - Metro & Firefly (Canadian) Fig. 3: Exploded View Of Timing Belt & Components (Typical)

DART Aluminum FORD 351 Small Block Technical Notes

FORD 351W Small Block Technical Notes

DART Aluminum FORD 351 Small Block Technical Notes

SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

GM LS Series Serpentine Drive System with & without Power Steering

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2012 SUBJECT: REFERENCES TO THE TURBOCHARGER PURGE ROUTINE

SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

IMPORTANT FITTING INSTRUCTIONS PLEASE READ THESE INSTRUCTIONS BEFORE FITTING YOUR TURBO. FAILING TO FOLLOW THEM COULD INVALIDATE THE WARRANTY.

Rocker Lever Housing

460cc Do-It-Yourself Assembly Guide


TECHNICAL INSTRUCTIONS FOR SAFETY RECALL ALE VALVE SPRING AND LASH ADJUSTER REPLACEMENT GS 350: IS 350:

LUBE-01, Oil Cooler General Information and Seal Replacement

CAMSHAFT TIMING CHAIN, SPROCKET, AND TENSIONER REPLACEMENT

Section 1.26 Camshaft Gear Assembly Series 60 Exhaust Gas Recirculation (EGR) Model

Purging Air From Divider Block Lubrication Systems

88cc Big Bore Kit Install Instructions

DODGE CUMMINS ARP HEAD STUDS. Installation Instructions

Removing and installing cylinder head

Skirted GEN III - Technical Notes

Fig. 6: Assembling Piston & Rod. NOTE: Notch must face forward Toyota Starlet CRANKSHAFT MAIN BEARINGS

Iron GEN III - Technical Notes

COMPONENT LOCATOR > DISASSEMBLED VIEWS

2. Timing Belt SERVICE PROCEDURE A: REMOVAL 1. CRANKSHAFT PULLEY AND BELT COVER. 1) Remove A/C belt. (With A/C model)

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

(g)honda Service Bulletin

MINI MANIA REMOTE OIL COOLER INSTALLATION INSTRUCTIONS P/N NME1055

Housing (Front) - Remove

Eurocompulsion Camshaft Installation

Intake Manifold Removal (Upper)

Copper Sleeve, Unit Injector, Replacement

Vespa LX 50 4valvole. Refitting the valves. Inspecting the cam shaft. Characteristic. Engine

JET METER INSTRUCTIONS

I-317. AWWA Check Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS SERIES 317 WARNING

DTC P0341 Camshaft Position (CMP) Sensor Performance

1991 Volkswagen Vanagon Syncro

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

INSTALLATION INSTRUCTIONS

M-SERIES DIAPHRAGM COMPRESSOR REBUILD KIT

Testing and Inspection. Diagnostic Procedure Step 1-2

Removal and Installation of the DD15 and DD16 Cylinder Head April Removal of the DD15 and DD16 Cylinder Head

Instructions for Miniature Ball Rail Systems

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

SLP Camaro ZL1 STAGE 3 (650 HP)

ContiTech: Expert Tips for Changing Timing Belts


Tool GH29000 / 3366 Bulletin and Notes

Cylinder Head, Remove and Install (Z 22 SE)

Replacement of the High Pressure Fuel Pump Camshaft Oil Seal (P/N: A )

Compy Model: HPL-1 Instructions

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: August 2013 SUBJECT: VALVE LASH ADJUSTMENTS ADDITIONS, REVISIONS, OR UPDATES

Trus-T-Lift 750 Limited Maintenance Manual. Copyright 2016

IN-VEHICLE SERVICE. Engine Components

GEN-3 Super-duty Supercharger Shaft Kit PART# - RY17040-UK-6S5-3

Engine. Special Tool(s) Compressor, Piston Ring 303-D032 (D81L-6002-C) or equivalent. Compressor, Valve Spring (T93P-6565-AR)

WARNING: ALWAYS relieve fuel pressure before disconnecting any fuel related component. DO NOT allow fuel to contact engine or electrical components.

CRANKSHAFT & MAIN BEARINGS

Diesel Technology: Engines

Maintenance Schedules - Diesel Engines

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

CP-1, CP-2, CP-2L & CPD-2 Series Overhaul

Intake Manifold Replacement

ELECTRIC WATER PUMP (EWP ) KIT INSTALLATION INSTRUCTIONS

Valve Timing Inspection and Adjustment

CRANKSHAFT/TRANSMISSION 9-9

Section 1.24 Gear Train and Engine Timing

Oil Pump Removal and Installation

file://c:\program Files\tsocache\OFFICE_5416\SY1~us~en~file=SY131B46.htm~gen~ref...

Engine. Special Tool(s) Compressor, Valve Spring (T97P-6565-AH) Compressor Spacer, Valve Spring (T91P-6565-AH)

Aluminum Small Block Chevy - Technical Notes

Volkswagen New Beetle 1.8 Liter 4-Cyl. 5V Turbo OBD II Engine Mechanical 17 Engine-Lubrication system (Page GR-17)

Engine Dismantle and Assemble ( )

Fig. 1: Remove the bolts which fasten the upper timing belt cover... Fig. 2:... and remove the cover

DrVanos.com Stage II Installation Instructions. Tool rental is available with the purchase of a vanos kit *See website for more info*

2004 Volvo C70 L5-2.4L Turbo VIN 63 B5244T7 Cylinder Head Assembly Service and Repair, Removal and Replacement: Cylinder Head/Gasket, Replacing

5. Cylinder Head. 2-3a [W5A1] SERVICE PROCEDURE A: REMOVAL 1. RELATED PARTS 2. CYLINDER HEAD

1995 Aerostar/Ranger/Explorer

MOTORCYCLE DIVISION 4-STROKE BULLETIN NO. GS/GSX/GSX-R - 97 REVISED DATE: 9/2/98

Maintenance Schedules - Diesel Engines

NOTE: These gears are measured and adjusted with the gear case cover installed.

MK Rittenhouse & Sons Ltd. 115 Litre/30 US Gallon Greenhouse Sprayer Manual

Disassembly and Assembly

Cycle, Inc Cty Hwy G Viola, Wisconsin Phone: Fax:

GenX Street/Strip Cylinder Heads for the GM LT1

AEROMOTIVE Part # Subaru STI Fuel Rails INSTALLATION INSTRUCTIONS

Remove Air Cleaner Cover and. Filter

SERVICE BULLETIN. Oil Seepage Diagnosis and Repair Procedures

SECTION C Engine 6.0L Diesel

INTEGRATED ENGINE BRAKE. P55003 P67 LoadLeash Kit: 2007½-2013 Dodge Pickup Trucks & Sterling Chassis Cab Trucks w/ Cummins 6.

INSTALLATION INSTRUCTIONS B-375-D Fiberglass DoubleWall Spill Bucket

Engine. Special Tool(s) Adapter for (T97T-6256-A) Adapter for (T97T-6256-D)

TOP FEED FUEL RAIL KIT for WRX

INSTALLATION INSTRUCTIONS

COBB CAMSHAFTS INSTALLATION Impreza RS/TS

COOLING AND LUBRICATION SYSTEM

Transcription:

READ THIS BEFORE PROCEEDING Congratulations for purchasing a quality cylinder head from Kiwi Cylinder Heads. Please read the following notes carefully to ensure the installation goes smoothly and the repair is completed effectively. If you have any further questions please call 0800 549 429 for assistance prior to fitting this head. This kit contains Instructions & warranty information One bare cylinder head May contain associated parts, e.g. studs, heat shields, water pipes etc. If the purchaser chooses to fit parts other than those supplied, this does not invalidate the Kiwi Cylinder Heads warranty other than to the extent that the replacement parts carry no warranty unless purchased from Kiwi Cylinder Heads. Additionally, any consequential damage to Kiwi Cylinder Heads products as a result of using these alternative parts is not warranted. These are suggestions only and all normal professional standards must be observed by the repairer. This includes following any original manufacturers specific instructions for the replacement of cylinder heads on a particular vehicle. If this product is being fitted as a replacement for a head which has failed in service it is critical that the cause of the original failure is identified and rectified. Failure to do so may result in this product also failing for the same reasons which will not be covered under any warranty. Warranty All Kiwi Cylinder Heads products are warranted for 12 months and unlimited kilometres from the date of purchase. All claims for failure are investigated by an independent component failure assessor, and the results of these findings will be made available to the claimant as part of the process. If the cause of the failure is due to faulty product, Kiwi Cylinder Heads will meet reasonable costs for repair. This includes standard labour times for the repair, gaskets, bolts and consumables associated with putting the engine into the same condition as it was prior to the failure. This excludes service items such as oil, coolant, filters etc as well as any vehicle recovery costs and the cost of any replacement vehicle. For full details on the warranty and the claim process see the website www.kiwicylinderheads.co.nz Toyota 1KD-FTV P/N 10081134 NOV.2011

SIX STEPS TO SUCCESS! TO ENSURE A SUCCESSFUL INSTALLATION OF THIS CYLINDER HEAD 1. ENSURE BOTH MATING SURFACES ARE CLEAN AND FREE OF DIRT AND OIL. 2. DO NOT CLEAN BLOCK THREADS WITH A THREAD TAP. USE AN OLD HEAD BOLT WITH A CLEANING GROOVE CUT THE LENGTH OF THE THREAD TO THOROUGHLY CLEAN BLOCK THREADS. 3. MAKE SURE NEW TORQUE TO YEILD HEAD BOLTS ARE ALWAYS USED. ENSURE A LIGHT COVERING OF ENGINE OIL IS APPLIED TO THE THREADS AND UNDER THE BOLT HEAD AND WASHER. 4. ENSURE THE CORRECT TORQUE SETTINGS AND SEQUENCE IS EMPLOYED. 5. MULTI-LAYER STEEL (MLS) HEAD GASKETS: FLUSH BLOCK OF ANY REMAINING ANTI-FREEZE, DO NOT ADD ANY NEW ANTI-FREEZE TO COOLANT SYSTEM UNTIL ENGINE HAS TRAVELLED A MINIMUM OF 600KMS. TO ENSURE THE GASKET HAS THE BEST POSSIBLE CHANCE TO SEAL CORRECTLY. 6. FUEL INJECTORS MUST BE CHECKED FOR CORRECT OPERATION AND SERVICED IF REQUIRED. IF YOU HAVE ANY QUERIES PLEASE CALL US ON 0800-549-429

CLEAN SURFACES USE AN OLD BOLT TO CLEAN THREADS OIL HEAD BOLTS CORRECT TORQUE PROCEDURE? NO ANTI-FREEZE FOR MIN. 600KMS SERVICE THE INJECTORS

VEHICLE REGO ENGINE MODEL CYLINDER HEAD INSTALLATION CHECK LIST On receiving the new cylinder head visually check for courier damage and that it is in all respects the same as the old head with the same openings, threads, holes and bungs. Check dowel hole depths Check that injectors, sparkplugs, and other fittings, fit correctly in the threaded holes before fitting the head to the rest of the engine. Check that there are no visible blockages in water ways and oil galleries and use a compressed air gun to blow all of these out as debris can sometimes become trapped during the manufacturing process. (if this is a complete assembled cylinder head) Confirm all the tappet/valve clearances are correct while they were set at assembly it is still worth checking. Also check tappet adjusters are tight and will not move in service. Prevention is better than cure! (if this is a complete assembled cylinder head) Ensure the camshaft, cam followers and all other moving parts are well lubricated with the pre-lube oil supplied before attempting to turn the engine over. Ensure all gasket surfaces and the cylinder head and block mating faces are clean, undamaged, smooth and free from oil, grease & water before fitting. This is especially critical when using multi-layer steel gaskets. Use new head bolts and gaskets and tighten the bolts to manufacturer s specifications. Be sure to oil the threads and under side of the bolt heads & washers before fitting. It may also be best to leave the head & gasket to settle between each stage of the tightening process. Do not clean block threads with a tap, use an old head bolt with a cleaning groove cut the length of bolt instead. With spark plugs/glow plugs & rocker cover removed, the engine should be turned over until oil is flowing through all the oil galleries in the cylinder head. This is typically 30 60 seconds after the oil pressure light goes out. Complete the re-assembly of the engine to industry standards and test run checking for any leaks (oil or water) after the engine has reached full operating temperature but prior to any road test. Be sure to bleed all air from the cooling system at this time. If using a multi-layer steel gasket it is recommended that anti-freeze is only added to the cooling system after the vehicle has run 500 1000 km COMPLETED BY: _ DATE IF YOU HAVE ANY DOUBTS OR QUERIES CALL US FREE ON 0800-549-429

Toyota 1KD-FTV Torque Sequence HEAD BOLT P/N QUANTITIES: HEAD BOLT TIGHTENING SEQUENCE. STEP ONE: 35Nm STEP TWO: 55Nm STEP THREE: 85Nm STEP FOUR: +90* STEP FIVE: +90* IMPORTANT: ALL BOLT THREADS, BOLTHEADS AND WASHERS MUST BE LIGHTLY OILED. USING AN OLD HEADBOLT WITH GROOVE CUT DOWN THREAD, CLEAN THE BLOCK HEADBOLT THREADS. 11 3 6 14 17 9 1 8 16 FRONT 15 7 2 10 18 13 5 4 12 www.kiwicylinderheads.co.nz 0800-549-429