Series BFM Bulk Flow Monitor 1A FUSE RED LED RELAY. Part Number BFM-1 BFM-2 BFM-3 BFS-1

Similar documents
FM200 FLOW/NO-FLOW MONITOR INSTALLATION AND TECHNICAL MANUAL 120 VAC MODEL 6/1/2017

MODEL MSD MOTION CONTROL INSTALLATION AND OPERATION

DWYER INSTRUMENTS, INC. Phone: 219/ P.O. BOX 373 MICHIGAN CITY, IN 46361, U.S.A. Fax: 219/

MODEL RMS INSTALLATION INSTRUCTIONS. CONTENTS Page A. Introduction 1. Usage 2 2. How it operates 2

MODEL CMS INSTALLATION INSTRUCTIONS A. INTRODUCTION 1. USAGE 2 2. HOW IT OPERATES 2 B. SPECIFICATIONS 1. ELECTRICAL 3 2.

PRODUCT INFORMATION BULLETIN

GE Sensing & Inspection Technologies

331-SV. User Manual THREE PHASE DUPLEX LIFT STATION CONTROL PANEL WITH STATIONVIEW CONTROLLER. Ashland, OH

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

CP-8301-xxx Series. Application. Features. Applicable Literature. 1 to 15 Vdc Input Electronic Actuator Drive General Instructions

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

CAPSU-PHOTOHELIC PRESSURE SWITCH/GAGE*

DOC # DOCSST-D 08/16/99

5000 SERIES POWER SUPPLY/CHARGERS INSTALLATION GUIDE

System 350 P352AB Electronic Pressure Control Series

Temperature Control Panel Wiring Diagram Model: ISPA-120-1P-15A

RP-4000 Reserve Power Control

CIVACON GROUND VERIFICATION RACK MONITOR SYSTEM and ASSOCIATED EQUIPMENT

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

General Description. Product Specification. Document Digital Temperature Interlock

TRAC-Station BT Installation Instructions

Self-Testing Industrial Series

INSTALLATION INSTRUCTIONS FOR SYMCOM'S MODEL 777-HVR-SP ELECTRONIC OVERLOAD RELAY

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version

1100 Series Piston Type Differential Pressure Gauges

Electro-Mechanical Swing Operator. Table of Contents

Patient Care Facility

INSTALLATION MANUAL ACL 5500 COMBUSTION SAFETY CONTROLLER

Model 116 DPI Switch Installation and Operating Instructions

Patient Care Facility

Drug Testing Labs. Style 2 W/ Ver 4.41 pcb & Pulse Relay pcb(s) Installation, Operations, Start-up and Maintenance Instructions

Drug Testing Labs. Style 2 W/ Ver 4.41 pcb & Pulse Relay pcb(s) Installation, Operations, Start-up and Maintenance Instructions

MBCM-24 MULTIPLE BATTERY CHARGING MODULE (FOR MARINE APPLICATIONS) FEATURES SPECIFICATIONS APPLICATIONS DESCRIPTION & OPERATION ORDERING INFORMATION

Product Instruction. Door Control Board: Board 1Ø4 for PM/SSC (R3)

Paddle Wheel Turbine Flow Meters Installation, Operating & Maintenance Manual

Application Engineering

Power Operated Retrofit Kit for Manual Door 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual

SITRANS AS 100. Instruction Manual September 2001 ITRANS AS 100

INSTALLATION INSTRUCTIONS FOR Owner's Copy FILTERED AND REGULATED POWER SUPPLY VOLTS DC INPUT: Hz.

M100F Incremental Motor Actuator R81F Interface Board

Spectron Industrial Series

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

MA-5200 Series MA-5300 Series

3 Phase Smart Controller

RESISTIVITY MONITOR/CONTROLLERS

Paddle Wheel Turbine Flow Meters Installation, Operating & Maintenance Manual

Application Engineering

PROCAP Capacitance Level Sensors

Valcom Failsafe Unit. 1620ESv2 SERIES. Operation and Maintenance Manual

PD404-AN V analog control 4 Channel x 500 W Dimmer & Switch Packs ANALOG 0-10 V. Serial Number


27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2

IMI vibration switch USER MANUAL INSTALLATION - OPERATION - MAINTENANCE

Therm-L-Tec Building Systems LLC. Therm-L-Tech. Power Operated Retrofit Kit 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual

PRO REMOTE Series CAPACITANCE PROBE

MAXIGARD A2000 SPEED SWITCH. Introduction

ACCESSORY KIT INSTALLATION INSTRUCTIONS

DPD72001, DPD Unipolar Step Motor Driver. User s Guide E. Landon Drive Anaheim, CA

U00X ULTRASONIC LEVEL SWITCH. Ultrasonic Liquid Level Switches INSTALLATION AND OPERATIONS MANUAL. For Models: U002, U003 & U004

Visit our web site at AMR LS-3000, LS-3010 & LS-3020 BELT SLIP/SEQUENCE CONTROL INSTALLATION AND SETUP INSTRUCTIONS

Installation, Operation and Maintenance Manual

PRO REMOTE 25 LV CAPACITANCE PROBE

RF Point Level Control with Sensor Monitor

Patient Care Facility Multiple Room Configuration Style 3 W/ Ver 4.41 pcb & Pulse Relay pcb(s)

Installation, Operation and Maintenance Manual

Installation, Operation and Maintenance Manual

FC/FCA 12, 24, 32 & 48 VOLT, 6 & 10 AMP BATTERY CHARGER OPERATION & MAINTENANCE GUIDE

Art. No. EC-315. Art. No. EC-330. Art. No. EC-340 SWITCH-MODE BATTTERY CHARGER CONTENTS IMPORTANT SAFETY PRECAUTIONS... 2

METROLOGIC INSTRUMENTS, INC. MX001 Industrial Control Interface Installation and User s Guide

Model 550 Series Vibration Switches

M9206-Bxx-2S Series On/Off Electric Spring Return Actuators

32XR. 3 Phase Duplex Pump Control Panel (Level Transmitter Based) Quick Start Guide

Installation Instructions

PROCAP Capacitance Level Sensors

ANALOG CONTROL PANEL

Motor. Document # Vari-Green Motor and Controls. Table of Contents. Features, Operation, Wiring and Troubleshooting

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Model LA 4400 Time Delay OFF Controller

Installation Instructions

CSI-300 Installation Instructions

Operations Manual. Zero Speed Switch Sensor Model ZS09P

DPS32001 and DPS32PS1

VA-908x Series Electric Rotary Actuators for Two-Position and Modulating Service

ROTARY Point Level Measurement for Inventory Control

3143 Production Drive Fairfeild, Ohio Model HA Installation and Service Manual

PCVS Series Control Valve Supervisory Switch

B-PC20 Power Close Module

BLDPN30001 Series. 30A Brushless DC Controller. User s Guide E. Landon Drive Anaheim, CA

Sentry Battery Charger. Installation and Operations Manual Section 75

A25 Series Warm Air Control with Manual Reset

TM4500. Track Mounted Step Motor Driver. User s Guide. CE Certified and RoHS Compliant #L010060

Model LA 4100 Time Delay OFF Controller

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

Moniteur INSTALLATION & OPERATING INSTRUCTIONS. SERIES 40 Positioners. Installation and Operating Instructions Series 40 Positioners.

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

th Street, Surrey, B.C. Canada V3W 0A6 Telephone Fax July 2012

The POWER. In PRESENTATION PRODUCTS. Instruction Book for COSMOPOLITAN ELECTROL For Sizes Up To 9'x12' DA-LITE SCREEN COMPANY, INC.

Starting System DS-102 Series 200. Elmatik AS P.O.Box 309 NO-3471, Slemmestad T F

OPERATING INSTRUCTIONS PLEASE READ CAREFULLY

SG1000A Slide Gate Sensor Slide Gate & Valve Position

Transcription:

Series Bulk Flow Monitor Specifications - Installation and Operating Instructions Bulletin FL-1-4x 3/4 CONDUIT KNOCKOUTS BFS 1A FUSE RED LED RELAY 5-9/64 [130.45] TRANSFORMER 3[76.20] GREEN LED 7 [177.80] SENSITIVITY ADJUSTMENT POTENTIOMETER FLOW MONITOR PRODUCT LABEL FOR MAIN CONTROLLER UNIT 1-19/32 [40.64] 6X 1/2 CONDUIT KNOCKOUT TIP 1-1/2 [38.10] 3 [76.20] 6 18 AWG WIRE FLOW 1/2 [12.69] 3/32 [2.29] Series Bulk Flow Monitor provides effective monitoring for most flow/no flow conditions in pipes and chutes. It s sensing techniques, which use a Piezo element, makes the versatile for most flow/no flow applications. The Control offers many unique advance features that exceed the industry standards. The Central Processing Unit monitors movement of almost anything through a pipe or chute system. The is ideal for sensing the presence or absence of materials in Pneumatic Conveying Systems. The offers adjustable sensitivity depending on the application demand. Also, it provides easy installation and requires no maintenance. The unit has L.E.D indicators flow (green)/ no flow (red). The BFS-1 Sensor yields many advance features. It externally mounts to the outside of the pipe or chute. It provides mounting tabs for easy installation. The Sensor is prewired with 3 wire. Series has many practical applications. You can use it to monitor Oil Spray Systems, Discharge Chutes, Distributors, Screw Conveyors, Drag Conveyors, Water Systems, Air Systems, Pneumatic Systems, Gravity Feed Systems, Slurry Systems, Chemical Processing, Food Processing and Rotary Drums. Part Number -1-2 -3 BFS-1 SPECIFICATIONS Specifications Service: Solids and liquids. Power Requirement: 120VAC, 220VAC or 12VDC. Power Consumption:.1A. Temperature Limits: 120 F (48.9 C). Output: Relay: SPDT rated 4A @ 125/250VAC, 1/10 HP @ 125/250VAC, 3A @ 30VDC. TTL: 0-5 V. Serial Communications: RS-232. Electrical Connection: Screw Terminal. Conduit Connection: Knockouts (two 3/4 for power, three 1/2 for sensor and outputs). Enclosure Rating: NEMA 4. Material: Polycarbonate. Weight: 3 lbs (1.36 kg). BFS Specifications Pipe Size: 1/2 to 60 (1.27 to 152.4 cm). Enclosure Rating: NEMA 4. Electrical Connection: 3 (0.9 m) of 18 gauge wire. Temperature Limits: 155 F (68.3 C). Materials: PVC Type 1 Grade 1 Grey. Weight: 5 oz (141.8 g). Descriptions Control Unit: NEMA 4X, Polycarbonate Housing, Weatherproof, 120VAC Control Unit: NEMA 4X, Polycarbonate Housing, Weatherproof, 220VAC Control Unit: NEMA 4X, Polycarbonate Housing, Weatherproof, 12VDC Sensor DWYER INSTRUMENTS, INC. Phone: 219/879-8000 www.dwyer-inst.com P.O. BOX 373 MICHIGAN CITY, INDIANA 46361, U.S.A. Fax: 219/872-9057 e-mail: info@dwyer-inst.com

WIRING The polycarbonate housing comes with 10 PG conduit knockouts in the housing. A 1-Amp fuse is located next to the transformer. High voltage inputs above 24 volt AC should be routed into the housing through the 3/4 (20mm) conduit hole. All Low voltage wiring (TTL, RS232, and sensor) should be routed through the 1/2 (14mm) conduit hole. 3/4 HIGH VOLTAGE INPUT 1/2 LOW VOLTAGE INPUT Figure 3 HIGH VOLTAGE INPUTS Figure 1 INPUTS Connect the low voltage Flow Sensor to the Sensor terminals TB1 (Fig. 4): Connect the 120VAC, 50/60 HZ, 1 Amp supply on TB2 terminals (Fig. 2): 120VAC (Hot) supply to 117VAC terminal (or 12VDC, 240VAC per the model) AC Common to AC COM terminal Earth-Ground to E GND terminal. Must connect to prevent accidental electrical shock. Positive RED (or White) sensor lead to the + Sensor terminal on TB1. Negative BLACK sensor lead to the - Sensor terminal on TB1. The sensor wiring should be a minimum of 18 AWG stranded 2-conductor cable. Use 18 AWG for up to 500 (155m) and 16 GA up to 2000' (620m). All Sensor wire splices must be SOLID and WATER TIGHT. Figure 2 Figure 4

RELAY AND LOW LEVEL LOGIC WIRING See those sections later in this manual. SIDE VIEW FRONT VIEW INSTALLATION The BFS-1 sensor is in very a rugged polymer housing with a sealed 6 cable pigtail (Fig. 5): NOTE: PILOT HOLES ARE DRILLED INTO FLAT SURFACE AND MOUNTED WITH PORPER HARDWARE. Red/Black = Positive White/Black = Negative (this is electrically connected to the metal sensor stud) Figure 6 BLACK LEAD MOUNTING TO A ROUND OR NON-FLAT SURFACE: (FIG. 7) Using strapping (such as heavy duty wire-ties) or clamps to secure the sensor housing to the pipe so the metal sensing stud makes firm contact with the surface. RED/WHITE LEAD SIDE VIEW FRONT VIEW Figure 5 MOUNTING PROCEDURES FOR : The BFS-1 Sensor can be screwed, clamped or strapped in place and is able to detect flow through most sheet metal. NOTE: STRAPS OR CLAMPS ARE USED FOR MOUNTING TO NON-FLAT SURFACE Clean the surface area where the sensor is to be installed. The surface should not have any buildup or scale but does be perfectly clean. The sensor stud located at the bottom of the sensor housing must make solid contact with the surface of the pipe to be monitored. Figure 7 MOUNTING TO A FLAT SURFACE: Refer to the mounting holes located at each end of sensor housing (Fig. 6). Mark mounting holes. Drill pilot holes for mounting screws. Screw sensor housing to flat surface.

LOCATION: TO ENHANCE SENSITIVY INSTALL THE WHERE THE FLOW IS MOST TURBULENT OR WHERE MATERIAL IMPACTS THE PIPE WALL. THE FOLLOWING POINTS ARE IDEAL (FIG 8): Pipe elbow Point where material drops into spouting or chutes Point where material drops from conveyor onto the chute BE SURE STUD IS MAKING A GOOD TIGHT CONTACT WITH MOUNTING SURFACE. STUD TTL LOGIC OUTPUT: The TTL Logic output is a 5VDC output. To obtain a TTL Logic Output install jumper J3 as indicated on the PCB. Connect logic level output wiring to the Out (+5V) terminal and the Sensor - (0V) terminals on TB1. NO FLOW: Red LED lights and 0VDC will be present at the OUT terminal. FLOW: Green LED will light and 5VDC will be present at the OUT terminal. RS232 LOGIC OUTPUT: The RS232 output is an industry standard 5VDC minimum into 3K load. To obtain an RS232 logical output do not install jumper J3 as indicated on PCB. INPUT PUMP NO FLOW: Red LED lights and 0 VDC will be present at the "OUT" terminal. FLOW: Green LED will light and 5VDC min. will be present at the "OUT" terminal. LOW LEVEL (LOGIC) OUTPUT WIRING Low level outputs available (Fig. 9): TTL logic output RS232 logic output Figure 8 NOTE: For proper logic input to your computer, consult your computer manual for the correct pin configuration for RS232 or TTL. RELAY OUTPUT WIRING Relay (CTR1) Contact Specifications: 4 amp at 125 or 250 VAC 1/10 HP at 125 or 250 VAC 3 amp at 30 VDC Relay Output Wiring on TB2 (Fig. 10): COM = Common contact N/C = Normally closed N/O = Normally open Figure 9 Figure 10

SOUNDING AN ALARM TO INDICATE DECREASED FLOW: An alarm will sound when flow drops below the preset amount (Fig. 11): When flow drops the relay contacts close to energize the alarm. The power to the alarm (connected to the COM terminal) is from the motor starter circuit so the alarm can only sound when the motor is running. When the motor Stop button is pressed the alarm will silence. Before the controlled equipment can be started again, the following must occur: Material is flowing past the BFS-1 sensor. The Green L.E.D. (FLOW) indicator light is lit indicating material flow. You may have to hold down the Start button until flow reaches the preset rate. As long as material continues to flow past the BFS-1 sensor above the preset rate, the machine equipment supplying material will continue to run. If the rate of material flow falls below the preset level, the relay will open and the machine equipment supplying the material will stop. MACHING SUPPLYING MATERIAL NOTE: AUXILLARY SET OF NORMALLY CLUSED CONCACTS (CLOSED WHEN STARTER IS ENERGIZED). MOTOR STARTER START SWITCH 117VAC ALARM TB2 COM N/0 N/C AC COM STOP START STARTER COIL TB2 COM N / 0 M / C Figure 11 STARTER CIRCUIT WITH SHUTDOWN SHUTTING DOWN EQUIPMENT WHEN FLOW DECREASES: Figure 13 Equipment shut down mode is required if the flow rate drops below the preset level. The relay is often wired to stop the equipment that is supplying the material (Fig. 12 and 13). STOP START STARTER COIL NORMAL STARTER CIRCUIT Figure 12

SENSITIVITY RANGE ADJUSTMENT AND CALIBRA- TION The has (3) three sensitivity range inputs. Select the range to get the desired sensitivity for the application. WARNING: TO AVOID ELECTRICAL SHOCK DISCONNECT AC SUPPLY VOLTAGE BEFORE ADDING OR REMOVING JUMPERS ON TB1. Minimum (low) range: Install jumper J2 (only) Medium range: No jumpers installed (as shipped from factory) Maximum (high) range: Install jumper J1 (only) ADJUSTING THE SENSITIVITY RANGE: Figure 14 NOTE: The sensitivity range is factory preset to the Medium range (no jumpers installed). Verify that the supply voltage and the flow sensor are wired and installed correctly prior to testing (Fig. 14). After selecting proper sensitivity range, proceed to the next calibration section. 1. With no material flowing, turn the Sensitivity adjustment to full clockwise position: RED LED will turn on. 2. Start the material flowing at the full rate you wish to monitor: If the GREEN LED turns on, then turn the Sensitivity adjustment fully counterclockwise. If that causes the RED LED to turn on then the correct sensitivity range is selected. If that does not cause the RED LED to turn on (Green stays lit) then install jumper J2 (Minimum range) and repeat the test beginning with step #1. If the GREEN LED does not turn on when material is flowing, then install jumper J2 (Maximum range) and repeat the test beginning with step #1.

CALIBRATION: Perform sensitivity range jumper selection before performing calibration. 1. Stop all material from flowing. 2. Turn the Sensitivity adjustment fully clockwise. 3. Start material flowing at the minimum full flow rate desired GREEN L.E.D. will light to indicate FLOW. MAINTENANCE Upon final installation of the Series Bulk Flow Monitor, no routine maintenance is required. A periodic check of system calibration is recommended. The Series is not field serviceable and should be returned if repair is needed (field repair should not be attempted and may void warranty). Be sure to include a brief description of the problem plus any relevant application notes. Contact customer service to receive a return goods authorization number before shipping. 4. Turn the Sensitivity adjustment counter clockwise until the RED LED lights to indicate NO FLOW. 5. Turn the Sensitivity adjustment clockwise very slowly until GREEN LED lights to indicate FLOW. 6. Calibration is now complete. FINAL SYSTEM CHECK: Stop or reduce flow of material and the GREEN LED (FLOW) will go out and the RED LED (NO FLOW) will light.

Copyright 2008 Dwyer Instruments, Inc. Printed in U.S.A. 12/08 FR#R2-443673-00 DWYER INSTRUMENTS, INC. Phone: 219/879-8000 www.dwyer-inst.com P.O. BOX 373 MICHIGAN CITY, INDIANA 46361, U.S.A. Fax: 219/872-9057 e-mail: info@dwyer-inst.com