Model 377, 379, 386, 388, Sleeper no window

Similar documents
Installation Manual #

Installation Manual #

Installation Manual Blackhawk Road Rockford, IL

Installation Manual #

TABLE OF CONTENTS INTRODUCTION 3. INSTALLATION PROCEDURES Air Conditioner Location 4. A/C Ducting Installation 5

Installation Manual. 9000i Passenger side install Blackhawk Road P.O. Box 6007 Rockford, IL

Installation Manual. CH, CL, CXU, CXN and Vision Blackhawk Road P.O. Box 6007 Rockford, IL

Installation Manual. Cascadia. For Phoenix Gen 4 units built after 6/26/2017

Classic Sleeper including T600, T660, T800 and W900

Installation Manual. Underbunk Columbia and Century models Blackhawk Road P.O. Box 6007 Rockford, IL

Kenworth T680 without factory installed heater

TABLE OF CONTENTS INTRODUCTION.. 3. A/C Ducting Installation. Power Kit Installation (Batteries)...5 OPERATION MANUAL 7-8 TOOLS LIST..

Installation Manual CLASSIC SLEEPER NO WORKSTATION Blackhawk Road P.O. Box 6007 Rockford, IL

Kenworth T680 without factory installed heater

Mustang Shaker

1963 GEN IV SUREFIT VINTAGE AIR CONDITIONING INSTALLATION

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST MUSTANG

WPS-104 Heater Installation Instructions For 500EFI, 700 XP, & Crew Applications

LGT-312L E-Z-Go TXT Light Bar Bumper Kit Installation Instructions

Adjustable Light Kits E-Z-Go TXT All Models Installation Instructions

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

Installation Instructions for Lingenfelter GM 2500 Suburban & Yukon XL Auxiliary Fan System (with AC clutch controlled fan output)

2010 Mustang V6 Shaker CDC #

INSTALLATION INSTRUCTIONS

NITE SSI Service Parts List NITE Tech Support Line #

SCION FRS FOG LIGHTS. Part Number: SFR-313

PRODUCT SAFETY NOTICE

OIL COOLER KIT INSTALLATION INSTRUCTIONS PART NUMBER D

& 76 CHEVROLET NOVA HEATER ONLY

99-03 V6 "Shaker" System Instructions. *03 Model requires new hood Contents w/ Kit. Tool List For Appliqué:

Amp & Speaker Upgrade Install Instructions for Road Glide

Setting the World s Performance Standards

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST FORD FAIRLANE & CROWN VICTORIA

PRODUCT INSTRUCTIONS

Deuce/Ace Installation Instructions

2015 Mustang Lightbar (All Models) CDC#

Amp & Speaker Upgrade Install Instructions for Victory Cross Country

Jeep Wrangler TJ 4.0 LITER Installation instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Part# , , ,

Part Number: SFR-713. Hardware Bag Contents. General Applicability All models. Conflicts - Fog Lights. Date: SCION FRS LED DRL

Ram 1500 Crew Cab A Ram 2500/3500 Crew Cab A

TOYOTA TACOMA LED DRL. Part Number: TTA-712

Heater/Defroster Installation Instructions

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

CAMRY STRIP LED DRL TOYOTA Part Number: Accessory Code: LDRS10. PIO / DIO Rev. A 02/26/13. Doc

Part Number: TAV-713 TOYOTA AVALON LED DRL

Mustang V6 Shaker 99-04* Components Check List:

INSTALLATION INSTRUCTIONS

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

Air Conditioner for M915 A0/A1 Truck

INSTALLATION INSTRUCTIONS

SCION xd INTERIOR LIGHTING UPGRADE Preparation

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION GUIDE

OIL COOLER KIT INSTALLATION INSTRUCTIONS PART NUMBER D E92 335i/xi (N55 engine) with BMW Standard bumper and with stock oil cooler

Part Number: TCA-712SE

SCION tc FOG LIGHT. Part Number: STC-312 / STC-812

Jeep Wrangler TJ. Complete Air Conditioning System. Slide Control Head. Installation instructions

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST 1969 CHEVROLET CAMARO/ FIREBIRD NOTE: INSTRUCTIONS DEPICT CAMARO

Jeep Wrangler 4.0 Liter TJ Jeep Wrangler 2.5 Liter TJ Installation instructions

TOYOTA CAMRY FOG LIGHT (Halogen and LED) Part Number: TCA-312 / TCA-812

OIL COOLER KIT INSTALLATION INSTRUCTIONS PART NUMBER D E92 335is (N54 engine) with BMW M-Technic bumper and with stock oil cooler

350 S. St. Charles St. Jasper, In Ph Fax

CVO - with ipod Amp & Speaker Upgrade Install Instructions for Batwing Fairing

6945 (12v) 6944 (24V) installation instructions

2-row and All-row systems included.

TOYOTA COROLLA L, LE FOG LIGHT (Halogen and LED) Part Number: TCO-314 / TCO-814

Part Number: TTA-2N1. Hardware Bag Contents. General Applicability SR5, TRD Sport, TRD Off-Road, Limited

INSTALLATION INSTRUCTIONS

GENUINE PARTS INSTALLATION INSTRUCTIONS

Part # C-10 Level 1 Air Suspension System

TOYOTA HIGHLANDER 2016 ON BOARD VACUUM CLEANER

TOYOTA COROLLA LED DRL eyebrow. Part Number: TCO-DRL

OIL COOLER KIT INSTALLATION INSTRUCTIONS PART NUMBER D

PFadvantage MF 6850/6855; Ideal 9080/9090

pg 2 Disassembly, Wire and Amplifier Plate Installation pg 9 Glovebox Subwoofer Installation pg 13 Kick Panel Speakers Installation

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS

Part Number: T4R-2N1. Hardware Bag Contents. General Applicability Models with factory fog light. Conflicts -

Part Number: TTU-BGB14-DRL TTU-BGP14-DRL

Turner M50 Manifold Adapter Install. April 26, 2012

Depress each tab as you pull the bezel off. The bezels are tight. L.H. shown.

Instructions for 2-row monitoring only

PRODUCT SAFETY NOTICE DEALER/INSTALLER NOTICE

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS C-VS-2000-DUR-1 20 VEHICLE SPECIFIC CONSOLE for 2018 Dodge Durango with Standard Shifter

RESPA -CF/CFX Installation Kit for Komatsu D475A-5E0

This harness kit includes: Installing the Hybrid ReVolt Universal grid charger in an Insight

INSTALLATION INSTRUCTIONS

Factory Five Racing, Inc. 818 Kit Assembly manual revision 1J update

Rostselmash Torum 740

INSTALLATION INSTRUCTIONS CATCH CAN KIT

97-02 JEEP TJ BODY LIFT KIT INSTRUCTIONS

SHELBY GT500

Toyota Tacoma Double Cab up A Toyota Tacoma Access Cab* up A. 3-5 Hours INSTALLATION GUIDE INSTALLATION TIME SKILL LEVEL

FRONT MOUNT INTERCOOLER GOLF / JETTA IV 1.8T PART # & P INSTALATION INSTRUCTIONS

BLACKBIRD INSTALLATION SUPPLEMENT

L/6.7L DODGE CUMMINS

YARIS 4-DOOR 2007 INTERIOR LIGHT UPGRADE

INSTALLATION INSTRUCTIONS

INSTALLATION OF THE ENCLOSURE FOR THE MULE 3010 TRANS INSTALLATION GUIDE FOR THE MULE 3000 TRANS ENCLOSURE P. 1. Sept 07

Transcription:

Installation Manual Model 377, 379, 386, 388, 389 63 Sleeper no window 2390 Blackhawk Road P.O. Box 6007 Rockford, IL 61125 www.nitesystem.com 1-866-204-8570

NITE Plus Installation Procedures 1-2 Table of Contents Introduction Before You Start Parts List Tools Required Installation Procedures Electrical Installation Espar Heater Webasto Heater Checklists 1-3 1-4 1-5 1-7 1-8 2-1 3-1 4-1 5-1

Introduction NITE Plus Installation Procedures 1-3 Congratulations. You have chosen the premier no-idle climate control system on the market today the NITE Plus system from. The NITE Plus is a powerful 12V rechargeable DC system that keeps sleeper compartment cool in hot weather and warm in cold weather (with optional heater) without having to idle the truck s engine and without a genset. It not only dramatically reduces fuel burned, it s also very environmentally friendly. Your NITE Plus is a self contained, hermetically sealed, compact A/C system that produces approximately 4,600 Btuh and has been quality engineered for years of reliable service. The system operates independently from your truck s engine using its own deep cycle batteries that are completely separate from the truck s starting batteries. The deep cycle batteries used are the most advanced ever and will efficiently power the system for 8 to 10 hours. The batteries are then fully recharged after just 4 to 6 hours of driving. NOTE: The NITE Plus A/C system is designed to maintain a comfortable temperature inside the sleeper without running the engine. For optimal comfort, the curtain between the cab and the sleeper must be closed when using the unit. To enhance cooling efficiency during the day, solar reflectors or curtains should be placed over the windshield and all windows to block sunlight from entering the cab and sleeper. The NITE Plus A/C unit will not pull down a hot sleeper that has been sitting in the sun without the factory A/C running. To assist the NITE Plus unit in cooling down the sleeper, start the engine and run the factory A/C until desired temperature is reached. The NITE Plus unit will then maintain a comfortable temperature depending on solar load & ambient temperature. Add it all up, and you have a revolutionary no-idle system that will save you money and fuel year after year the NITE Plus from.

Before NITE Plus You Installation Start Procedures 1-4 A typical installation of the NITE Plus generally takes between 8 to 10 hours, although your particular situation may vary. This manual contains step-by- step installation instructions. It is divided into three categories: General installation Electrical installation Heater installation (optional) There is also a section on how to check your NITE Plus to make sure the installation was successful, and a section on how to operate your NITE Plus. If relocation or reinstallation of any pre-installed equipment is necessary for installation of the NITE Plus equipment - please refer to the components manufacturer's instructions or safety guidelines for proper installation. Before you start, we highly recommend doing the following to help make your installation as easy as possible. 1. Lay out all parts and check to make sure you have all parts listed on the parts list. Depending on truck, some hardware may not be used. If you are missing any parts, please call 1-866-204-8570. 2. To prevent damage to compressor, keep the NITE Plus unit in an upright position at all times. If unit is tipped, place back in upright position for a minimum of 6 hours prior to running. 3. Check the list of tools needed for installation and make sure you have all of them. Keep all tools within easy reach. 4. Look through the whole installation manual to get an understanding of the order in which components are installed. 5. Make sure you have good lighting and enough space to work in. 6. You may want to get an assistant to help you to reduce the number of times you have to climb in and out of the cab. 7. Make sure you wear all appropriate safety equipment. Photo above is representative of kit 1000113986 only.

Parts NITE Plus List Installation Procedures 1-5 Part Description Quantity Part # Part # 1000113877 NITE STANDARD KIT A/C ONLY 585414 1000078163 ASSEMBLY, NITE UPGRADE UNIT 1 1000014440 KIT, NITE POWER 1 1000007552 POLICY, NITE WARRANTY 1 585421 MANUAL, NITE OPERATION 1 585511 CARD, NITE, WARRANTY SURVEY 1 1000119244 NITE STANDARD KIT A/C & HEAT 1000078163 ASSEMBLY, NITE UPGRADE UNIT 1 530713 KIT, ESPAR HEATER 1 1000014440 KIT, NITE POWER 1 1000007552 POLICY, NITE WARRANTY 1 585421 MANUAL, NITE OPERATION 1 585511 CARD, NITE, WARRANTY SURVEY 1 1000113986 INSTALL KIT 454651 ANGLE DUCT COLLAR 1 500105 LOUVER, CARY 633 WITH 631 BEZEL 2 500198 GRILLE, AIR RETURN 1 560235 HOSE DEFROST 4.0 X 45 1 584510 PLUG BUTTON.5 IN HLE 3L4566 2 870235 ASSY, MOUNT PLATE 4 BEND 1 1000007614 DUCT, UPPER 1 Parts List 1000007617 DUCT, STEALTH 1 1000007618 DUCT, TRANSITION 1 1000011467 CONTROL DUCT ASSY 1 1000113415 WIRE HARNESS NO IDLE CONTROL 1 1000113881 TEMPLATE, NITE FLOOR 1 1000115617 CD ROM, NITE INSTALL MANUALS 1 1000113995 KIT, NITE STANDARD HARDWARE 1

NITE Parts Plus List Installation Procedures 1-6 Part # Part Description Quantity B290303 CLAMP, HOSE 4.12 I.D. 2 B300571 EDGING BULK 4 FT B360692 GROMMET, NO 6 AND NO 10 HOSE ADAPTER 2 1000014440 NITE Plus POWER KIT 660706 ASSY, WIRE BATTERY CABLE 5300MM BLACK 2 660707 ASSY, WIRE BATTERY CABLE 5000MM RED 3 660694 ASSY, WIRE BATTERY CABLE 225MM 2 660678 HARNESS, WIRE NO-IDLE POWER 1 660827 WIRE, 16 GAUGE BLACK 1 651383 SEPARATOR 200 AMPS 1 651225 FUSE, MAXI 50 AMP 1 B230083 RING TERMINAL, 5/16 2 B300642 WIRE LOOM,.413 I.D. X BULK BLACK SPLIT PLASTIC 70 ft. B300652 WIRE LOOM,.625 I.D. X BULK BLACK SPLIT PLASTIC 15 ft. B360113 STRAP, CABLE TIE 50 709860 BLADE TERMINAL 1 708000 RING TERMINAL, 5/16 16 GAUGE 1 651462 HEAT SHRINK TUBING 10 670136 5/16 RING TERMINAL, 4 GAUGE 8 670137 3/8 RING TERMINAL, 4 GAUGE 2 660706 ASSY, WIRE BATTERY CABLE 5300MM BLACK 2 660707 ASSY, WIRE BATTERY CABLE 5000MM RED 3 660694 ASSY, WIRE BATTERY CABLE 225MM 2

Tools NITE Plus Required Installation Procedures 1-7 1) Drill Bit Set 2) Hole saws (1, 1-5/8, 2, 2-1/2 and 4-3/4 ) 3) Electric/Air Drill 4) Screwdrivers/Assorted Bits (Flat Head & Phillips Head) 5) Impact Gun 6) Air saw/jigsaw (Cutting Sheet metal) 7) Torx Head (T30) Bit 8) Metric Wrenches 9) SAE Wrenches 10) 1/4, 3/8 Drive Ratchets 11) SAE Socket Set 12) Metric Socket Set 13) Wire Cutters 14) Terminal Crimpers 15) Wire Strippers 16) Razor Knife 17) Electrical Tape 18) Cable Cutters 19) #4 Professional Grade Cable Crimpers 20) Cable Strippers 21) Work Light 22) Torque Wrench up to 50 in/lbs 23) U-barrel Crimper 24) Pop Rivet Gun

NITE Plus Installation Procedures 1-8 1 Prepare the Work Area Set up your work light, clear the sleeper compartment of loose items, and remove the divider curtain if there is one. Then remove the mattress and set outside the cab. The NITE Plus unit is going to be mounted under the lower bunk in the central storage compartment. Remove the particle board decking and set outside the truck. 2 Remove Bunk Support Decking Remove all the screws from metal deck covering the center storage compartment. Next use grinder to cut rivets securing the safety belt brackets. Then remove decking. 3 Remove Floor Mat from Center Compartment Remove floor mat to expose the floor under the storage compartment.

NITE Plus Installation Procedures 1-9 4 5 6 Determine Location for NITE Plus unit Mounting Plate Using the provided template, determine where the NITE Plus unit will be mounted. Mark the two rectangular openings (marked as 1 and 2). Check under the truck for any obstructions before drilling or cutting. Drill Pilot Holes and Cutout Floor Openings Remove the template to reveal cut out locations. Drill ½ starter holes in opposing corners of the two areas marked for cutting. Use air saw/jigsaw to cut through truck floor. These two openings will provide air intake and exhaust for the NITE Plus unit condenser fan. Install NITE Plus Mounting Plate Position the NITE Plus mounting plate with the pre-cut recirculation grills, over the holes cut in the truck floor. The openings in the plate should be towards the front of the truck. Attach to the floor through the predrilled holes using selftapping screws. Template Position 1 2 Front of truck

NITE Plus Installation Procedures 1-10 7 Attach Metal Flange Adapter to Elbow Attach with 3 hex head self-drilling screws. Seal around flange with silicone sealant (not included in kit). 8 Temporarily Position NITE Plus unit in Mounting Plate Set NITE Plus unit in mounting plate and hold the elbow duct (A) in position on the side of the unit to help determine the location for the rest of the NITE Plus duct work. Ideal location is indicated by dotted circle. A 9 Drill Hole for Flexible Duct Use a 4 ¾ hole saw to drill a hole through the back wall of the center storage unit at the location determined earlier.

NITE Plus Installation Procedures 1-11 10 Attach Transition Duct to the Bottom of NITE Duct Attach the transition duct to the bottom of the NITE Duct using two 1 5/16 selftapping screws (circled). 11 Locating the Position for the NITE Duct and Cutting Bunk Support Angle Position the NITE Ductbased on the hole drilled through support wall. While holding the duct in position, mark the section of bunk support angle that will need to be removed. Set duct aside and use air saw to cut marked area. 12 Feed Control Wiring Through NITE Duct Take the NITE Duct and thread the end of the wiring harness with the 5 prong black plug through the opening from the backside to front. Attach the control panel to the wiring harness using the wires with a 5-prong plug make sure the connection is tight and secure. (The other three wires are not used in this particular installation.) NOTE: If you will be installing the optional ESPAR heater please review step 17 of the heater control panel installation instructions before proceeding.

NITE Plus Installation Procedures 1-12 13 Attach Control Panel to NITE Duct Push wiring behind duct, and mount the control panel to the duct using ¾ black Phillips head screws through the pre-drilled holes. Tighten carefully. When finished make sure switch is in the off position! 14 Run Wiring behind NITE Duct Place the wiring harness along the channel on the back of the duct. The duct is now ready to be attached. 15 Attach Duct to Back Wall Align duct between area cut out of the bunk support angle and align the bottom of the transition duct with the hole drilled in rear support wall. Press the top of the duct up against the back wall. Make sure the duct is square and level against the back wall. Use 1 5/16 hex head self-tapping screws to attach top of duct to back wall. Place 3-5 screws in each duct opening and install at different angles. Take care not to over tighten. 16 Attach Vents to NITE Duct Snap the louvered vents into each of the duct openings no screws are necessary.

NITE Plus Installation Procedures 1-13 17 Prepare NITE Unit for Install Remove the three screws shown in the illustration from the front bottom of the NITE Plus unit, and one screw from the right-side bottom corner. The unit is now ready to be placed in the truck. 18 Place NITE Plus Unit into Position Carefully lift the NITE Plus unit by the two strap handles and set it on top of the aluminum mounting plate. Be Careful to keep NITE Plus unit level at all times. The STOP label should be towards the front of the truck facing the driver s side as pictured. Be careful not to catch or pull on the wiring harness. 19 Attach NITE Plus Unit Install screws through the lip on the mounting plate into the NITE Plus unit.

NITE Plus Installation Procedures 1-14 20 Install Drip Tube Under Truck All drip tubes are the same but photo may not represent actual application 21 Attach Flexible Duct to Assembled Elbow and Transition Duct Insert flexible duct (A) onto the round end of the elbow unit (B) using hose clamp to secure flex duct to elbow. Run the other end of the flexible duct through the 4 ¾ hole you drilled in the back wall of the center storage compartment. NOTE: Hole position may vary on back wall. You should also run the control harness wiring through the 4 ¾ hole at the same time (indicated by arrow.) Attach flex duct to bottom of transition duct (C) and secure with hose clamp. NOTE: Use protective loom or similar product to cover sharp edges of the 4 ¾ hole. Attach the elbow (B) to the side of the NITE Plus unit using #30 torque screws. A C B

NITE Plus Installation Procedures 1-15 22 Attach Control Cable to Unit Snap control cable harness, coming from the NITE duct, into plug on top of NITE Plus unit it only fits one way. 23 Install the NITE Plus Unit Power Harness Take the power harness and place the protective split plastic loom around it. Install provided grommet into hole in the floor (A). Make sure to use this grommet to protect cables as you run the cables from the NITE Plus unit, down through the frame rails to the NITE Batteries. Secure with zip ties. Insert a 50 amp MAX fuse in the fuse holder at the NITE Plus unit end of the power harness (B). Plug the positive end into the positive plug on the NITE Plus unit (C). Remove a screw from the NITE Plus unit surface, place it through BOTH of the negative ring terminals and reattach to the NITE Plus unit (D). NOTE: DO NOT USE THE SCREW HOLDING CARRYING STRAP FOR GROUNDING! A B C D 24 Cut Notch in Metal Deck Re-position decking to mark cut-out around NITE duct. Cut a 2 x 13 notch. Set decking aside for installation after testing the unit.