RPC Upgrade for the CMS experiment

Similar documents
arxiv: v1 [physics.ins-det] 1 Jul 2014

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

SBS Update Mark Jones

CLAS12 RICH Mid-Term Review

Status of the Tail Catcher/Muon

RPCs for an atmospheric neutrino experiment

Thanks to ATLAS and CMS (Plots are from both) SLAC Ian Hinchliffe 07/24/06 1

Power Integrity Guidelines Samtec MPT/MPS Series Connectors Measurement and Simulation Data

Overview on the LHCb

Module design and development for LHCb VELO Upgrade Project

SFM/TFM Power Integrity Guidelines Samtec SFM/TFM Series Measurement and Simulation Data

Created: 4/23/2003 Page: 1 of 12. Abstract

Straw Detectors for the Large Hadron Collider. Dirk Wiedner

Preliminary Results of 25 ns Test Beam on Florence Detector. Simone Busoni - INFN Firenze for CMS Florence group

Life Extension Testing of Electrical Penetration Assemblies

Fabrication of 12 GeV Prototype Quadrupoles 1. Introduction 2. Design 3. Fabrication

Quality control considerations for the development of the front end hybrid circuits for the CMS Outer Tracker upgrade

Mini-F: A Small Plasma Focus Device

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

Note on preliminary cost estimate for an integrated tracker for the STAR experiment at RHIC

ZPMC Lanka Company (Pvt) Ltd

The LHCb experiment. The LHCb experiment. dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges:

TOF Low Voltage System Review. October 6, 2006 V. Ghazikhanian 1

Cooling, etc. CMS Week Barrel Muon DT Session. BMU Cooling Measurement, etc.

600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS

The PANDA FAIR. Anastasios Tassos Belias / GSI

The g-2 Project at FNAL. Horst Friedsam John Kyle IWAA 2014 at Beijing October 2014

The ITk strips tracker for the phase-ii upgrade of the ATLAS detector of the HL-LHC

Linear Induction Motor (LIMO) Modular Test Bed for Various Applications

MPA Chassis for Multi-Probe Magnetic Transducers

OPAL : Commissioning a New Research Reactor. IAEA Conference, Sydney, November 2007

PHI 5000 VersaProbe II Consumable Parts List

Heats Sinking for InnoSwitch

Global Trigger and Global Muon Trigger

Technical Specifications (In-Cash Procurement)

The CU Beam Test at CERN Status Report and highlights from workshop II

This chapter gives details of the design, development, and characterization of the

PHI 5000 VersaProbe II Consumable Parts List

PETRA III Damping Sections

The ATLAS Detector at the Large Hadron Collider. Peter Krieger IPP/University of Toronto

Development of low-mass, high-density, hybrid circuit for the silicon microstrip sensors in high track density environment

EU Procurement of In Vessel Components for ITER

Cooling tests of the MSGC barrel B1 rod prototype

3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009

RT2DB Excitation and voltage regulation system for synchronous generators

The Advanced Instrumentation and Technology Centre (AITC)

DMT PERFORMING UNDER PRESSURE DMT. Pressure Scanner Features. Applications. Description 1/7

Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory

Company Overview. REV 2018, April

SciFi. Forum on Tracking Detector Mechanics R. Walet. on behalf of the SciFi Tracker Group Rev_06

Hydrogen Station Equipment Performance Device (HyStEP Device) Specification

LHCb Silicon Tracker & Testbeam Data Analysis

Recent Cooling Tests on the Pixel Staves and Real Scale Circuits

mga research corporation

The H1 Silicon Tracker. Benno List

Magnet, Support and Infrastructure. Whit Seay November 7, 2014

Flex review. Outline. Preproduction: layout and status QA during the production Electrical tests done/foreseen Details on R signals Details on R LV

Linky Smart Metering system is Smart Grid Ready Pierre Marlard Feb 2 nd 2011, New-Delhi

Study of the impact of the remote alignment in the vacuum system

Some insights about the Russian Rouble. Steven Palstermans Head of Strategic Financial Initiatives, Russia & CIS 13 th IRSF, London, 23 April 2013

Water side Economizer WC chiller

Investigation & Analysis of Three Phase Induction Motor Using Finite Element Method for Power Quality Improvement

Vacuum pumps for the ESRF EBS project Michael Hahn

SOFE

McQuay. Cabinet Unit Heater. CHB, CHF Vintage A. FCHB, FCHF Design A (1) Last Manufactured: 2010

Auto TLD Badge Reader TL1010A is a personal monitoring system, designed to read the TLD card (TL dosimeters) worn by radiation workers.

A New Device to Measure Instantaneous Swept Volume of Reciprocating Machines/Compressors


Report, Test of HIFROST Longitudinal Holding Coil (7/19/6)

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

Cooldown Measurements in a Standing Wave Thermoacoustic Refrigerator

UGANDA NATIONAL BUREAU OF STANDARDS NATIONAL METROLOGY LABORATORY

Wearable Textile Battery Rechargeable by Solar Energy

NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA

Powering Schemes for the Strip Trackers

Grounding of the ATLAS Experiment

Modul-System SMART AND VERSATILE MULTI-BOX

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

Analysis and/or Testing of Polices and Technologies: General Guidelines

FT Integration. Raffaella De Vita INFN Genova Jefferson Lab 10/15/2013

Powering Schemes for the Strip Trackers

NATIONAL WORKSHOP FOR PROMOTION OF LOW SULPHUR FUELS IN BOTSWANA, MARCH 2016.

HIGH VOLTAGE MODULE TEST SYSTEM

UNCLASSIFIED UNCLASSIFIED

D C. Introduction Hoist Repowering Project for 4100A Shovels. P&H 4100A Hoist Repowering Project. Solutions Explored

Rotor Powered Battery Charger

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Continuing Research and Development of Linac and Final Doublet Girder Movers

SimLIGO : A New LIGO Simulation Package

Vehicle Cluster Testing and Data Logging using Ni Compact-RIO

Pressure Instrument Testing Equipment

2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

Precision Alignment of Multipoles on a Girder for NSLS-II*

/ PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April

Garrett Ng, Head of Data Center Segment, Singapore

Fabco Valve Upgrade. Model way Solenoid Valve

US/EU EV-Smart Grid Interoperability Centers Harmonization of PEV standards, technology and test procedures

Advance Your Company s Success in Technology Development & Commercialization PARTNER WITH ARGONNE NATIONAL LABORATORY

Overview of Magnetic Measurement Activities at SLAC National Accelerator Lab (SLAC)

Transcription:

RPC Upgrade for the CMS experiment L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre, Mumbai 1

Restoration of the full TDR, RE4 ( ) Present experiment runs with 3 endcaps 2

one of the end cap under installation : 72 RPCs / end cap Type 2 chambers Type 3 chambers 3

RE4/2 = 72 RE4/3 = 72 Spares RPC = 56 Total no. of RPCs = 200 RPCs NPD BARC, Mumbai & Panjab University, Chandigarh CERN India Belgium 4

Arrival of mechanics : Feb 2012 Engineering support from MDPDD VME DAQ and TDCs The road map : 2012 2014 RPC budget Signals from single GEM foil L. M. Pant 5 India CMS Meeting, BARC, 03 Aug 12

Two wooden packages being offloaded from the truck 24 th February 2012 at NPD BARC L. M. Pant 6 India CMS Meeting, BARC, 03 Aug 12

Honey Comb Panels stacked at Mumbai site : 25 sets Retrofitting need to be done 7

Cu Faraday with mylar, Cu Read Out Strips, Screen Covers stored in shelves Platform for mylar cutting Cu Faraday with Mylar : 25 sets Cu Read Out Strips : 50 sets Screen Covers : 25 sets 8

Leak and Spacer test facility at NPD BARC, Mumbai Bottom Gap of RE*/2 type from old stock (2007) 20 cm 20 mbar of overpressure with water column 9

Pressure Transducer : Sensor Technics (CTE7000) with a 20 bit ADC Picolog (20 mbar of overpressure) Leak rate : 2.3 x 10 4 mbar. litre / sec bottom gap of RE*/2 type mbar 19.4 19.35 19.3 19.25 y = 0.0001x + 19.687 R² = 0.9681 Series1 Linear (Series1) 102 intact spacers in a bottom gap of RE*/2 type non spacer region 19.2 19.15 3000 3500 4000 4500 5000 sec 10

Arrival of mechanics : Feb 2012 Engineering support from MDPDD VME DAQ and TDCs The road map : 2012 2014 RPC budget Signals from single GEM foil L. M. Pant 11 India CMS Meeting, BARC, 03 Aug 12

Aluminum patch panels fabricated for 200 chambers Responsible : Manish Kumar, MDPDD BARC 12

13

Cu plates (DHP) cutting, bending and drilling : BARC, Mumbai DHP copper being used for the plates and pipes (semi hard) DHP : Deoxidized High Residual Phosphorous 14

Cu pipes (semi hard) soldered to Cu plates (Sn : Ag : Pb :: 62 : 2 : 36 @ 200 o C) MDPDD BARC, Mumbai Cu cooling set on jig while soldering Finished product (for type RE4/3) undergoes leak test with Argon at 20 bar 15

16

Cu cooling system for 200 chambers Cu cooling circuits for the first 30 chambers under fabrication at Mumbai : RE4/2 type 10 sets for Mumbai Being fabricated RE4/3 type 05 sets for CERN & Completed RE4/2 type 05 sets for CERN & Being fabricated RE4/3 type 10 sets for Ghent Completed Delivery to CERN and Ghent expected by end September 2012 Fabrication of remaining 170 sets, to be completed in a phased manner, by end March 2013 17

Leak test of Cu cooling system @ NPD BARC Pressure transducer Temp and RH sensor 18

Outlet Pressure 20 bar Inlet pressure 80 bar Safety release 0 35 bar pressure transducer Argon gas Cu tube pinched at one end 19

Leak test of Cu system RE4/3 001 at NPD BARC 05 April 2012 30 minutes data Pressure (bar) Time (sec) 20

Pressure (bar) and Temperature ( o Celsius) 25 20 15 10 5 0-5 Leak test of Cu system RE4/3 001 at NPD BARC 05 April 2012 30 minutes data Time (data points for each minute) Pressure Temp 21

Plexi glass spacers for guiding the coaxial cables only for 50 RE4/2 chambers being built in India 22

Transportation trolley for ten RPCs Total weight for 10 RPCs : 800 kg Gross weight : 1000 kg 23

Arrival of mechanics : Feb 2012 Engineering support from MDPDD VME DAQ and TDCs The road map : 2012 2014 RPC budget Signals from single GEM foil L. M. Pant 24 India CMS Meeting, BARC, 03 Aug 12

RPC characterization software We are waiting for the final version to be confirmed from CERN for implementation at BARC Hodoscope set for simultaneous testing of three RPCs and three gas gaps for HV scan 3 x V1190A, 128 multihit TDCs implemented in the software The signals from scintillators and the trigger also implemented in the software HV scripts being tested for stability tests : 120 h Minor bugs to be rectified 25

VME based DAQ 1 x CAEN V2718 VME bridge 3 x TDC modules CAEN V1190A 128 LVDS input channels The flat cables from 3 RPCs mate with the flat cables from TDC on a patch panel 26

2D plot : Timing (ch # X axis) vs TDC ch # (Y axis) Responsible : Renju & Raman, NPD BARC TDC Channel numbers (0 to 127) 96 read outs from CMS RPC TDC ch # 32 to 127 Two strips not firing Few strips very noisy Master Trigger TDC ch # 31 16 o/p from scintillators in the hodoscope TDC ch # 0 15 Timing (ch #) L. M. Pant 27 India CMS Meeting, BARC, 03 Aug 12

Time profile of CMS RPC strips 28

Arrival of mechanics : Feb 2012 Engineering support from MDPDD VME DAQ and TDCs The road map : 2012 2014 RPC budget Signals from single GEM foil 29

QC for chamber assembly Production on three different sites : CERN, GHENT, BARC CERN site (904) will coordinate logistic & setting up protocols for QA / QC Common technical specification and protocols for production and QC discussed and agreed among the three sites Detailed DB for production and test in preparation CERN 904 BARC GHENT 10 RPCs per month 3 RPCs per month 5 RPCs per month 30

Delivery of gas gaps, other accessories Tentative delivery of accessories from CERN Aug end Tentative arrival of RE4/2 gas gaps from KODEL Sep end T o for chamber assembly and characterization starts Initially 3 RPCs per month 10 RPCs by Jan 2013 to CERN for SM assembly 31

RE4 Super Module preassembled 10 degree sector 32

RE4 Super Module (RE4/2 + RE4/3) : Prototype RE 4/3 RE 4/2 33

Arrival of mechanics : Feb 2012 Engineering support from MDPDD VME DAQ and TDCs The road map : 2012 2014 RPC budget Signals from single GEM foil L. M. Pant 34 India CMS Meeting, BARC, 03 Aug 12

HV and LV systems BARC and PU (160 kchf for each institute) Multichannel Power Supply (SY1527) Branch Controller (A1676A) HV AC to DC Convertor (A3485) LV MAO AC to DC Convertor (A3486) HV Module (A3512N) LV Module (A3009) EASY3000 Front Side EASY3000 Back Side 35

Installation and Commissioning : (2013 2014) India will contribute to 20 man months during installation and commissioning phase BARC will contribute PU will contribute : 5 man months for Installation : 5 man months for Commissioning : 5 man months for Installation : 5 man months for Commissioning 36

detector contribution from India for RE4 upgrade : 400 kchf 20 man months from India to be shared equally between BARC and PU 10 man months for Installation & 10 man months for Commissioning kchf 200 150 100 50 0 BARC + PU 150 33 33 115 50 19 detector 37

Thanks! 38

Arrival of mechanics : Feb 2012 Engineering support from MDPDD VME DAQ and TDCs The road map : 2012 2014 RPC budget Signals from single GEM foil L. M. Pant 39 India CMS Meeting, BARC, 03 Aug 12

1 2 3 Anode plane : 256 ch in 10 cm 6 GEM foil : 10 cm x 10 cm 5 GEM foil on a frame 4 Drift plane over the GEM foil Drift plane : 10 cm x 10 cm GEM foil over the anode plane 7 Sealing with capton foil 8 Single GEM ready for testing Single GEM assembled at NPD, with Anode plane, GEM foil and the Drift plane 40

Single GEM with voltage divider, gas flow in RPC Lab., NPD with P10 gas Ar + CO 2 online gas mixer installed on 14 July 2012 41

Responsible : Renju, NPD BARC 42

43

44

pseudorapidity, = ln tan( /2) Is the polar angle of the particle wrt the beam axis 45

Trigger efficiency : existing end caps 46

simulated trigger efficiency plot : Piet Verwilligen 47

Phase I : Upgrades Currently running CMS detector : low luminosity detector To increase the physics potential at higher luminosities of 1 2x10 34 cm 2 s 1 Upgrades are proposed (CERN RRB 2011 077) M CHF 20 18 16 14 12 10 8 6 4 2 0 Magnet Tracker HCAL Muon M CHF CSC DT RPC 48