AWWA C504. Double Eccentric AWWA C504

Similar documents
Installation & Operation Manual

24-48 HP250II Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #: 2448HP250OOOM Revision Date: 1/10/11

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

2" - 24" OS Series Butterfly Valves. Operation and Maintenance Manual. Job Name: Contractor: Date:

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

24 and Larger Butterfly Valves

3" 20" Bonded Seat Butterfly Valves

Data Sheet Issue A

Val-Matic 3-Way Tapered Plug Valve

VSI, LLC SERIES 2100 RESILIENT SEATED BUTTERFLY VALVES INSTALLATION, OPERATION AND MAINTENANCE MANUAL

AVK SERIES 41 SWING CHECK VALVE FIELD MAINTENANCE AND INSTRUCTION MANUAL FOR SWING CHECK VALVES 3" - 12"

RESILIENT SEATED GATE VALVE FAF 6200

AVK SERIES 41 SWING CHECK VALVE FIELD MAINTENANCE AND INSTRUCTION MANUAL FOR SWING CHECK VALVES 3" - 12"

Wafer and Globe Style Silent Check Valve. Operation, Maintenance and Installation Manual

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

740G Double Disc Check. Valve. Operation / Maintenance Manual. General Information 2. Installation/Operation 3

AMERICAN AVK COMPANY TABLE OF CONTENTS

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Val-Matic 3"-24" Butterfly Valve With LSA Actuator and External Stops

Herpteraium SECTION VALVES GENERAL

VSI INDUSTRIAL BALL VALVES SERIES 7100 SERIES 8100 SERIES 7200 SERIES 8300 SERIES 7400 SERIES 8400 SERIES 8000 SERIES 8500

Triton. Wet Barrel Ductile Iron. Fire Hydrants. Reliable Connections. operation / Maintenance manual. Inspection and Installation 2

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

SECTION GENERAL-DUTY VALVES FOR PLUMBING PIPING

AMERICAN AVK COMPANY AVK SERIES 25/45/55/65/66 RESILIENT SEAT GATE VALVE FIELD MAINTENANCE AND INSTRUCTION MANUAL TABLE OF CONTENTS

2-12 Grooved End Dual Disc Check Valve. Operation, Maintenance and Installation Manual

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

740G Double Disc Check Valve

series BUTTERFLY VALVE DOUBLE ECCENTRIC FLANGED FAF 3800 PRODUCTION STANDARDS DN100 DN2000 PN Design EN 593 EN ISO Flanged

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

BUTTERFLY VALVE 17 SERIES Gearbox

582 Series. Instruction Manual. Two-Door Wafer Check Valve N-582 (R-08/2016)

TRUMBULL MUD VALVES. Installation, Operation and Maintenance Manual

Val-Matic 3-72 Cam-Centric Plug Valve

Val-Matic 30" and Larger Butterfly Valve With LSA Actuator and External Stops

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607)

Val-Matic 30" and Larger Butterfly Valve With LSA Actuator and External Stops

INSTRUCTION MANUAL RECTANGULAR BUTTERFLY VALVE 3-SIDED SEAT

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Installation Operation Maintenance. LSSN Butterfly Valve AGA Approved 50MM - 150MM. QAD#IM6055.REVA

Butterfly valves. Introduction. Made of ductile cast iron

INSTRUCTION MANUAL. for BUTTERFLY VALVES

SECTION VIII. (Sub-section 430) Wastewater Valves and Appurtenances. 1. General thru Gate Valves thru 430-3

AVK SAUDI VALVES MANUFACTURING COMPANY

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

TITAN FLOW CONTROL, INC.

I & M Mark 708ME. Ideal Installation. Start-Up Procedure. Installation & Maintenance Instructions for Mark 708 & Motor Actuator

SECTION VALVES AND OPERATORS

INSTALLATION, OPERATION AND MAINTENANCE FOR SERIES 500 K-FLO BUTTERFLY VALVES

Operating Instructions ROCO Butterfly Valve with SKG Slider-crank Mechanism, with Electric Multi-turn Actuator

Val-Matic 1-4 Combination Air Valve (Single Housing Type)

14 and Larger Wafer and Lug Style Dual Disc Check Valve. Operation, Maintenance and Installation Manual


MUELLER ECCENTRIC PLUG VALVE

SECTION GENERAL-DUTY VALVES FOR PLUMBING PIPING

SEries 41 check valve installation, operation & maintenance manual

CUSTOM COMBINATION AIR VALVE

IOM Manual. IOM Manual. Series 76/77.

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS

516509_tabs 11/16/10 4:55 AM Page 1 FIRE HYDRANTS

Butterfly Valves (BFV)

MILLCENTRIC FULL/100% POR T ECCENTRIC PLUG VALVE

MODEL 106/206-PG POWER OPERATED GLOBE VALVE Sizes 1/2" to 8" (106-PG) 3" to 10" (206-PG) Installation, Operating and Maintenance Instructions

Operating & Maintenance Manual For Steam Conditioning Valve

AMERICAN FLOW CONTROL 3-16 SERIES 2100 RESILIENT SEATED CHECK VALVE

SECTION GENERAL-DUTY VALVES FOR PLUMBING PIPING

Series 800 AWWA Butterfly Valves

LARGE DIAMETER VALVES

Butterfly Valve Type 58 (PDCPD)

Suggested Specifications

FIREFLO - MODEL F-06 INSPECTION, INSTALLATION & MAINTENANCE MANUAL. Item No.s/Description

SERIES 2200 Replaceable Seat Butterfly Valves

Butterfly_Valve_Type57P

Installation, Operation, and Maintenance Manual

SERIES 900 PLUG VALVES

AUTOMATION ACCESSORIES IN-PLANT VALVE PRODUCTS EXTENSION STEMS FLOORBOX STEM GUIDES FLOORSTANDS COMMITTED TO ENVIRONMENTAL RESPONSIBILITY FLAP VALVES

CENTER LINE. INSTALLATION and MAINTENANCE INSTRUCTIONS RESILIENT SEAT BUTTERFLY VALVES MANUAL AND AUTOMATED

SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RUBBER-SEATED BUTTERFLY VALVES 3 INCHES THROUGH 72 INCHES ANSI/AWWA C504 Class 150/250 December 2012

back to main page Type: Butterfly valves Instructions and Operation Manual Warning! Warning! Danger for life! 1. Intended use Danger for life!

Metal Seated Ball Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #: MSBVOM Revision Date: 07/06/09

Butterfly Valve Type 57P

AMERICAN AVK COMPANY AVK SERIES 67 - HIGH PRESSURE, POST/FLUSHING HYDRANT FIELD MAINTENANCE AND INSTRUCTION MANUAL TABLE OF CONTENTS

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

Val-Matic 4-20 Air/Vacuum Valve

HP250II AND HP250 BUTTERFLY VALVES Engineering Creative Solutions for Fluid Systems Since 1901

SECTION VALVES

ALC-3 BUTTERFLY VALVES NOMINAL PRESSURE NOMINAL SIZE MATERIALS CONNECTIONS DESIGN. ANSI Class PN DN

GA Industries, LLC 9025 Marshall Road Cranberry Township, PA USA Telephone (724) Fax (724)

SOLENOID CONTROL VALVE

Instructions for installation, operation and maintenance of: GATE VALVE

PO Box 411 Berwick PA VALV

SECTION GENERAL-DUTY VALVES FOR PLUMBING PIPING

Michigan State University Construction Standards. GENERAL-DUTY VALVES FOR PLUMBING PIPING Page

M&H VALVE COMPANY AWWA C CLASS 150 & 250 BUTTERFLY VALVES

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION WATER DISTRIBUTION VALVES

A. This Section includes general duty valves common to several HVAC piping systems.

SERIES 2100 Resilient Seated Butterfly Valves

Crispin Valves Operating Guide. Crispin

OPERATION AND MAINTENANCE MANUAL 2-66 SERIES 2500 RESILIENT WEDGE GATE VALVE

INSTALLATION - MAINTENANCE MANUAL Severe Service Series M4 Ball Valve

Transcription:

AWWA C504 Double Eccentric AWWA C504 Series 3900F - Flanged with Handwheel or Lever Handle Series 3900MJ - Mechanical Joint with Handwheel or Lever Handle 0418 0318

MODEL 3975F - Butterfly Valve with Manual Gear Operator GENERAL Butterfl y valves are a signifi cant component of any water distribution system or treatment plant operation. Valve failure caused by faulty installation, improper operation, or maintenance in these systems could result in damage, downtime, and costly repairs. In buried or underground installations, problems or malfunctions can result in extensive an costly excavation to correct or eliminate the problem. Many problems with butterfl y valves can be traced to improper installation, or maintenance procedures. MATERIAL LIST/PRESSURE AND TEMPERATURE: UNLOADING Nominal Pressure 250 Psi Working Temperature EPDM: -10 C to 120 C NBR: -10 C to 82 C Suitable Media Water, Oil, Gas Item Part Material 1 Body Ductile Iron 2 Bushing Bronze 3 Lower Shaft Stainless Steel 304 4 Pin Stainless Steel 304 5 Bolts Stainless Steel 304 6 Plate Stainless Steel 304 7 Disc Ductile Iron 8 Y-Ring NBR 9 O-Ring NBR 10 O-Ring NBR 11 Pin Stainless Steel 304 12 Bolts Stainless Steel 304 13 Gland Stainless Steel 304 14 Key Carbon Steel 15 Upper Shaft Stainless Steel 304 16 Stud Stainless Steel 304 17 Hexagon Nut Stainless Steel 304 18 Washer Stainless Steel 304 19 T-Sealing Ring EPDM 20 Holder Plate Stainless Steel 304 21 Bolts Stainless Steel 304 22 Bolts Stainless Steel 304 23 Shaft Retainer Stainless Steel 304 24 Bolts Stainless Steel 304 25 Washer Stainless Steel 304 26 O-Ring NBR 27 Adjusting Screw Stainless Steel 304 28 Bottom Cap Ductile Iron 29 Adjusting Spacer Bronze 30 Bolts Stainless Steel 304 Inspect valves on receipt for damage in shipment and conformance with quantity and description of the shipping notice and order. Unload valves carefully to the ground without dropping them. On valves larger than 36 in. (900mm), use forklifts or slings under the skids. On smaller valves, do not lift valves with slings or chain around the operating shaft, actuator, or through the waterway. Lift valves with eye bolts or rods through the fl ange holes or chain hooks at ends of the valve parts. STORAGE If it is not practical to store a valve indoors, protect the valve and actuators from weather; the accumulation of dirt, rocks and debris. When valves fi tted with power actuators and controls are stored, energize electric actuators or otherwise protect electrical-control equipment to prevent corrosion of electrical contacts caused by condensation resulting from temperature variation. Do not expose rubber seats to sunlight or ozone for any extended period. Also, see the manufacturer s specifi c storage instructions. INSPECTION PRIOR TO INSTALLATION Verify fl ange faces, joint-sealing surfaces, body seats, and disc seats are clean. Verify the bolts attaching an actuator to a valve are tight, and if loose, tighten fi rmly. Open and close a valve to verify it operates properly and that stops or limit switches are correctly set so that the valve seats fully. Close a valve before installing it.

INSTALLATION It is strongly recommended that instruction manuals supplied by the valve manufacturer be reviewed in detail before installing butterfl y valves. 1. Handle valves carefully when positioning, avoiding contact or impact with other equipment, vault walls or trench walls. 2. Valves are to be installed in accordance with the manufacturer s instructions. 3. When valves have adjustable seating, install the seat-adjustment side of a valve for access and adjustment in service. 4. When valves are provided with fl anged ends in buried applications, the purchaser is advised to consider providing means to accommodate issues such as differential settlement, capability to remove the valve or actuator for maintenance, access to the valve interior for inspection, support of the valve, and controlling the shear loading on the adjacent pipe fl anges. Many types of large buried pipes are designed to defl ect 2-5 percent of pipe diameter, which is harmful to valve integrity. Adjacent pipe must be supported or stiffened to provide a round mating connection for the valve in service. 5. Foreign material in a butterfl y valve can damage the rubber seat when the valve is operated. Be sure valve interiors and adjacent piping are clean and free of foreign material when making a valve-to-pipe-joint connection. 6. Prepare pipe ends and install valves in accordance with the pipe manufacturer s instructions for the joint used. Do not use a valve as a jack to pull pipe into alignment. The installation procedure should minimize the bending of the valve/pipe connection with pipe loading. 7. In the case of wafer type butterfl y valves, concentrically center the valve disc between the mating fl anges. 8. Make sure the valve disc, when opened, will not contact the pipe port. This is especially necessary on pipe with linings and when wafer valves are used. Check manufacturer s recommendations for minimum pipe inside diameter require for clearance. 9. Buried valves installed with valve boxes shall be installed so that the valve box does not transmit shock or stress to the valve actuator as a result of shifting soil or traffi c load. 10. When valves are installed in vaults, the vault design shall provide space for removal of the valve-actuator assembly for purposes of repair. The possibility of groundwater or surface water entering the valve and the disposal of the water should be considered. The valve operating nut should be accessible from the top opening of the vault with the tee wrench. 11. Buried valves can be installed with the shaft horizontal and the actuator input drive nut upwards. 12. A valve can be buried with the shaft vertical with either a torque tube in a manhole or with an extension bonnet to place the actuator aboveground. 13. Valve box or extension pipe should be installed so that the actuator input drive nut and extension stem turn freely. 14. Valves should be tested for operation and adjusted prior to backfi ll. TESTING When rubber-seated butterfl y valves are used to isolate sections of a line for testing, it is important to realize that these valves are designed or factory adjusted to hold rated pressure only. Test pressures above valve rated pressure may cause leakage past the rubber seat and damage to the valve. 1. In order to prevent time lost searching for leaks, where feasible, it is recommended that excavations for buried valves not be backfi lled until after pressure tests have been made. 2. Seat leakage can occur from foreign material in the line. If this occurs, open the valve 5-10 to obtain high-velocity fl ushing action, then close. Repeat several times to clear seats for tight shutoff. 3. Seat leakage can result from rotational shift in the position of the disc with relation to the body seat. Re-adjust closing the stop in accordance with the manufacturer s instructions. RECORDS On completion of installation, the valve location, size make, type, date of installation, number of turns to open, direction of opening, and any other information deemed pertinent should be entered on the owner s permanent records.

OPERATION 1. Do not permit the use or operation of any valve at pressures above the rated pressure of the valve. 2. Do not exceed 300 ft-lb (406 N.m) input torque in actuators with wrench nuts and do not exceed 200 ft-lb (890-N.m) rim pull for handwheels or chain wheels. If portable auxiliary actuators are used, size the actuator or use the torque limiting device to prevent application of torque exceeding 300 ft-lb (406 N.m). If an oversize actuator with no means of limiting torque is used, stop the actuator before the valve is fully opened or closed against stops and complete the operation manually. Be sure to check the actuator directional switch against the direction indicated on wrench nut, handwheel, or records before applying opening or closing torque. 3. If a valve is stuck in some intermediate position between open and closed, check fi rst for jamming in the actuator. If nothing is found, the interference is inside the valve. In this case, do not attempt to force the disc open or closed, because excessive torque in this position can severely damage internal parts. MAINTENANCE Maintenance of rubber-seated butterfl y valves by the owner is generally limited to actuators and shaft seals. In some instances, valve design permits fi eld adjustment when leakage occurs past the disc. Unless the owner has skilled personnel and proper equipment, any major internal problem will probably require the removal of the valve from the line and its return to the manufacturer for repair. 1. Normal maintenance is in the area of shaft seals and actuators. Seal leakage, broken parts, hard operation, and in some cases, seat leakage should be corrected by a repair crew as soon as possible after a defect is reported. 2. If repairs are to be made in the fi eld, repair crews should take a full complement of spare parts to the job site. Be sure to review the valve-manufacturer s drawings prior to any repair work. 3. Provisions should be made to shop line fl ow and isolate the valve from line pressure prior to performing any corrective maintenance. 4. After completing repairs, cycle the valve through one complete operating cycle and, after line pressure has been restored, inspect for leakage. 5. If major repairs require the removal of the valve for repair, be sure to notify all interested parties in the water department and fi re department that the valve and line are out of service, On completion of repair and re-installation, notify the same personnel of the return of the valve and line to service. GEARBOX INSTALLATION STYLE 1. Horizontal installation, hand wheel side, see attached fi gure A; 2. Horizontal installation, hand wheel up, see attached fi gure B; 3. Horizontal installation, driving cap upward, see attached fi gure C; (See following page)

Figure A Figure B Figure C