CABLE MANAGEMENT SOLUTIONS CATALOGUE2003/04 A COMPLETE CABLE MANAGEMENT SOLUTION FOR COMMERCIAL AND INDUSTRIAL APPLICATIONS www.legrand.co.uk
POWER TRACK THE QUICK-FIT VERSATILE SOLUTION Arena-Walsall This ultra-compact 63 A busbar system can be installed quickly, easily and safely... offering flexible access to standard, clean earth, dual and three The compact flexible choice phase power circuits. 134
POWER TRACK 1 2 Easy connections with complete safety... Push the connectors together, slide the cover over and create a safe, secure coupling which can only be released by inserting a screwdriver into the locking point 3 4 With a track height of 17 mm and an overall height of just mm (including tap-offs), even the smallest of floor voids can be serviced 17mm mm With multiple tap-off points, floor boxes can be supplied pre-wired in numerous configurations to meet individual requirements www.legrand.co.uk 135
standard Two bar and earth 63amp Power Track system. Standard Feeder Unit, Track Lengths and Standard Feeder Unit Standard Track Lengths SFU 1.2 metres, 4 Tap-Offs STL12 1.8 metres, 6 Tap-Offs STL18 2.4 metres, 8 Tap-Offs STL24 3.0 metres, 10 Tap-Offs STL30 3.6 metres, 12 Tap-Offs STL36 SEC Standard Feeder Unit Joining Track Lengths Arena-Walsall Standard Track Length When assembled all sliders must be pushed fully home to ensure earth continuity. Standard Feeder Unit 125 Standard Track Length 2-20/25mm knock-out entries. Terminal Capacity 16mm 2 max. Supplied complete with terminal block, lid and turnbuckle fastener. Terminal Block Connection 283 75 Track Housing Manufactured from pre-galvanized sheet steel to BS4678 part 1. 1971. Track Conductor (x2) Manufactured from high conductivity copper. Track Insulator Manufactured from extruded PVC. Sockets / Plug / Slider Shutters Manufactured from mineral filled nylon. Feed Pins 17 63 Simply push-fit end cap on to unused ends of track lengths. 19 136
standard Standard Tap-Offs Standard Flexible Bend & Mark 1 Adaptor Standard Tee Units & Four Way Standard Tap-offs Standard Flexible Bend Standard Tee Unit 3 Metres, Unfused STO3U 3 Metres, Fused STO3F 5 Metres, Fused STO5F All Tap-offs comply with Section 7 of BS7671: 2001 (Blue Book). For compliance to Section 7 of BS7671: 1992 (Yellow Book) see page 145. Mark 1 to Standard Adaptor SFB1 SMA Left feed Centre feed Right feed Standard Four Way STU/A STU/B STU/C SFW Standard Flexible Bend Standard Tee Unit (Centre Feed) Standard tap-offs are denoted by a silver label with a black border. These tap-offs can also be used with the Dual Circuit Power Track. Mark 1 to Standard Adaptor Standard Four Way 43 Cable Length - 3 or 5 metres Unfused tap-offs are rated at 32amp. Fused tap-offs are supplied with a standard BS1362 13amp fuse. Tap-off length refers to the cable and not the conduit length. The conduit is 200mm shorter than the cable length. Standard Flexible Bend 1 metre Comprises a length of 25mm conduit with a plug-in feed at each end, pre-wired with 10mm 2 tri-rated cable. Cable length = 1 metre Other lengths are available to order. Can be used as a bend or an offset. Mark 1 to Standard Adaptor STU/A Left feed. STU/B Centre feed. Plug Pins (x2) Earth / Fuse Clips Manufactured from phosphor bronze. Cable 4mm 2 LSF. Conduit Manufactured from galvanized steel and comes complete with a 20mm gland. 1 metre Used for joining an existing run of Mark 1 Track Length to updated run of Standard Track Length. Mark 1 Track Length STU/C Right feed. Tees and Four Ways are supplied complete with slider. 137
clean earth Three bar and earth 63amp Power Track system with additional fully floating clean earth bar. Clean Earth Feeder Unit, Track Lengths and Clean Earth Feeder Unit Clean Earth Track Lengths CFU 1.2 metres, 4 Tap-Offs CTL12 1.8 metres, 6 Tap-Offs CTL18 2.4 metres, 8 Tap-Offs CTL24 3.0 metres, 10 Tap-Offs CTL30 3.6 metres, 12 Tap-Offs CTL36 SEC Clean Earth Feeder Unit Joining Track Lengths Arena-Walsall Clean Earth Track Length When assembled all sliders must be pushed fully home to ensure earth continuity. Clean Earth Feeder Unit 125 Clean Earth Track Length 283 2-20/25mm knock-out entries. Terminal Capacity 16mm 2 max. Supplied complete with terminal block, lid and turnbuckle fastener. Terminal Block Connection 75 Track Housing Manufactured from pre-galvanized sheet steel to BS4678 part 1. 1971. Track Conductor (x3) Manufactured from high conductivity copper. Track Insulator Manufactured from extruded PVC. Sockets / Plug / Slider Shutters Manufactured from mineral filled nylon. Feed Pins 17 63 Simply push-fit end cap on to unused ends of track lengths. 19 138
clean earth Clean Earth Tap-Offs Clean Earth Flexible Bend & Mark 1 Adaptor Clean Earth Tee Units & Four Way Clean Earth Tap-offs Clean Earth Flexible Bend Clean Earth Tee Unit 3 Metres, Unfused CTO3U 3 Metres, Fused CTO3F 5 Metres, Fused CTO5F All Tap-offs comply with Section 7 of BS7671: 2001 (Blue Book). For compliance to Section 7 of BS7671: 1992 (Yellow Book) see page 145. CFB1 Mark 1 to Clean Earth Adaptor CMA Left feed Centre feed Right feed Clean Earth Four Way CTU/A CTU/B CTU/C CFW Clean Earth Flexible Bend Clean Earth Tee Unit (Centre Feed) Clean Earth tap-offs are denoted by a silver label with a red border. These tap-offs can also be used with the Dual Circuit Power Track. Mark 1 to Clean Earth Adaptor Clean Earth Four Way 43 Cable Length - 3 or 5 metres Unfused tap-offs are rated at 32amp. Fused tap-offs are supplied with a standard BS1362 13amp fuse. Tap-off length refers to the cable and not the conduit length. The conduit is 200mm shorter than the cable length. Clean Earth Flexible Bend 1 metre Comprises a length of 25mm conduit with a plug-in feed at each end, pre-wired with 10mm 2 tri-rated cable. Cable length = 1 metre Other lengths are available to order. Can be used as a bend or an offset. Mark 1 to Clean Earth Adaptor CTU/A Left feed. CTU/B Centre feed. Plug Pins (x3) Earth / Fuse Clips Manufactured from phosphor bronze. Cable 4mm 2 LSF. Conduit Manufactured from galvanized steel and comes complete with a 20mm gland. 1 metre Used for joining an existing run of Mark 1 Track Length to updated run of Clean Earth Track Length. Mark 1 Track Length CTU/C Right feed. Tees and Four Ways are supplied complete with slider. 139
dual circuit Five bar and earth 63amp Power Track system incorporating both standard and clean earth systems within one enclosure. Dual Circuit Feeder Unit, Track Lengths and Dual Circuit Feeder Unit Dual Circuit Track Lengths DFU 1.2 metres, 4 Tap-Offs DTL12 1.8 metres, 6 Tap-Offs DTL18 2.4 metres, 8 Tap-Offs DTL24 3.0 metres, 10 Tap-Offs DTL30 3.6 metres, 12 Tap-Offs DTL36 SEC Dual Circuit Feeder Unit Joining Track Lengths Arena-Walsall Dual Circuit Track Length When assembled all sliders must be pushed fully home to ensure earth continuity. Dual Circuit Feeder Unit 125 Dual Circuit Track Length 283 2-20/25mm knock-out entries. Terminal Capacity 16mm 2 max. Supplied complete with terminal block, lid and turnbuckle fastener. Terminal Block Connection 75 Track Housing Manufactured from pre-galvanized sheet steel to BS4678 part 1. 1971. Track Conductor (x5) Manufactured from high conductivity copper. Track Insulator Manufactured from extruded PVC. Sockets / Plug / Slider Shutters Manufactured from mineral filled nylon. Feed Pins 17 63 Simply push-fit end cap on to unused ends of track lengths. 19 140
dual circuit Dual Circuit Tap-Offs Dual Circuit Flexible Bend Dual Circuit Tee Units & Four Way Dual Circuit Tap-Off Dual Circuit Flexible Bend Dual Circuit Tee Unit 3 Metres, Unfused DTO3U 3 Metres, Fused DTO3F 5 Metres, Fused DTO5F DFB1 Left feed Centre feed Right feed DTU/A DTU/B DTU/C All Tap-offs comply with Section 7 of BS7671: 2001 (Blue Book). Dual Circuit Four Way For compliance to Section 7 of BS7671: 1992 (Yellow Book) see page 145. DFW Standard and Clean Earth tap-offs may also be used with Dual Circuit Power Track, see pages - 137 and 139. Dual Circuit Flexible Bend Dual Circuit Tee Unit (Centre Feed) Dual Circuit tap-offs are denoted by a silver label with a black and red border. These tap-offs can only be used with the Dual Circuit Power Track. Dual Circuit Four Way 43 Cable Length - 3 or 5 metres Unfused tap-offs are rated at 32amp. Fused tap-offs are supplied with a standard BS1362 13amp fuse. Tap-off length refers to the cable and not the conduit length. The conduit is 200mm shorter than the cable length. Dual Circuit Flexible Bend 1 metre Comprises a length of 25mm conduit with a plug-in feed at each end, pre-wired with 10mm 2 tri-rated cable. Cable length = 1 metre Other lengths are available to order. Can be used as a bend or an offset. DTU/A Left feed. DTU/B Centre feed. Plug Pins (x5) Earth / Fuse Clips Manufactured from phosphor bronze. Cable 4mm 2 LSF. Conduit Manufactured from galvanized steel and comes complete with a 20mm gland. DTU/C Right feed. Tees and Four Ways are supplied complete with slider. 141
three phase Four bar and earth 63amp Power Track system. Three phased bars, one neutral bar and earth. Three Phase Feeder Unit, Track Lengths and Three Phase Feeder Unit Three Phase Track Lengths PFU 1.2 metres, 4 Tap-Offs PTL12 1.8 metres, 6 Tap-Offs PTL18 2.4 metres, 8 Tap-Offs PTL24 3.0 metres, 10 Tap-Offs PTL30 3.6 metres, 12 Tap-Offs PTL36 SEC Three Phase Feeder Unit Joining Track Lengths Arena-Walsall Three Phase Track Length When assembled all sliders must be pushed fully home to ensure earth continuity. Three Phase Feeder Unit 125 Three Phase Track Length 283 2-20/25mm knock-out entries. Terminal Capacity 16mm 2 max. Supplied complete with terminal block, lid and turnbuckle fastener. Terminal Block Connection 75 17 Track Housing Manufactured from pre-galvanized sheet steel to BS4678 part 1. 1971. Track Conductor (x4) Manufactured from high conductivity copper. Track Insulator Manufactured from extruded PVC. Sockets / Plug / Slider Shutters Manufactured from mineral filled nylon. Feed Pins 63 Simply push-fit end cap on to unused ends of track lengths. 19 142
three phase Three Phase Tap-Offs Three Phase Flexible Bend Three Phase Tee Units & Four Way Three Phase Tap-offs Three Phase Flexible Bend Three Phase Tee Unit 3 Metres, Unfused Reconfigurable PTO3UR PFB1 Left feed 3 Metres, Fused Reconfigurable PTO3FR Centre feed 3 Metres, Unfused (L1, L2 & L3 connected) PTO3U Right feed 5 Metres, Fused Reconfigurable PTO5FR Three Phase Four Way PTU/A PTU/B PTU/C PFW Three Phase Flexible Bend Three Phase Tee Unit (Centre Feed) 3 Phase tap-offs are denoted by a white label with a blue border. These tap-offs must only be used with the 3 Phase Power Track. Three Phase Four Way 43 Cable Length - 3 or 5 metres Unfused tap-offs are rated at 32amp. Fused tap-offs are supplied with a standard BS1362 13amp fuse. Tap-off length refers to the cable and not the conduit length. The conduit is 200mm shorter than the cable length. Three Phase Flexible Bend 1 metre Comprises a length of 25mm conduit with a plug-in feed at each end, pre-wired with 10mm 2 tri-rated cable. Cable length = 1 metre Other lengths are available to order. Can be used as a bend or an offset. PTU/A Left feed. PTU/B Centre feed. Plug Pins (x4) Earth / Fuse Clips Manufactured from phosphor bronze. Cable 4mm 2 LSF. Conduit Manufactured from galvanized steel and comes complete with a 20mm gland. PTU/C Right feed. Tees and Four Ways are supplied complete with slider. 143
clamp and hanger brackets Hold Down Clamp Vertical Hanger Bracket Horizontal Hanger Bracket Hold Down Clamp SHC Vertical Hanger Bracket SVB Horizontal Hanger Bracket SHB Arena-Walsall 111 125 80 120 C Use suitable screws to fasten hold down clamp to floor through two 6mm diameter holes. Simply clip track length into hold down clamp (no additional fastenings required). Recommended spacing between hold down clamps is 2 metres with at least one clamp per length. Supplied in two parts complete with clamping screws A. Use one M8 threaded rod B and four M8 nuts C (one above and below each bracket flange). Recommended spacing between vertical hanger brackets is 1 metre maximum. A B A C Supplied in two parts. Use two M8 threaded rods A and four M8 nuts B (one above and below each bracket flange). Recommended spacing between horizontal hanger brackets is 1 metre maximum. A B A B Threaded Rods page 93 Threaded Rods page 93 144
technical information Certification 15003 Asta Certified and tested to BS EN 439-1:1999 and BS EN 439-2:2000. Manufactured within a BSI/ASTA approved BS EN ISO 9002 1994 facility. IEE Wiring regulations Legrand fully complies with regulations of BS7671:2001 (IEE Wiring regulations - Blue Book). Section 7 Requirements Tap-Offs All items within this Product Guide comply with the relevant paragraphs of Section 7 of BS7671:2001 (IEE Wiring regulations - Blue Book). If compliance to Section 7 of BS7671:1992 (Yellow Book) is required, then this must be stated clearly at time of order, as an extra protective conductor may be required. Section 3-02-02 of the wiring regulations require any conductor exceeding 3m in length to have a fault current protective device (e.g. Fuse) at the point where current carrying capacity is reduced (tap-off plug). All tap-offs over 3m will be supplied by Legrand with a BS1362 13amp fuse fitted within the plug. If the system is to be protected by a 32amp breaker then Unfused tap-offs exceeding 3m may be specified at time of order. 4mm 2 LSF cable is used in all fused and unfused tap-offs. System Coding The four systems are colour coded using the following format: System Label Border Background Standard Black Silver Clean Earth Red Silver Dual Circuit Black and Red Silver 3 Phase Blue White The sytem is designed such that locations of all conductors are consistant throughout the standard, Clean Earth and Dual Circuit variants. This means that tap-offs from the Standard and Clean Earth systems can be used with the Dual Circuit track to tap-off the relevant circuit. At any time along a run of Dual Circuit track the installation could be down graded, if required, to either the Standard or Clean Earth systems. 145
technical information Specification / Technical Data Electrical Data Arena-Walsall Rated Current Rated Voltage Frequency Rated Short Circuit Withstand Track Conductor Resistance - Line and Neutral Track Conductor Impedance Volt Drops Line and Neutral: Track Tap-Off (32amp - 4mm 2 cable) Flexible Bend (10mm 2 tri-rated cable) Feed Unit Track Connector Earth Fault Loop Impedance: L+N Track Conductors Earth Track Conductor Tap-Off (32amp - 4mm 2 cable) Feed Unit Track Connector Flexible Bend (10mm 2 tri-rated cable) Mechanical Data 63amps 250V / 415V 50/ Hz 16kA 3mΩ/m 1.5mΩ/m 3mV/A / m 10mV/A / m 3.7mV/A / m 0.3mV/A / m 0.4mV/A / m 1.5mΩ/m 1.2mΩ/m 33mΩ (3 metre L/N/E) 0.3mΩ 0.4mΩ 3.7mΩ (1 metre length L/N/E) Number of Conductors PE + 2,3,4 & 5 Track Conductor cross section area 13mm 2 Incoming Cable termination capacity 16mm 2 Tap-Off Cable 32amp Unfused 4mm 2 Tap-Off Cable 32amp Fused 4mm 2 Tap-Off Conduit 16mm / 20mm Diameter Feeder Conduit Entry 20mm / 25mm Diameter IP Rating IP40 (When fully assembled) Maximum Profile Height mm Including Tap-Off Track Height 17mm Material Specification Track Housing Track Conductors Track Insulator Sockets, Track Connectors, Track Ends Tap-Off Plugs End Shutters and Track Shutters Tap-Off / Flexible Bend Cable Tap-Off / Feeder and Connector Pins Galvanized Steel High Conductivity Copper Self Extinguishing PVC Extrusion Nylon Nylon Glass Filled Nylon LSF/PVC Brass 146
technical information Typical Layout 3 compartment service outlet box complete with 1 standard twin socket and 1 clean earth red twin socket. Meeting Rooms 3 compartment service outlet box complete with 2 clean earth red twin sockets. 3 compartment service outlet box complete with 2 standard twin sockets. A typical layout might consist of numerous service outlet boxes with both standard and clean earth sockets, e.g. within a call centre. Two boxes with just clean earth sockets (fax, photocopier etc.) and boxes with standard sockets in the meeting rooms. With the Arena- Walsall Power Track the boxes with both standard and clean earth sockets can be fed with a dual circuit tap-off into dual circuit track. The two clean earth boxes can be fed from the dual circuit track with just a clean earth tap-off. The system can then be downgraded by connecting standard track on to the dual circuit track by means of a flexible bend or direct connection. The continuing circuit is then restricted to a standard 2 bar and earth. This will save the contractor time and money by eliminating the need for extra feed cable, feed units and end caps that would be required with separate systems. Call Centre Plant Room 1