(A) Project Manager, Infrastructure Approvals

Similar documents
886 March Road McDonald's Transportation Study

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

Village of Richmond Transportation Brief

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

Sugarland Crossing Gwinnett County, Georgia

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

Provide an overview of the development proposal including projected site traffic volumes;

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings


APPENDIX G. Traffic Data

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

Weaver Road Senior Housing Traffic Impact Analysis

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

Lakeside Terrace Development

LEMON FLATS SECOND ACCESS

STANDARD LIMITATIONS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Re: Cyrville Road Car Dealership

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Wellington Street West

LOST LAKE CORRIDOR REVIEW

Traffic Impact Analysis Farmington Center Village

10 th Street Residences Development Traffic Impact Analysis

Appendix B: Traffic Reports

Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth University of Oregon North Campus Conditional Use Permit Application Transportation Assessment

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

267 O Connor Street Residential Development

Sweetwater Landing Traffic Impact Analysis

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

CastleGlenn Consultants Inc.

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Salvini Consulting Inc. 459 Deer Ridge Drive Kitchener, ON N2P 0A November 8, 2017 Revised December 20, 2017

700 Hunt Club Road. Transportation Impact Study - Addendum #1. Submitted by:

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

1140 Wellington Street West Transportation Brief

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

One Harbor Point Residential

Date: December 20, Project #:

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Minto Mahogany Stage 2

Interstate 80 Corridor Study

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

Parking/Traffic Assessment Study

C. iv) Analysis/Results

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

TRANSPORTATION ANALYSIS. Wawa US 441 and Morningside Drive. Prepared for: Brightwork Real Estate, Inc.

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

1012 & 1024 McGarry Terrace

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

830 Main Street Halifax Regional Municipality

Final Technical Report US 17 Corridor Study Update (Market Street Road Diet)

Downtown One Way Street Conversion Technical Feasibility Report

Oakbrook Village Plaza City of Laguna Hills

Proposed Pit Development

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

Mobilia Centre Merivale Road and 530/540 West Hunt Club Road Transportation Overview and Parking Study

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Dartmouth, NS B3B 1X7 Tel: WSP. Canada Inc.

Ingraham High School Parking and Traffic Analysis

Traffic Impact Analysis Update

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

CitiGate Retail Development

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

MEMORANDUM November 19, 2012

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

City of Fairfax, Virginia City Council Work Session

MEMORANDUM BOSTON REGION METROPOLITAN PLANNING ORGANIZATION. DATE March 1, 2012

Appendix I: The Project Traffic Impact Study report by TJKM Transportation Consultants

770 SOMERSET STREET RESIDENTIAL DEVELOPMENT

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

TECHNICAL MEMORANDUM

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

Appendix H: Construction Impacts H-2 Transportation

Appendix A City of Sammamish Town Center Sub-Area Plan FEIS September 2007

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

Transcription:

February 14th, 2014 BY E-MAIL: wally.dubyk@ottawa.ca City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor, Ottawa, Ontario K1P 1J1 Attention: Wally Dubyk, C.E.T (A) Project Manager, Infrastructure Approvals Dear Sir: Reference: Transportation Impact Study Addendum #2 Dow Honda Car Dealership 15 Colonnade Road, Ottawa Our File No. : 114009 1.0 INTRODUCTION A Transportation Impact Study (TIS) was submitted to the City in January 2012, in support of Site Plan applications for the above noted property. Since the submission of this TIS (and a subsequent Addendum in May 2013 to address City comments), the westernmost portion of the site has been severed and sold to Dow Honda, who intend to develop the site as an auto dealership. Following recent discussions with staff, it has been agreed that an Addendum to the original TIS will be sufficient to fulfil the Site Plan requirements of the Dow Honda development. The purpose of this Addendum is to assess the transportation related-impacts of the proposed development, which will be achieved by checking if the traffic generated by the new car dealership is likely to be less than what had been projected for the restaurant land uses that were originally proposed. Should this prove to be the case, no further quantitative analysis of study area intersections (over and above that which was completed as part of the original TIS) is required. Also, the relevant site-specific issues (parking, access, loading, on-site circulation etc.) will be addressed. 2.0 PROPOSED DEVELOPMENT (ORIGINAL vs. CURRENT) 2.1 Original Development Proposal The parcel of land that is to be developed with the Dow Honda car dealership is broadly comparable to Phase 1A of the development proposal, as outlined in the original TIS. Phase 1A M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

of the original development consisted of the following: Building 1 (Restaurant) 4,500ft 2 Building 2 (Restaurant) 7,500ft 2 Building 3 (Restaurant) 6,500ft 2 Building 4 (Restaurant) 15,000ft 2 The total Gross Floor Area of the restaurant land uses originally proposed as part of Phase 1A is 33,500ft 2. 2.2 Current Development Proposal The development content of the proposed Dow Honda care dealership can be summarized as follows: Main Showroom with a GFA of approximately 8,300ft 2 ; Service/Parts Centre with a GFA of approximately 20,000ft 2 ; Body shop with a GFA of approximately 11,000ft 2 Paved parking lot with 108 spaces; Ancillary Car storage area with capacity for 50-60 vehicles. In addition, there are future proposals to add a used car showroom (GFA approx. 5,000ft 2 ) and increase the size of the Service Centre (additional GFA approximately 4,500ft 2 ). This TIS Addendum addresses the traffic impacts of the fully-developed site. Pedestrian connections to the main building will be provided from Colonnade Road and Merivale Road. The access configuration proposed as part of the original TIS will be retained for the new site plan. The site plan for the Dow Honda car dealership is presented in this Addendum as Appendix A. 3.0 TRIP GENERATION As noted in the original TIS, site-generated traffic for Phase 1A (restaurants) was estimated using the relevant peak hour vehicle trip rates identified in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9 th Edition. A similar approach has been taken for the proposed Dow Honda car dealership; the calculations for peak hour trip volumes for each development proposal (original vs. current) are presented in Table 1 below. The relevant trip generation graphs for the Automobile Sales land use (ITE Code 841) have been included in this Addendum as Appendix B. It should be noted that the GFA calculation for the Dow Honda car dealership reflects the future M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

scenario, in which the Service Centre is expanded and the used car showroom is in place, as per the site plan presented in Appendix A. Table 1: Trip Generation of Original/Current Development Proposals Land Use ITE Code GFA (x1000ft 2 ) Trip Rates per 1,000ft 2 GFA AM Peak Hour PM Peak Hour AM Peak Hour Trip Volumes PM Peak Hour Original Development Proposal (Phase 1A) Sit-down Restaurant (4 total) 932 33.5 (total) 1 0 9.85 0 vph 330 vph 198 in, 132 out Current Development Proposal (Dow Honda) Automobile Sales 841 39.45 1.92 2.62 76 vph 57 in, 19 out 103 vph 41 in, 62 out NET CHANGE IN TRIPS GENERATED +76 vph +57 in, +19 out -227 vph -157 in, -79 out Based on the results presented in Table 1, it is likely that the Dow Honda development will generate more trips that the original restaurant land uses during the weekday AM peak hour, and significantly less trips during the weekday PM peak hour. The peak hour of trip generation for the Dow Honda development is actually expected to occur on a Saturday, as is the case for most car dealerships. Based on the trip rate identified in the Trip Generation Manual for Saturdays, the Dow Honda dealership is expected to generate approximately 160 trips during the peak hour, with an even split between arrivals and departures. This volume is approximately 60% greater than the projected trip volume of the car dealership during the weekday PM peak hour. However, it is also 65% less than the projected trip volume for the originally proposed restaurant land uses during the Saturday peak hour. Based on the foregoing, it is concluded that the proposed Dow Honda dealership will only generate more trips that the originally-proposed restaurant land uses during the weekday AM peak hour. As such, only the weekday AM peak hour traffic scenario will be carried forward for further analysis. M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

4.0 TRIP DISTRIBUTION As noted in Section 2.2 of this Addendum, the access configuration proposed for the original site plan will be retained for the new site plan. For this reason, it is considered reasonable to assume that the distribution of site traffic generated by the Dow Honda development will be broadly similar to the projected distribution of site traffic for the original restaurant land uses. These distribution parameters were derived as part of the original TIS using the following key factors: characteristics and existing operation of the study area road network, the land use and parcel layout of the proposed development, the proposed access/egress configuration on Colonnade Road & Merivale Road, For the purposes of this analysis, it has been conservatively assumed that all trips likely to be generated by the Dow Honda development will be primary (i.e. new) trips on the road network within the study area. This is generally consistent with the nature of the proposed land use. The trip distribution parameters for the Dow Honda development have been carried forward from the original TIS, and can be summarized as follows: 40% to/from the North via Colonnade Road & Merivale Road; 30% to/from the South via Colonnade Road & Merivale Road; 20% to/from the East via Colonnade Road & Colonnade Road North; 10% to/from the West via Colonnade Road & Colonnade Road South; With respect to trip distribution across the proposed access configuration, it has been assumed that all inbound and outbound trips will use the proposed signalized access on Colonnade Road, with the exception of outbound trips to the north, which will use the right-out egress on Merivale Road. The projected weekday AM peak hour site traffic for the Dow Honda development is shown in Figure 1. 5.0 INTERSECTION ANALYSIS Intersection capacity analysis has been completed using the Synchro 8.0 and SimTraffic 8 software packages, and is based on existing lane configurations and traffic signal timing plans obtained from the Public Works & Services Department. Operating conditions at signalized intersections have been evaluated in terms of the volume to capacity (v/c) ratio and the corresponding Level of Service (LOS) based on City of Ottawa criteria. Operating conditions at unsignalized intersections have been evaluated in terms of delay and LOS based on Highway M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

23 VIEWMOUNT DRIVE 23 6 UNSIGNALIZED RO EGRESS SIGNALIZED ACCESS FUTURE ACCESS FUTURE ACCESS CANADA POST M:\2002\102015\2011&2012\CAD\Phase-01-02\Design\Figures\Traffic\May 2013\Traffic Flow Diagrams Revised May2013.dwg, Fig 1 Site Traffic, Feb 14, 2014-8:56am, goneill WOODFIELD DRIVE 23 MERIVALE ROAD 6 6 8 6 17 ROYDON PLACE COLONNADE ROAD 21 (70) 12 (53) xx VPH COLONNADE ROAD SOUTH LEGEND Unsignalized Intersection Signalized Intersection AM Peak Hour DOW HONDA 15 COLONNADE ROAD PROJECTED SITE TRAFFIC FEB 2014 114009 FIGURE 1 11

Capacity Manual 2000 (HCM) criteria. 4.1 2014 Total Traffic Intersection capacity analysis has been completed for the 2014 total traffic conditions. The total traffic conditions have been determined by adding the projected site traffic volumes (as shown in Figure 1) to the 2014 background traffic volumes that were presented in the original TIS. The 2014 total traffic volumes are presented in this Addendum as Figure 2. For the purposes of the analysis of the 2014 buildout year, it has been assumed that the mitigation measures identified in Section 4.1.3 of the original TIS will be implemented, namely: Addition of a second westbound left-turn lane at Merivale Road / Colonnade Road; Increase in length of the southbound left-turn lane at Merivale Road / Colonnade Road from 50m to 155m; The detailed design of the road modifications that incorporate the aforementioned mitigation measures is currently underway. The results of the analysis are summarized in Table 2 for critical movements during the weekday AM hours, and have been directly compared to the projected operating conditions presented in the original TIS (in the same scenario). Detailed reports are included in Appendix C. Table 2: Intersection Analysis 2014 AM Peak Hour, Total Traffic (Original vs. Current) Intersection or Access Original (Restaurant) max. v/c or delay LOS Lane group Current (Dow Honda) max. v/c or delay LOS Lane Group Colonnade N / Colonnade S 0.60 A NBL 0.62 B NBL 0.80 C NBR 0.81 D NBR Merivale / Colonnade 0.70 B SBL 0.74 C WBL Merivale / Viewmount 0.64 B NBT 0.66 B NBT Merivale / Woodfield / Roydon 0.83 D EBL 0.83 D EBL Colonnade / Signalized Access #1 0.36 A EBT 0.37 A EBT Merivale / Unsignalized RO Egress #4 10 sec B WBR 10 sec B WBR M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

17 1057 18 19 38 122 VIEWMOUNT DRIVE 1245 8 UNSIGNALIZED RO EGRESS SIGNALIZED ACCESS FUTURE ACCESS FUTURE ACCESS CANADA POST M:\2002\102015\2011&2012\CAD\Phase-01-02\Design\Figures\Traffic\May 2013\Traffic Flow Diagrams Revised May2013.dwg, Fig 2 2014 Total Traffic, Feb 14, 2014-8:56am, goneill WOODFIELD DRIVE 856 412 MERIVALE ROAD 35 825 97 142 181 15 0 12 8 6 17 232 ROYDON PLACE COLONNADE ROAD 214 210 xx VPH 1 0 2 COLONNADE ROAD SOUTH LEGEND Unsignalized Intersection Signalized Intersection AM Peak Hour DOW HONDA 15 COLONNADE ROAD 2014 TOTAL TRAFFIC 41 113 17 FEB 2014 114009 FIGURE 2

Based on the results presented in Table 2, it is apparent that the change in proposed land use for the subject lands is not expected to have any significant adverse impact on the operation of the study area intersections and accesses. Therefore, it is anticipated that the access configuration presented in the original TIS will be sufficient to accommodate the projected peak hour trip volumes attributable to the Dow Honda development. 6.0 ON-SITE DESIGN This section of the report provides a review of the on-site design in terms of the vehicular access configuration, on-site parking and loading activities. 6.1 Proposed Access Access to the subject site will be provided by a signalized full-movement access on Colonnade Road and a right-out egress on Merivale Road. The need to provide these new connections to the subject lands was confirmed as part of the original TIS, and the location and functional geometry of these intersections has been discussed at great length (and subsequently agreed upon) with City staff. The full-movement access will be located on the north side of Colonnade Road, between the signalized intersections of Merivale Road/Colonnade Road and Colonnade Road N/Colonnade Road S. The approximate centreline spacing between the proposed signalized access and Merivale Road is 215m, measuring from centreline to centreline. This spacing will allow for proper co-ordination between the signal timings during peak hours, which will help to minimize the adverse effects of queue starvation and spillback. The right-out egress will be located on the east side of Merivale Road, approximately 100 metres north of Colonnade Road, measuring from centreline to centreline. This meets the minimum spacing requirement identified in Section 25(l)(ii) of the Private Approach By-law. This egress has been designed such that it can be used effectively by small trucks and cars, but is unsuitable for larger trucks and tractor-trailers. This has been achieved by limiting the clear throat width and maximizing the curvature of the egress, which helps to discourage the left-out movement (there is no median on the adjacent section of Merivale Road). Larger trucks and tractor-trailers will use the new signalized access on Colonnade Road exclusively - more information about on-site loading activities is provided in Section 6.3 of this Addendum. 6.2 On-site Parking 6.2.1. Vehicle Parking The site is located in Area C of Schedule 1 of the ZBL, and not within 600 meters of a rapid transit station. Based on the foregoing, minimum parking space rates for the Dow Honda M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

development are identified in Table 3 below: Table 3: Minimum Parking Spaces Required Land Use GFA (m 2 ) or # Bays Minimum Parking Provision Parking Spaces Required (no sharing) Dow Honda Sales/Showroom Dow Honda Service Bays 1,250 2 per 100m 2 25 10 2 per bay 20 Other Areas 1,400 1 per 100m 2 14 TOTAL PARKING SPACES REQUIRED 59 Based on the above table, the ZBL identifies a minimum requirement to provide a total of 59 onsite parking spaces to serve the Dow Honda car dealership. A total of 108 on-site surface parking spaces are shown on the Site Plan, which is almost twice the minimum requirement of the ZBL. However, it should be noted that some of the on-site parking spaces will be used for inventory storage purposes, which means that the number of available parking spaces will be somewhat less than the 108 shown on the Site Plan. All vehicle parking spaces will comply with the dimensions identified in Section 106 of the ZBL. 6.3.2. Bicycle Parking The minimum number of bicycle parking spaces required for the proposed on-site development is identified in Table 4 below. Table 13: Bicycle Parking Requirements Land Use GFA (m 2 ) Minimum Parking Provision Parking Spaces Required (no sharing) Dow Honda (All buildings) 4,665 1 per 1,500m 2 3 Based on the calculations presented in Table 13, Section 111 of the ZBL identifies a minimum M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

requirement to provide 3 on-site bicycle parking spaces. The specific location of bicycle parking facilities for each phase of the development will be considered at the detailed design stage. In general, the bicycle parking spaces will be located in safe, illuminated and accessible locations, as close as is practicable to the main entrances to the building. 6.3 Loading Activities Loading activities associated with the proposed development will consist almost exclusively of car deliveries on long wheelbase transporter trucks (comparable to a WB-20 design vehicle). These deliveries will take place adjacent to the body shop, at the northeastern corner of the site. The transporter trucks will enter and exit the site using the new signalized access on Colonnade Road, completing a full loop around the body shop after unloading the cars. The truck apron around the back of the body shop is clearly shown the site plan, and the AutoTurn analysis demonstrates that the trucks can complete this movement safely, without having to back up. As noted in Section 6.3.1, some of the on-site parking spaces will be used for the storage of inventory. Based on discussions with the proponent, it is estimated that approximately 70% of the 108 on-site parking spaces will be used for storage of inventory. In addition to the paved parking spaces, a gravel area directly north of the main parking lot will provide additional storage area for cars at times when inventory levels are high. This area will also provide adequate space to move cars around as required, due to purchasing and sales activities. The gravel area will be delineated from the main driveway aisle by a mountable curb. 7.0 SUMMARY AND CONCLUSIONS Based on the results of the foregoing analysis, the main conclusions and recommendations of this report are as follows: Compared to the restaurant land uses that were originally proposed for the subject site, the Dow Honda car dealership is expected to generate more trips in the weekday AM peak hour (as the restaurants would be closed at this time) and significantly less trips during the weekday PM peak hour. The peak hour of generation for the Dow Honda car dealership is likely to occur Saturday, which is consistent with the land use and site's location along a major commercial/retail corridor. However, even on Saturdays, the Dow Honda car dealership is only expected to generate approximately 35% of the trip volume that the originallyproposed restaurants would have. M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

Since the weekday AM peak hour is the only time that the Dow Honda dealership is expected to generate more traffic volume than the restaurant land uses, this was the only scenario carried forward for quantitative analysis. For the purposes of the aforementioned analysis, all trips generated by the Dow Honda dealership are assumed to be primary (i.e. new) auto trips, and the distribution of these primary trips is assumed to be identical to that which had been assumed for the restaurant land uses in the original TIS. These assumptions are consistent with the nature of the proposed development, and its relative location to areas of retail, residence and employment. Under total traffic conditions during the 2014 weekday AM peak hour (as tested in the original TIS), there is no significant adverse impact associated with replacing the restaurant land uses with the Dow Honda dealership. No mitigation measures (other than those already specified in the original TIS) have been identified in this Addendum, as none are required. Although it has not been confirmed through intersection analysis, the ITE-derived trip generation volumes presented in this Addendum strongly suggest that with the Dow Honda dealership in place of the restaurant land uses, the overall traffic impact of the subject lands will be markedly less during the busier weekday PM peak hour. The key aspects of the proposed access configuration (location, type of control, movements allowed etc.) are unchanged from the original TIS. The design of the rightout egress on Merivale Road is intended for small trucks and cars only, and not for larger trucks and tractor-trailers. The City of Ottawa's Zoning By-law identifies a requirement to provide a minimum of 59 on-site parking spaces for the various land uses that make up the Dow Honda dealership. The site plan presented with this Addendum shows a total of 108 on-site parking spaces, satisfying this requirement. Loading activities using large car transporters can be accommodated entirely on-site, without the need for reversing manoeuvres. Car transporters (and any other large delivery trucks) will use the new signalized access on Colonnade Road exclusively. In addition to the paved parking spaces, a gravel area immediately north of the paved parking lot will provide additional space for storage of inventory (i.e. cars). This area will also facilitate the movement of cars around the site, as required by ongoing retail and service activity. We trust that this Addendum adequately address the transportation-related impacts of the latest Site Plan, when read in conjunction with the original TIS. If you have any further comments or questions, please feel free to call. M:\2014\114009\DATA\REPORTS\TRAFFIC\20140129 -TIS_ADDENDUM 1.DOC

APPENDIX A Site Plan - Dow Honda Car Dealership

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X MERIVALE ROAD PART A 14055.44 m2 3.47 ACRES 7500 7000 X X X X X X X X X X X X X X X X X X X X X X X X PART B 4019.8 m2 0.99 ACRES PART C 3504.3 m2 0.86 ACRES 7500 brian k. clark A R C H I T E C T 141 Catherine Street, Unit 102 Ottawa, Ontario K2P 1C3 TEL (613) 238-7412 FAX 238-1799 Email bkclarkarchitect@on.aibn.com TP TP 2 COLONNADE ROAD TP 2 2 2 TP TP DC 1 SITE PLAN A001 SCALE 1:300 A001

APPENDIX B Trip Graphs for Land Use 841 - ITE Trip Generation Manual (9th Ed.)

APPENDIX C Intersection Analysis Report - Synchro 8

HCM Signalized Intersection Capacity Analysis 1: Colonnade ROad South/Main Access & Colonnade Road/Colonnade Road North 14/02/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 44 334 367 17 113 41 123 2 11 2 0 1 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Lane Width 3.7 3.7 3.5 4.5 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 Total Lost time (s) 5.8 5.8 5.8 5.8 5.8 5.2 5.2 5.2 5.2 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.96 1.00 0.87 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1695 1750 1455 1826 1700 1695 1525 1695 1517 Flt Permitted 0.65 1.00 1.00 0.54 1.00 0.76 1.00 0.75 1.00 Satd. Flow (perm) 1161 1750 1455 1035 1700 1351 1525 1335 1517 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 48 363 399 18 123 45 134 2 12 2 0 1 RTOR Reduction (vph) 0 0 110 0 10 0 0 10 0 0 1 0 Lane Group Flow (vph) 48 363 289 18 158 0 134 4 0 2 0 0 Confl. Bikes (#/hr) 1 Heavy Vehicles (%) 2% 4% 4% 3% 3% 2% 2% 2% 2% 2% 2% 2% Turn Type Perm NA Perm Perm NA Perm NA Perm NA Protected Phases 2 6 8 4 Permitted Phases 2 2 6 8 4 Actuated Green, G (s) 68.3 68.3 68.3 68.3 68.3 15.0 15.0 15.0 15.0 Effective Green, g (s) 68.3 68.3 68.3 68.3 68.3 15.0 15.0 15.0 15.0 Actuated g/c Ratio 0.72 0.72 0.72 0.72 0.72 0.16 0.16 0.16 0.16 Clearance Time (s) 5.8 5.8 5.8 5.8 5.8 5.2 5.2 5.2 5.2 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 840 1267 1053 749 1231 214 242 212 241 v/s Ratio Prot c0.21 0.09 0.00 0.00 v/s Ratio Perm 0.04 0.20 0.02 c0.10 0.00 v/c Ratio 0.06 0.29 0.27 0.02 0.13 0.63 0.02 0.01 0.00 Uniform Delay, d1 3.7 4.5 4.5 3.6 4.0 37.0 33.4 33.4 33.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.6 0.6 0.1 0.2 5.6 0.0 0.0 0.0 Delay (s) 3.9 5.1 5.1 3.7 4.2 42.6 33.5 33.4 33.3 Level of Service A A A A A D C C C Approach Delay (s) 5.0 4.1 41.8 33.4 Approach LOS A A D C Intersection Summary HCM 2000 Control Delay 9.7 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.35 Actuated Cycle Length (s) 94.3 Sum of lost time (s) 11.0 Intersection Capacity Utilization 61.6% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 1

HCM Signalized Intersection Capacity Analysis 2: Merivale Road & Colonnade Road 14/02/2014 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph) 181 142 1209 715 412 856 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 Total Lost time (s) 6.3 6.3 6.9 6.9 6.9 6.9 Lane Util. Factor 0.97 1.00 0.95 1.00 *1.00 0.95 Frpb, ped/bikes 1.00 0.94 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 0.85 1.00 1.00 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot) 3288 1427 3325 1467 1679 3357 Flt Permitted 0.95 1.00 1.00 1.00 0.13 1.00 Satd. Flow (perm) 3288 1427 3325 1467 231 3357 Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 181 142 1209 715 412 856 RTOR Reduction (vph) 0 128 0 187 0 0 Lane Group Flow (vph) 181 14 1209 528 412 856 Confl. Peds. (#/hr) 1 2 2 2 Confl. Bikes (#/hr) 20 Heavy Vehicles (%) 2% 2% 4% 4% 3% 3% Turn Type NA Perm NA Perm pm+pt NA Protected Phases 8 2 1 6 Permitted Phases 8 2 6 Actuated Green, G (s) 12.2 12.2 56.6 56.6 94.6 94.6 Effective Green, g (s) 12.2 12.2 56.6 56.6 94.6 94.6 Actuated g/c Ratio 0.10 0.10 0.47 0.47 0.79 0.79 Clearance Time (s) 6.3 6.3 6.9 6.9 6.9 6.9 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 334 145 1568 691 557 2646 v/s Ratio Prot c0.06 0.36 c0.19 0.25 v/s Ratio Perm 0.01 0.36 c0.39 v/c Ratio 0.54 0.10 0.77 0.76 0.74 0.32 Uniform Delay, d1 51.2 48.9 26.3 26.2 23.7 3.6 Progression Factor 0.99 2.20 0.70 0.43 0.84 0.60 Incremental Delay, d2 1.8 0.3 3.3 6.9 4.6 0.3 Delay (s) 52.4 108.0 21.8 18.2 24.6 2.4 Level of Service D F C B C A Approach Delay (s) 76.8 20.5 9.6 Approach LOS E C A Intersection Summary HCM 2000 Control Delay 21.7 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.75 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 20.1 Intersection Capacity Utilization 85.0% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 2

HCM Signalized Intersection Capacity Analysis 3: Merivale Road & Viewmount Drive 14/02/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 52 61 89 122 38 19 18 1222 125 18 1057 17 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Total Lost time (s) 6.6 6.6 6.6 6.6 5.8 5.8 5.8 5.8 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 Frpb, ped/bikes 1.00 0.98 1.00 0.99 1.00 1.00 1.00 1.00 Flpb, ped/bikes 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.91 1.00 0.95 1.00 0.99 1.00 1.00 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1669 1597 1677 1662 1694 3227 1723 3345 Flt Permitted 0.72 1.00 0.36 1.00 0.18 1.00 0.16 1.00 Satd. Flow (perm) 1265 1597 634 1662 322 3227 290 3345 Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 52 61 89 122 38 19 18 1222 125 18 1057 17 RTOR Reduction (vph) 0 48 0 0 14 0 0 5 0 0 1 0 Lane Group Flow (vph) 52 102 0 122 43 0 18 1342 0 18 1073 0 Confl. Peds. (#/hr) 11 3 3 11 21 12 12 21 Confl. Bikes (#/hr) 7 2 6 2 Heavy Vehicles (%) 2% 2% 2% 3% 3% 3% 2% 2% 2% 0% 3% 3% Bus Blockages (#/hr) 0 0 0 0 0 0 0 15 0 0 0 100 Turn Type Perm NA pm+pt NA pm+pt NA Perm NA Protected Phases 4 3 8 5 2 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 14.4 14.4 31.3 31.3 76.3 76.3 68.1 68.1 Effective Green, g (s) 14.4 14.4 31.3 31.3 76.3 76.3 68.1 68.1 Actuated g/c Ratio 0.12 0.12 0.26 0.26 0.64 0.64 0.57 0.57 Clearance Time (s) 6.6 6.6 6.6 6.6 5.8 5.8 5.8 5.8 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 151 191 254 433 232 2051 164 1898 v/s Ratio Prot 0.06 c0.04 0.03 0.00 c0.42 0.32 v/s Ratio Perm 0.04 c0.08 0.05 0.06 v/c Ratio 0.34 0.53 0.48 0.10 0.08 0.65 0.11 0.57 Uniform Delay, d1 48.5 49.6 35.8 33.7 10.5 13.6 12.0 16.5 Progression Factor 1.00 1.00 1.00 1.00 1.09 0.67 1.00 1.00 Incremental Delay, d2 1.4 2.8 1.4 0.1 0.1 1.2 1.3 1.2 Delay (s) 49.8 52.5 37.2 33.8 11.5 10.4 13.3 17.8 Level of Service D D D C B B B B Approach Delay (s) 51.8 36.1 10.4 17.7 Approach LOS D D B B Intersection Summary HCM 2000 Control Delay 17.8 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.67 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 24.8 Intersection Capacity Utilization 76.1% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 3

HCM Signalized Intersection Capacity Analysis 4: Merivale Road & Woodfield Drive/Roydon Place 14/02/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 200 1 90 12 0 15 31 1169 19 97 825 35 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Lane Width 3.5 3.5 3.5 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 Total Lost time (s) 6.9 6.9 6.9 6.9 6.2 6.2 6.2 6.2 6.2 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frpb, ped/bikes 1.00 0.98 1.00 0.97 1.00 1.00 0.99 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1658 1449 1629 1431 1727 3390 1434 1729 3390 1547 Flt Permitted 0.75 1.00 0.69 1.00 0.29 1.00 1.00 0.13 1.00 1.00 Satd. Flow (perm) 1307 1449 1188 1431 524 3390 1434 244 3390 1547 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 217 1 98 13 0 16 34 1271 21 105 897 38 RTOR Reduction (vph) 0 78 0 0 0 13 0 0 9 0 0 38 Lane Group Flow (vph) 217 21 0 0 13 3 34 1271 12 105 897 0 Confl. Peds. (#/hr) 10 10 7 7 Confl. Bikes (#/hr) 1 15 4 Heavy Vehicles (%) 2% 2% 2% 5% 5% 5% 0% 2% 0% 0% 2% 0% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 15 0 0 0 Turn Type Perm NA Perm NA Perm pm+pt NA Perm pm+pt NA NA Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 8 2 2 6 Actuated Green, G (s) 24.2 24.2 24.2 24.2 72.3 68.8 68.8 80.7 73.0 0.0 Effective Green, g (s) 24.2 24.2 24.2 24.2 72.3 68.8 68.8 80.7 73.0 0.0 Actuated g/c Ratio 0.20 0.20 0.20 0.20 0.60 0.57 0.57 0.67 0.61 0.00 Clearance Time (s) 6.9 6.9 6.9 6.9 6.2 6.2 6.2 6.2 6.2 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 263 292 239 288 350 1943 822 259 2062 0 v/s Ratio Prot 0.01 0.00 c0.37 c0.03 c0.26 v/s Ratio Perm c0.17 0.01 0.00 0.06 0.01 0.25 v/c Ratio 0.83 0.07 0.05 0.01 0.10 0.65 0.01 0.41 0.44 0.00 Uniform Delay, d1 45.9 38.8 38.7 38.3 9.8 17.5 11.0 11.4 12.5 60.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.40 1.26 1.00 Incremental Delay, d2 18.6 0.1 0.1 0.0 0.1 1.7 0.0 1.0 0.6 0.0 Delay (s) 64.5 38.9 38.8 38.3 10.0 19.2 11.0 16.9 16.4 60.0 Level of Service E D D D A B B B B E Approach Delay (s) 56.5 38.5 18.8 18.1 Approach LOS E D B B Intersection Summary HCM 2000 Control Delay 23.1 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.68 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 19.3 Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 4

HCM Signalized Intersection Capacity Analysis 31: Colonnade Road & Signalized Access 14/02/2014 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Volume (vph) 67 1060 232 26 10 20 Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 Lane Width 3.2 3.7 3.5 3.2 3.7 3.7 Total Lost time (s) 5.8 5.8 5.8 5.8 5.2 5.2 Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot) 1602 3390 3316 1433 1695 1517 Flt Permitted 0.60 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm) 1004 3390 3316 1433 1695 1517 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 73 1152 252 28 11 22 RTOR Reduction (vph) 0 0 0 7 0 21 Lane Group Flow (vph) 73 1152 252 21 11 1 Turn Type pm+pt NA NA Perm NA Perm Protected Phases 5 2 6 4 Permitted Phases 2 6 4 Actuated Green, G (s) 104.8 104.8 90.0 90.0 4.2 4.2 Effective Green, g (s) 104.8 104.8 90.0 90.0 4.2 4.2 Actuated g/c Ratio 0.87 0.87 0.75 0.75 0.04 0.04 Clearance Time (s) 5.8 5.8 5.8 5.8 5.2 5.2 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 921 2960 2487 1074 59 53 v/s Ratio Prot 0.01 c0.34 0.08 c0.01 v/s Ratio Perm 0.06 0.01 0.00 v/c Ratio 0.08 0.39 0.10 0.02 0.19 0.01 Uniform Delay, d1 1.0 1.5 4.1 3.8 56.2 55.9 Progression Factor 0.32 0.26 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.0 0.3 0.1 0.0 1.5 0.1 Delay (s) 0.4 0.6 4.1 3.8 57.8 56.0 Level of Service A A A A E E Approach Delay (s) 0.6 4.1 56.6 Approach LOS A A E Intersection Summary HCM 2000 Control Delay 2.5 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.40 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.8 Intersection Capacity Utilization 43.4% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 5

HCM Unsignalized Intersection Capacity Analysis 33: 8 Colonnade /Unsignalized Access #1 & Colonnade Road 14/02/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 102 893 75 10 214 29 5 0 5 72 0 39 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 111 971 82 11 233 32 5 0 5 78 0 42 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (m) 90 241 px, platoon unblocked 0.93 0.93 0.93 0.93 0.93 0.93 vc, conflicting volume 264 1052 1414 1519 526 983 1544 132 vc1, stage 1 conf vol 1233 1233 270 270 vc2, stage 2 conf vol 180 286 712 1274 vcu, unblocked vol 264 914 1301 1414 351 840 1441 132 tc, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tc, 2 stage (s) 6.5 5.5 6.5 5.5 tf (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 91 98 97 100 99 79 100 95 cm capacity (veh/h) 1297 692 184 229 603 375 212 893 Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1 Volume Total 596 567 127 148 11 121 Volume Left 111 0 11 0 5 78 Volume Right 0 82 0 32 5 42 csh 1297 1700 692 1700 282 471 Volume to Capacity 0.09 0.33 0.02 0.09 0.04 0.26 Queue Length 95th (m) 2.1 0.0 0.4 0.0 0.9 7.7 Control Delay (s) 2.3 0.0 1.0 0.0 18.3 15.3 Lane LOS A A C C Approach Delay (s) 1.2 0.5 18.3 15.3 Approach LOS C C Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 58.6% ICU Level of Service B Analysis Period (min) 15 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 6

HCM Unsignalized Intersection Capacity Analysis 35: 14 Colonnade/Unsignalized Access #2 & Colonnade Road 14/02/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 101 794 75 10 210 30 5 0 5 73 0 38 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 110 863 82 11 228 33 5 0 5 79 0 41 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type TWLTL None Median storage veh) 2 Upstream signal (m) 189 142 px, platoon unblocked 0.96 0.96 0.96 0.96 0.96 0.96 vc, conflicting volume 261 945 1301 1406 472 923 1430 130 vc1, stage 1 conf vol 1123 1123 266 266 vc2, stage 2 conf vol 177 283 657 1164 vcu, unblocked vol 261 854 1226 1336 361 831 1361 130 tc, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tc, 2 stage (s) 6.5 5.5 6.5 5.5 tf (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 92 99 97 100 99 79 100 95 cm capacity (veh/h) 1301 748 208 252 609 384 235 895 Direction, Lane # EB 1 EB 2 WB 1 WB 2 WB 3 NB 1 SB 1 Volume Total 541 513 11 152 109 11 121 Volume Left 110 0 11 0 0 5 79 Volume Right 0 82 0 0 33 5 41 csh 1301 1700 748 1700 1700 310 477 Volume to Capacity 0.08 0.30 0.01 0.09 0.06 0.04 0.25 Queue Length 95th (m) 2.1 0.0 0.3 0.0 0.0 0.8 7.5 Control Delay (s) 2.4 0.0 9.9 0.0 0.0 17.0 15.1 Lane LOS A A C C Approach Delay (s) 1.2 0.4 17.0 15.1 Approach LOS C C Intersection Summary Average Delay 2.3 Intersection Capacity Utilization 55.4% ICU Level of Service B Analysis Period (min) 15 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 7

HCM Unsignalized Intersection Capacity Analysis 37: Merivale Road & RO Egress (Merivale) 14/02/2014 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Volume (veh/h) 0 22 1351 0 0 1245 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 24 1468 0 0 1353 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 100 344 px, platoon unblocked 0.73 0.70 0.70 vc, conflicting volume 1920 734 1468 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 1012 0 802 tc, single (s) 6.8 6.9 4.1 tc, 2 stage (s) tf (s) 3.5 3.3 2.2 p0 queue free % 100 97 100 cm capacity (veh/h) 171 756 569 Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3 Volume Total 24 734 734 451 451 451 Volume Left 0 0 0 0 0 0 Volume Right 24 0 0 0 0 0 csh 756 1700 1700 1700 1700 1700 Volume to Capacity 0.03 0.43 0.43 0.27 0.27 0.27 Queue Length 95th (m) 0.7 0.0 0.0 0.0 0.0 0.0 Control Delay (s) 9.9 0.0 0.0 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 9.9 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 49.4% ICU Level of Service A Analysis Period (min) 15 2014 AM Total 31/01/2014 Dow Honda TIS Addendum, 15 Colonnade Road Synchro 8 Report Graham O'Neill, NECL Page 8