July 24, Project IR

Similar documents
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

Schedule TOU-EV-9 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, LARGE DEMAND METERED

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

Methodology of Cost Allocation

Rate Schedules. Effective 1/1/2019

Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4 ERRATA Replacing Appendix D, Pages D-1 & D-3

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Schedule DP-1 SMALL GENERAL SERVICE (EXPERIMENTAL)

Small General Service Time-of-Use Rate Schedule GS-TOU3

Douglas Electric Cooperative Roseburg, Oregon

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 1st Revised Sheet No. 149 Canceling P.S.C. MO. No. 1 Original Sheet No.

June 13, Dear Mr. Klauss,

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No.

RATE APPLICATION MANUAL. Kansas City Board of Public Utilities

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No.

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

STANDBY SERVICE. Transmission Service Primary Service Secondary Service

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Zero Emission Bus Impact on Infrastructure

MISSOURI SERVICE AREA

Agricultural Service Rate Schedule AG

CHOPTANK ELECTRIC COOPERATIVE, INC. DENTON MARYLAND TERMS AND CONDITIONS

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

Electrical District No. 3 SOLAR Q & A

Street Address. City-Village-Township

Large General Service Time-of-Use Storage Program

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule)

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

This rate schedule applies anywhere the City of Palo Alto provides Electric Service. Demand Charge (kw) $3.49 $20.35 $23.84

FLORENCE ELECTRICITY DEPARTMENT. GENERAL POWER RATE--SCHEDULE GSC (October 2015) Availability

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018)

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

STANDBY SERVICE. RULES AND REGULATIONS: Terms and conditions of this schedule and the General Rules and Regulations govern use of this schedule.

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

January 1, 2018 RATE SCHEDULE. 395 Southgate Drive, Guelph, ON N1G 4Y1. Billing: Admin: Fax:

Advanced Rate Design. Smart Electric Power Alliance Grid Evolution Summit. David Littell Principal The Regulatory Assistance Project (RAP)

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Street Address. City-Village-Township

Matthew K. Segers Office 202, An Exelon Company Assistant General Counsel

Group 3: Pricing from 1 April 2018 and load management

New York s Mandatory Hourly Pricing Program

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

D Original Sheet No. 11!81 Revised

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

FLORENCE ELECTRICITY DEPARTMENT. MANUFACTURING SERVICE RATE--SCHEDULE TDMSA (October 2015) Availability

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

ENERGY & UTILITIES. Electricity Metering & Sub-Metering Concepts and Applications. BuildingsOne April 30, 2018

Schedule D DOMESTIC SERVICE

Effect of DG Installation on Customer Load Shapes

SOLAR FEASIBILITY STUDY

Emerald People s Utility District RATE SCHEDULES. Rate Schedules Effective April 1, 2018

Large Power Service Time-of-Use (LPS-TOU)

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 7 Third D Original Sheet No. 19 t8l Revised

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

Explanation of VEPGA Rates & Schedules (What you need to know)

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

EXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE

Solar Power. Demonstration Site. Annual Performance Report 2017

SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC

ELECTRICITY RATES. Rates Effective October 1, 2009

Consolidated Edison Company of New York, Inc.

RESOLUTION NO

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

FOR COMMERCIAL, INDUSTRIAL AND LIGHTING CUSTOMERS

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

is attached to and becomes a part of a agreement dated, 20

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

LADWP Energy Storage Update. Board of Water and Power Commissioners August 15, 2017

Electricity Rates. For Commercial and Industrial Customers

COVER PAGE FOR THE NEW JERSEY ELECTRIC TARIFF CURRENT UPDATE This Internet update on or about: November 30, 2015

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM

SERVICE CLASSIFICATION NO. 7 LARGE GENERAL TIME-OF-DAY SERVICE

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) SETTLEMENT TESTIMONY MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS ENTERGY SERVICES, INC.

is attached to and becomes a part of a agreement dated, 20,

Power Supply Cost Recovery

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

JEA Distributed Generation Policy Effective April 1, 2018

Transcription:

July 24, 2017 Project IR13164420 Maria Pope Manager, Facilities Operation and Maintenance John Wayne Airport, Orange County 3160 Airway Avenue Costa Mesa, California 92626 Re: Central Utility Plant Operating Cost Analysis Dear Ms. Pope: Amec Foster Wheeler Environment & Infrastructure, Inc. (Amec Foster Wheeler) performed an analysis to compare estimated costs associated with two scenarios for supplying electricity and air conditioning to Landside facilities (terminals and parking structures) at John Wayne Airport (JWA). This analysis was authorized by JWA under Task Order 4J-01 dated September 23, 2016. The following sections of this letter summarize the objective, background, basis, and results of the analysis. OBJECTIVE Currently, most of the electricity and air conditioning used in JWA Landside facilities and operations are supplied by the JWA Central Utility Plant (). If the were not in operation (e.g., permanently shut down), all electricity would have to be purchased from a public utility (Southern California Edison [SCE]), and JWA would need to maintain and operate an air conditioning plant powered by purchased electricity. The objective of this analysis was to compare the costs associated with continued operation of the with costs associated with providing electricity and air conditioning to Landside facilities by obtaining electricity from SCE. The analysis entailed a review of current (2016) electricity generation and air conditioning costs, and a comparison of those costs with the estimated costs that would be incurred for electricity and air conditioning if the were not in operation. BACKGROUND JWA began operation of the in 2011. The produces chilled water (used for air conditioning of the terminals) and generates electricity for the terminal buildings and parking structures. Without the, all electricity would have to be obtained from SCE, and JWA would have to maintain and operate the electric chillers in the to produce air conditioning for the terminals. The has been in operation for over six years. During this time, operations and cost data have been collected and operations have been optimized to produce more reliable and efficient electricity and air conditioning. In accordance with the current Interconnect Agreement between JWA and SCE (required by Public Utilities Commission Rules), JWA must import a minimum amount of electricity (at least 200 kilowatts) at all times. The Interconnect Agreement Amec Foster Wheeler Environment & Infrastructure, Inc. 121 Innovation Drive, Suite 200 Irvine, CA USA 92617-3094 Tel (949) 642-0245 Fax (949) 642-4474 www.amecfw.com Page 1 of 15

Maria Pope John Wayne Airport July 24, 2017 Page 2 establishes the electricity import rate structure, which is classified as a Time-Of-Use (TOU) Schedule 8-B-S (Standby, Option B). During the winter months (October through May) the (along with the mandatory 200 kw import) can supply all electrical needs of the airport. However, during the summer months, the airport s electricity and air condition demands are greater and the cannot supply all of the electricity needed. Therefore, during the summer months some additional electricity (above the mandatory 200 kw) is purchased from SCE. The relies mainly on the use of lithium bromide absorption chillers to supply chilled water for airport air conditioning needs. The absorption chillers produce chilled water by recovery of waste heat from the generation of electricity. Thereby, air conditioning is produced using recovered heat, rather than by use of electricity. However, if the electric generators were shut down, terminal air conditioning would have to be supplied fully by the electrical chillers (which rely completely on electricity). If the were shut down, all of JWA s electricity would be supplied by SCE. Because there would no longer be an Interconnect Agreement with SCE (Interconnect Agreement is only allowed with self-generating electric facilities), JWA would import all electricity under a TOU-8 Critical Peak Pricing (CPP) commercial rate schedule, rather than a TOU-8-B-S rate schedule. COST ANALYSIS BASIS An analysis was performed to compare the costs of continuing to operate the with the costs of shutting down the electricity generation portion of the, continuing to operate the electric chillers and cooling tower, and obtaining all required electricity from SCE. Key factors that would result in cost differences between the two scenarios are listed below in Table 1. TABLE 1 Key Factors Accounting for Cost Differences Factor SCE Electricity Import Rate TOU-8-S (Option B) TOU-8-CPP Schedule Electricity Import Amount Air Conditioning Production Import 200 kilowatts at all times (minimum), sometimes higher in summer months Lithium Bromide Adsorption Chillers using heat recovery (mainly), electric chillers as needed Fuel (Natural Gas) Usage High None Operator Requirements Full time Part time Equipment Maintenance High Low SCE Departing Load Charge Yes None Import all electricity required by the airport Landside facilities and operations Electric Chillers (always); no lithium bromide adsorption chillers P:\164420\Docs\ Cost Analysis\July 24, 2017\Central Utility Plant Operating Cost Analysis.docx Page 2 of 15

Maria Pope John Wayne Airport July 24, 2017 Page 3 COST ANALYSIS RESULTS Electricity costs associated with both scenarios are broken down into two seasons: summer and winter. Summer rates (consisting of the four months of June-September) for electricity are significantly higher than winter rates (consisting of the eight months of October-May) under both SCE rate schedules. The cost analysis indicates that continued operation of the would be much less expensive than operation of the electric chillers and cooling tower (no ) in the summer months. This is due to the higher SCE electricity rates in the summer. It also indicates that continued operation of the would be less expensive than purchasing electricity in the winter months (all months other than the summer months), although not to the same extent as in the summer months. Table 2 below summarizes estimated costs associated with the two scenarios. Costs associated with the scenario are based upon actual data from year 2016 (as provided in Appendix A), with the exception of the major overhaul costs. Major overhaul costs are estimated based upon the past and predicted costs to maintain the for the life of the plant, as a yearly average. Costs associated with the no scenario are based upon estimated electricity use rates and their associated rate schedule, and estimated labor, parts, and maintenance costs to maintain the chillers and cooling towers (including both JWA labor and contractor labor). No other factors, such as those that may be associated with inflation, property taxes, insurance, etc., have been included in the cost estimates. TABLE 2 Annual Operating Costs versus Item Electricity $1,846,405 1 $6,761,652 Operators $1,666,710 1 $291,200 Fuel (Natural Gas) $835,253 1 $0 Major Overhauls (averaged over life of the plant) $400,000 $0 Chiller Plant and Cooling Tower Operation & Included in $125,000 Maintenance Operators Cost Annual Total $4,748,368 $7,177,852 Annual Difference $2,429,485 Note: 1 Costs are based upon actual billings or contracts for year 2016. P:\164420\Docs\ Cost Analysis\July 24, 2017\Central Utility Plant Operating Cost Analysis.docx Page 3 of 15

Maria Pope John Wayne Airport July 24, 2017 Page 4 CONCLUSION The annual estimated costs to continue operating the are significantly lower than the estimated costs associated with the shutdown the. The annual estimated cost saving for continued operation of the is $2,429,485. Amec Foster Wheeler appreciates this opportunity to provide services to JWA. Please contact Robert Romansik at (949) 722-4122 should you have any questions regarding this letter. Sincerely, Amec Foster Wheeler Environment & Infrastructure, Inc. Robert Romansik Principal - Chemical Duane Paul, P.G. Senior Associate Hydrogeologist Enclosure Appendix A: Supporting Data P:\164420\Docs\ Cost Analysis\July 24, 2017\Central Utility Plant Operating Cost Analysis.docx Page 4 of 15

APPENDIX A Supporting Data Page 5 of 15

Electric Import April-16 Total Electricity used (kwh) 1,785,328 987,016 240,340 1,005,955 133,440 2,126,411 Reactive Usage (kvarh) 782,592 432,655 440,957 873,611 Maximum 4,928 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1,888 1,044 1,064 2,108 On peak Mid peak Off peak Mid peak 264,784 987,016 1,005,955 133,440 2,126,411 Off peak 1,520,544 0 On peak Mid peak Off peak Mid peak 2,720 3,200 1,050 Off peak 4,928 500 Quantity Rate Cost SCE Import Quantity Rate Cost Demand - Facility Related 6,450 $18.34 $ 118,293.00 On peak $0.02336 Mid peak $0.02336 Off peak $0.02336 Mid peak 264,784 $0.01815 $4,805.83 2,391,195 $0.02336 $55,858.32 Off peak 1,520,544 $0.01815 $27,597.87 1,520,544 $0.02336 $35,519.91 bond charge (kwh) 1,785,328 539 $9,622.92 3,911,739 539 $21,084.28 Customer charge $356.62 $356.62 $356.62 Power factor charge (kvar) 1,888 $0.51000 $962.88 3996 $0.5500 $2,197.57 Capacity reservation charge $56,325.50 energy credit (kwh) 1,785,328-022 -$392.77 On peak 0 $18.97 Mid peak 0 $3.58 On peak $0.07072 Mid peak $0.04730 Off peak $0.03165 Mid peak 264784 0.04763 $12,611.66 2,391,195 $0.04579 $109,492.83 Off peak 1,520,544 $0.03234 $49,174.39 1,520,544 $0.03645 $55,423.83 s-backup on peak Mid peak Subtotal for billing month $ 161,064.90 Sate tax $517.75 3,911,739 029 $1,134.40 Total monthly bill $161,582.65 SCE monthly bill $161,582.65 DEPARTING LOAD $38,892.84 Total monthly cost $200,475.49 $399,360.77 Cost Difference between vs $198,885.27 Page 6 of 15

May-16 Total Electricity used (kwh) 1,813,760 899,340 203,236 850,654 138,532 1,888,526 Reactive Usage (kvarh) 803,416 398,368 376,802 775,171 Maximum 5,216 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1,888 936 885 1,822 On peak Mid peak Off peak Mid peak 283,136 899,340 850,654 138,532 1,888,526 Off peak 1,530,624 0 On peak Mid peak Off peak Mid peak 4,288 3,200 1,050 Off peak 5,216 Demand - Facility Related 6,450 $ 18.34 $ 95,661.44 On peak $ 0.02336 Mid peak $ 0.02336 Off peak $ 0.02336 Mid peak 283,136 $0.01815 $5,138.92 2,171,662 $ 0.02336 $50,730.02 Off peak 1,530,624 $0.01815 $27,780.83 1,530,624 $ 0.02336 $35,755.38 bond charge (kwh) 1,813,760 539 $9,776.17 3,702,286 539 $19,955.32 Customer charge $356.62 $ 356.62 $356.62 Power factor charge (kvar) 1,888 $0.51000 $962.88 1822 $ 0.5500 $1,038.40 Capacity reservation charge $56,325.50 energy credit (kwh) 1,813,760-022 -$399.03 On peak 0 $ 18.97 $122,356.50 Mid peak 0 $ 3.58 $18,673.28 On peak $ 0.07072 Mid peak $ 0.04730 Off peak $ 0.03165 Mid peak 283136 0.04763 $13,485.77 2,171,662 $ 0.04579 $ 99,440.40 Off peak 1,530,624 $0.03234 $49,500.38 1,530,624 $ 0.03645 $55,791.24 s-backup on peak Mid peak Subtotal for billing month $162,928.03 Sate tax $525.99 3702286 $ 0.00029 $547.67 Total monthly bill $163,454.02 SCE monthly bill $163,454.02 DEPARTING LOAD $38,892.84 Total monthly cost of SCE $202,346.86 $500,306.27 Cost Difference between vs $297,959.41 Page 7 of 15

June-16 Total Electricity used (kwh) 807,456 2,567,707 1,079,086 4,516,567 118,060 7,202,334 Reactive Usage (kvarh) 639,832 2,034,663 3,578,950 5,613,613 Maximum 4,832 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1,856 5,902 10,382 16,284 On peak 32,896 586,262 1,806,626.96 59,030.00 2,451,919 Mid peak 60,680 790,904 1,806,626.96 59,030.00 2,656,561.34 Off peak 320,296 1,026,246 903,313.48 1,929,559 Mid peak 26,912 0 Off peak 366,672 0 On peak 896 4,800 1,650 Mid peak 1,728 4,800 1,650 Off peak 4,512 3,200 1,050 Mid peak 1,440 Off peak 4,832 Demand - Facility Related 6,450 $ 18.34 $ 118,293.00 On peak 32,896 $0.01532 $503.97 2,484,815 $ 0.02336 $58,045.28 Mid peak 60,680 $0.01532 $929.62 2,717,241 $ 0.02336 $63,474.76 Off peak 320,296 $0.01532 $4,906.93 2,249,855 $ 0.02336 $52,556.62 Mid peak 26,912 $0.01815 $488.45 26,912 $ 0.02336 $628.66 Off peak 366,672 $0.01815 $6,655.10 366,672 $ 0.02336 $8,565.46 bond charge (kwh) 807,456 539 $4,352.19 807,456 539 $4,352.19 Customer charge $315.81 $ 315.81 $315.81 Power factor charge (kvar) 1,856 $0.51000 $147.90 Power factor charge (kvar) 1,856 $0.55000 $861.30 18140 $ 0.5500 $9,976.86 Capacity reservation charge $59,243.19 energy credit (kwh) 807,456-022 -$177.64 On peak 6,450 $ 18.97 $122,356.50 Mid peak 6,450 $ 3.58 $23,091.00 On peak 32,896 $0.06264 $2,060.61 2,484,815 $ 0.07072 $175,726.11 Mid peak 60,680 $0.04197 $2,546.74 2,717,241 $ 0.04730 $128,525.52 Off peak 320,296 $0.02816 $9,019.54 2,249,855 $ 0.03165 $71,207.92 Mid peak 26912 0.04763 $1,281.82 26,912 $ 0.04579 $1,232.30 Off peak 366,672 $0.03234 $11,858.17 366,672 $ 0.03645 $13,365.19 s-backup on peak 896 $10.91000 $8,247.96 Mid peak 1,728 $2.01000 $2,930.58 Subtotal for billing month $116,172.23 Sate tax $234.16 807,456 $ 0.00029 $234.16 Total monthly bill $116,406.39 SCE monthly bill $116,406.39 DEPARTING LOAD $38,892.84 Total monthly cost of SCE $155,299.23 $851,947.34 Cost Difference between vs $696,648.11 Page 8 of 15

July-16 Total Electricity used/produced (kwh) 593,200 2,727,630 1,096,826 4,590,819 146,633 7,465,082 Reactive Usage (kvarh) 552,496 2,540,466 4,275,808 6,816,274 Maximum 3,232 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1,440 6,621 11,144 17,766 On peak 44,768 474,775 1,836,327.62 73,316.34 2,384,419 Mid peak 83,624 645,388.00 1,836,327.62 73,316.34 2,555,031.96 Off peak 464,808 1,635,294 918,163.81 2,553,458 Mid peak 0 0 Off peak 0 0 On peak 1,504 4,800 1,650 Mid peak 1,824 4,800 1,650 Off peak 3,232 3,200 1,050 Mid peak 0 Off peak 0 Demand - Facility Related 6,450 $ 18.34 $ 118,293.00 On peak 44,768 $0.01532 $685.85 2,429,187 $ 0.02336 $56,745.81 Mid peak 83,624 $0.01532 $1,281.12 2,638,656 $ 0.02336 $61,639.00 Off peak 464,808 $0.01532 $7,120.86 3,018,266 $ 0.02336 $70,506.69 Mid peak 0 $ 0.02336 Off peak 0 $ 0.02336 bond charge (kwh) 593,200 539 $3,197.35 593,200 539 $3,197.35 Customer charge $308.28 $ 308.28 $308.28 Power factor charge (kvar) 0 $0.51000 Power factor charge (kvar) 1,440 $0.55000 $792.00 19206 $ 0.5500 $10,563.09 Capacity reservation charge $59,783.50 energy credit (kwh) 593,200-022 -$130.50 On peak 6,450 $ 18.97 $122,356.50 Mid peak 6,450 $ 3.58 $23,091.00 On peak 44,768 $0.06264 $2,804.27 2,429,187 $ 0.07072 $171,792.10 Mid peak 83,624 $0.04197 $3,509.70 2,638,656 $ 0.04730 $124,808.43 Off peak 464,808 $0.02816 $13,088.99 3,018,266 $ 0.03165 $95,528.11 Mid peak 0 0.04763 0 $ 0.04579 Off peak 0 $0.03234 0 $ 0.03645 s-backup on peak 1,504 $10.91000 $16,408.64 Mid peak 1,824 $2.01000 $3,666.24 Subtotal for billing month $112,516.27 Sate tax $172.03 593,200 $ 0.00029 $172.03 Total monthly bill $112,688.30 SCE monthly bill $112,688.30 DEPARTING LOAD $37,911.27 Total monthly cost of SCE $150,599.57 $859,001.39 Cost Difference between vs $708,401.82 Page 9 of 15

August-16 Total Electricity used (kwh) 296,720 2,736,722 1,014,545 1,036,029 177,406 3,950,157 Reactive Usage (kvarh) 96,496 890,006 336,926 1,226,932 Maximum 2,208 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 928 8,559 3,240 11,799 On peak 33,096 636,755 414,411.53 88,703.10 1,139,870 Mid peak 54,792 814,405.00 414,411.53 88,703.10 1,317,519.63 Off peak 208,720 1,451,160 207,205.76 1,658,366 Mid peak 0 0 Off peak 0 0 On peak 1,280 4,800 1,650 Mid peak 1,120 4,800 1,650 Off peak 2,208 3,200 1,050 Mid peak 0 Off peak 0 Demand - Facility Related 6,450 $ 18.34 $ 118,293.00 On peak 33,096 $0.01532 $507.03 1,172,966 $ 0.02336 $27,400.48 Mid peak 54,792 $0.01532 $839.41 1,372,312 $ 0.02336 $32,057.20 Off peak 208,832 $0.01532 $3,199.31 1,867,198 $ 0.02336 $43,617.74 Mid peak 0 $0.01815 0 $ 0.02336 Off peak 0 $0.01815 0 $ 0.02336 bond charge (kwh) 296,720 539 $1,599.32 296,720 539 $1,599.32 Customer charge $308.25 $ 308.25 $308.25 Power factor charge (kvar) 0 $0.51000 Power factor charge (kvar) 928 $0.55000 $510.40 12727 $ 0.5500 $7,000.06 Capacity reservation charge $59,783.50 energy credit (kwh) 296,720-022 -$65.28 On peak 6,450 $ 18.97 $122,356.50 Mid peak 6,450 $ 3.58 $23,091.00 On peak 33,096 $0.06264 $2,073.13 1,172,966 $ 0.07072 $82,952.13 Mid peak 54,792 $0.04197 $2,299.62 1,372,312 $ 0.04730 $64,910.34 Off peak 208,832 $0.02816 $5,880.71 1,867,198 $ 0.03165 $59,096.81 Mid peak 0 0.04763 0 $ 0.04579 Off peak 0 $0.03234 0 $ 0.03645 s-backup on peak 1,280 $10.91000 $13,964.80 Mid peak 1,120 $2.01000 $2,251.20 Subtotal for billing month $93,151.40 Sate tax $86.05 296,720 $ 0.00029 $86.05 Total monthly bill $93,237.45 SCE monthly bill $93,237.45 DEPARTING LOAD $36,930.27 Total monthly cost of SCE $130,167.72 $582,768.88 Cost Difference between vs $452,601.16 Page 10 of 15

September-16 Total Electricity used (kwh) 282,616 2,515,847 1,264,976 5,294,619 64,009 7,874,476 Reactive Usage (kvarh) 95,624 851,245 1,791,451 2,642,695 Maximum 1,568 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 352 3,134 6,594 9,728 On peak 32,664 499,283 2,117,847.65 32,004.72 2,649,135 Mid peak 50,648 983,630.00 2,117,847.65 32,004.72 3,133,482.37 Off peak 199,304 1,032,230 1,058,923.83 2,091,154 Mid peak 0 0 Off peak 0 0 On peak 1,376 4,800 1,650 Mid peak 992 4,800 1,650 Off peak 1,568 3,200 1,050 Mid peak Off peak Demand - Facility Related 6,450 $ 18.34 $ 118,293.00 On peak 32,664 $0.01532 $500.41 2,681,799 $ 0.02336 $62,646.83 Mid peak 50,648 $0.01532 $775.93 3,184,130 $ 0.02336 $74,381.29 Off peak 199,304 $0.01532 $3,053.34 2,290,458 $ 0.02336 $53,505.09 Mid peak $0.01815 0 $ 0.02336 Off peak $0.01815 0 $ 0.02336 bond charge (kwh) 282,616 539 $1,523.30 282,616 539 $1,523.30 Customer charge $308.25 $ 308.25 $308.25 Power factor charge (kvar) 0 $0.51000 Power factor charge (kvar) 352 $0.55000 $193.60 10080 $ 0.5500 $5,543.99 Capacity reservation charge $59,783.50 energy credit (kwh) 282,616-022 -$62.18 On peak 6,450 $ 18.97 $122,356.50 Mid peak 6,450 $ 3.58 $23,091.00 On peak 32,664 $0.06264 $2,046.07 2,681,799 $ 0.07072 $189,656.85 Mid peak 50,648 $0.04197 $2,125.70 3,184,130 $ 0.04730 $150,609.37 Off peak 199,304 $0.02816 $5,612.40 2,290,458 $ 0.03165 $72,492.99 Mid peak 0 0.04763 0 $ 0.04579 Off peak 0 $0.03234 0 $ 0.03645 s-backup on peak 1,376 $10.91000 $15,012.16 Mid peak 992 $2.01000 $1,993.92 Subtotal for billing month $92,866.40 Sate tax $81.96 282,616 $ 0.00029 $81.96 Total monthly bill $92,948.36 SCE monthly bill $92,948.36 DEPARTING LOAD $37,863.79 Total monthly cost of SCE $130,812.15 $874,490.42 Cost Difference between vs $743,678.27 Peak total $ 2,949,281.16 Peak Average $ 737,320.29 Page 11 of 15

October-16 Total Electricity used (kwh) 409,776 1,836,431 777,000 3,252,172 97,327 5,185,930 Reactive Usage (kvarh) 59,176 265,200 469,648 734,848 Maximum 1,952 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 288 1,291 2,286 3,576 On peak 5,856 Mid peak 9,952 Off peak 14,912 Mid peak 138,304 1,285,502 2,276,520 68,129 3,630,151 Off peak 240,752 550,929 975,651 29,198 1,555,779 On peak 544 1,650 Mid peak 576 1,650 Off peak 864 1,050 Mid peak 1,952 Off peak 1,952 Demand - Facility Related 6,450 $ 18.34 $ 118,293.00 On peak 5,856 $0.01532 $89.71 $ 0.02336 Mid peak 9,952 $0.01532 $152.46 $ 0.02336 Off peak 14,912 $0.01532 $228.45 $ 0.02336 Mid peak 138,304 $0.01588 $2,196.27 3,768,455 $ 0.02336 $88,031.10 Off peak 240,752 $0.01588 $3,823.14 1,796,531 $ 0.02336 $41,966.96 bond charge (kwh) 409,776 539 $2,208.69 4,039,927 539 $21,775.20 Customer charge $308.25 $ 308.25 $308.25 Power factor charge (kvar) 0 $0.51000 Power factor charge (kvar) 288 $0.55000 $158.40 3864 $ 0.5500 $2,125.41 Capacity reservation charge $59,783.50 energy credit (kwh) 409,776-022 -$90.15 On peak 544 0 $ 18.97 Mid peak 576 0 $ 3.58 On peak 5,856 $0.06264 $366.82 $ 0.07072 Mid peak 9,952 $0.04197 $417.69 $ 0.04730 Off peak 14,912 $0.02816 $419.92 $ 0.03165 Mid peak 138304 0.04064 $5,620.67 3,768,455 $ 0.04579 $172,557.54 Off peak 240,752 $0.03239 $7,797.96 1,796,531 $ 0.03645 $65,483.55 s-backup on peak 544 $10.91000 $791.34 Mid peak 576 $2.01000 $154.37 Subtotal for billing month $84,427.50 STate tax $118.84 4039927 $ 0.00029 $1,171.58 Total monthly bill $84,546.34 SCE monthly bill $84,546.34 DEPARTING LOAD $30,839.03 0 Total monthly cost of SCE $115,385.37 $511,712.60 Cost Difference between vs $396,327.23 Page 12 of 15

November-16 Total Electricity used (kwh) 958,176 1,359,610 546,116 2,285,795 80,649 3,726,054 Reactive Usage (kvarh) 249,624 354,206 595,495 949,701 Maximum 4,512 4,800 1,650 6,450 Standby 4,233 6,650 6,650 Reactive Demand (kvar) 1,632 2,316 3,893 6,209 On peak Mid peak Off peak Mid peak 267,392 951,727 1,600,057 56,454 2,608,238 Off peak 690,784 407,883 685,739 24,195 1,117,816 On peak 1,650 Mid peak 1,650 Off peak 1,050 Mid peak 267,392 1,650 Off peak 690,784 1,050 Demand - Facility Related 279 $18.00000 $5,022.00 6,450 $ 18.34 $ 118,293.00 On peak $0.01532 $ 0.02336 Mid peak $0.01532 $ 0.02336 Off peak $0.01532 $ 0.02336 Mid peak 267,392 $0.01588 $4,246.18 2,875,630 $ 0.02336 $67,174.72 Off peak 690,784 $0.01588 $10,969.65 1,808,600 $ 0.02336 $42,248.90 bond charge (kwh) 958,176 539 $5,164.57 3,566,414 539 $19,222.97 Customer charge $308.25 $ 308.25 $308.25 Power factor charge (kvar) 0 $0.51000 Power factor charge (kvar) 1,632 $0.55000 $897.60 7841 $ 0.5500 $4,312.54 Capacity reservation charge $38,054.67 energy credit (kwh) 958,176-022 -$210.80 On peak 544 0 $ 18.97 Mid peak 576 0 $ 3.58 On peak $0.06264 $ 0.07072 Mid peak $0.04197 $ 0.04730 Off peak $0.02816 $ 0.03165 Mid peak 267392 0.04064 $10,866.81 2,875,630 $ 0.04579 $131,675.10 Off peak 690,784 $0.03239 $22,374.49 1,808,600 $ 0.03645 $65,923.48 s-backup on peak $10.91000 Mid peak $2.01000 Subtotal for billing month $97,693.43 STate tax $277.87 3566414 $ 0.00029 $1,034.26 Total monthly bill $97,971.30 SCE monthly bill $97,971.30 DEPARTING LOAD $20,874.97 0 Total monthly cost of SCE $118,846.27 $450,193.22 Cost Difference between vs $331,346.95 Page 13 of 15

December-16 Total Electricity used (kwh) 1,525,648 1,046,501 297,510 1,245,243 6,912 2,298,656 Reactive Usage (kvarh) 698,840 479,361 570,397 1,049,759 Maximum 4,736 4,800 1,650 6,450 Standby 4,233 6,650 6,650 Reactive Demand (kvar) 1,888 1,295 1,541 2,836 Electricity (kwh) On peak Mid peak KWH) (kwh) Mid peak 167,544 732,551 871,670 4,838 1,609,059 Off peak 1,358,104 313,950 373,573 2,074 689,597 Demand (kw) On peak 1,650 Mid peak 1,650 Off peak 1,050 (kw) Mid peak 267,392 Off peak 690,784 2,298,656 Demand - Facility Related 503 $18.00 $9,054.00 6,450 $ 18.34 $ 118,293.00 On peak $ 0.02336 Mid peak $ 0.02336 Off peak $ 0.02336 Mid peak 167,544 $0.01588 $2,660.60 1,776,603 $ 0.02336 $41,501.45 Off peak 1,358,104 $0.01588 $21,566.69 2,047,701 $ 0.02336 $47,834.29 bond charge (kwh) 1,525,648 539 $8,223.24 3,134,707 539 $16,896.07 Customer charge $308.25 $ 308.25 $308.25 Power factor charge (kvar) 0 $0.51000 Power factor charge (kvar) 1,888 $0.55000 $1,038.40 4724 $ 0.5500 $2,598.23 Capacity reservation charge $38,054.67 energy credit (kwh) 1,525,648-022 -$335.64 Demand On peak 0 $ 18.97 Mid peak 0 $ 3.58 On peak $ 0.07072 Mid peak $ 0.04730 Off peak $ 0.03165 Mid peak 167544 0.04064 $6,808.99 1,776,603 $ 0.04579 $81,350.65 Off peak 1,358,104 $0.03239 $43,988.99 2,047,701 $ 0.03645 $74,638.69 s-backup on peak $10.91000 Mid peak $2.01000 Subtotal for billing month $131,368.19 STate tax $442.44 3134707 $ 0.00029 $909.07 Total monthly bill $131,810.63 SCE monthly bill $131,810.63 DEPARTING LOAD $30,839.03 Total month cost of SCE $162,649.66 $384,329.69 Cost Difference between vs $221,680.03 Page 14 of 15

Table 1 Electric Costs, versus Annual Operating Plant Type Winter - Electric Operating Costs 1,279,526 - Electric Operating Costs 3,593,444 Difference Annual Summer Total Annual $ $ 566,879 $ 1,846,405 $ $ 3,168,208 $ 6,761,652 $ 2,313,918 $ 2,601,329 $ 4,915,248 Table 2 Annual Costs Associated with versus Operating Plant Type Total Annual Electric Cost - One AC Mechanic - One Operator / Supervisor - Water Treatment - Chiller Extended Warranty - Contract Chiller Mechanics & Repairs - Contract Cooling Tower Mechanics & Repairs $ 1,846,405 $ 6,761,652 $166,400 $124,800 $20,000 $30,000 $25,000 $50,000 Annual Operator Contract Cost (includes all routine maintenance & equip.) Annual Major Overhauls (accrual) Cost Annual Fuel (natual gas) Cost Total $ 1,666,710 $ 400,000 $ 835,253 $ 4,748,368 $ 7,177,852 Annual Cost Saving for Operation $2,429,485 Page 15 of 15