Decision on Merced Irrigation District Transition Agreement

Similar documents
Merger of the generator interconnection processes of Valley Electric and the ISO;

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Overview of ISO New England and the New England Wholesale Power Markets

Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

Yukon s Independent Power Production Policy

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

BC Hydro OATT - Balancing Area Transmission Service Workshop. January 20, 2014

best to you all Gail Carbiener Page 1 of 5

JEA Distributed Generation Policy Effective April 1, 2018

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Net Metering Policy Framework. July 2015

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

Interconnection and Net Metering Service in Ohio

Net Metering and Solar Incentive Proposed Framework

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

Solar-Wind Specific Request for Proposals

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

The Gambia National Forum on

Renewable Energy System Tariffs and Pricing

Overview of S.L Competitive Energy Solutions for North Carolina

Ancillary Services. Horace Horton Senior Market Trainer, Market Training, NYISO. New York Market Orientation Course (NYMOC)

SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC

California s Energy Storage Summit California Energy Storage Association and Association of California Water Agencies

Electric Vehicle Charge Ready Program

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Impact of Energy Efficiency and Demand Response on Electricity Demand

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

City of Palo Alto (ID # 6416) City Council Staff Report

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

Electricity Transmission Infrastructure Development in New England

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Frequently Asked Questions New Tagging Requirements

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

ISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company

BEFORE THE PUBLIC UTILITIES COMMISSION OF NEVADA. Investigation regarding the Energy Choice ) Initiative ) Docket No )

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Behind the Meter Net Generation Model Cost Allocation for BTM Loads

Microgrids A Regulatory Perspective

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

THE PUBLIC SERVICE COMMISSION OF MARYLAND

Legal Considerations Related to Distributed Energy Resources

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Department of Market Quality and Renewable Integration November 2016

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resources Planning. From: Sarah Liuba Approved by: /s/

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

OVERVIEW OF UNIFORM TRANSMISSION RATES

Michigan Renewable Energy Case Study

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

February 8, Southwest Power Pool, Inc. Revisions to SPP Open Access Transmission Tariff to add Schedule 12 Docket No.

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications

Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers

May 2017 Pei Sue Ong, Capital Accounting Advice Manager Pacific Gas and Electric Company

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

2015 Grid of the Future Symposium

Muskegon Waste Water Treatment Site Muskegon County, MI

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

APPENDIX F: Project Need and Description

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Calif. Energy Storage Juiced By New Federal Guidelines

Transmission Access Charges (TAC) Structure Use Transmission Energy Downflow (TED) as the TAC Billing Determinant

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Review of Reliability Must Run and Capacity Procurement Mechanism

Transcription:

California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation District Transition Agreement This memorandum requires Board action. EXECUTIVE SUMMARY Merced Irrigation District (Merced), a customer-owned electric cooperative based in the central valley, has taken the first step towards joining the California Independent System Operator Corporation s balancing authority area. On February 14, 2013, Merced and the ISO entered into a memorandum of understanding (MOU) that outlines activities necessary for Merced s 2015 transition into the ISO balancing authority (see Attachment 1). Under the MOU, Merced will become a participating generator effective July 2014 and a participating transmission owner, utility distribution company and load-serving entity in the ISO, effective as early as July 2015. The MOU identifies a new 230 kv interconnection that will be built to connect Merced to the ISO. Merced has applied to PG&E for an interconnection study that is underway. This new interconnection will resolve transmission constraints that exist for Merced today and which limit its future opportunities for economic growth. The MOU also provides that Merced will bid its hydro facilities in the ISO market, which will provide revenues to Merced to the benefit of its customers. The hydro facilities will also help the ISO by providing flexible capacity to the system. Upon full implementation, the District s load will assume its share of ISO grid management and transmission access charges. The memorandum of understanding addresses four key areas requiring action by the ISO and Merced: 1) Treatment of Merced Hydro Facilities - Merced owns hydro facilities that are connected to the PG&E system and sells its output to PG&E under a contract that expires on June 30, 2014. Merced intends to move these units, known as the P&CS/D. Fuller Page 1 of 5

Exchequer and McSwain facilities, into the ISO market as of July 2014 when the contracts with PG&E expire. 2) Transition Date and 230 kv transmission interconnection to PG&E - Merced is currently part of the Turlock Irrigation District balancing authority area. Merced s transition to becoming a PTO, utility distribution company and load serving entity in the ISO is targeted for July 2015 (the transition date ) and is dependent on completion of the 230kV interconnection with PG&E. 3) Resource adequacy and transfer of load and 115 kv facilities - Merced must meet the resource adequacy requirements of the ISO tariff upon its transition to the ISO balancing authority area. Merced serves its load currently through transfers across the Turlock Irrigation District system. As an ISO participating transmission owner, Merced s load will be served by the ISO through an interconnection at the PG&E Wilson substation. Merced will be recognized as a non-cpuc jurisdictional entity and its own local regulatory authority. 4) Congestion revenue rights - Merced will be eligible for an allocation of congestion revenue rights to serve its load, which is based on historic load data. The transition agreement contemplates special actions necessary in advance of the transition to facilitate Merced s participation in the Tier 1 congestion revenue rights allocation process. The next step is for Merced and the ISO to enter into a transition agreement based on the MOU. This agreement will resolve any tariff issues, such as those associated with Merced s allocation of congestion revenue rights. The transition agreement terminates at the transition date in 2015 and at that time the ISO tariff will govern. Management recommends the Board approve the following motion: Moved, that the ISO Board of Governors authorizes Management to enter into a transition agreement with Merced Irrigation District consistent with the parties Memorandum of Understanding dated February 14, 2013 and attached to the memorandum dated March 13, 2013; and Moved, that the ISO Board of Governors authorizes Management to make all necessary and appropriate filings with the Federal Energy Regulatory Commission to implement the transition agreement, as described in the memorandum dated March 13, 2013. BACKGROUND Merced Irrigation District is a community-owned utility that provides retail electric service to approximately 8,000 customers. Merced presently operates within the Turlock Irrigation District Balancing Authority Area, and owns 34 miles of 115 kv transmission facilities. It owns 110 megawatts of installed generating capacity at the Exchequer and McSwain hydro facilities, located approximately 23 miles northeast of Merced, which are currently P&CS/D. Fuller Page 2 of 5

connected to the ISO controlled grid. Merced s service territory has a peak load of approximately 98 MW. A map of Merced s service area is provided as Attachment 2. In 2011, Merced approached the ISO to explore transitioning to the ISO balancing authority area and becoming a participating transmission owner. Merced s evaluation of its options was triggered at least in part by the expiration of generator contracts in 2014 and transmission contracts in 2015. Merced and the ISO have worked to identify potential issues that must be addressed to facilitate the transition in July 2015. The proposed approaches and activities are included in the MOU entered into by Merced and the ISO. Because the transition activities must begin in January 2014, Management seeks Board authorization now to file the transition agreement and any other appropriate filings to obtain FERC approval by the end of 2013. DISCUSSION AND ANALYSIS There are four critical elements of the transition that require action by the ISO and Merced prior to the targeted transition date of July 2015. These elements are the focus of the MOU and will again be essential features of the transition agreement. Without a binding agreement and authorization from FERC, the parties would not be able to move forward in advance of the transition to address some critical requirements for Merced to fully participate. Accordingly, this section outlines the essential features in each of these four areas as described in the MOU. Treatment of Merced hydro facilities The Exchequer/McSwain generating facility is already interconnected to the ISO controlled grid, and no reliability or network upgrades are necessary for it to be fully deliverable. Merced will replace the expiring PG&E generation interconnection agreement with an ISO large generator interconnection agreement for Exchequer, and an ISO small generator interconnection agreement for McSwain. Merced will enter into a participating generator agreement and meter service agreement to manage the energy and ancillary services provided by these generators. Transition date and 230 kv transmission interconnection to PG&E The interconnection of the Merced 115 kv transmission and distribution systems to the ISO controlled grid will be accomplished through construction of a new 230 kv transmission interconnection between the Merced Lyons substation and the PG&E Wilson substation which are less than a mile apart. The interconnection is being processed in accordance with PG&E s transmission owner tariff, and the ISO is engaged in the ongoing study work to effectuate the interconnection. Merced will enter into a transmission interconnection agreement with PG&E. Prior to the transition date, Merced will execute the Transmission Control Agreement and apply to become a participating transmission owner consistent with that agreement. Lastly, Merced will assume responsibilities as a transmission operator and comply with all applicable WECC and NERC requirements. P&CS/D. Fuller Page 3 of 5

Ultimately Merced will seek FERC approval for rate recovery for all facilities constructed above 200kV to connect to the Wilson substation and PG&E costs to upgrade and reinforce the Wilson substation that are charged to Merced, consistent with the ISO s high-voltage access charge methodology. Resource adequacy and transition of load and 115 kv facilities Ultimately at the transition date, Merced will enter into a utility distribution company agreement with the ISO. Merced must comply with the resource adequacy requirements of the ISO tariff. Merced may or may not have local resource adequacy requirements, which ISO engineers will assess not later than six months prior to the transition date. Merced may be able to estimate what its local resource adequacy requirement would be after transitioning to the ISO system, by doing its own local congestion study that follows the process to be specified by the ISO prior to the transition date. Through its scheduling coordinator, Merced will need to participate in the year-ahead and month-ahead demonstrations that it has met its resource adequacy requirements. Costs associated with Merced s 115 kv system will be paid by its customers consistent with the ISO s low-voltage access charge methodology. Allocation of congestion revenue rights As a load serving entity, it will be necessary to provide a transition mechanism for Merced to obtain congestion revenue rights that will be effective as of the transition date. The ISO s congestion revenue rights allocation process starts in the summer of every year and first allows entities to nominate their prior year congestion revenue rights for a priority renewal in the current year process. For the 2015 allocation process, the ISO will specify a hypothetical congestion revenue rights portfolio based on historical data that Merced can nominate for renewal. This will occur during the summer of 2014, with preparations beginning in the January-February 2014 timeframe. Economic estimates Merced s move into the ISO provides it with benefits by solving transmission issues that limit its opportunities for future growth. Merced s commitment to offer its hydro resources into the ISO market benefits the ISO by providing for renewable integration. Merced will also bring additional load into the ISO, which results in grid management and transmission access charge payments to the ISO, although they are not adequate to completely offset the cost to the ISO market. Annual estimated cost to ISO participants are shown on the following page: P&CS/D. Fuller Page 4 of 5

Annual Cost to ISO participants ($ millions) 2015 annual transmission revenue requirement estimate based on facilities required for interconnection Merced Irrigation District contribution to ISO transmission access charge Merced contribution to ISO grid management charge Merced contribution to market uplift charges, e.g. real-time imbalance energy offset $6.7-8.4 ($5.0) ($0.4) ($0.2) Total estimate annual cost to ISO ratepayers $1.1-2.8 This cost is based on estimates for the required interconnection facilities that are currently under study. Impact on the transmission access charge paid by ISO ratepayers is expected to be less than 1 cent per MWh in the 2015 and 2016 timeframe which is less than one tenth of one percent. This cost will be somewhat offset by the added flexibility provided by the hydro units. POSITIONS OF THE PARTIES After the MOU execution on February 14, 2013, the ISO posted the memorandum of understanding on its website and issued a market notice on February 21, 2013. Following the posting of the MOU, one participant asked questions regarding the network status of the facilities involved in the interconnection and the cost to ratepayers when Merced joins the ISO. The Merced interconnection is similar to several facilities within the ISO (on PG&E s and SCE s systems) that are within ISO operational control and operated as network facilities. The cost estimates appear above. On February 28, the ISO hosted a call with stakeholders to explain the provisions and proposed transition process, and to answer questions. Approximately 32 participants were on the call. Following the presentation there were no questions from the participants. MANAGEMENT RECOMMENDATION Management recommends approval of this proposal to develop and file the Merced Irrigation District-ISO transition agreement with FERC as described above. The relationship between Merced and the ISO is an exciting new partnership that brings new benefits as described above. P&CS/D. Fuller Page 5 of 5