600kW Stand-Alone power system with cooling

Similar documents
Product Specification

June 13, Dear Mr. Klauss,

Product Specification

The Geli Guide to SGIP April 26, 2017

IMM CONE CT Study Results

IMM CONE CT Study Results

PVI 60KW, PVI 82KW, PVI 95KW

Mid-Scale Wind and Net Metering. MWWG October 8 th, 2009

Price List. Specialty Products / Strainers / Check Valves / Butterfly Valves. Effective July 2, MuellerSteam.com 2018 MUELLER PRICE LIST

Specialty Products. Strainers. Check Valves. Butterfly Valves

WARRANTY POLICY. Grid-Tied Photovoltaic Inverters. Revision D. 2014, Solectria Renewables, LLC DOCIN

PVI 1800/PVI Residential/Commercial Grid-Tied Photovoltaic Inverter WARRANTY MANUAL. Subject to Change REV , Solectria Renewables

To complete the process for a net metering interconnection, please follow the steps below:

User Manual Breeze Revision 01.2 September 2018 Tempest Lighting, Inc.

RATE 765 RENEWABLE FEED-IN TARIFF

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Shedding Light on S lar Overview of Solar Finance

G3PE-Single-phase. Solid State Relays for Heaters

Please Refer to Attached Sample Form

DC to AC Power Inverters

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

40KW Solar System for Apple Sauce Co

July 24, Project IR

Why Light Duty Diesels Make Sense in the North American Market MARTEC. Automotive News World Congress. January 16, 2007

Solar Seminar. July 21st, Barry Cinnamon

CARTHAGE WATER & ELECTRIC PLANT ELECTRIC RATES RESIDENTIAL SERVICE

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER. Exhibit Accompanying Rebuttal Testimony of Dana M.

Installation Instructions

TurboPHASE: Cost- Effective and Efficient Peaking Power

DC to AC Power Inverters

PETROLEUM TRADERS CORPORATION RIGGINS, INC.

PowerMax Diesel Upgrade For Cummins Engines

Installation Instructions

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Installation Instructions

24/3000H-3PH 24/4500H-3PH 24/6000H-3PH

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT

TERMS AND CONDITIONS

Rig Master Power by Mobile Thermo Systems Inc.

LED Auxiliary Devices

MIL-24/2600Q MIL-24/3200DQ

Umatilla Electric Cooperative Net Metering Rules

Installation Instructions

ETSU Solar Array. Suggestions for a potential solar array on campus. Scott Finney

Distributed Generation Interconnection Policy

Tension Meter. Edition FT 03.E. FT Series. Instruction Manual. Valid as of: Please keep the manual for future reference!

Economics and Barriers to Solar Photovoltaic Applications in Barbados

Muskegon Waste Water Treatment Site Muskegon County, MI

Please Refer to Attached Sample Form

Commercial Solar Opportunities. Kevin Moore Koch

Electric Vehicles: Opportunities and Challenges

Dimensions 12/800N 12/1200N D. DC to AC Power Inverters. OWNERS MANUAL for Models: OWNERS MANUAL April ISO 9001:2000 Certified Company

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

Energy Savings through Solar Energy for Municipalities

Installation Instructions

Putting you in control of your business travel costs. allstarcard.co.uk/plus

Utility Jack Model Number: HD HD HD

TERMS OF USE TERMS AND CONDITIONS. Plumbing and Heating Products (PL-WR)

Installation Instructions

We power the world with innovative gas turbines

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

OWNERS MANUAL JANUARY 2007 ISO

The Nuts and Bolts of Solar. June 13 th, 2015 San Mateo Public Library Oak Room 10 am An Educational Workshop On Solar And Energy Efficiency Faire

For the highest caliber solar system choose Rosendin Electric s exceptional collaborative team

5 Year / 160,000 km (100,000 mi) ** 1 Year / 30,000 km (19,000 mi) 3 Year / 100,000 km (62,000 mi)

Solar PV Projects PPA Model

ADI-125/750 ADI-125/1500 ADI-125/2500

OWNERS MANUAL JANUARY 2007 ISO

HIGH VOLTAGE DIGITAL AMMETER

Warranty Statement. Global Commercial Warranty Statement. Commercial Generating Set Transfer Switch Switch Gear. A028U870 (Issue 1)

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Solar Electric Systems for Multi-Tenant Units. Presenters

Rider 11 Partial Requirements Service (PRS)

INTERNATIONAL MALLEABLE IRON PIPE FITTINGS & UNIONS

Installation Instructions. Application List Dodge 24V PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

STEEL PIPE NIPPLES - WELDED Price Sheet PNW-7.18 Effective: July 16, 2018 Cancels Price Sheet PNW-3.18 of March 5, 2018

24. SOLAR INCENTIVE PROGRAM II

Installation Instructions

Installation Instructions

Net +Plus Connection Code

Installation Instructions

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Business Park North Muskegon County, MI

Installation Instructions and Warranty Information

INSTALLATION & OPERATION MANUAL

INSTALLATION INSTRUCTIONS PART NUMBER:

To complete the process for a net metering interconnection, please follow the steps below:

advanced FLOW engineering Instruction Manual P/N: / / /

GLYCOL SYSTEM MONITOR (GSM)

Installation Instructions

Tomorrow s Energy Grid

Installation Instructions

UNION MINE DISPOSAL SITE Renewable Energy Project Feasibility and Economic Analysis

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

q u i e t price list march 2018

Installation Instructions and Warranty Information

Transcription:

Beaver Rd Grow Adelanto, CA September 21, 2017 600kW Stand-Alone power system with cooling We are pleased to offer the following proposal for a C600S microturbine with Cooling. This system will provide reliable clean power and cooling for your Grow facility. The system will act as your facility s power utility, running independent from the SCE grid. Due to the large amount of power required at the site and limitation on SCE power availability, running isolated from the grid is required. While the microturbines provide clean and reliable power the included exhaust gas fired absorption chillers will provide about 188 RT of cooling for use in climate control. This high efficiency design and re-capture of exhaust energy provides an approx. net annual energy savings of $600,000 against the SCE s TOU-8 utility tariff. Capstone microturbines feature a patented low maintenance air bearing technology, the lowest emissions of any non-catalyzed gas combustion engine, and digital power conversion to stand as the optimal power generation solution. The stand-alone power plant consists of 3 200kW power modules, each capable of independent operation. This configuration ensures full power is available in any operating condition and provides redundancy for reliable power during unplanned equipment outages and during planned maintenance.

The C600S Signature Series Microturbine provides up to 600kW of reliable electrical power in one small, ultra-low emission, and highly efficient package. Ø Ultra-low emissions - eliminates maintenance and safety hazard of catalytic reduction system Ø Modular design provides inherent N+1 redundancy on a smaller scale Ø One moving part minimal maintenance and downtime Ø Patented air bearings no lubricating oil or coolant Ø Compact modular design allows for easy, low-cost installation Ø High electrical efficiency over a very wide operating range Ø High availability part load redundancy Ø Remote monitoring and diagnostic capabilities Ø Proven technology with tens of millions of operating hours Ø Various Factory Protection Plans available Electrical Performance Electrical Power Output Voltage Electrical Service 600 kw 400/480 VAC 3-Phase, 4 Wire Wye

Frequency 50/60 Hz Electrical Efficiency LHV 33% Fuel/Engine Characteristics Inlet Pressure Fuel Flow (HHV) Net Heat Rate (LHV) 75-80 psig 6,840,000 BTU/hr 10,300 BTU/kWh Exhaust Characteristics NOx Emissions @ 15% O2 <9 ppmvd Exhaust Mass Flow 8.8 lbm/s Exhaust Gas Temperature 535 F Dimensions & Weight Width x Depth x Height Weight 117 x 230 x 114 in 29,400 lbs Minimum Clearances Horizontal Clearance Left Right Front Rear 60 in 0 in 65 in 80 in Certifications Ø UL 2200 Listed Ø CE Certified Ø UL 1741 Ø California Rule 21 Compliant

Broad Exhaust Fired Absorption Chiller Two stage exhaust 188RT chilled water Fuel Used - Waste form of heat directly and indirectly from a Capstone CCHP Features: Ø Oxygen Free Copper Tubes in evap Long Unit Life Ø Stainless steel Tubes in all other bundles Long Unit Life Ø Highest Vacuum standard in the Industry Long Unit Life Ø Highest COP and NPLV Lowest Operating Cost Ø PLC controls with 24/7 Monitoring Simple and easy to operate Ø Zero Maintenance Pumps No maintenance required Ø Marine water boxes with hinges Lowers cost to clean tubes Ø PLC PID control with Diagnostics Lowers operating cost Ø Factory Acceptance Test (FAT) Ensures QC and performance

Project Economics Payback Calculation Total Installed Cost Fuel, O&M, and Other Costs Initial Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 $1,602,900 $309,953 $315,031 $320,210 $325,492 $330,880 $280,294 $285,900 $291,618 $297,451 $303,400 Savings/Avoided Costs Include in Analysis? Electricity Production $528,628 $549,773 $571,764 $594,635 $618,420 $643,157 $668,883 $695,638 $723,464 $752,402 Heat Cogeneration $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Cooling $0 $143,839 $149,593 $155,576 $161,799 $168,271 $175,002 $182,002 $189,282 $196,854 $204,728 Power Quality/ Reliability $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Financing/ Inv. Tax Credits $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Emissions or other Credits $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Depreciation Tax Benefit $131,438 $210,300 $126,180 $75,708 $75,708 $37,854 $0 $0 $0 $0 Total $0 $803,905 $909,666 $853,521 $832,142 $862,400 $856,013 $850,885 $884,921 $920,318 $957,130 Net Cash Flow Cumulative Cash Flow Depreciation Method ($1,602,900) $493,952 $594,636 $533,311 $506,650 $531,519 $575,719 $564,985 $593,302 $622,867 $653,731 ($1,602,900) ($1,108,948) ($514,313) $18,998 $525,648 $1,057,167 $1,632,886 $2,197,871 $2,791,173 $3,414,040 $4,067,771 MACRS 5 YR (half-yr convetion) Annual Savings (Year 1) 10 yr IRR $493,952 Operating Hours/year 31.8% Microturbine Depreciation Timeline 5 years Discount Rate 8.0% 10 yr NPV $2,149,171 Heat 0 Tax Rate 41% Payback Period [Years] 2.96 Cooling 8,585 8,585 Operating Cost Comparison (Year 1) Cumulative Cash Flow $800,000 $700,000 $5,000,000 $600,000 $500,000 $400,000 $493,952 Net Other Cost/Benefit Gas Bill $4,000,000 $3,000,000 $300,000 $200,000 $100,000 Electricity Bill Net Annual Savings $2,000,000 $1,000,000 $0 Maintenance Fuel Costs $0 Initial Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 ($1,000,000) Year 10 ($2,000,000) 16552 to 16572 Beaver Rd 600kW CCHP SCE TOU-8 Sep 6 2017.xlsx 1 of 1 Copyright (c) 2017 Capstone Turbine Corp Assumptions; 4% electric and 2% gas escalator, plan B 5 yr FPP, 600kW production with 188RT cooling, $4.35 fuel

Pricing Product Quantity Price Total C600S 1 $942,900 $942,900 Broad 188RT 1 $360,000 $360,000 Chiller EST Installation 1 300,000 $300,000 Total $1,602,900

Cal Microturbine, Inc. 2537D Pacific Coast Highway #146 Torrance, CA 90505 (424) 256-8225 www.calmicroturbine.com QUOTE ADDRESS George Spizzirri 806 E. Avenida Pico Ste I-313 San Clemente, CA 92673 QUOTE # 1078 DATE 09/21/2017 CATALOG NUMBER PRODUCT DESCRIPTION QTY RATE AMOUNT 600S-HD4-BU00-AL00 C600S,HPNG,DM,UL,LE,C1KC 1 942,900.00 942,900.00 Braod BE 125 188 RT Absorption Chiller with manifold 1 360,000.00 360,000.00 All Price Quotes are valid for thirty (30) days from the date of the Price Quote. Prices quoted will only be honored when a written Price Quote is signed and returned to the Company within thirty (30) days from the date of the Price Quote. No verbal pricing will be honored. 20% deposit is required upon receipt of signed Price Quote from the Client. All shipping costs are the responsibility of the Client. This Price Quote and all orders associated herewith are subject to the Company s Standard Terms and Conditions of Sale as may be attached hereto or issued by the Company. Accepted By Accepted Date

Factory Protection Plan Capstone offers an industry leading maintenance program designed to give you financial peace of mind by fixing the cost of scheduled AND unscheduled maintenance. Ø Reduces total cost of ownership Ø Predictable maintenance costs over the life of the equipment Ø Protection against expensive unscheduled maintenance repairs Ø Minimizes downtime Ø Ensures the microturbine operates at peak performance Ø Available for all microturbine systems regardless of current run hours Ø Length of contract can be tailored based on your specific needs Ø Customizable payment plans Annual price per C600, assuming over 6 thousand hours per year runtime Ø Plan B Price 56,082 Ø Plan D Price 85,279

Warranty Products sold by Cal Microturbine include warranties from the equipment manufacturers only. Any warranties or representations concerning the goods are those of the manufacturer and not those of Cal Microturbine. The manufacturer provides all information regarding the product. Descriptions of products are for identification only and shall not constitute any representation or warranty by Cal Microturbine. Since Cal Microturbine is the agent between the purchaser and the manufacturer the following conditions apply to warranty claims: If Purchaser discovers that such item was not as warranted by manufacturer and promptly notifies Cal Microturbine thereof, Cal Microturbine shall remedy such nonconformance by repair or replacement of the item and any affected part of the product(s). Purchaser agrees to notify Cal Microturbine, of any apparent defects in design, materials, or workmanship, prior to performing any corrective action back chargeable to Cal Microturbine. Cal Microturbine does not warrant: (a) defects caused by failure to provide a suitable installation environment for the product, (b) damage caused by use of the product for purposes other than those for which it was designed, (c) damage caused by natural disasters, (d) damage caused by unauthorized attachments or modification, (e) any other abuse or misuse by the Purchaser, including improper installation, (f) damages or premature failure caused by poor or improper setup, installation or maintenance, based on the manufacturers recommended procedures, (g) normal wear and tear, (h) consumable or wear parts. Terms 20% due ARO 80% due within 30 days of invoice Delivery 8-12 weeks from date of order

We sincerely appreciate the opportunity to provide this quote. Please do not hesitate to contact us should you have any questions. Marc Rouse Vice President of Sales Cal Microturbine (713) 304-0656 (Mobile) mrouse@calmicroturbine.com