A1100 GUARDIAN OVERFILL PREVENTION VALVE (with Installation Kit)

Similar documents
A1100 GUARDIAN OVERFILL PREVENTION SYSTEM

A1100 GUARDIAN OVERFILL PREVENTION SYSTEM

INSTALLATION INSTRUCTIONS. Double Wall, Drain Valve, BSPT. Torque Wrench w/ 100 to 150 ft-lbs. Setting

Vapor Tight Overfill Prevention Valves

Specification Grade Contemporary Wall Mount/Technical Installation Data

Defender Series. Overfill Prevention Valve. Automatic Shutoff for USTs. Installation, Operation and Maintenance Series

Captivate Illuminated Mirror Light

Installation and Maintenance Instructions 44TA Liquid Level Float Switch

Installation Instructions

Operating and Installation Instructions

INSTRUCTION BOOK FOR. Dual Masking Electrol

Model 1100 Turbine Flow Meter Repair Kits

INSTALLATION INSTRUCTIONS LED RETROFIT ASSEMBLY (LRA) Rev F

INSTRUCTION BOOK FOR. Tensioned Dual Masking Electrol

Pressurized oil drain for collection of used lubricants and anti-freeze.

INSTALLATION INSTRUCTIONS LED Canopy Retrofit Kit

M Remote Mounting Kit

OPW Installation and Maintenance Instructions OPW Series Primary and Secondary Bucket Replacement Instructions

Retractor SM Installation Guide

AEROMOTIVE Part # Street Rod Fuel Pump System INSTALLATION INSTRUCTIONS

Stainless Steel Air Motor Conversion Kits

Stainless Steel Air Motor Conversion Kits

AEROMOTIVE Part # A2000 Fuel Pump Kit INSTALLATION INSTRUCTIONS

MOONRING 1.5 MOONRING 3

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS MOONRING 1 LP1/MR1

INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # and F-Body Fuel System Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Mustang 5.0L Fuel System Kit INSTALLATION INSTRUCTIONS

INSTRUCTIONS PARTS LIST

Continental Super Flow

18670, INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # /2 4.6L SOHC Ford Fuel Rail Kit INSTALLATION INSTRUCTIONS

Safety, Installation and Operating Instructions Instructions importantes concernant la sécurité

Defender Series. Overfill Prevention Valve. Automatic Shutoff for USTs. Installation, Operation and Maintenance Series

Please visit for the latest version of these installation instructions.

Pump Package Conversion Kits

Model For petroleum products and other fluids compatible with aluminum and buna-n seals.

AEROMOTIVE Part # Fuel System Prime Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # & Mustang 5.0L Stealth Fuel System Kit INSTALLATION INSTRUCTIONS

15H882 Slider Bearing Kit

In this kit there should be: 1 x Engine Case Cover (ECC0085) 2 x M6x28mm long button head bolts PLEASE READ THESE INSTRUCTIONS FULLY BEFORE STARTING

AEROMOTIVE Part # L Ford F L Ford Expedition L Ford F-250 Super Duty INSTALLATION INSTRUCTIONS

Model 1100 Turbine Flow Meter

L DODGE CUMMINS MK-2 + BLK APPS Mount

Motor Mounting Kits. Instructions J EN. 16C487 Motor Coupler Kit includes 2.25 in. (57.2 mm) key For NEMA 182/184 TC Frame ATEX Electric Motors

AEROMOTIVE Part # Subaru STI Fuel Rail Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Ford 5.4L GT500 Shelby Mustang Fuel Rail Kit INSTALLATION INSTRUCTIONS

Installation Instructions

CSD Series Current Devices Split Core

Installation Instructions

Universal Hand Pump. Instructions D EN. - For transferring grease to Grease Jockey and G3 Systems - Part No Hand Operated - 35# Pump

INSTALLATION INSTRUCTIONS

M Remote Mounting Kit

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

INSTRUCTION BOOK FOR. Tensioned Advantage Deluxe Electrol

Owner s Manual Hydro-X Xtreme Xtractor

AEROMOTIVE Part # / L SOHC Ford Fuel Rail Kit INSTALLATION INSTRUCTIONS

24G621 Agitator Speed Controller Accessory

READ AND FOLLOW ALL SAFETY INSTRUCTIONS 1. DANGER RISK OF SHOCK DISCONNECT POWER BEFORE INSTALLATION

RV-10 Center Arm Rest Console

MODELS. 2 & 4 Low Profile Linears

BMK-30. Heavy-Duty By-Pass Filtration System Installation and Servicing Instructions

11202 INSTALLATION INSTRUCTIONS

Palomino BATTERY CHARGERS. Installation and Operating Instructions. One Technology Place Caledonia, New York The Power of Excellence

Fitting Instructions for RSET14BK Adjustable Rearsets Aprilia RSV4R and Factory ( 09-)

18660, 18661, & Stealth Fuel Cell INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # C5 Corvette Fuel Rail Kit INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # L Ford F L Ford Expedition L Ford F-250 Super Duty INSTALLATION INSTRUCTIONS

Please visit for the latest version of these installation instructions.

AutoSparge. Lauter Tun Level Control. Operation, Assembly & Maintenance Manual

MODELS SafeSite LED Linear, Class I Div V, 2 & 4 Versions

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # Subaru Fuel Rails for Top Feed Injectors WRX & STI INSTALLATION INSTRUCTIONS

AEROMOTIVE Part # C5 Corvette Fuel Rail / Regulator Kit INSTALLATION INSTRUCTIONS

LAL SERIES LED LUMINAIRE

Installation Instructions

HP190SL Series Slimline Radon Fans

FITTING INSTRUCTIONS FOR CP0393BL AERO CRASH PROTECTORS SUZUKI GSX-S

Pump/Manifold Kits. Instructions F ENG. To convert E-Flo 4-Ball Piston Pumps to a different size lower. For professional use only.

AEROMOTIVE Part # & Generic Fuel System Kit INSTALLATION INSTRUCTIONS

MODELS 2 & 4 Top Conduit Linears

INSTALLATION INSTRUCTIONS

# and # FAST Fuel System Kits

INSTRUCTION BOOK FOR. Tensioned Advantage Deluxe Electrol

Level Alert Model Multi-Switch Liquid Level Sensor. Assembly and Installation Instructions

VA-4233-AGx Series Electric Valve Actuators

AEROMOTIVE Part # Generic Fuel System Kit INSTALLATION INSTRUCTIONS

NL-FTPR150, FUNCTIONAL TRAINER ASSEMBLY INSTRUCTIONS

Direct Communication Module

Cleaning System. Instructions/Parts A

CONTENTS. VIKING PUMP, INC. A Unit of IDEX Corporation Cedar Falls, IA USA SECTION TSM 710.1

Installation Instructions

Kit INSTALLATION GUIDE. For maximum effectiveness and safety, please read these instructions completely before proceeding with installation.

Classic PH/PHX-25 PH/PHX-40 Proportioners

IMPORTANT SAFEGUARDS When using electrical equipment, basic safety precautions should always be followed including the following:

VW/AUDI MK7 VEHICLES

OmniAire Omnitec Design, Manufacturing Air Purification Equipment Since 1988

390 Airless Sprayer. Parts J EN. Models: , , , , , ,262024, , , , Hi-Boy.

Transcription:

A1100 GUARDIAN OVERFILL PREVENTION VALVE (with 493192 Installation Kit) Assembly and Installation Instructions Important: Read these instructions completely and carefully before attempting to install and operate this valve. Failure to do so may result in improper valve operation allowing for a potential storage tank overfill. An overfilled tank can create extremely hazardous fuel spills which may result in personal injury and property damage. For further information, please call our Customer Service Department at (252) 243-0150. Important: Veuillez lire ces instructions attentivement avant d'installer et d'exploiter cette vanne. Ne pas le faire peut entraîner un fonctionnement incorrect de la vanne permettant un potentiel débordement de la citerne de stockage. Un réservoir trop plein peut créer des déversements de carburant extrêmement dangereuses qui peuvent entraîner des blessures et des dommages matériels. Pour plus d'informations, s'il vous plaît communiquer avec notre service à la clientèle au (252) 243-0150. Assembly 2-7 Tools 2 Packing List 2 Procedure 2-6 Installation 7 General Maintenance 8 Warranty 8 Note: All information, illustrations and specifications in this manual are based on the latest product information available. We reserve the right to make changes at any time without notice. CAUTION: Never disconnect the drop elbow from the tight-fill adapter when the A1100 has reached the positive shut-off level. At this point, the tank truck hose is still full and must not be disconnected until enough fuel has been removed from the underground storage tank to drain the hose. Premature disconnection will result in a hazardous spill and a potential for personal injury and property damage. ATTENTION: Ne jamais déconnecter le coude de baisse de l'adaptateur permet le remplissage étanche lorsque le A1100 a atteint le niveau d'arrêt positive. A ce point, le tuyau de camion-citerne est encore pleine et ne doit pas être débranché jusqu'à ce que suffisamment de carburant a été éliminée du réservoir de stockage souterrain pour vidanger le tuyau. Déconnexion prématurée entraîne un déversement dangereux et un risque de blessures et de dommages matériels.

WARNING: If the underground storage tank is equipped with a ball float vent valve, make sure it is not extended below the positive shut-off point of the A1100, or remove the float vent valve. ATTENTION: Si le réservoir de stockage souterrain est équipé d'un flotteur évent de balle vanne, assurezvous qu'il n'est pas prolongée en dessous du point d'arrêt positive de la A1100, ou supprimer la vanne flotteur de ventilation. ASSEMBLY Tools Needed 1. 13/64" drill bit 6. hammer 2. hand drill 7. fine half round file 3. tape measure 8. heavy duty pop rivet gun 4. fine tooth hacksaw (24-36 teeth per inch) WARNING: Do not use electrical devices near gasoline vapors, as it could result in fire or explosion. AVERTISSEMENT: Ne pas utiliser d'appareils électriques à proximité des vapeurs d'essence, car il pourrait provoquer un incendie ou une explosion. Packing List (included with A1100-010) (1) valve assembly #A1100 (8) pop rivets #564412 (1) hose clamp #564421 (1) o-ring #480049 (1) warning plate #564420 (1) counter sink indenter #564416 (1) drop tube O-ring #561683 (1) Seal-All sealant #566726 (1) 572719 drill fixture NOTICE: If this valve is to be used with coaxial Stage I drop tube assemblies, you must order the appropriate special kit for proper assembly: Standard coaxial (A0070 style) kit #493195 Self sealing coaxial (A0088 style) kit #493197 TOP TUBE INSTALLATION PROCEDURE The A1100 Guardian can only be installed after the containment manhole has been installed. Existing drop tube may be used only if: 1. Tube is in good condition without holes, cracks, or bends. 2. I.D. of tube will fit over the valve body diameter. Step 1: If already in place, remove the existing 4 cap, adapter and drop tube assembly. Step 2: Find measurement A which is the distance from the top of the tank to the top of the 4 riser pipe as shown in Figure 1. If the tank has a manway, make sure to include the height of the manway when finding measurement A as shown in Figure 2, A = J + H. Consult your tank diagram to determine the proper H dimension. If this dimension cannot be found, use 6 as the H dimension (typical manway height is 5-7 ). 2

Figure 1 Riser Pipe With Spill Containment Manhole Figure 2 Riser Pipe Installed Inside Manway 3

Step 3: Find measurement B from the chart below. It is the distance from the maximum fluid height allowed to the inside top of the tank. Calculations are based on cylindrical tanks with flat ends. For exact dimensions, consult the tank gauge chart provided with your tank. Use the actual capacity of the tank for calculations. NFPA30 Guidelines limit tank fill to 95%. 95% Shut-off Tank Diameter B Dimension Feet Meters Inches MM 6.5 1.98 7.5" 190 7.0 2.13 8.0" 203 7.6 2.29 9.0" 229 8.0 2.44 9.5" 241 8.2 2.50 9.5" 241 8.5 2.59 10.0" 254 9.0 2.74 10.5" 267 9.5 2.90 11.0" 279 10.0 3.05 11.5" 292 12.0 3.66 14.0" 336 The A1100 Overfill Prevention Valve is not recommended for tanks under 6.5 in diameter. Step 4: To determine the top tube cut length, C: Add A and B; subtract 2. A + B - 2 = C Step 5: Place a tape measure at one end of the drop tube and mark length C. Note: If you are using an unflanged tube, you will require part #566679 collar kit. 4 Step 6: Secure the hose clamp (p/n 564421, supplied) at cut mark C from Step 5 as shown. Step 7: Cut tube to proper length using a fine tooth hacksaw. The hose clamp acts as a guide. IMPORTANT: Do not use a power saw or tubing cutter to cut the tube.

Step 8: Remove clamp. File away cutting burrs to prevent damage to the O-ring when attaching to the valve. Step 9: Slide the drill fixture (p/n 572719, supplied) on the drop tube. Drill the four holes using the 13/64 drill bit. Remove drill fixture and set aside. Step 10: Lubricate the O-ring (p/n 480049, supplied) with the Seal-All and insert into the top groove of the A1100 valve. Lubricate the top 1 of the outside circumference of the valve with Seal-All. Step 11: Insert the A1100 valve into the top tube. Align the holes. Step 12: Using the indent tool #564416, countersink one hole. Secure with a pop rivet. Apply sealant over the rivet. Repeat this process with the remaining three holes. 5

BOTTOM TUBE INSTALLATION PROCEDURE Step 13: Slide the 572719 Drill Fixture on drop tube. Drill the four holes using the 13/64 drill bit. Remove drill fixture. File cutting burrs from end of tube. Step 14: Lubricate bottom of A1100 valve with Seal-All and install bottom tube, being careful to align holes. Step 15: Using the indent tool, countersink one hole and install a rivet. Apply sealant over the rivet. Repeat with remaining three holes. Step 16: Measure from top of riser pipe to the bottom inside of the tank, measurement D, Figure 1. Step 17: Subtract 6 from measurement D to obtain the correct total assembly length E. Measure length E (D - 6 = E) on the assembly from the flanged end. Mark tube to length E. Step 18: Secure the hose clamp to the tube. Step 19: Square cut the the lower tube to length E. Optional: 45 degree cut - The shortest point should start at length E to maintain the 6 maximum clearance requirement at bottom of tank. E 6

INSTALLATION OF COMPLETED ASSEMBLY INTO THE TANK Step 21: Turn completed assembly upside down and shake vertically to remove any metal chips left from the drilling process. Step 22: Install the O-ring (p/n 561683, supplied) on the top flange. Step 23: Position the completed assembly vertically over the riser pipe with the square cut down. Carefully lower the completed drop tube/valve assembly into the riser pipe. Step 24: Use the hose clamp to clamp the warning plate (p/n 564420, supplied) onto the riser below the threads. Make sure label is facing up. Step 25: Reinstall the adapter onto the riser and torque with an adapter wrench. Replace the tightfill cap. The system is now in place and ready for operation. 7

MAINTENANCE The A1100 Guardian is maintenance free. Periodic inspection of drop tube wear due to corrosion is suggested. Please leave these instructions with the owner/operator of the service station for future reference. WARRANTY Emco Wheaton Retail Corporation service station products are warranted to be free from defects in material and workmanship under normal use and service for a period of twelve (12) months from the date of manufacture. The warranty set forth herein shall be the exclusive warranty made by Emco Wheaton Retail Corporation and in lieu of all other warranties, expressed or implied, (whether written or oral), including but not limited to any implied warranty of merchantability or fitness for any particular purpose. Emco Wheaton Retail Corporation s liability under this warranty is limited to, at Emco Wheaton Retail Corporation s option, the repair or replacement of that part which proves to be defective within twelve (12) months of date of manufacture. Emco Wheaton Retail Corporation is not responsible for claims for damage due to improper installation or maintenance, corrosive fluids, or use of a product for a purpose other than that for which it was specifically designed. Emco Wheaton Retail Corporation shall have no liability or be required to fulfill any obligation under this warranty unless the original purchaser returns the claimed defective item to Emco Wheaton Retail Corporation for inspection to determine whether the claimed defect is covered by this warranty. Under no circumstances shall Emco Wheaton Retail Corporation be liable for any consequential, special or contingent damages or expenses or any other charges beyond the invoice value of the defective items. The remedies set forth herein shall be the exclusive remedies available to the user and are in lieu of all other remedies except for the remedies described below. If an Emco Wheaton Retail Corporation product fails within the warranty period, call the Customer Service Department at (800) 234-4394. Describe the problem and provide the product date stamp information to the customer service representative. The customer service representative will provide a product complaint number, if applicable. Ship the defective equipment PREPAID, to Emco Wheaton Retail Corporation for repair or replacement. Emco Wheaton Retail Corporation products should be used in compliance with applicable federal, state and local laws and regulations. Product selection should be based on physical specifications and limitations and compatibility with the environment and material to be handled. EMCO WHEATON RETAIL COR- PORATION MAKES NO WARRANTY OF FITNESS FOR A PARTICULAR USE. All illustrations and specifications in this catalog are based on the latest product information available at the time of publication. Emco Wheaton Retail Corporation reserves the right to make changes at any time in prices, materials, specifications and models and to discontinue models without notice or obligation. 2018 Emco Wheaton Retail Corporation p/n 564417 Rev. P, 07/18