New Panelboard for Lot H, EV Charger Energization, Las Positas College. Scope of Work and Technical Specifications

Similar documents
320A Single Phase URD Meter Loop Installations

District-Wide Prop 39, Interior LED Lighting Upgrades Pre-Conference Meeting Re-Bid No January 9 at 10:00 AM Las Positas College

Customer Requirements Downtown Secondary Network Service

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

FLORIDA DEPARTMENT OF TRANSPORTATION

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

Quik-Spec Coordination Panelboard Specifications

10 Commercial, Industrial, Agricultural Services

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

SECTION PANELBOARDS

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

For Conduit Inspections

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

CENTER BREAK GROUP OPERATED AIR BREAK SWITCHES RATED 15.5kV THROUGH 170kV EFFECTIVE DATE: 10/25/16 REV B

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

Gregory Wolfe 2004 Senior Thesis Lighting / Electrical

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

Metering and Service Installation:

Request for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV

SECTION SWITCHGEAR. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

PHOTOVOLTAIC SYSTEMS

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

2010 PM CM ELECTRICAL. The High-Velocity Edge: Achieving Operational Excellence. 21st Annual Conference

Requirements for Secondary Voltage Revenue Metering (750 V and less)

CONTRACT DOCUMENTS FOR WAYNE STATE UNIVERSITY

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

Publication No.: PSG

.3 Section Concrete Forms and Accessories: Installation of Anchor Devices, Setting Templates

Product Specification Guide. Title: Southern States 362 kv RLSwitcher Vertical Interrupter Style Reactor Switcher

Commercial Electric Policy

1 OF 8 LAD LAD PROJECT AREA KIMBERLY GERBER TITLE SHEET C.E.S. DWG. NO. NPN12045 SHEET INDEX

Customer Requirements Meter Socket Configurations

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Outdoor Power Transmission & Distribution

Three-Phase Pole Mounted Recloser

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

IEEE Guide for the Design of Low Voltage AC and DC Auxiliary Systems for Substations

A. Submit manufacturer's literature and technical data before starting work.

Capital Projects Group Inverter, Rectifier and Charger Specification

IS46/PS33 Current Power Supply System

Product Specification Guide. Title: Southern States 72 kv RLSwitcher Vertical Interrupter Style Reactor Switcher

CITY OF LOMPOC UTILITIES DEPARTMENT ELECTRICAL DIVISION SPECIFICATION NO. ELE-112 SUBSTATION CLASS VACUUM CIRCUIT BREAKERS OCTOBER 2008

OVERHEAD SERVICE. Items to consider

A. Products shall be designed, manufactured, tested, and installed in compliance with the following standards:

COMMERCIAL QUICK REFERENCE

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

UTILITY CROSSING DETAIL

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards


Chapter 6 Generator-Voltage System

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

AMENDMENT ELECTRIC SERVICE MANUAL 2014

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

CHAPTER V RESIDENTIAL WIRING

AREA OF WORK ENERGY

ADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

.3 Section Waste Management and Disposal.

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

EMERGENCY GENERATOR SET

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

Residential Photovoltaic (PV) Packet

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV)

SUBSTATION VACUUM CIRCUIT BREAKER (38KV)

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV)

George Carter III Dept. of Enterprise Services Olympia Washington

LIFT STATION 11 ONE-LINE DIAGRAM

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS

Overhead Crane Specification prepared by SVEDA CRANES SPECIFICATION. * (Top/Under) running * (single/double) girder crane

2012 INSTALLERS MEETING UES INSTALLER S MEETING

ENGINEERING SPECIFICATION

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Q: I saw a WCB on the schedule but cannot find it in any of the drawings? A: Refer to Addendum to the Project Drawings

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

Underground Distribution Switchgear

SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

Solar PV Standard Electrical Plan

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

7 Single Family Service

MECHANICAL AND ELECTRICAL COORDINATION SECTION MECHANICAL AND ELECTRICAL COORDINATION PART 1 - GENERAL

CITY OF MARYVILLE ELECRIC DEPARTMENT Maryville, Tennessee SPECIFICATIONS FOR 15KV POWER CIRCUIT BREAKERS. September 2018

Rotary Disconnect Switches, Bulletin 194R

ELECTRICAL SERVICES REPORT PROPOSED AVIEMORE RESIDENTIAL APARTMENT DEVELOPMENT, SEDGEFIELD. Mr. L. Gregory

WARREN COUNTY, N.Y. M/E REFERENCE

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Transcription:

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT New Panelboard for Lot H, EV Charger Energization, Las Positas College Scope of Work and Technical Specifications Chabot-Las Positas Community College District ( District ) requests that firms provide a lump sum proposal to furnish all equipment, labor and materials for a new panelboard to energize the existing Electric Vehicle charging equipment in Lot H at Las Positas College. Overview, Objective and Site Information The Las Positas College, located at 3000 Campus Hill Drive in Livermore, has installed an EV Charging electrical distribution system and needs to add a new panelboard in the existing PV inverter circuit to energize the EV charger system. Scope of Work The project scope includes the following: Procurement of a new panelboard with an 800A 3pole, 480V breaker and 2-150A 3 pole 480V breakers. Relocation of the existing ModHopper cabinet and other components of the EV charger distribution system as required. Installation of the new panelboard. Wiring the new panelboard in the circuit between the PV inverter and the 500kVA 480/21kV transformer, incorporating the existing 800 A fused switch. Attachments Dwg E-2.1LPS dated 5/15/2008 Sketch- Proposed Single Line Photographic notes Existing 800A fused switch shop drawing Description of Allowances and Alternates A. Allowance # 1: Provide Non-Specified Owner s Allowance of $10,000 Submittals: A. All materials, products and systems, including those not specifically addressed in the program requirements, and therefore not carrying a minimum requirement, are subject to review and approval by the District via standard design development and construction submittal review processes. B. Shop Drawings: For the new panelboard, include plans, elevations, sections, details, and attachments to other work. Page 1 of 2- RFP 17-18-01 New Panel Board- EV Charger Energization

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT 1. Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. 2. Wiring Diagrams: For power, signal, and control wiring. 3. Provide details to meet current seismic requirements for anchoring. C. Coordination Drawings: Site Plan(s) and other details, drawn to scale, on which the electrical equipment is shown and coordinated with each other. Project Closeout A. As-Built Drawings: Upon completion of work, the design build team shall provide to the District three (3) bound copies of maintenance manuals showing all approved shop drawings and maintenance and operations documentation. Include a half size set of the as-built drawings folded and bound into the maintenance manuals. Incorporate all red- lines from field notes onto the design CAD and PDF files and submit two (2) hard copies of the final full size As-builds drawings. B. Operation and Maintenance manual: 1. Include operation data required including the following information: a. System and equipment descriptions b. Operation standards and procedures c. Wiring, control and piped system diagrams 2. Maintenance manual-include the following as applicable: a. Product name, Manufacturer and model number b. Reordering information for specially manufactured products c. Repair instructions d. List of items recommended to be stocked as spare parts C. Warranties: Warranty coverage shall include replacement of materials including required labor and equipment due to workmanship and operation of the equipment for one (1) year or per manufacturer warranty. General Requirements A. General: 1. Do not pull new cabling into conduits with existing conductors. If the design requires the installation of new cabling into a conduit with existing conductors, remove the existing conductors, inspect for damage and reinstall with new conductors. B. Conduit: 1. All exterior conduit shall be galvanized rigid, underground conduit shall be Schedule 40 PVC. C. Conductors: 1. All conductors shall be copper, THHN. Page 2 of 2- RFP 17-18-01 New Panel Board- EV Charger Energization

Attachment 1

Attachment 2 PROPOSED NEW PANELBOARD SINGLE LINE JUNE 2017 150A 3pole 150A 3pole 800A 3pole XX 112kva Transformer

Attachment 3 LAS POSITAS COLLEGE- LOT H NEW PANELBOARD Relocate ModHopper Remove existing conduit and wire to unused disconnect remove existing disconnect Install new Panelboard Adjust location of existing 120/208 panelboard as required Connect to existing 112kv 480/120-208 Transformer Modhopper cabinet contents Interior of existing 800A fused switch

Attachment 4