Cellwatch Electrical Installation

Similar documents
Mid-Power Remote Unit (MRU) SISO Outdoor Enclosure Assembly Quick Installation Sheet

Mid-Power Remote Unit (MRU) Outdoor Enclosure MIMO Assembly Quick Installation Sheet

24V 3A EN54 Ancillary Power Supply

FORD TERRITORY TOWBAR FITTING INSTRUCTION Part # VEHICLE YEARS OF MANUFACTURE - From May

Installation Instructions Studio Makeup Station

Cabinet and Rack Installation

Cabinet and Rack Installation

Cabinet and Rack Installation

Cabinet and Rack Installation

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Installing Power Components

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Company Switch Installation Instructions and User Manual

Actionpac LNS4. Panel Installation Datasheet. Actionpac LNS4 RELEASE 1.0 JUNE In partnership

Installation Guide Rollerdor RD55 Econ Roller Garage Door

Outrigger 4 A 12 Volt DC Power Pole Distribution Panel

The Powermatic User Guide Test Sieve Shaker

Assembly Instructions

10 Commercial, Industrial, Agricultural Services

SPECIAL SPECIFICATION 6894 Communication Cabinet

Z22C-** Preconfigured Network Zone System

SPECIAL SPECIFICATION 1788 Surveillance Cabinet

Technical Installation Manual

Raritan PX. Power Cord Installation Guide. Safety Guidelines. Safety Instructions

BLACK BOX. Fully assembled, ready-to-use wallmount cabinets. Elite Wallmount Cabinet User s Manual. Customer Support Information

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Arena-Walsall power track system standard

The economical 42U cabinet that s easy to transport and assemble on-site.

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

INSTALLATION MANUAL. Melink Corporation (513) Revision

Universal Network Zone System Part Numbers: Z23U-****

CHECKLIST & COMPONENTS

Electric Range installation manual

Network Zone System Part Numbers: Z23N-***** Z23R-****

Electrak powertrack / underfloor busbar system

INTEGRID TRACK (120V) SPECIFICATIONS

REF QTY PART DESCRIPTION PART NUMBER 1 1 Side Mirror, Driver (Not Shown) 1 Loctite - 263, 0.5 ml, Red Instructions

Safe-T-element Installation Instructions

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

Installation Instructions

Mizer Single Pump and Starter Box

INSTALLATION INSTRUCTIONS AM rev. A

HR25 Solo. Installation and User Instructions. Through the Wall Heat Recovery Ventilators

SECTION PANELBOARDS

CABLE MANAGEMENT SOLUTIONS CATALOGUE2003/04 A COMPLETE CABLE MANAGEMENT SOLUTION FOR COMMERCIAL AND INDUSTRIAL APPLICATIONS.

INSTALLATION INSTRUCTIONS

ChargePoint Gateway Installation Instructions

VD0C06N908C July 1998 Raleigh, NC, USA. Instruction Bulletin ALTIVAR 66, ALTIVAR 58, ALTIVAR 18. Dynamic Braking Resistor Kit User s Manual

SURFACE TRACK (120/250V) SPECIFICATIONS

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2

19 floor rack with steel door

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

Overview. Chassis Packaging

INSTALLATION MANUAL ELECTRIC DOUBLE OVEN RANGE

LED AC DRIVERLESS FLOODLIGHTS WITH PIR FOR MODEL: FLAC10BPIR, FLAC20BPIR, FLAC30BPIR & FLAC50BPIR

RECESSED TRACK (120V) SPECIFICATIONS

FAQ s. Designing metering switchboards as per Victorian service installation rules

Installation Instructions: Side Delivery Units BDS-2555

OPERATING INSTRUCTIONS

1E EJB Junction Boxes Cl. I, Div. 1 and 2, Groups B, C, D

User s Manual. ACS550-PC/PD Packaged Drive with Disconnect Supplement to ACS550-01/U1 User s Manual

Solar PV General Introduction Guide for Electricians

At-A-Glance Trailer Assembly Overview

Panduit PreConfigured Industrial Distribution Frame (IDF) Installation Instructions Part Numbers ZDF and ZDF

For reference, there is a photograph of a completed upgrade on the last page of this document, refer also to drawing that is attached.

Operating Instructions

HS6B Series Subminiature Interlock Switch

AIR FILTER MODEL NO: AF1000 OPERATION & MAINTENANCE INSTRUCTIONS PART NO:

INSTALLATION GUIDE. For Carrier/Bryant Residential Power Systems

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

F I R S T! Assembly* 4 Battery systems pull toward you, or 8 battery systems Lift up, both sides with a. Fig. B. *performed by licensed electrician

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

LOW MOUNT SPA COVERLIFT Installation Instructions

Catalog. Industrial Plugs & Sockets

RE-PR1-F 1-Phase Din-Rail Mount 1.5, 3 & 6kW

Installation Instructions: Read these instructions in its entirety before performing any installation work.

1E EJB Junction Boxes Cl. I, Div. 1 and 2, Groups B, C, D

K25000 & KD25000 Series

INSTALLATION MANUAL. Ford 3.5L F

JABSCO & Series 1½ 80 SIZE UTILITY Pump

Installation Guide Rollerdor RD77 Econ Roller Garage Door

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

Installation, Operating, Maintenance and Safety Instructions JABSCO & Series 1 40 SIZE UTILITY Pump

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

H15P. Toyota Hilux A-DECK Dual Cab

The EFL 2000/1 & 2 User Guide Test Sieve Shaker. Contents

UtilityMate Trailer Kit Assembly Guide

Owner's/Installation Manual

PVM 220 Installation Guide

IBER DISTRIBUTION FRAME (FDF) FOR EXCHANGE SIZE 900MM x 2200MM x 300 MM

VOLKSWAGEN AMAROK TOWBAR FITTING INSTRUCTION

PSU EN54-4 Power Supplies

MOUNT BRACKET PARTS and HARDWARE: Installation parts with * come loose in hardware kit bag. Other parts are preassembled

Installation Instructions

DIGITAL AlphaServer 1000 and DIGITAL AlphaStation 600 Rackmount Installation Information

ANZI Transfer Switch and Generator Wiring Installation Addendum

A B C D E F. Tools Required (supplied by others)

Checker Unload Checkstand Installation Instructions

Installation Guide. WARNINGS Read all instructions and warnings before attempting installation

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

Transcription:

Tech20081110-1-1 Cellwatch Electrical Installation Critical Distances...2 Typical Layout...3 Typical ibmu Placement...4 Typical Control Unit Placement...5 Physical Mounting and Location - General...6 CU Cabinet Mounting Overview...6 Cabinet Mounting Instructions - General...7 Masonry wall...7 Sheet steel fixing...7 ibmu Mounting...8 Rack Mounting......8 Wall Mounting...8 Wall Kit Mounting Instructions...9 Prepare the ibmu Chassis...9 ibmu Electrical Connection...10 The Control Unit (CU)...11 Control Unit Power Connection...11 Physical Mounting of Control Units...12 Power Inputs Description...12 Installation should be carried out by competent qualified engineers in accordance with all relative Health and Safety Regulation and NDSL procedures. All system components are to be installed to a system design agreed upon by all parties involved in a contract. Cable entry to the steel cabinets used for housing the Battery Monitoring Unit and Control Unit should be via properly installed conduit, or cable entry glands. When making entry points into those cabinets, ensure that the integrity and strength of the cabinets is not impaired. The system is not designed to withstand sprayed liquids, either continuously or intermittently (for instance for cleaning purposes. Ensure that the cabinets are not mounted where water or other liquids will be sprayed or be present. Page 1 of 15

Critical Distances When installing the power feeds for the Cellwatch system maintaining the critical distances for the low voltage conduit as shown in the diagram below is very important. The distances shall be measured not by line-of-sight, but the actual length the cable will be spooled through the conduit. If the distances must be greater than specified, please consult a qualified Cellwatch installer or contact Cellwatch customer support to determine what added Cellwatch equipment will be required. Page 2 of 15

BMU to last CU Low voltage cabling Distance = 2,000 ft maximum. To Battery A To Battery B To Battery C Low voltage CU to Battery Cabinet Low voltage cabling Distance = 150 feet Maximum All cabling: power, external fiber optic cable and data cables to be installed in minimum 3/4" conduit according to N.E.Code. Power feed 110/230 volts Power shall be run in separate conduit from Low voltage cabling. Cellwatch Critical Distances November 2008 NDSL Ltd 2003-2008 Typical Layout Page 3 of 15

Battery Monitoring Unit BMU Battery Cabinet UPS Power feed 110/230 volts Data feed\ Control Unit CU-1 Control Unit CU-2 Control Unit CU-3 To battery A ( FO, CT, TP ) To battery B ( FO, CT, TP ) To battery C ( FO, CT, TP ) Typical ibmu Placement Page 4 of 15

Wall Mount Power feed Data feed Power feed ibmu Data feed Wall Mounted 19" Rack Box Typical Control Unit Placement Page 5 of 15

UPS Power feed 110/230 volts Data feed to Battery and/or other CUs Data feed from ibmu Data feed to ibmu Control Unit Never Mount Control Units in this configuration Control Unit Mounted on Battery Cabinet Physical Mounting and Location - General CU Cabinet Mounting Overview Page 6 of 15

The CU is supplied with fixings appropriate to two types of mounting. Supplied with each cabinet are the following items 1 : Qty 4 minimum 12x1½ steel screw, combination head. Qty 4 minimum plastic masonry wall plugs. Qty 4 minimum SAE ¼ flat steel washer. Qty 4 minimum ¼ x20x1 round head steel machine screw. Qty 4 minimum ¼ x20 Hexagonal steel nylon insert, self locking nut. The installer will also need: (Note. Fixing should only be attempted by a qualified installer, equipped and using appropriate safety equipment, especially eye protection. Ensure all power cables in the vicinity of drilling are isolated). For masonry fixings: 5/16 (8mm) masonry drill (carbide tipped or similar). Cross head (Phillips, Pozi-drive ) screwdriver, size 2. For sheet steel mounting surface:- 5/16 (8mm) high speed drill. Cross head (Phillips, Pozi-drive ) screwdriver, size 2. Wrench, hexagonal size 7/16 AF. 1 note, In UK and Europe, metric equivalents will be provided. Page 7 of 15

Cabinet Mounting Instructions - General Masonry wall Hold cabinet (either ibmu or CU) against wall, check for position and square. Mark, using a pencil or appropriate marker through the cabinet corner mounting holes, the location of the four holes onto the wall. Move the cabinet well away from the area to be drilled to ensure no drilling debris enters the cabinet. Drill the four holes with the carbide tipped drill bit in a suitable electric tool to a depth of approximately 2 inches. Place the plastic wall plugs supplied into each of the holes and tap home until there is no protrusion. Place the cabinet back against the wall and starting with one of the two top mounting holes, place a washer on the 1½ screws provided and drive almost all the way home into the wall plug. Repeat until all 4 corners are loosely fixed. Tighten all screws. Clean out any debris that may have collected in the cabinet. Sheet steel fixing Hold cabinet (either ibmu or CU) against steel surface, check for position and square. Mark using a pencil or appropriate marker through the cabinet corner mounting holes the location of the four holes onto the wall. Move the cabinet well away from the area to be drilled to ensure no drilling debris enters the cabinet. Drill the four holes with the high-speed drill bit in a suitable electric tool. Page 8 of 15

Place the cabinet back against the surface and starting with one of the two top mounting holes, place a washer on the 1 machine screws provided and insert through the cabinet and the sheet steel mounting surface. Attach nut to rear of machine screw using 7/16 wrench. Repeat until all 4 corners are loosely fixed. Then tighten all screws and nuts. Clean out any debris that may have collected inside the CU cabinet. ibmu Mounting Installation should take place as part of the Cellwatch Battery Monitoring System installation and should only be carried out by a qualified Cellwatch installer. The ibmu should be installed either in a standard 19 rack mounting enclosure, or mounted on a wall using the ibmu Wall Mount Adapter Kit. When fitted in a rack enclosure, care should be taken to ensure that airflow is not impeded. Air intake is at the front of the case. Air outlet is at the rear and top of the case. Page 9 of 15

Rack Mounting Due to the large variations in rack fittings from different manufacturers, the rack mounted IBMU is NOT supplied with fixings. The IBMU should be adequately supported in the rack using shelf supports and retained in place with retaining fixtures. Contact your racking supplier for suitable shelf supports and retaining fixtures. Wall Mounting When fitting to a wall using the optional NDSL Wall Mounting Kit, ensure there is adequate space around the ibmu to allow airflow. Allow at least 4 between the sides, top and bottom of the unit, and any adjacent surfaces. In particular allow enough space for the hinged front doors to be fully opened above the unit. The unit should be mounted with the cable connections to the bottom of the unit and with the two support brackets secured to the wall at the top of the unit (see illustration). ¾ (18mm) conduit (x4 available openings) Page 10 of 15

Wall Kit Mounting Instructions The wall mounting kit comprises two upper brackets and a lower main body as shown left, complete with a bag of fasteners. The lower bracket enclosure has a hinged door for concealing the cables and other material at the back or bottom of the ibmu. Cables/conduit should be brought through the holes already pre-drilled in the bracket enclosure. to fix the ibmu to a wall or panel. The top L brackets are mounted with the 4 of 10 x 32 supplied to the 19 rack mounting ears and used Prepare the ibmu Chassis. Take the ibmu main body and place it on a secure horizontal surface with the yellow label facing upwards. Fix the angled L brackets to the mounting flange of the ibmu with the four 10x32 screws provided. The wall side of the ibmu is the bottom or non-labeled side. Ensure the L brackets are mounted under the ibmu flanges with the wall mounting hole towards the bottom or non-labeled side of the ibmu as shown in the sketch here. Hold the ibmu carefully against the wall in the correct position ensuring there is sufficient room for the two doors at the top of the ibmu to open. Mark where the two top wall mounting holes need to be. Take the ibmu away from the wall and protecting it from dust and drill debris, drill the wall and use the appropriate wall fixing (not supplied) to mount the ibmu by the top fixings to the wall. Page 11 of 15

Position the bottom bracket over the bottom of the ibmu note the cover slides around the ibmu. Mark the holes, drill the holes as above and fix. ibmu Electrical Connection To wire directly to the ibmu PSU from power fed directly from conduit attached to the ibmu lower mounting bracket use the rewirable IEC plug provided with the ibmu packaging. Note: This is the rear view of the ibmu that sits into the lower mounting bracket. The power feed to the wired rewirable IEC plug should be positioned and/or strapped such that the cabling force will not pull the IEC plug from its socket. Page 12 of 15

The Control Unit (CU) Control Unit Power Connection Page 13 of 15

Physical Mounting of Control Uits The control unit comes ready drilled for wall mounting and recommendations in the section above entitled System Installation and Cabinet Mounting Instructions should be followed. Page 14 of 15

The Control Unit is ready punched on the lower surface for fitting of ¾ conduit. It is a condition of UL Approval that installation of electrical conductors be carried out in accordance with the relevant sections in the National Electrical Code. In particular, Article 300 (Wiring Methods) of the National Electrical Code and Article 346 (Rigid Metal ) of the National Electrical Code define the applicable standards and recommended installation procedures. Failure to conform to the above standards invalidates current and future UL approval of the equipment. Power Inputs Description Mounted on the lower left corner of the PCB is a three way screw terminal connector. This provides for power input from a suitable AC power source, wired in compliance with National Electrical Code and / or other local statutes. A suitable, clearly labeled and identified, safety isolation switch should be selected and fitted into the feeds to the CU and BMU. Both the CU and BMU should have feeds from a UPS supported power source. All cabling to the CU and BMU should be installed via grounded steel conduit. For ratings of connection cable see the cable selection guide in this handbook. The input power is protected by a fuse. Only replace with the correct rating and size of fuse as stated in the Control Unit. Connections are, from left to right:- Ground connection from Cabinet Grounding Lug. AC inlet neutral connector. AC inlet live connector. Page 15 of 15