PERFORMANCE SPECIFICATION SHEET BATTERY, RECHARGEABLE, NICKEL CADMIUM, VENTED, 1.2-VOLT, 13 AMPERE- HOUR, BB-475/A CELL

Similar documents
PERFORMANCE SPECIFICATION SHEET BATTERY, STORAGE, AIRCRAFT, MAINTENANCE-FREE, 24-VOLT, 1.5-AMPERE-HOUR

PERFORMANCE SPECIFICATION SHEET SWITCHES, SENSITIVE, MOMENTARY, 4 CIRCUIT OR DPDT (10 AMPERES), UNSEALED

DETAIL SPECIFICATION SHEET TRANSMITTER, LIQUID QUANTITY, FLOAT TYPE, ENGINE FUEL. Inactive for new design after 28 September 1993.

PERFORMANCE SPECIFICATION SHEET

PERFORMANCE SPECIFICATION SHEET SWITCHES, SENSITIVE, SPDT, UNSEALED

PERFORMANCE SPECIFICATION SHEET RUBBER, SYNTHETIC, TUBING

PERFORMANCE SPECIFICATION SHEET

DETAIL SPECIFICATION SHEET

MILITARY SPECIFICATION SHEET

DETAIL SPECIFICATION SHEET SWITCHES, TOGGLE, MINIATURE, LEVER SEAL, PANEL SEAL, FOUR POLE LOGIC LOAD TO 5 AMPERES

PERFORMANCE SPECIFICATION SHEET SWITCHES, SENSITIVE, 10 AMPERES AND LOW LEVEL, UNSEALED

PERFORMANCE SPECIFICATION SHEET ADAPTER, CONNECTOR, COAXIAL, RADIO FREQUENCY. (BETWEEN SERIES BNC TO SERIES TNC), CLASS 2, STRAIGHT PLUG

DETAIL SPECIFICATION SHEET SWITCHES, ROTARY, SNAP ACTION CLASS 1SR BASE MOUNTED, SIDE CONNECTED

DETAIL SPECIFICATION SHEET DISK, VALVE. Inactive for new design after 15 October 1998.

MILITARY SPECIFICATION LUBRICATING OIL, VACUUM PUMP, MECHANICAL

PERFORMANCE SPECIFICATION SHEET SWITCHES, SENSITIVE, PLUNGER, 10 AMPERES 2PDT AND 7 AMPERES 4PDT, RESILIENT SEAL

PERFORMANCE SPECIFICATION SHEET

DETAIL SPECIFICATION SHEET NUT, TUBE COUPLING, SHORT

DETAIL SPECIFICATION SHEET

DETAIL SPECIFICATION SHEET

COMMERCIAL ITEM DESCRIPTION PINTLE ASSEMBLY, TOWING, MANUAL RELEASE, , AND LBS CAPACITY

DETAIL SPECIFICATION SHEET SLEEVE, SWAGING-WIRE ROPE

DETAIL SPECIFICATION SHEET NUT, TUBE COUPLING, SHORT

PERFORMANCE SPECIFICATION ACTUATOR, LINEAR, ELECTROMECHANICAL

DETAIL SPECIFICATION SHEET

DETAIL SPECIFICATION SHEET

DEPARTMENT OF DEFENSE INTERFACE STANDARD

DETAIL SPECIFICATION SHEET

DETAIL SPECIFICATION SHEET SLEEVE, SWAGING-WIRE ROPE

DETAIL SPECIFICATION SHEET

PERFORMANCE SPECIFICATION SHEET

MILITARY SPECIFICATION SHEET SCREW, CAP, HEXAGON HEAD (FINISHED HEXAGON BOLT), STEEL, CORROSION RESISTING, PASSIVATED, UNC-2A

DETAIL SPECIFICATION SHEET

MILITARY SPECIFICATION MICROCIRCUITS, LINEAR, CMOS, ANALOG SWITCH WITH DRIVER, MONOLITHIC SILICON

DETAIL SPECIFICATION SHEET CONNECTORS, PLUG, ELECTRICAL, STRAIGHT, MINIATURE, CLASSES E, F, G AND R

MIL-PRF-29595A 26 April 2011 SUPERSEDING MIL-B-29595(AS) 15 February 1994 PERFORMANCE SPECIFICATION

PERFORMANCE SPECIFICATION COOLERS, LUBRICATING OIL, AIRCRAFT, GENERAL SPECIFICATION FOR

PERFORMANCE SPECIFICATION BATTERIES AND CELLS, STORAGE, NICKEL-CADMIUM, AIRCRAFT GENERAL SPECIFICATION FOR

COMMERCIAL ITEM DESCRIPTION RELAYS, ELECTROMAGNETIC, GENERAL PURPOSE 10 AMPERES, 1-3PDT, AC AND DC COILS, SOCKET MOUNT

PERFORMANCE SPECIFICATION BATTERIES AND CELLS, STORAGE, NICKEL-CADMIUM, AIRCRAFT GENERAL SPECIFICATION FOR

MIL-STD S 26 JULY 1985

COMMERCIAL ITEM DESCRIPTION RELAYS, ELECTROMAGNETIC, GENERAL PURPOSE 10 AMPERES, 1-3PDT, AC AND DC COILS, FLANGE MOUNT

DETAIL SPECIFICATION SHEET COUPLING HALF, HOSE ATTACHMENT, HYDRAULIC, SELF-SEALING, GROUND SUPPORT, QUICK DISCONNECT, TYPE I AND TYPE II

MILITARY SPECIFICATION MICROCIRCUITS, DIGITAL, BIPOLAR, ADVANCED LOW POWER SCHOTTKY TTL, NAND GATES, MONOLITHIC SILICON

This specification is approved for use by all Departments and Agencies of the Department of Defense.

MILITARY SPECIFICATION SHEET CAPACITORS, FIXED, CERAMIC DIELECTRIC (GENERAL PURPOSE), STYLE CK05

DETAIL SPECIFICATION SHEET CAP INSERT, ASSEMBLY, PRESSURE SEAL, FLARED TUBE FITTING

DETAIL SPECIFICATION SHEET

PERFORMANCE SPECIFICATION SHEET

PERFORMANCE SPECIFICATION SHEET

[INCH-POUND] A-A December 1999 SUPERSEDING MIL-C-4109F 31 October 1986

DEPARTMENT OF DEFENSE STANDARD PRACTICE IDENTIFICATION CODING AND APPLICATION OF HOOKUP AND LEAD WIRE

COMMERCIAL ITEM DESCRIPTION HOSE AND HOSE ASSEMBLIES, NONMETALLIC SPRAY

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA 27106

DETAIL SPECIFICATION SHEET CONNECTORS, PLUG, ELECTRICAL, STRAIGHT, MINIATURE, CLASSES E, F, G AND R

FEDERAL SPECIFICATION METHANOL (METHYL ALCOHOL) 1.1 Scope. This specification covers three grades and four unit quantities of methanol.

PERFORMANCE SPECIFICATION

PERFORMANCE SPECIFICATION LUBRICATING OIL, JET ENGINE

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA 91790

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA 91790

PERFORMANCE SPECIFICATION GREASE, AIRCRAFT, GENERAL PURPOSE, WIDE TEMPERATURE RANGE, NATO CODE G-395

DETAIL SPECIFICATION SHEET INSULATION SLEEVING, ELECTRICAL, HEAT SHRINKABLE, CROSSLINKED CHLORINATED POLYOLEFIN, FLEXIBLE

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA RG-128-1, RG-128-2, RG-128-3

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA RG-380E/44 Series

DEFENSE LOGISTICS AGENCY LAND AND MARITIME P.O. BOX 3990 COLUMBUS, OH

PRODUCT SPECIFICATION

FEDERAL SPECIFICATION TRUCKS, HAND, TWO WHEELED

COMMERCIAL ITEM DESCRIPTION CLAMPS, HOSE

PERFORMANCE SPECIFICATION CALIBRATING FLUIDS, AIRCRAFT FUEL SYSTEM COMPONENTS

MILITARY SPECIFICATION SHEET

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA 91790

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA 91790

DETAIL SPECIFICATION RUBBER, FLUOROSILICONE ELASTOMER, OIL AND FUEL RESISTANT, SHEETS, STRIPS, MOLDED PARTS, AND EXTRUDED SHAPES

DETAIL SPECIFICATION SHEET INSULATION SLEEVING, ELECTRICAL, HEAT SHRINKABLE, FLUORINATED ETHYLENE PROPYLENE, NON-CROSSLINKED

PROCUREMENT SPECIFICATION FOR CNP19 CHERRY RIVETLESS NUT PLATE

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA RG-131

INCH-POUND MIL-DTL-24211D 25 February 2016 SUPERSEDING MIL-DTL-24211C 9 February 2011 DETAIL SPECIFICATION

Concorde Battery Corporation 2009 San Bernardino Road West Covina, California, USA 91790

Downloaded from

PERFORMANCE SPECIFICATION

PERFORMANCE SPECIFICATION COOLERS, LUBRICATING OIL, AIRCRAFT, GENERAL SPECIFICATION FOR

Military Batteries. (Rechargeable)

DETAIL SPECIFICATION GASKETS, WAVEGUIDE FLANGE GENERAL SPECIFICATION FOR

³ NOTICE OF³ ³INCH-POUND³. NOTICE 1 4 March 1991 MILITARY SPECIFICATION

Verification/Report Number(s): HEARTWAY MEDICAL PRODUCTS Co., Ltd. Applicant Name/Address:

DETAIL SPECIFICATION

Downloaded from

QQ-W-343F 19 November 1990 (TO SUPERSEDE) QQ-W-343-E November 13, 1981 FEDERAL SPECIFICATION WIRE, ELECTRICAL, COPPER (UNINSULATED)

SEP 2016 Rev D2

BOOST POWER 1212 Product Description

NCPP. Nickel Cadmium Pocket Plate Batteries. Block Cell Dimensional and Electrical Data

DETAIL SPECIFICATION DETECTOR PAD, FREE WATER. This specification is approved for use by all Departments and Agencies of the Department of Defense.

DETAIL SPECIFICATION SHEET

DETAIL SPECIFICATION SHEET INSULATION SLEEVING, ELECTRICAL, HEAT SHRINKABLE, POLYOLEFIN, FLEXIBLE, CROSSLINKED

Document Number: G006 Revision:09 Page 1 of 5

PERFORMANCE SPECIFICATION LIGHT EMITTING DIODE (LED) MILITARY DRIVING HEADLAMP

SM1206 Series. Overload Interrupt Time (Second) Nominal Rating - Note 2. Cold Resistance (Ohm) Note 1. Maximum I 2 T (Ampere 2 Second) Nominal Rating

COMMERCIAL ITEM DESCRIPTION BEARING, BALL, ANNULAR, SINGLE ROW, RADIAL, NON-FILLING SLOT, DIMENSION SERIES 02

MILITARY SPECIFICATION MOUNT, TELESCOPE AND QUADRANT: M172

PERFORMANCE SPECIFICATION GREASE, AIRCRAFT AND INSTRUMENT, FUEL AND OXIDIZER RESISTANT

Transcription:

INCH-POUND 25 FEB 2011 PERFORMANCE SPECIFICATION SHEET BATTERY, RECHARGEABLE, NICKEL CADMIUM, VENTED, 1.2-VOLT, 13 AMPERE- HOUR, BB-475/A CELL This specification is approved for use within Army CECOM Life Cycle Management Command, Department of the Army, and is available for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the product herein shall consist of this specification and MIL- PRF-81757. REQUIREMENTS 1. Part or identifying number. The part or identifying number (PIN) of the cell shall be M81757/22-1. 2. Dimensions and weight. The dimensions and weight of the cell shall be as specified in 3.10.8 as modified herein and as shown on figure 1 herein. The weight of the cell shall be not greater than 1.21 pounds (0.55 kg). 3. Capacity. The minimum capacity of the battery shall be 13 ampere-hours (14.2 initially). When tested as specified in MIL-PRF-81757, the test parameters and requirements of Table I herein shall apply. AMSC N/A Page 1 of 8 FSC 6140 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited

TABLE I: Test parameters and requirements, BB-475/A cell Test Test Method Discharge Rate(A) 1/ Cut Off Voltage(V) 1/ Capacity (Ah) Minimum 1/ Initial capacity discharge 4.5.13 13 0.95 14.2 Humidity 4.5.14 13 0.95 9.75 and Charge Retention Shock 4.5.15 330 0.53 5.5 Vibration 4.5.16 330 0.53 5.5 Temperature Shock 4.5.17 13 0.95 13 Altitude 4.5.18 13 0.95 13 Twenty-second pulse 4.5.20 330 0.53 5.5 discharge Medium Rate Discharge 4.5.21 117 0.76 9.7 and Operating Position Cycle Life 4.5.23 Normal Rate (Cycle 1) 13 0.95 13 High Rate 330 0.53 3.7 Normal Rate (Cycle 100) 13 0.95 13 Normal Rate (Cycle 200) 13 0.95 13 1/ Test parameters and requirements cited herein supersede those in the general specification. 4. Voltage. The nominal voltage of the BB-475/A cell shall be 1.2 volts. 5. MIL-PRF-81757 variance. The BB-475/A cell shall comply with MIL-PRF-81757 except as follows. 5.1 Modify the following paragraph(s): 3.6.2 Fasteners. After the phrase free of any coating add the following: except as otherwise specified herein. 5.2 Add the following new paragraph: 3.7.11.9 Shipping condition of cells. All cells shall be delivered complete with electrolyte to the proper level and completely discharged, but fully formed. Each individual cell, as supplied, shall be equipped with a shorting device across the output terminals. 5.3 Modify the following paragraph: 3.10.22 Constant voltage discharge. This requirement is not applicable to this battery. 2

VERIFICATION 1. MIL-PRF-81757 variance. The BB-475/A cell shall comply with MIL-PRF-81757 except as follows. 1.1 Modify the following paragraphs: 4.2.1 Inspection of replaceable cells. Delete text in its entirety and replace with the following: Five complete packages of cells (19 each) and one additional cell shall be furnished for inspection. 4.3.3 Sample size and selection for groups A, B, and C inspection. Add the following: Samples sizes specified for batteries shall apply to complete packages of 19 cells each. 4.5.12 Cell vent test. Add the following after the title: This test shall be performed on all M81757/22-1 cells in a package connected in series and configured as they would be in a M81757/21-1 (BB-664/A) or similar battery configuration (i.e., BB-476/A). 4.5.14 Humidity and charge retention test. Add the following after the title: This test shall be conducted with all M81757/22-1 cells in a package connected in series and configured as they would be in a M81757/21-1 (BB-664/A) or similar configuration battery (i.e., BB-476/A). 4.5.15 Shock. Add the following after the title: This test shall be conducted with all M81757/22-1 cells in a package connected in series and configured as they would be in a M81757/21-1 (BB-664/A) or similar configuration battery (i.e., BB-476/A). After examination, discharge at 330 amperes in three 20-second pulses with 120 seconds at rest between pulses. 4.5.16 Vibration. Add the following after the title: The following test shall be performed. This test shall be conducted with all M81757/22-1 cells in a package connected in series and configured as they would be in a M81757/21-1 (BB-664/A) or similar configuration battery (i.e., BB-476/A). Testing materials required are listed below. Upon completion, cells shall meet the requirements of 3.9. ITEM NSN P/N (CAGEC) QUANTITY Battery Container --- --- 1 Bus, Conductor 6150-01-041-4581 10371-114 (74025) 18 Screw, Hex head, SS, #8-38 32 UNC 3A, 7/16 L Washer, Spring 5310-00-118-1977 M81757/1-8A (81349) 38 16128-26 (74025) Washer, Flat 5310-00-976-4621 162A7819-22 (01002) 38 Notes: NSN = National Stock Number P/N = Part Number CAGEC = Commercial and Government Entity Code 3

a. Constant current charge cell assembly at the 1C rate. b. Assemble cells and hardware into a battery container. Use of polyamide shims to secure cells in place and petrolatum lubricant is permissible but not required. c. Attach container to vibration equipment in the normal, upright position. d. Connect cell assembly to the test system. e. Attach no less than two accelerometers to cells in the direction of the vibration motion; use the spectral density average of accelerometers to control test levels. f. Subject cells to the vibration test of MIL-STD-810, Method 514, Procedure I (Operational service), using Annex D parameters for Category 14, Helicopters, vibration parameters for General Materiel, f x values for Main Rotor of AH-64 (early) g. Disconnect cell assembly from vibration equipment; reattach to vibration equipment in a perpendicular axis. h. Repeat steps d through g for a total of 3 mutually perpendicular axes. i. Each vibration period shall be not less than one hour. j. Discharge cell assembly or individual cells at the 0.1C rate during each vibration period; monitor cell voltage during discharge. Use M81757/21-1 (BB-664/A) voltage parameters of MIL-PRF-81757/21. k. Upon completion of all three vibration periods, constant current charge cell assembly at the 1C rate. l. Discharge cell assembly with three 20-second pulses of 330 amperes with 120 seconds of rest between pulses. m. Remove cells from the battery container. n. Examine cells for the requirements of 3.9. 4.5.18 Altitude test. This test is required as described with the following exceptions: 1) For step b, use a test temperature of -1.1 C in lieu of -40 C 2) For step c, use a pressure that simulates 6,090 meters (19,980 ft.) of altitude in lieu of the 18,500 meters (60,700 ft.) pressure equivalent. 4.5.20 Twenty-second pulse discharge test. This test is applicable. However, for step (c), use a constant current of 330 amperes in lieu of the sloping discharge rate. 4.5.22 Constant voltage discharge test. This test is not applicable to this battery. 4.5.23 Cycling test. Delete text in its entirety and replace with the following: The following test shall be performed. 4

a. Cycle 1. Charge at a constant current at the C rate to 1.55 ± 0.10 volts per cell, then 1.1 amperes for another three hours. Rest for one hour at open circuit. Then discharge at the normal rate specified herein to cut-off voltage. b. Cycle 2. Charge at a constant current at the C rate to 1.55 ± 0.10 volts per cell, then 1.1 amperes for another three hours. Rest for one hour at open circuit. Then discharge at the high rate specified herein for not less than 20 seconds, followed by 260 seconds of rest, then discharge for another 20 seconds at the rate specified. c. Cycles 3-98. Charge at a constant current at the 1.5C rate to 1.55 ± 0.10 volts per cell and rest for one hour at open circuit. Then discharge at the high rate specified herein for not less than 20 seconds, followed by 260 seconds of rest, then discharge for another 20 seconds at the rate specified. d. Cycle 99. Charge at a constant current at the 1.5C rate to 1.55 ± 0.10 volts per cell and rest for one hour at open circuit. Then discharge at the high rate specified herein for not less than 20 seconds, followed by 260 seconds of rest, then discharge for another 20 seconds at the rate specified. e. Cycle 100. Repeat step a. f. Cycle 101. Repeat step b. g. Cycle 102-198. Repeat step c. h. Cycle 199. Repeat step d. i. Cycle 200. Repeat step a. NOTE: Water may be added on the 100th cycle. The amount of water added shall be recorded. Reconditioning is not allowed during the cycle life test. 1.2 Modify the Tables of MIL-PRF-81757 as follows: Table III. Qualification inspection of batteries. Delete and replace with the following: 5

Table III. Qualification inspection of replaceable cells. Test number Examination and tests 1/ Sample number 2/ Requirement paragraph Test paragraph 1 2 3 4 5 1 INSPECTION FOR DAMAGE X X X X 3.10.1 4.5.1 2 VISUAL AND MECHANICAL X X X X 3.10.6 4.5.6 4 DIMENSIONS AND WEIGHT X X X X 3.10.7 4.5.7 7 CELL VENT TEST X X X X 3.10.13 4.5.12 8 INITIAL CAPACITY DISCHARGE X X X X 3.10.14 4.5.13 9 HUMIDITY AND CHARGE RETENTION X X 3.9, 3.10.15 4.5.14 10 SHOCK TEST (BASIC DESIGN) X X 3.9, 3.10.16 4.5.15 11 VIBRATION X X 3.9 4.5.16 12 TEMPERATURE SHOCK TEST X X 3.9, 3.10.17 4.5.17 13 ALTITUDE X X 3.9, 3.10.18 4.5.18 15 TWENTY-SECOND PULSE DISCHARGE) 16 MEDIUM-RATE DISCHARGE OPERATING POSITION TEST X X 3.9, 3.10.20 4.5.20 X X 3.9, 3.10.21 4.5.21 18 CYCLING TEST X X 3.9, 3.10.23 4.5.23 19 TEMPERATURE RISE AND FLOAT X X 3.9, 3.10.9, 4.5.24.1 3.10.24 22 INTERNAL PRESSURE TEST X 3.9, 3.10.26 4.5.26 24 GAS BARRIER MATERIAL TEST (ONLY FOR CELLS WITH GAS BARRIER MATERIALS OTHER THAN THOSE LISTED IN 6.10.4) X X 3.10.28 4.5.28 25 STORAGE EFFECTS X 3.9, 3.10.29 4.5.29 26 SHELF LIFE X X 3.9, 3.10.30 4.5.30 27 CELL BAFFLE TEST SAMPLE CELL OF 4.2.1 3.7.11.5, 3.10.12 4.5.11 1/ Cells shall be tested connected in series as a complete battery unless otherwise specified. 2/ Sample numbers apply to groups of 19 cells 6

A Dimension 5.094 ±.025 B Dimension 5.687 ±.025 C Dimension 5.328 ±.025 D Dimension 1.530 ±.015 E Dimension 2.734 ±.020 F Dimension 1.187 ±.020 G Dimension.594 ±.010 H Dimension.602 ±.010 E G F H D H Filler/Vent Cap 8-32 UNC 2B thread to meet interface requirement (2 PL) Cell Identification C A B FIGURE NOTE: FIGURE 1: Battery Cell, BB-475/A All dimensions are in inches 7

Note: Potassium carbonate. Previous versions of specifications for the Army Apache battery had requirements and test methods for potassium carbonate. It has been determined that failure to control and limit potassium carbonate in production would result in cells incapable of complying with the performance requirements herein. Users of this document should be aware that there remains a need to limit potassium carbonate levels in order to provide assurance of capability in both qualification and conformance inspections. Custodians: Army CR Preparing activity Army CR (Project Number 6140-2009-023) NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https://assist.daps.dla.mil or https://assist.daps.dla.mil/quicksearch/. 8