TECHNICAL BULLETIN

Similar documents
CONTENTS 1 V500 OWNER S MANUAL

CONTENTS 1 V400 SERVICE MANUAL. 1.0 Vulcan On-Board Scale System... 5

CONTENTS 1 V200 SERVICE MANUAL

TECHNICAL BULLETIN

STRESS-TEK, INC S. 194 th Street Kent, WA June 2011 Stress-Tek, Inc. Doc Rev A

TMC 90 SPRING SUSPENSION

C-10 INSTALLATION INSTRUCTIONS

MS2200, MS2500, and MS3000 Suspension Installation Manual ON/OFF HIGHWAY SUSPENSION SYSTEM

INSTALLATION AND MAINTENANCE MANUAL

Version VDL Weweler b.v. Maintenance & Installation Manual

Trailer Suspension Series Installation Instructions. Advancing the Practical Application of Suspension Technology

REYCO SUSPENSION PARTS

INSTALLATION INSTRUCTION 88148

TMC 11T Air Suspension Service Manual

INSTALLATION INSTRUCTION 88051

KI AIR SUSPENSION (wide Pivot Bush)

WD DODGE SUSPENSION LIFT KIT P/N

KI AIR SUSPENSION (narrow Pivot Bush)

Technical Support Line: (952) Hanover Ave. Lakeville, MN

KT AIR SUSPENSION (Engineering Lit. No. KL006)

INSTALLATION AND MAINTENANCE MANUAL E6100 SERIES SPRING SUSPENSION

Flange Mount (Fl/mt) Flange mount hangers may be welded or bolted to the frame, or a combination of bolting and welding may be used.

Chrysler A-Body Tubular A-Arms Installation Instructions A-ARM INSTALLATION

INSTALLATION INSTRUCTIONS FOR FORD 4WD SUPER DUTY 2-1/2 SUSPENSION SYSTEM

BRAKE SYSTEM Return To Main Table of Contents

Part # WD Jeep Wrangler TJ Stage I 3 to 4 Lift Now Manufactured With Chromolly Arms PRO COMP SUSPENSION. Suspension Systems that Work!

MAINTENANCE & SERVICE BULLETIN KT AIR SUSPENSION. Note: For parts identification go to the FKH Parts View Bulletin KPS on

INSTALLATION INSTRUCTIONS Mopar Performance 2 Lift System 2009 and Newer Dodge Ram 1500 (DS) 4WD PART NUMBER P

'99-03 CHEVROLET/GMC IFS 4WD 6" SUSPENSION SYSTEM P/N INSTALLATION INSTRUCTIONS

TECHNICAL PROCEDURE NON-STEERABLE SUSPENSION SYSTEMS

Configurations & Parts Identification

INSTALLATION INSTRUCTION 88146

Parking brake Mechanical brake acting on rear wheels

product guide demand durability. select silent drive application charts

Parts & Installation. Slider Series Featuring The Hutch P 3 Pneumatic Pin Puller

Detroit Speed, Inc. Mini-Tub Kit Chevy Nova, Oldsmobile Omega, Pontiac Ventura P/N: &

East Manufacturing Corporation 1871 State Route 44 * P O Box 277 Randolph, Ohio Toll Free (800) Fax (330)

& UP Toyota Tacoma 2/4WD 6-Lug, 2000-UP Toyota Tundra 2/4WD Installation Instructions

INSTALLATION AND MAINTENANCE MANUAL. ROADTRACKtm RTD SUSPENSION

Superlift Leveling System / 6 Upgrade System for 2004 and Newer Ford F-150 4WD INSTALLATION INSTRUCTIONS

ON-BOARD SCALES. ON-BOA R D WEIGHING S O LUTIONS F O R THE R E FUSE INDUSTRY

WATER PUMP INSTALLATION INSTRUCTIONS WEIAND WATER PUMPS ACTION PLUS & TEAM G APPLICATIONS FOR SMALL BLOCK & BIG BLOCK CHEVROLETS

'88-'00 CHEVROLET/GMC IFS 4WD(8LUG) OLD BODY STYLE 6" SUSPENSION SYSTEM P/N

Folding Ball Gooseneck

Technical Information

Suspension. Table of Contents

INSTALLATION INSTRUCTIONS FOR FORD 4WD SUPER DUTY 6 SUSPENSION SYSTEM

OWNER S GUIDE 8A DURALIFT II 13,200 LB. CAPACITY. Link Mfg. Ltd th St. N.E. Sioux Center, IA USA

Airflex Air Ride Suspension System Installation Instructions

TMC 75 SPRING SUSPENSION

Presented By. NicolScales.com Contact Us

INSTALLATION INSTRUCTIONS 88511

Part # WD & 2WD Jeep XJ Cherokee 3 Lift Now Manufactured With Chromolly Arms PRO COMP SUSPENSION. Suspension Systems that Work!

HA/HAS Series. NO: SUBJECT: Driveline Angularity Procedures DATE: March, 1999 REVISION: C CONTENTS ITEM SUBJECT PAGE

INSTALLATION INSTRUCTION 88578

Trailer Suspension Series Configurations & Parts Identification

PN# Dodge RAM Cummins 2500/3500 4WD (Except PowerWagon) Steering Box Brace Kit PRO COMP SUSPENSION. Suspension Systems that Work!

WARNING DO NOT EXCEED THE MANUFACTURER S RECOMMENDED GROSS VEHICLE WEIGHT RATING (GVWR).

Superlift 4 lift system for FORD 1 TON 4WD INSTALLATION INSTRUCTIONS

PRIMAAX. - MAAXimize durability - MAAXimize driver comfort - MAAXimize performance. Severe-Duty Vocational Air Suspension

TECHNICAL BULLETIN TACTICAL WHEELED VEHICLES: REPAIR OF FRAMES

Installing RideSentry Suspension Axle Seats onto RideStar RHP Series Single-Axle and Sliding Tandem Trailer Air Suspension Systems

BRAKE SYSTEM GENERAL... 2 BRAKE PEDAL MASTER CYLINDER BRAKE BOOSTER BRAKE LINE PROPORTIONING VALVE... 19

01 09 Installation guidelines Air suspension units GL70 GL70HD GL70L GN Air suspension units GL70 GL70HD GL70L

Linkage Service Manual

Installation Instructions

Installation. Slider Series Parts & The World s Leading Manufacturer Of Trailer Sliders For Over Three Decades.

88-98 GM 2-3 SUSPENSION KIT

PRE-TRIP INSPECTION CDL SKILLS TEST

Airflex Air Ride Suspension System Installation Instructions

Installation Instructions

WARNING!! C-659 SUBKIT FIGURE 4

Suspension System RS6525 (B)

TECHNICAL PROCEDURE HENDRICKSON SUSPENSION SYSTEMS

ASSEMBLY INSTRUCTIONS FOR DYNAPRO BIG BRAKE FRONT HAT KIT, WITH DIAMETER VENTED ROTOR - RACE

GM P/U, Blazer, Suburban, 1 Ton 4WD 4-6 Kits

TRAILER INSTALLATION INSTRUCTIONS

Suspension System RS6507B (Rubicon models require end link kit RS6753B for a complete installation)

FRONT DRIVELINE MODIFICATION MAY BE NECESSARY!!!!

COMPETITION ENGINEERING. 80 Carter Drive P.O. Box 1470 Guilford, CT Phone: (203) Fax: (203)

DO NOT GRIND ANY WELDS! DO NOT QUENCH WELDS WITH WATER OR OIL. ALLOW TO AIR COOL.

TMC LMV & LMXp series

Part # Jeep Grand Cherokee/Wagoneer 4WD 3 Lift Now Manufactured with Chromolly Arms PRO COMP SUSPENSION. Suspension Systems that Work!

Cougar DC Truck Vibrators

Jeep Wrangler (JK)

Jeep Wrangler (JK) Present

PFadvantage Metalfor Araus 1360

Jeep Wrangler (JK) Present

INSTALLATION INSTRUCTIONS 88518

Motion System Components Diagram. Note: #2 Mirror Cover and X-Axis Motor Cover have been removed for visibility. Maintenance.

DODGE LIFT KIT

2216 (STOCK) / 2224 (3 LOWER) 2WD SPORT SWAY BAR SET 97-UP DODGE DAKOTA INSTALLATION OF HOTCHKIS PERFORMANCE FRONT SWAY BAR

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTION 88088

TECHNICAL PROCEDURE TRAILER SUSPENSIONS SYSTEMS

TMC ARS AIR SUSPENSION

WESCO INDUSTRIAL PRODUCTS, INC. Scale Pallet Truck. Part Number: &

LR-3510 Install and Operation Manual

TP29045, Rev 0 02/17. BASEPLATE Jeep Wrangler Original Equipment Bumper PARTS LIST. Pin Height- 16-3/4 Center- 24 ITEM PART # QTY DESCRIPTION

PRO COMP SUSPENSION. Suspension Systems that Work!

Transcription:

Stock No. H26 - MODULAR CENTER HANGER MOUNTING KIT, SPLIT BUSHING Stock No. H32 - MODULAR CENTER HANGER MOUNTING KIT Page 1 of 10 CONCEPT: This mounting kit, when used with our standard L02 load cells, will to fit into multi-leaf trailer suspensions without modifying the trailer frame. (U.S. PATENT 5,861,581) APPLICATION: Compatible with cast or fabricated Hutch H-7700, H-9600, H-9700, Transpro model 86 and 88 suspension systems up to 67" axle spreads, and Fruehauf F-2 suspension systems up to 67" axle spreads. Designed for multi-axle suspensions; Tandem axles require two load cells and mounting kits, Tri-axle and Quad-axle suspensions require four load cells and mounting kits. Fits undermount and split bushing applications. Either Hutch or Severson Industries (urethane) single hole equalizer bushings must be used with all center hanger load cells. SPLIT BUSHING TORQUE ARM CONNECTOR (H26 ONLY) Figure 137-A

Page 2 of 10 SPECIFICATIONS: CAPACITY: 25,000 lb per axle, maximum capacity. ACCURACY: Typical system error less than 1% of capacity for 2-axle suspensions only. Three and four axle suspensions may vary more than 1% depending on configuration. MATERIAL: High strength steel. Figure 137-B H26 Split Bushing Hanger Shown

Page 3 of 10 Figure 137-C H32 Hanger Shown EQUALIZER AND SUSPENSION REQUIREMENTS: VULCAN Center Hanger Mounting Kits are designed for spring suspensions with a 49" to 67" axle spacing. We found optimum performance can be achieved by using the following components: 1. EQUALIZER - A Hutch fabricated equalizer should be used. 2. EQUALIZER BUSHING - For most applications, Severson Industries Urethane Bushing (Part No. A80Bl8666) will provide the best service. Hutch single hole rubber bushings may also be used. 3. NO HOP AND UNDER SLUNG SUSPENSIONS This scale system is not compatible with NO HOP AND UNDER SLUNG SUSPENSIONS. The non-level torque arm in these suspensions can divert a significant amount of weight away from the load cell causing scale inaccuracies. We recommend that the suspension be converted to a standard suspension where the torque arm is close to horizontal.

ADDITIONAL PARTS NEEDED, STRESS-TEK, INC. DOES NOT SUPPLY OR SELL THESE PARTS: QTY PART NUMBER DESCRIPTION: 2 Hutch Hutch 49" to 67" equalizer. 2 Severson A80Bl8666 Urethane equalizer bushing. 4 Hutch 07620-00 Split bushing torque arm bushing. 2 Hutch 12709-01 Step bolt. 4 Hutch 12710-01 Washer. 4 Hutch 12711-01 Plain washer. 2 Hutch 00034-02 Hex lock nut. 2 Hutch 16150-01 1 1/8" X 7", GR5 cap screw. 4 Hutch 837-00 1 1/8" washer. 2 Hutch 11154-00 1 1/8" - 7 UNC, GR5 hex lock nut. Page 4 of 10 Note: A Hutch 9600 series suspension has these parts. New parts would only be needed if existing one were worn. INSTALLATION: Note: On two axle trailers, the trailer ride height will be increased by 1-3/8". On three or four axle trailers, the trailer ride height will be increased 2-5/8" and the front and rear spring hangers will need to be lowered to match the added height of the center hanger. Be sure to check the trailer height for adequate bridge or bunker clearance. Step 1 - PARTS ASSEMBLY: A new equalizer and bushing should be used when installing the VULCAN Center Hanger Load Cell Mounting Kit in worn suspensions. Using the 1-1/8" x 7" Grade 5 Cap Screw and Grade 5 Hex Locking Nut, assemble the hanger, load cell and equalizer as shown in Figure 137-D.

Page 5 of 10 Step 2 - HANGER ALIGNMENT: Use the suspension manufacturer s installation instructions for hanger spacing and alignment. Following these instructions will result in the longest service life and provide the best scale accuracy. VULCAN load cells used in conjunction with the modular center hanger mounting kit must be installed with the connectors on the inboard side. CAUTION: Cocked, tilted, or misaligned center hangers may cause inaccurate weight readings or cause premature bushing failure. DO NOT hammer the center hanger or use excessive force in an effort to properly position it. RETROFIT trailer frames must be cleaned, inspected for cracks, rust, and other signs of damage or deterioration. Proper repairs must be made prior to the installation of the center hanger load cell. Never assume that the structure is adequate for the new center hanger mounting kit - INSPECT IT! -- CORRECT IT! Consult frame manufacturer as required. Figure 137-D

Step 3 - WELDING: Page 6 of 10 All welding and welding procedures must meet the American Welding Society Specifications. The specification of the welding electrode, as well as proper preparation of the weld area, is dependent on the composition and thickness of the frame material. If there is any doubt about which welding process to use, contact the frame manufacturer for clarification. After the suspension is aligned, tack the center hanger in place. It is recommended that the welding process be done in a minimum of four steps as shown in Figure 137-E. VULCAN load cells are extremely sensitive instruments! They are also easily damaged while being installed; therefore remove the load cell from the center hanger mounting kit to avoid damage during welding. Caution! Do not exceed 140 degrees Fahrenheit (60 C) on the load cell. Arcing on the body of the load cell may seriously damage the load cell s structural integrity and the load cell must NOT be installed if this occurs. This also voids manufacturer s warranty. A CONTINUOUS WELD MUST BE COMPLETED AROUND EACH CORNER.

Page 7 of 10 Figure 137-E Connect the brace channel between both center hangers using a weld on tab and two 5/8" grade 8 cap screws with Grade G Locking Nuts. Reinforcing members can be added, if necessary, from the brace channel to the trailer frame without affecting the performance of the load cell. Do not attach any reinforcing to the load cell or the equalizer bracket, as this would make the load cell non-functional. IF ADDITIONAL REINFORCEMENT IS INSTALLED, ENSURE THAT CLEARANCE IS AVAILABLE TO INSTALL AND TORQUE THE EQUALIZER CAP SCREW AND THE ELECTRONIC CONNECTORS.

Page 8 of 10 Step 4 - TORQUE SPECIFICATIONS: Hutch 9600Torque Arm Grade 5 Step Bolt 1" Diameter Hutch 9700Torque Arm Grade 8 Cap Screw 1" Diameter Hutch 9600 or 9700 Equalizer Grade 8 Cap Screw 1-1/8" Diameter 350 lb-ft, Oiled, 470 lb-ft, Dry 540 lb-ft, Oiled, 720 lb-ft, Dry 590 lb-ft, Oiled, 790 lb-ft, Dry Figure 137-F NOTE: Torque readings should be taken from nut only. Check torque periodically.

Page 9 of 10 Step 5 - FINAL INSPECTION: Make certain that all springs are properly seated on their wear pads. Twisted springs, springs with insufficient clearance or cocked hangers can cause uneven and excessive wear and possibly inaccurate scale readings. Check the equalizers to be sure there is adequate clearance between the ends of the springs and the equalizer beam hub when the axle is unloaded and loaded. Double check all fasteners to see that they have been tightened to the proper torque. Step 6 - WIRING: Secure Vulcoders to the trailer frame. Route black cables to the load cells so they will not be damaged by road debris. Route orange cable from Vulcoder to the Meter in the cab of truck (or NEMA enclosure on trailer). It is suggested that you use a separate cable (or two dedicated wires in 7-wire cable) between the truck and the trailer. If a separate cable is used, a 4 pin Berg type connector can be used at each end of the cable. Additional electronic installation notes and system operational procedures can be found in your Vulcan Operations and Maintenance Manual for V200 and V400 systems and the Owner s Manual for the V500 and V600 systems. Starting calibration numbers for this system follow: V200 Electronics - V01 2 lead Vulcoder - Cal Number 4100 V500 and V600 Electronics - V23 2 lead Vulcoder - Cal Number 4100 V500 and V600 Electronics - V24 4 lead Vulcoder - Cal Number 4100 Input the starting Cal number and the correct Tare weight then start the calibration process as outlined in the Vulcan Operations and Maintenance Manual for V200 systems and the Owner s Manual for the V500 and V600 systems.

Page 10 of 10 Step 7 - MAINTENANCE Look for mud, ice build-up, or other debris between the load cell and bracket. Refer to location A shown on Figure 137-F. Check load cell connectors (refer to location B shown on Figure 137-F) to make sure they are finger tight plus an additional 1/8 of a turn with channel lock pliers. The additional tightening is necessary to prevent scale errors, which can occur from moisture entering into the load cell connector. Do not grease or lubricate inside the Vulcan load cell connector or VSL Vulcoder connector. These components are highly sensitive to foreign substances and inaccurate readings will occur if these components are contaminated. Your manufacturer s warranty does not cover the failure of Vulcan components due to contamination (use of grease or other conductive substance) in either the Vulcan load cell connectors or VSL Vulcoder connectors. If a connector is opened for any reason, you must clean the load cell connector and cable connector with cotton swabs and isopropyl alcohol, dry with a hair dryer (DO NOT OVERHEAT), and replace the O-ring before reconnecting. Check the torque on load cell cap screws monthly. New trucks must be checked once a week for 2 weeks. Vulcan On-Board Scales recommended torque values are shown on Figure 137-F. As a method of monitoring changes in fastener torque, Vulcan On-Board Scales recommends applying torque stripes to all fasteners. Note: Retightening the fasteners in the center hanger after the scale system has been used may cause a shift in tare weight and/or scale operation. Recalibration may be needed. Vulcan load cells are plated for increased rust protection. Certain minimum maintenance will be necessary to claim warranty of load cells. Annually, apply a high quality paint to the load cells, bearing pads, and mounting brackets. For environments where high concentrations of salts are used on road surfaces, undercoating is recommended (3M, Universal Rubberized Undercoating, 3M P/N: 8883). Spray undercoating when load cells are connected to electronics and fully assembled with bearing pads and brackets. See Vulcan Load Cell Maintenance document 44-20006-001 for further details. Check welds on load cell brackets. IMPORTANT: If a weld repair is required, remove the load cell. Caution! Do not exceed 140 degrees Fahrenheit (60 C) on the load cell. Arcing on the body of the load cell voids the manufacturer s warranty and may seriously damage the load cell s structural integrity. The load cell must NOT be installed if this occurs.