Summary of the Alcoa Highway Redevelopment Project

Similar documents
Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Letter of Transmittal

Public Information Workshop

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Traffic Engineering Study

# TO: FROM: PREPARED BY: DATE: SUBJECT:

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Traffic Impact Study Speedway Gas Station Redevelopment

Request for Design Exception (#1) S.M. Wright Phase IIB

PERFORMANCE ACTIVITY 603 SIGNS

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

STH 60 Northern Reliever Route Feasibility Study Report

Transportation & Traffic Engineering

IMPROVEMENT CONCEPTS

2.0 Development Driveways. Movin Out June 2017

800 Access Control, R/W Use Permits and Drive Design

Knox County Zoning Ordinance Amendments: Section Off-street parking lot layout, construction and maintenance. 4-A-15-OA

Wentzville Parkway South Phase 2 & 2A

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Technical Feasibility Report

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

APPENDIX A Interstate 26 Widening Traffic Analysis Report

INDUSTRIAL DEVELOPMENT

Maryland Gets to Work

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

IH 35 FEASIBILITY STUDY

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

EXCEPTION TO STANDARDS REPORT

The remainder of this memorandum contains the details of our peer review findings.

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

King Soopers #116 Thornton, Colorado

5.9 TRANSPORTATION AND TRAFFIC

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Lacey Gateway Residential Phase 1

US 67 WIDENING PROJECT

PUBLIC INFRASTRUCTURE PROJECTS

US 70 Corridor Planning for the Future

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

9. Downtown Transit Plan

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Traffic Feasibility Study

ANDERSON PROPERTY SITE ANALYSIS

CAR 10-1 TRAFFIC CALMING CAR 10-1 OPR: Engineering 06/06

3.15 SAFETY AND SECURITY

STATE LOOP 195 PUBLIC MEETING. Footer Text

Interstate 85 Widening Traffic Analysis Report

TRAFFIC IMPACT ANALYSIS

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

Exposition Corridor Transit Project

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Committee Report. Transportation Committee. Business Item No

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

TRAFFIC CALMING PROGRAM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

Public Meeting Summary And Responses to Comments

Speed Evaluation Saw Mill Drive

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

Appendix J Traffic Impact Study

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

Sound Transit East Link: Bus/LRT System Integration Study

Letter EL652 City of Mercer Island. Page 1. No comments n/a

COUNTY ROAD SPEED LIMITS. Policy 817 i

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction

Proposed Project I 35 Improvements from SH 195 to I 10

Oakbrook Village Plaza City of Laguna Hills

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

APPENDIX E. Traffic Analysis Report

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Access Management Standards

Construction Realty Co.

Regular Meeting and Public Hearing of the Zoning Subcommittee

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:

Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

Transportation Highway Engineering Conference February 24, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

10/11/2018 Request of LeConte Holdings for a Plan Amendment to General Commercial and Commercial Rezoning to C-4 for 9608 Westland Drive,

CTA Blue Line Study Area

Draft US Corridor Study Traffic Analysis Report

Transcription:

Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community) has actively participated in the formation of plans for the reconstruction of Alcoa Highway. This brief summary of the redevelopment plans attempts to explain the Tennessee Department of Transportation s (TDOT s) construction plan and presents limited information relating to the implementation schedule. It was obtained from numerous published reports, including Knoxville News Sentinel articles and TDOT s Public Hearing Summary and webpage. It does not present the enormous number of letters to and from the community groups who contributed to discussions regarding safety issues and construction plans. Background: State Route 115 (US 129 Alcoa Highway) is a principal urban highway artery in the National Highway System, and is responsible for moving traffic between the cities of Alcoa and Knoxville. Figure A-1, TDOT Alcoa Highway Project Plan, depicts four projects planned for the improvement of the Alcoa corridor. An environmental impact study prepared for Alcoa Highway improvements addresses all four projects; the planned design approach for the entire highway section is consistent and will widen the existing highway to three lanes in each direction, with 12-foot wide shoulders and limited access control. This access will be limited to right-in/right-out only access, facilitated by new or reconstructed interchanges. The implementation schedule of the four projects will not be concurrent. TDOT prepared a feasibility study for improvements to Alcoa Highway between State Route 35 and the Cherokee Trail Interchange in 1989. The City of Alcoa, the Knoxville/Knox County Metropolitan Planning Organization (MPO), and the Knoxville Airport authority retained consultants to review the feasibility study and make recommendations regarding the highway improvements relative to each organization s domain. The resulting functional design plan of 1993 incorporates these organizations recommendations and includes: No left turns and no median cuts No signals (for 20-year study period) One-way frontage roads (where warranted) Three lanes of through traffic in each direction Liberal use of right-in/right-out turns Moderate use of interchanges and crossovers Knox County four new grade separations (bridges) Blount county six new grade separations Appendix B B - 1 Alcoa Highway Redevelopment Project

The discussion that follows describes the project from Maloney Road to Woodson Drive (PIN 100241.04 in Figure B-1.). Figure B-1: TDOT Alcoa Highway Project Plan Purpose: To provide a partial access control facility to improve safety and efficiency for traffic movement from just south of Maloney Drive to north of Montlake Road with minimum interference. The proposed improvements are designed to eliminate left turns on and off Alcoa Highway. In addition, no median openings will be constructed, and for this project three bridges over Alcoa are proposed. The design speed is 50 mph. The proposed improvements to the corridor will include three 12-feet traffic lanes in each direction, a twelve-foot outside shoulder for each traffic direction, and a median with a concrete barrier, thereby requiring a 138-feet proposed right of way. Appendix B B - 2 Alcoa Highway Redevelopment Project

Proposed Development Approach: Figure A-2 is the author s interpretation of the Maloney to Montlake portion of the Alcoa Project. It was obtained primarily from TDOT s publication resulting from the Public Hearing, dated March 29, 1999. It is obviously subject to change, if it hasn t been changed already. Figure B-2: Maloney Drive to Montlake Road Project Appendix B B - 3 Alcoa Highway Redevelopment Project

This project is initiated south of Maloney Road, where a third northbound lane will be added, with tapering of the southbound side from three lanes to the existing two-lane section (in the event that this project is initiated prior to PIN100241.02-Figure B-1). A bridge over Alcoa is proposed for Maloney to eliminate left turns to and from the highway. New connector lanes to the bridge will be placed on both sides of Alcoa north of the overpass. These two-way connector roads tie Alcoa to Maloney and allow right-in/right-out movement from Alcoa. It allows motorists to proceed in either direction on Maloney and Alcoa; with the absence of left turns from Alcoa. Access control fences around the connector roads will prevent the connection of driveways and side roads. Ginn Road, which is just north of Maloney on both east and west sides of Alcoa, will tie in as T- type intersections with a right-in/right-out only traffic pattern. South Circle Road will be closed at Alcoa Highway and a connection will be made to tie into Ginn Road on the east side. A second bridge crossing over Alcoa is proposed at approximately 2300-feet north of Maloney to provide access to the shops in the Village Plaza South Shopping C enter and to improve traffic flow. This additional roadway will intersect the northbound lanes 656-feet north of Ginn and crosses over Alcoa at the Vulcan Materials entrance and continues west before circling behind the shopping center. It then intersects the southbound lanes at the shopping center entrance. This roadway will not be access controlled and will allow full access to businesses and the use of driveway connections. A third bridge is proposed to support Mt Vernon Drive traffic. This overpass will have one lane of traffic in each direction. Mt. Vernon will be connected to Montlake Drive by a connector road on the west side of Alcoa; it will be a two-way, two lane access road, and will intersect Montlake 460-feet west of the intersection of Montlake and Alcoa. An exit ramp on this connector will allow traffic travelling westbound on Mt. Vernon to enter southbound Alcoa. A connector road is proposed to the south and east of this interchange to allow right hand turns from northbound Alcoa onto Mt. Vernon and/or Montlake. This connector road will be an extension of the Bunker Hill Drive. Vehicles traveling northbound on Alcoa can use this connector road to access both Mt Vernon and Montlake. And in turn, vehicles using either Montlake or Mt. Vernon can use these connector roads to access northbound Alcoa by using the connector road. The Montlake and the Barber Hill Lane intersections will also have the restriction of right-in/rightout turns with Alcoa. With left turn restrictions and concrete median barriers, all traffic from Montlake will be required to use the proposed Mt. Vernon overpass and connector roads. Traffic desiring to turn left from Barber Hill will be required to turn right and proceed to a section of Alcoa where a u-turn intersection is permissible. (The details of Woodson Drive to Cherokee Trail (PIN 100241.03, Figure B-1) address this interchange and are not available to the author at this time.) Appendix B B - 4 Alcoa Highway Redevelopment Project

Implementation Schedule: The four Alcoa Highway projects are currently in the environmental Stage. The Environmental Document has been sent to the Federal Highway Administration Division for review. Several public meetings have been held; Planning Division meeting in 1997, Design Division Meeting in 1999, and three neighborhood meetings on interchanges at Woodson Drive, Montlake Drive and Mount Vernon Drive. To date the Environmental Assessment findings indicate no significant impact. An evaluation of IC King Park has been defined. Public hearings and review will be held following approval of environmental documents, and the earliest date for a public hearing is spring 2010. Required changes that result from the public hearings will be incorporated into the final Right of Way Plans, but no timetable beyond the spring 2010 public hearings has been established. Right-of-way activity is underway for the section north of Maloney to Woodson, but no set timetables have been established for the remaining Alcoa Highway sections. (Because the rightof way acquisitions have been initiated in this section of the planned Alcoa corridor improvements, it would appear to the author that this project will be initiated first.) The schedule of contract letting and beginning of construction has not yet been determined. Other Notes and Observations: TDOT provides advance notification of impending right-of-way acquisition once a project is approved. The Right of Way Office appraises purchases and, if required, assists families and businesses in relocating. To date, some of the properties have been bought along the planned Alcoa upgrade, including two residences on the west side of Alcoa between Montlake and the shopping center. The third residence belongs to Dick and Carol Warren, who also own property on Timberlake; as of this writing, they have not sold to TDOT and have rejected TDOT s current offer. Another property, the first residence on the northwest side of Maloney, has also been acquired by TDOT, as has the business property of storage structures at the northwest corner of Alcoa and Maloney. The Timberlake community held several meetings and produced a slew of letters encouraging changes to the Alcoa corridor to improve safety. These letters range in topics from asking for more police support for enforcing speed limits, to installation of stop lights, and to petitions for additional safety measures. Several community groups have been formed in the past, (e.g., Make Alcoa a Safe Highway (MASH)) to address the problems on Alcoa; the Mash report summarized findings in the summer of 1986. The MASH report is posted online at http://ttcknox.home.comcast.net/mash.pdf and is included in Appendix E of the Timberlake History Project (electronic version only). Several of our current Timberlake citizens participated in these earlier studies and public hearings, including John Rennie, Gene Burr, and Kermit Duckett. They are to be congratulated for their time, energy and inputs to make the (eventual) Alcoa Highway safer. Appendix B B - 5 Alcoa Highway Redevelopment Project