UNITED KINGDOM RESCUE ORGANISATION. Advancing professional rescue. Lifting Plans. Fire Service College Heavy Rescue Workshop

Similar documents
UNITED KINGDOM RESCUE ORGANISATION Advancing professional rescue

LGV Boarding UKRO Workshop. August 2012 Lincoln

Public Service Vehicle (PSV) Workshop

rtc rescue A simple look at Bus Construction and some of the hazards we may face Bus Construction

Principles of Vehicle Extrication

Driver CPC 4U National Transport Training

Standard Operating Procedure Ottawa Fire Service. Extrication Vehicle Extrication Procedures - Revised

Chapter 42. Objectives. Objectives 01/09/2013. Gaining Access and Patient Extrication

UKRO HYBRID VEHICLES. Challenge Hampshire 2010

Placement on the fireground simply refers to how and where an apparatus is placed at the scene.

Conduct on-road training for motorcycle riders

Technical test - Theory. No. Question Answers Max. Mark

L.D02.C.M(.A) Installation Manual. Citroën Jumper X244, Fiat Ducato X244, Peugeot Boxer X244, Auxiliary Air Suspension

CPCS renewal test factsheet

Crane Services. For all brands of cranes and carriers.

Rescue Refresher: Vehicle Extrication

CPCS renewal test factsheet

Auxiliary Air Suspension. Installation Manual L.NAV.05.C.M. Nissan Navara (D40) May 2009

Auxiliary Air Suspension. Installation Manual L.HI.L4.C.M. Toyota Hilux 4 WD. May 2011

CPCS renewal test factsheet

Incidents Involving Electric Vehicles

L.IVE.LS.C.M (RWD Single Tire) Iveco Daily L and S (2005)

CPCS renewal test factsheet

L.D94.C.M(.A) Auxiliary Air Suspension. Installation Manual

L.312.C.M. Auxiliary Air Suspension. Installation Manual. Mercedes Benz Sprinter 200/300 Series ( ) Volkswagen LT ( )

CPCS renewal test factsheet

Vehicle Operation Procedure HSE

RAPID INTERVENTION TEAM STANDARD OPERATING PROCEDURES

SAFETY ARTIC TIPPER GUIDANCE - PREVENTING OVERTURNS LAFARGETARMAC.COM

Assisted and Automated Driving DEFINITION AND ASSESSMENT: SUMMARY DOCUMENT

L.D84.C.M. Auxiliary Air Suspension. Installation Manual

GEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures IVN Authority: Effective Date: Page 1 of WETHERINGTON/HODGE 4/01/02 5

Emergency response guide

Hybrid & Electric Cars Guidance for organisers of Speed events

RHA The HGV Driver Road Haulage Association 30 November 2017

Travis County Emergency Services District #1 Standard Operating Guidelines

TIME TASK FORCE. Guidelines for the Mitigation of Motor Vehicle Fluid Spills at Crash Scenes (Non-Cargo)

Basic Vehicle Stabilization

Air Brake Adjustment. What You ll Learn After reading this chapter you will be able to:

Six keys to achieving better precision in linear motion control applications

Auxiliary Air Suspension. Installation Manual. L.IVE.35.C.M & L.IVE.C.C.M Iveco Daily 30-8 / ( ) Iveco Daily 35C / 55C (1999 onwards)

rtc- rescue.com Carbon Fibre Reinforced Plastics in high- end road vehicles What is Carbon Fibre Reinforced Plastics (CFRP)?

AUTO EXTRICATION / STABILIZATION

CPCS renewal test factsheet

Safe Work Instruction

CPCS renewal test factsheet

Unit Standard Demonstrate knowledge of the safe operation of a motorcycle

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Hiab Multilift XR Power range hooklifts

SOME BASICS OF TROUBLESHOOTING

Recover Light Vehicles Using Advanced Winching Techniques

CPCS renewal test factsheet

SELECTING A MOBILITY SCOOTER

Guidance on safe procedures for staff and students in respect of road traffic incidents and breakdowns

MULTILIFT XR Power range hooklifts

PREVOST AIR SYSTEMS WHAT THEY DO AND HOW THEY DO IT

SHOCK ABSORBERS By Syd Gallagher. Triumph Saloon & Estate PI 2000Mk PI 2000TC TC 2500S

MANUAL & POWERED WHEELCHAIRS TRANSPORTATION & TIE-DOWN INFORMATION. Tie-Down Point

E17H RAIL WHEEL INSPECTION

Bus and coach engineering technician standard: Employer Occupational Brief

Technical Test Theory Mobile Elevating Work Platform - Boom A26

TRAILER MANUAL MODEL CDT1.2 CABLE DRUM TRAILER

Agricultural tractor Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Forward tipping dumper Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Diesel Locomotive Train Driver. Lesson Plan and WorkBook

MODULE 6 Lower Anchors & Tethers for CHildren

UNDER VEHICLE ACCESS SAFETY

L.L200.2.C.M L.L200.4.C.M Mitsubishi L200 Two - and Four - wheel Drive ( )

Driver Assessment Report

English. Fitting Instructions: Tiger 800 and Tiger 800XC A and A or A of 5. Parts Supplied: A Parts Supplied: A

Emergency response guide

The Econic as a fire appliance. When saving seconds can save lives.

AIR-SUSPENSION. Designed for: Alko Chassis

Keeping your new driver safe.

TJA2.5 ALUMINIUM TROLLEY JACK

Technical Test Theory Lorry Loader A36

High-Voltage, High-Current DC- DC Converters Applications and Topologies

Installation Manual L.MAS.10.C.M. Nissan NV400, 2010 Onwards Opel, Vauxhall Movano 2, 2010 Onwards Renault Master X Onwards

Off-Road Skills Demonstration

Technical Test Theory Telescopic Handler A17

Driver CPC exemptions: examples

AD45 Front Strut Handling Tool George Fisher Mine, Mount Isa Mines, a Glencore Company

Design Considerations for Pressure Sensing Integration

Diesel Locomotive Train Driver. Mentor s Q&A

Product presentation RAILWAY

Development of a Multibody Systems Model for Investigation of the Effects of Hybrid Electric Vehicle Powertrains on Vehicle Dynamics.

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Convertible with unique safety features

Apparatus Riding Assignments

Heavy vehicle service and maintenance technician standard: Employer Occupational Brief

Glendale Fire Department

INSTRUCTOR GUIDE TOPIC: APPARATUS RESPONSE LEVEL OF INSTRUCTION: TIME REQUIRED: TWO HOURS MATERIALS: APPROPRIATE AUDIO-VISUAL MATERIALS

BRIDGEMONT BMS. The new force in weighbridge design

The Apparatus Architect-Part 24. Designing Rescue Squad Apparatus


used only in conjunction with university sponsored activities. Talking on cell phone or texting while driving are prohibited.

TABLE OF CONTENTS SECTION TITLE PAGE NUMBER

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition)

SUM Chevy Truck frame mount booster kit

Transcription:

Lifting Plans Fire Service College 2015 Heavy Rescue Workshop

Heavy Vehicle Lifting and Stabilisation Rescue from road vehicles involved in collisions has long been associated with the Fire and Rescue Service. FRS s across the UK attend these sorts of incidents on a daily basis, rescuing trapped casualties from all types of vehicle on the UK s roads. Heavy Vehicle Road Traffic Collisions (RTC s) offer many varying challenges to attending emergency responders for a number of reasons, for example: Size, Weight and Construction of the Heavy Vehicle (Up to 44 Tons GVW for a normal LGV, Special Types can be 150Tons+) Vehicle systems and design, significantly different to light vehicles, (air brakes, air suspension and suspended cabs/ drivers seats etc). Many different vehicle options are available depending of the vehicles intended use.

Heavy Vehicle Lifting and Stabilisation Multitude of loads carried on UK roads, from supermarket foodstuffs to explosives, not only dealing with these loads but getting accurate early information can be problematic. Heavy Vehicle incidents may involve Emergency Responders working at height to free trapped drivers, or involved in securing/ removing loads which may have shifted to facilitate a rescue. Wider range of rescue equipment required, not only to release or gain access to the trapped occupants, but to perform any required securing, lifting and stabilising actions safely and correctly. Forces generated can be significant, Commercial vehicles are restricted by law to 56 MPH for an LGV, 65 MPH for a PSV/ Coach. The larger busses and coaches on UK roads can carry up to around 70 people, with the normal coach or bus around 49-52 depending on design, this will ensure high casualty numbers if involved in a significant collision.

Heavy Vehicle Lifting and Stabilisation To ensure any Heavy Vehicle incident is satisfactorily concluded Operational Fire and Rescue Service personnel must equip themselves with the knowledge and techniques required. There are a number of critical interventions which must happen on arrival at a scene to ensure the safety of all attending personnel and casualties. Many of these risk critical steps can be successfully completed without any specialist equipment. Once these key operations of assessing and managing the vehicles air brake/ air suspension system are complete, the subsequent planning to release entrapment can move forward safely.

Heavy Vehicle Lifting and Stabilisation Stabilisation and lifting of a heavy vehicle will require a properly assessed lifting plan to ensure the vehicles chassis/ Axle s are stabilised correctly before, during and after the lifting process. Part of that planning will be to correctly allocate primary and secondary lifting resources to the task in hand. This planning should ensure all the lifting and stabilisation resources can complete their operation successfully without hampering each other's.

Heavy Vehicle Lifting and Stabilisation When FRS s consider equipment options for Heavy Rescue incidents, there is a wide range available from a number of manufacturers, from the more traditional high and low pressure air bags to purpose built hydraulic lifting struts, LGV rated stabilisation shores and rim lifting systems. To complement this state of the art equipment sometimes the most useful items of equipment can be something as simple as a trolley or bottle jack, especially when the lifting requirement is minimal to release the entrapment. As with any chosen piece of lifting equipment or preferred lifting technique, the key consideration should be its ability to be successfully dynamically stabilised whilst carrying out its operation. Should a chosen lifting technique potentially be difficult to stabilise, the lifting technique and Lifting plan should be revisited.

Lifting Plans (for all lifts) Ensure parking brake suitably managed/ applied (Including 1x pair of LGV wheel chocks fitted), (refer to guidance attached) Initial static stabilisation/ safety cell (air suspension protection etc) Primary lift set up (within equipment capabilities) Dynamic stabilisation, Maintains full contact whilst lift in progress. Secondary lift/ Plan B, set up as soon as possible/ resources allow Static stabilisation, if load suspended for long period (Wood/ blocks)

Ensure air brake Management/ wheel chocks Initial static stabilisation/ safety cell established Full lift Supported/ partial lift? Primary lift set up + Dynamic stabilisation Direct Lift Indirect Lift (Is Axle isolation required) Commence lift Secondary lift (plan B) set up as soon as possible/ resources allow Static stabilisation (if load to be suspended for a long period)

Lifting Plan (Direct lift) Main lift, Hiab crane Dynamic stabilisation, Paratech VSK Secondary lift, Air bags ( under axle) Static stabilisation if required, wooden sleepers

Considerations Parking brake managed using one of the following techniques (with engine off), Repeated foot valve operation Air reservoirs drained Red (emergency) suzie line removed (Artic/ drawbar) Trailer parking brake applied (Artic/ drawbar) Set of LGV wheel chocks fitted, On flat ground, either side of 1x wheel, (non parking brake axle) On a gradient, both chocks fitted on down hill side of 2 wheels, (non parking brake axle) All the above on a wheel which will not be raised off the ground during lifting.

Considerations Initial static stabilisation/ safety cell established Rigid chassis/ body stabilisation employed ASAP Either side of casualty/ casualty vehicle Protects against an air suspension failure/ compromise Permits personnel to work under an air suspended chassis (SSOW) Equipment must be fit for purpose, within SWL/ WLL and set up/ used correctly within the manufacturers recommendations. (including wooden cribbing- purpose built rescue struts/ props). Consider additional stabilisation if both sides of LGV or centreline compromised. May require additional stabilisation if immediate area to be stabilised is compromised due to access, deformity or corrosion etc. Needs to take into account vehicle GVW and any load shift factors.

Considerations Primary/ Main lift Can we lift the component trapping the casualty/ casualty vehicle directly (Direct lift)? Do we have the lifting capability whilst maintaining full dynamic stabilisation? If not can we indirectly lift the component (indirect lift) using isolation techniques?, again whilst maintaining full dynamic stabilisation? Within the above can we achieve this leaving any road wheels still in contact with the road to help maintain stability and parking brake requirements (Partial/ Supported lift)? If possible try to avoid lifting an axle fully off the ground, it will make the lift more unstable and remove braked road wheels from holding the vehicle in place. Equipment must be fit for purpose, within SWL/ WLL and set up/ used correctly within the manufacturers recommendations. Does the equipment we are choosing have the necessary performance in capacity and height required?

Considerations Is the vehicles construction in the area we are choosing to lift/ stabilise structurally sound and able to take any additional loading? When selecting a primary/ main lift, consider dynamic stabilisation at the same time. Certain lifting techniques will be easier to stabilise due to available access or suitable structure. If the lift cannot be dynamically stabilised correctly the lifting technique chosen must be reconsidered When placing lifting equipment, thought should be given to leaving space/ access for dynamic stabilisation and secondary lifting equipment. Inconsiderate equipment placement can restrict or rule out subsequent equipment use. Before initiating the lift ensure all connections and stabilisation are checked (final check)

Considerations Monitor closely the lifting phase, ensuring the lifting and stabilisation equipment remain in contact and maintain shape, should any part start to work outside its designed range or specification the lift should be stopped, statically stabilised and corrected before continuing. High and low pressure air bags due to their construction will change or adapt their shape during lifting operations, sometimes producing a sideways or offset force thus causing additional stabilisation issues. Lifting and stabilising struts are designed to operate within certain parameters, should they operate outside that the less of the vehicles applied weight they are able to accept (refer to manufacturers guidance/ best practice)

Dynamic stabilisation Considerations Must be employed in all lifting operations Must maintain full contact with the lift/ casualty vehicle and the ground at all times Will ensure that should there be an equipment failure or problem with the casualty vehicle, the lifted chassis/ item remains held in place. Variety of equipment in the market place from wooden blocks to purpose built struts Equipment must be fit for purpose, within SWL/ WLL and set up/ used correctly within the manufacturers recommendations. Does the equipment have the same or greater operating range than the lifting equipment, i.e. can it stay in contact throughout? When setting up dynamic stabilisation equipment, place a small amount of free play in the system, this will ensure that once the lifting equipment is made-up the operator is able to remove the stabilisation equipment. Suspension settlement can cause a different ride height initially. Operators of stabilisation equipment must be able to do so from a safe area, i.e. not under the vehicle. Before initiating the lift ensure all connections and stabilisation are checked (final check) Ensure the primary lift and dynamic stabilisation phase is properly controlled by suitably qualified personnel.

Secondary lift Static Stabilisation Considerations The purpose of a secondary lift, is to take over from the main/ primary lift should it fail to achieve its objective. This could be because of equipment failure, displacement, lack of capacity or a miscalculation in the setting up phase. In this instance the lift would cease and be held by dynamic stabilisation equipment. The secondary lift would then take over/ continue. A Secondary lift is set up/ considered as soon as resources and manpower permit, if possible alongside the main/ primary lift set up. It may involve supplementing or duplicating the main/ primary lift, or may use a completely different item of equipment and technique. This secondary lift must have the ability to be dynamically stabilised, either utilising the current dynamic stabilisation choice, or a different option. Experienced crews should allow and consider for secondary lifting in their main/ primary lift planning/ set up. Should the lifted casualty vehicle then be required to be left in the raised position for any period of time, additional static stabilisation should be considered. Not only to make the working environment as safe as possible for personnel working in or around the vicinity, but also to minimise the loading on equipment. Wooden or plastic cribbing is well suited for this task.

Any questions? Considerations

For further information please visit: Further Information http://www.ukro.org/cms/nat2011/ukro_lgv_psv_air_brake_system_2011_fir efighter_safety_v1.pdf http://www.ukro.org/cms/nat2011/ukro_lgv_psv_air_suspension_system_20 11_Firefighter_Safety_v1.pdf http://www.ukro.org/cms/ukro_lgv_psv_vehicle_stabilisation_2013.pdf http://www.ukro.org/cms/nat2010/ukro_heavy_rescue_workshop_hampshire_ 2010_Lo_Res.pdf