Installation or Inspection Checklist

Similar documents
Sequencing Batch Reactor. Maintenance Manual. Only modules bearing the NSF logo and designated PS1-XX are certified to NSF/ANSI Standards 40 and 245

Sequencing Batch Reactor. Reference Manual. Only modules bearing the NSF logo and designated PS1-XX are certified to NSF/ANSI Standards 40 and 245

Air Conditioner for M915 A0/A1 Truck

Step #1 From your spool of 18 gauge primary wire, cut between 11 and 21 three inch strips of wire. You will only need 11 for the ROV, but it is good t

SALEEN SPEEDLAB BOOST AND WATER TEMPERATURE GAUGE POD KIT

BEST MANAGEMENT PRODUCTS, INC. The SNOUT INSTALLATION INSTRUCTIONS U.S. Patent # Canadian Patent #

2003 CR-V - A/T Shift Cable Replacement-Print Preview

This harness kit includes: Civic harness (2003 to 2005) Installing the Hybrid ReVolt Universal grid charger in a First Gen Civic ( )

Your Legal Fuel Tank Source.

WET WALL. EvApORATIvE COOLINg SySTEm. 10" x 8" Tee INSTALLATION INSTRUCTIONS

Setting the World s Performance Standards

Hush-O-Matic MRS Control Package

2-3 Hours Professional installation recommended

I N S T A L L A T I O N G U I D E

HydroCycle 6" Pro NFT Lettuce Systems

60-90 EXTRA 260/300 DLE 20 INSTALLATION GUIDE

2-3 Hours Professional installation recommended

HydroCycle Vertical NFT Lettuce & Herb Systems

AutoDeploy with Radar. Installation Manual

System Date of Issue Bulletin Number Bulletin Type. Title: Elimination of AC Connectors J29a and J29b

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

Design of a Station for Pump Testing

TSB # 52 Ballast Pumps

Fitting Instructions

DODGE RAM 24V 5.9L CUMMINS

LEXUS CT 200h 2011 TVIP V2 PREPARATION

2-3 Hours Professional installation recommended

INSTALLATION INSTRUCTIONS

2005+ Roll Bar (Mm5RB-20.1 to -20.6) Recommended Center punch 1/8" pilot drill 1-3/4" Hole saw 2" Hole saw

Installation Instructions Table of Contents

3-5 Hours Professional installation recommended

3-5 Hours Professional installation recommended

Modular Outdoor Fountain System

EXPANSION TANK PARTS LIST AND INSTALLATION GUIDE

EMK-XP ElectroMelt Power Connection and End Seal Kit Installation Instructions

TOYOTA COROLLA 2009 TVIP V4 PREPARATION

TOYOTA COROLLA 2010 TVIP V4 PREPARATION

C A Heating Cable Gland Kit Installation Instructions

C Power Connection Kit

BEST MANAGEMENT PRODUCTS, INC. The SNOUT OIL-WATER-DEBRIS SEPARATOR SPECIFICATIONS U.S. Patent # Canadian Patent #

TOYOTA TUNDRA TVIP V3 (RS3000) Section I - Installation Preparation

Installation Instructions CONSTANT WATT (CW) AND SELF-REGULATING (SR) PIPE TRACING CABLES

TOYOTA RAV4 w/smart 2009 TVIP V4 PREPARATION

w w w. h d o n l i n e s h o p. d e CHROME 1.25 INCH (31.75 MM) DIAMETER HANDLEBAR KIT GENERAL INSTALLATION -J04405 REV Kit Number Models

Subaru Front Mount Intercooler Kit STI Subaru Front Mount Intercooler Kit STI

I N S T A L L A T I O N G U I D E. Chevrolet Silverado / GMC Sierra - Ext Cab * A (Diesel Only)

Nuheat WEATHER-READY HEAT TRACE PIPE FREEZE PROTECTION SYSTEM. Self-Regulating Heating Cable Installation Guide. UV Resistant Polyolefin Outer Jacket

INSTALLATION INSTRUCTIONS

Zip Tie Domes. Greenhouse Version. 2 Frequency Geodesic Dome Assembly Manual

Please read thoroughly before starting installation and check that kit contents are complete.

2013 Road King CVO FLHRSE5 Detachable Fairing w/ Garmin Zumo 665 Installation Instructions

ELECTRICAL TABLE OF CONTENTS

Conflicts TOYOTA HIGHLANDER DUAL USB POWER DOCK. Part Number: Accessory Code:CP1000. Service Part Numbers.

Supply Valve Replacement

INSTALLATION INSTRUCTIONS

Zip Tie Domes - 3V 3/8 Assembly Manual

Rear Vision System Liftgate Emblem Camera for Aftermarket Display Ford Flex (Kit part number )

Installation Instructions - ECS Tuning Vent Pod Vacuum/Boost Gauge Kit

MY F150 SuperCab 1. Tools Required. Page 1 of 12 9L3J-19A014-BA Copyright Ford 2013 FoMoCo

I N S T A L L A T I O N G U I D E

VELAR HITCH INSTALLATION INSTRUCTIONS TOW RANGE ROVER MODEL/ TRIM YEARS: WEIGHT CAPACITY to Present PARTS & SUPPLIES: TOOLS REQUIRES:

HydroCycle 4" Pro NFT Lettuce Systems

Terminator DP/FAK-2 and FAK-2L. Elbow Splice Kit for Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

LEXUS RX TVIP V2 PREPARATION

L/6.7L DODGE CUMMINS

The Go Baby Go Build Manual

CENTRAL VACUUM SYSTEMS

2015 Mustang Lightbar (All Models) CDC#

-Magnet (not completely necessary but can come in handy)

USER'S MANUAL and INSTALLATION GUIDE

Jeep JK Evap Can Relocation Kit P/N ECRK

Snow Melt EN_US_2014_V2.indb 171 2/7/ :18:52 AM

for Audi B7/A4 ( ) Part Number ES8017 Installation Instructions - ECS Tuning Vent Pod Vacuum/Boost Gauge Kit

3-5 Hours Professional installation recommended

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

½ DODGE CUMMINS

Product Catalog. Fittings ½ AIR PIPE FITTINGS Fitting, 1/2 Air Pipe End Cap Coupler, with Tank Valve

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V. Extended Capacity Replacement Tank for Diesel Chevrolet / GMC Trucks

COLD WEATHER START KIT Platinum Mini Split

INSTALLATION INSTRUCTIONS

3-5 Hours Professional installation recommended

INSTALLATION INSTRUCTIONS DOCUMENT REVISION : /17/2014

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

Amp & Speaker Upgrade Install Instructions for Victory Cross Country

Power Connection Kit installation instructions

PRO-Tect Pipe Freeze Protection Self-Regulating Heating Cable Install Manual (PT-Series)

OpenROV. Tether Reel from Cheap Extension Cord Reel

UNSIGNED HARDCOPY NOT CONTROLLED

LED ROLLER LIGHTING. LED Components... 6

Access Riser Fits PRO370 and PRO380 Series

Instructions on installing the R/R to the front battery cover.

SUT-250-S (These instructions are used for SUT-250-SCLC also)

Zip Tie Domes. 2 Frequency Geodesic Silo Dome Assembly Manual. Silo Dome Version

Ford F-150 Supercrew A (2004 Heritage) Ford F-150 Super Cab A

TOYOTA VENZA w/smart 2009 TVIP V4 PREPARATION

Accessory Kit Estimated Fitting Time: 120 Minutes

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

Model: KBAP/LDF. Bottled Water. Brewing System PN: SPARE PARTS CATALOG

SANITIZER PARTS SANITIZER PARTS

Transcription:

Sequencing Batch Reactor Installation or Inspection Checklist Only modules bearing the NSF logo and designated PS1-XX are certified to NSF/ANSI Standards 40 and 245 2018 Anua 1-2018

Pre-installation and Set-up While unpacking the box, the contents should be verified with the inserted parts list (packing slip). The components must be unpacked with care while unwrapping the protective shipping material. The components should be laid out on a clean surface for verification and inspection. In order to assemble the kit, please provide the following: Diagonal cutters/linesman s pliers 1.25 Schedule 40 PVC pipe for connection of reactor chamber pipe stands into the riser Aerator Stand Assembly Set 3" PVC weighted base stand on a smooth, hard surface for assembly. Note positions of the black alignment marks on both parts. Apply primer to the weighted base 1.25" PVC female slip socket and the bottom of the 1.25" PVC aerator stand. Apply in the same order as. Insert 1.25" PVC aerator stand into weighted base and turn at least a quarter inch until the black markers on the parts are in alignment. Repeat Steps 1 through 5 with 1.25" piping. Secure electrical cable to the stand using a wire tie. Repeat Steps 1 through 7 for the siphon/sludge pump stand and the clear water pump stand. To ensure proper bond, always twist PVC piping at least a quarter turn after mating pipe to fitting. After assembly, trim wire tie ends with cutters/pliers as needed. 1

Installation into Reactor Chamber Diagonal cutters/linesman s pliers Drill Stainless fasteners to mount the stand clip into riser Nutdrivers or screwdrivers 2 hole saw Permanent marker (Sharpie) PVC pipe cutters Align each stand clip mount in the riser making sure to use a marker to mark on the 1.25" pipe stand clip and on the riser. The pipe stand clips are included in the kit. Fasten all clips to the riser. Lower stands into the reactor chamber one-by-one. Make a mark on each 1.25" pipe just below each clip, respectively. Remove pump stands and cut pipe 7 below the mark. Insert 1.25" PVC tee into the stand and mark both the fitting and the pipe in the correct location. Apply primer to the 1.25" PVC tee female slip socket the top of the 1.25" PVC stand. Apply in the same order as. Aerator should always be in the middle of the pumps within the reactor chamber. Insert PVC tee into PVC stand and turn at least a quarter inch until the marks (see ) are in alignment. Step 9 Repeat steps 5 through 8 for each stand. Ensure 1.25" unions are used with the siphon/sludge pump and the clear water pump. 1.25" unions are included in the kit. 0 Cut an 8 section of 1.25" Schedule 40 PVC pipe and repeat steps 5 through 8 to make a connection in the top of the PVC tee. 1 Install 1.25" PVC cap on top of each stand by repeating steps 6 through 8. 2 Lower the stands into the tank and clip the stands into place. Connect the siphon/sludge pump and the clear water pump. 3 Cut the pipe off the aerator stand 3" from the top of the aerator riser clip. 2

4 Install the barbed fitting on the top of the aerator stand by repeating steps 6 through 8. 5 Floats can be installed on either pump stand. The timer enable (bottom) float must be installed 24" from tank bottom. The high water alarm float must be installed per the engineered site plan. See section 3.4 of the PuraSys SBR Reference Manual for emergency storage information. Wiring and Air Hose Connections Flat-head screwdriver Wire zip ties Wire stripper Wire nuts or heat shrink connectors Electrical coating or liquid electrical tape Heat gun 2 hole saw Slip joint pliers If the ambient air temperature is below 75⁰F, heat the end of the vinyl braided tubing with a heat gun. Place the 2.5" SS clamp over the end of the tubing. Insert tubing into the barbed fitting in the aerator stand. Tighten the SS clamp to secure the tubing. Use the hole saw to drill a 2 hole into the riser cover or the side of the riser. If exiting the side of the riser for the vent, a grommet and piping must be provided. Installer Note The air tube must exit to the atmosphere in order to obtain fresh oxygen to inject into the aerator. Install the vent and tighten the retainer nut on the bottom of the vent with slip joint pliers. Direct the end of the tubing into the vent housing and cut to the proper length to insure the hose will rest inside of the vent housing without impeding air flow to the aerator. Direct all cables to the junction box and tie them in place using wire ties. Run cable ends through the appropriate cord grip in the junction box. Run wires from the junction box to the control panel according to the wiring instructions located inside the smart control panel. In junction box, splice wires together with wire nuts, waterproof wire nuts, or heat shrink connectors. If using standard wire nuts, use electrical coating or liquid electrical tape on the connections to ensure a waterproof connection. After all electrical connections are made in the junction box and smart control panel, ensure the electrical conduit from the junction box to the smart control panel is properly sealed off. 3

Pretreatment Tank Pre-drilled Siphon Pipe Installation 1.25" Schedule 40 PVC coupler 1.25 Schedule 40 PVC 90 degree elbow 1.25" Schedule 40 PVC pre-drilled siphon pipe with pre-glued 90 degree elbow The kit comes with a 90 degree elbow pre-glued to the bottom of the pre-drilled siphon pipe. The pre-drilled siphon pipe must be installed at a relative height from the bottom of the pretreatment tank as outlined in Table 2 on page 7 of the PuraSys SBR Reference Manual. The top siphon hole must be installed at a height from the inside top of the tank as indicated on the engineered site plan. Mark the pre-drilled siphon pipe at the correct height. Cut the pre-drilled siphon pipe, leaving enough room to glue on a 1.25" PVC coupler. Apply primer to the end of the 1.25" PVC pre-drilled siphon pipe and 1.25" PVC coupler female slip socket. Apply in the same order as. Insert 1.25" PVC pre-drilled siphon pipe into 1.25" PVC coupler female slip socket and turn at least a quarter inch. Cut a length of 1.25" PVC Schedule 40 pipe (not included in the kit) at a height sufficient to clear the baffle wall. Repeat Steps 4 and 5 for gluing the other end of the 1.25" PVC coupler to the 1.25" PVC pipe. Repeat steps 4 and 5 for gluing the 1.25" PVC 90 degree elbow to the 1.25" PVC pipe. Step 9 Repeat Steps 4 and 5 for gluing the other end of the 1.25" PVC 90 degree elbow to the 1.25" siphon/sludge pump line. 4