THROTTLE BODY. ON VEHICLE INSPECTION 1. INSPECT THROTTLE BODY (a) Check that the throttle linkage moves smoothly. EG1 182

Similar documents
THROTTLE BODY ON VEHICLE INSPECTION EG INSPECT THROTTLE BODY (a) Check that the throttle linkage moves smoothly.

THROTTLE BODY. Port name. Clearance between lever and stop screw. 0 mm (0 in.) 0.50 mm (0.020 in.) 0.80 mm (0.031 in.) Throttle valve fully open

Throttle Body (4A FE)

Throttle Body (3S GTE)

EG1 361 THROTTLE BODY

EXHAUST GAS RECIRCULATION (EGR) SYSTEM (4A FE)

EXHAUST GAS RECIRCULATION (EGR) SYSTEM

EG2 173 EXHAUST GAS RECIRCULATION (EGR) SYSTEM

EXHAUST GAS RECIRCULATION (EGR) SYSTEM

EMISSION CONTROL SYSTEMS

Cylinder Head Setting Bolt Tightening Adaptor Injection Measuring Tool Set EFI Fuel Pressure Gauge

EG1 509 OIL COOLER COMPONENTS FOR REMOVAL AND INSTALLATION

TIMING BELT COMPONENTS

DISTRIBUTOR DISTRIBUTOR REMOVAL

INJECTOR ON VEHICLE INSPECTION 1. CHECK INJECTOR OPERATION

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

FUEL PRESSURE REGULATOR

INJECTOR COMPONENTS SF-18. Air Cleaner Hose. Accelerator Cable Water Bypass Hose Air Hose. PCV Hose. Throttle Position Sensor Connector.

TUNE UP EG2 12 ENGINE MECHANICAL

EMISSION CONTROL SYSTEMS (2JZ GE) SYSTEM PURPOSE

EG1 485 OIL PUMP COMPONENTS FOR REMOVAL AND INSTALLATION

Injectors (4A FE) FI 155. (b) If you have no sound scope, you can check the injector transmission operation with your finger.

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

INTEGRATED IGNITION ASSEMBLY (IIA) (4A FE)

FU-1 FUEL SYSTEM. Page PRECAUTIONS... TROUBLESHOOTING... ON-VEHICLE INSPECTION...

AUTOMATIC CLUTCH Models

ENGINE ADJUSTMENTS. Remote Controls

2003 ACCORD - Intake Manifold Removal and Installation

REMOVAL & INSTALLATION

ACC CUT RELAY INSPECTION

ACC CUT RELAY INSPECTION

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

ON-VEHICLE INSPECTION

1989 Nissan 300ZX. 3.0L V6 - VIN [H] & 3.0L V6 TURBO - VIN [C] 1989 Engines - 3.0L & 3.0L Turbo V6

TURBOCHARGER SYSTEM TURBOCHARGER TC 1

D - ADJUSTMENTS Article Text 1992 Dodge Colt For a a a a a Copyright 1998 Mitchell Repair Information Company, LLC Saturday, April 27, :46PM

ACCELERATOR CABLE AND PEDAL

2000 Chrysler SEBRING

FUEL PUMP. ON VEHICLE INSPECTION 1. CHECK FUEL PUMP OPERATION (a) Using SST, connect terminals +B and FP of the data link connector 1.

1991 Volkswagen Vanagon Syncro

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

POWER STEERING PUMP (3VZ FE) POWER STEERING PUMP REMOVAL AND INSTALLATION Remove and install the parts as shown.

FUEL PUMP SYSTEM CIRCUIT

1994 ENGINE PERFORMANCE TOYOTA SYSTEM & COMPONENT TESTING

GENERATOR CH-9 COMPONENTS FOR REMOVAL AND INSTALLATION

GENERATOR REMOVAL OF GENERATOR (4A FE) CH 6

Oil Pan Seal Cutter Oil Filter Wrench Transmission & Transfer Bearing Replacer. ( ) Replacer Pipe

TIMING CHAIN COMPONENTS

1996 Aerostar/Ranger/Explorer

CH 10 ALTERNATOR COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

DISTRIBUTOR (5S FE) REMOVAL OF DISTRIBUTOR IG 30

TIMING BELT COMPONENTS EM 15

REMOVAL AND INSTALLATION OF TRANSAXLE (4WD)

FUEL AND LUBRICATION SYSTEM

TURBOCHARGER ON VEHICLE INSPECTION TC 7

FUEL SYSTEM PRECAUTION FU 1

ENGINE AND EMISSION CONTROL

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

FUEL PUMP SYSTEM CIRCUIT

CYLINDER HEAD COMPONENTS FOR REMOVAL AND INSTALLATION

2001 Ford Windstar ENGINES 3.8L V6 - VIN 4 - Windstar

2. Disconnect the accelerator control cable and the cruise control cable from the throttle body. 3. Disconnect the vacuum hose from the throttle body.

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

ENGINE AND EMISSION CONTROL

ON VEHICLE REPAIR Valve Body

5. FUEL SYSTEM FUEL SYSTEM 5-0

7. FUEL SYSTEM ('04 - '05)

ENGINE AND EMISSION CONTROL

OIL AND FILTER INSPECTION

REMOVAL. Fig Sized for Print

PIERBURG. Carburetor: 2E3

Rochester Quadrajet Dodge

11A-1 ENGINE CONTENTS

INTAKE MANIFOLD COLLECTOR. 1. Electric throttle control actuator 2. Gasket 3. Vacuum hose

INSTRUCTION SHEET Rochester Carburetor Models 4G 4GC

2004 Toyota RAV ENGINE Lubrication - RAV4

Radiator Service Tool Set Hexagon Wrench Set TOYOTA Electrical Tester Set. Capacity

MANUAL GEAR HOUSING (4WD)

Power Steering Pump REMOVAL AND INSTALLATION OF POWER STEERING PUMP

2001 Ranger Workshop Manual. 1. Drain the cooling system. For additional information, refer to Section

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

EMISSION CONTROL SYSTEMS

FI 135. Fuel Pump (3S GTE)

IN-VEHICLE REPAIR. Upper Intake Manifold

Fig. 1: Throttle valve measurement 1.2L carbureted

TROUBLESHOOTING PROBLEM SYMPTOMS TABLE

HOW - TO EMISSION CONTROL BASICS EMISSION CONTROL BASICS

Performer Series Carburetor Rebuild Kit Catalog #1477 Models

ENGINE AND EMISSION CONTROL

Before performing any on-vehicle adjustments to fuel or ignition systems, ensure engine mechanical condition is okay.

OIL AND FILTER INSPECTION

ENGINE 6G74 3.5L-SOHC-24 VALVE

CARBURETOR SERVICE INFORMATION TROUBLESHOOTING THROTTLE VALVE DISASSEMBLY THROTTLE VALVE INSTALLATION...

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION

STARTING SYSTEM STARTING SYSTEM ST 1

12. CARBURETOR 12-0 CARBURETOR VITALITY 50

SECTION 6A ENGINE MECHANICAL (G10, 1-CAM 6-VALVES ENGINE)

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

VALVE BODY VALVE BODY AND/OR SOLENOID VALVE AT CLEAN TRANSMISSION EXTERIOR To prevent contamination, clean the exterior of the transmission.

D - ADJUSTMENTS - 4-CYL

Transcription:

EG1182 THROTTLE BODY ON VEHICLE INSPECTION 1. INSPECT THROTTLE BODY (a) Check that the throttle linkage moves smoothly. (b) Check the vacuum at each port. Start the engine. Check the vacuum with your finger. Port name At idle At 3,500 rpm 2. INSPECT THROTTLE POSITION SENSOR Check the resistance between the terminals. Unplug the connector from the sensor. Insert a thickness gauge between the throttle stop screw and stop lever. Using an ohmmeter, check the resistance between each terminal.

EG1183 Clearance between lever and stop screw Between terminals Resistance 3 M/T: INSPECT DASH POT (DP) A. Warm up engine Allow the engine to warm up to normal operating temperature. B. Check idle speed and adjust, if necessary (See step 15 in maintenance operations in Maintenance) Idle speed: 750 rpm C. Remove cap, filter, and separator from DP D. Check and adjust dash pot (DP) setting speed (a) Maintain engine speed at 2,500 rpm. (b) Plug the VTV hole with your finger. (c) Release the throttle valve. (d) Check the DP is set. DP setting speed: 2,000 rpm

EG1184 (e) If not as specified, adjust with the DP adjusting screw. E. Check operation of VTV (a) Set the DP setting speed in the same procedure as above (a) to (c). (b) Remove your finger from the hole and check that the engine returns to idle speed in approx. 1 second. F. Reinstall DP separator, filter and cap HINT: Install the filter with the coarser surface facing the atmospheric side (outward). 4. A/T: INSPECT THROTTLE OPENER A. Warm up engine Allow the engine to warm up to normal operating temperature. B. Check idles speed Idle speed: 750 ± 50 rpm C. Check and adjust throttle opener setting speed (a) Disconnect the vacuum hose from the throttle opener, and plug the hose end. (b) Maintain the engine at 2,500 rpm. (c) Release the throttle valve. (d) Check that the throttle opener is set. Throttle opener setting speed: 900 1,300 rpm

EG1185 (e) If not as specified, adjust with the throttle opener adjusting screw. (f) Reconnect the vacuum hose to the throttle opener. THROTTLE BODY REMOVAL 1. REMOVE INTAKE AIR CONNECTOR 2. DRAIN COOLANT 3. DISCONNECT ACCELERATOR CABLE 4. DISCONNECT FOLLOWING HOSES: (a) w/ A/C: A/C idle up hose. (b) PCV hose (c) No. 2 and No. 3 water bypass hoses. (d) Label and disconnect the emission control hoses. 5. DISCONNECT THROTTLE SENSOR CONNECTOR 6. REMOVE THROTTLE BODY Remove the 3 bolts and but, and remove the throttle body and gasket.

EG1186 THROTTLE BODY INSPECTION 1. CLEAN THROTTLE BODY BEFORE INSPECTION (a) Wash and clean the cast parts with a soft brush in carburetor cleaner. (b) Using compressed air, clean all the passages and apertures in the throttle body. NOTICE: To prevent deterioration, do not clean the throttle position sensor. 2. CHECK THROTTLE VALVE Check that there is no clearance between the throttle stop screw and throttle lever when the throttle valve is fully closed. 3. CHECK THROTTLE POSITION SENSOR (See step 2 on page EG1182) 4. IF NECESSARY, ADJUST THROTTLE POSITION SENSOR (a) Loosen the 2 screws of the sensor. (b) Insert a thickness gauge (0.70 mm or 0.0276 in.) between the throttle stop screw and lever, and connect the ohmmeter to terminals IDL and Ez. (c) Gradually turn the sensor clockwise until the ohmmeter deflects, and secure the sensor with the 2 screws (d) Using a thickness gauge, recheck the continuity be. tween terminals IDL and Et. Clearance between lever and stop screw Continuity (IDLE E2) Continuity No continuity

EG1187 THROTTLE BODY DISASSEMBLY 1. REMOVE THROTTLE POSITION SENSOR Remove the 2 screws and sensor. 2. REMOVE AUXILIARY AIR VALVE Remove the 4 screws, air valve and Oring. 3. M/T: REMOVE DASH POT 4. A/T: REMOVE THROTTLE OPENER THROTTLE BODY ASSEMBLY 1. M/T: INSTALL DASH POT 2. A/T: INSTALL THROTTLE OPENER 3. INSTALL AIR VALVE (a) Place a new Oring on the throttle body. (b) install the air valve with the 4 screws. 4. INSTALL THROTTLE POSITION SENSOR (a) Check that the throttle valve is fully closed. (b) Place the sensor on the throttle body as shown in the illustration. (c) Turn the sensor clockwise, and temporarily install the 2 screws. 5. ADJUST THROTTLE POSITION SENSOR (See step 4 throttle body inspection)

EG1188 THROTTLE BODY INSTALLATION 1. INSTALL THROTTLE BODY Using a new gasket, install the throttle body, 3 bolts and nut. Torque: 19 Nm (195 kgfcm, 14 ftlbf) 2. CONNECT THROTTLE SENSOR CONNECTOR 3. CONNECT THESE HOSES: (a) Emission control hoses (b) No. 2 and No. 3 water bypass hoses (c) PCV hose (d) w/ A/C: A/C idle up hose 4. CONNECT ACCELERATOR CABLE 5. INSTALL AIR INTAKE CONNECTOR 6. FILL WITH COOLANT