ONYX VALVE CO ISOLATOR RING Installation & Maintenance

Similar documents
ONYX VALVE CO QUICK START INSTRUCTION. Changing Instruments on an Onyx Isolator Ring

Winters Instruments: Corporate Engineering White Paper: Waste Water Treatment Application: Isolation Ring Assembly. Principle of Operation

ONYX VALVE CO MODEL CHR & CHP Installation & Maintenance

ONYX VALVE CO MODEL DBC Installation & Maintenance

ONYX VALVE CO MODEL CER with JORDAN ACTUATOR Installation & Maintenance

ONYX VALVE CO MODEL CER and CEP Installation & Maintenance

ONYX VALVE CO MODEL DAC-ADA Installation & Maintenance

ONYX VALVE CO MODEL CAR, CAP-PFO Installation & Maintenance

ONYX VALVE CO MODEL DEC Installation & Maintenance

ONYX VALVE CO MODEL DAC-PFO Installation & Maintenance

ONYX VALVE CO MODEL DAO-PFO Installation & Maintenance

ONYX VALVE CO MODEL DAO-PFC Installation & Maintenance

ONYX VALVE CO MODEL DAO-ADA Installation & Maintenance

ONYX VALVE CO MODEL GSF AND GSD Installation & Maintenance

ONYX VALVE. Pressure Isolator Ring. New Patented Design Assures Accuracy and Maintenance-Free Operation Patent #5,708,201

KEYSTONE OPTISEAL F14/16-15/17 AND BREWSEAL BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

Hydraulic Motors Repair Instructions

KEYSTONE SERIES GRF RESILIENT SEATED BUTTERFLY VALVES INSTALLATION AND OPERATION MANUAL

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

Instructions for installation, operation and maintenance of: GATE VALVE

CPF INSTALLATION, OPERATION, AND MAINTENANCE MANUAL FLANGED SERIES CHECK VALVE *

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

1004D2/1005E API Bottom Loading Coupler. 1005E Small handles used throughout Europe 1004D

Butterfly valves Figure 56 Installation & Maintenance Instructions

Installation, Operation, and Maintenance Manual

1004D3/1005E3 API Bottom Loading Coupler. 1005E3 Small handles used throughout Europe 1004D

KEYSTONE SERIES GR RESILIENT SEATED BUTTERFLY VALVES GRW/GRL INSTALLATION AND OPERATION MANUAL

Transmission Overhaul Procedures-Bench Service

Copper Sleeve, Unit Injector, Replacement

SECTION 4 - FUEL/LUBRICATION/COOLING

1004D4 API Bottom Loading Coupler 1004D

Operating & Maintenance Manual For Steam Conditioning Valve

Instruction for RBP250-3 and RBP300-3

1004D4 API Bottom Loading Coupler

Instructions for INSTALLATION -- OPERATION -- MAINTENANCE of the SELAS AIR/GAS BLENDER VALVE. (for PROPANE/AIR, BUTANE/AIR AND OTHER BLENDS)

INSTRUCTION MANUAL AND PARTS LIST FOR 3E CANNED MOTOR PUMPS

Model 3051 Sensor Module Replacement

MODEL 905V OPERATING INSTRUCTIONS

MUELLER GAS. Shur StopTM Unit 812 PE Line Stopping. System 8" 12" SDR Reliable Connections. General Information 2

GT-200 GATE VALVES PN16, Screwed end

Instruction Manual for HSPA Take-Up Units

1004D3/1005E3 API Bottom Loading Coupler

1. SPECIFICATION. Altitude of motor installation. Information: Resistance and temperature specifications of the PTC thermistor / posistor/.

Remove. Note : Make sure the puller capscrews are threaded all the way through the puller before applying pressure to the puller screw.

Welker Automatic Insertion Diffusing Probe Model AIP-3DP

Operating and Maintenance Manual Gas/Diesel Engine Powered Self-Priming Centrifugal Pumps Series

Fisher 657 Diaphragm Actuator Sizes and 87

KEYSTONE Figure 990/991 Butterfly valves Installation, operation and maintenance instructions

250L Cartridge Dual Seal

HYGRODYNAMICS DEW POINT MONITOR MODEL 8092P 8092P-230VAC TABLE OF CONTENTS DIAGRAMS

255 Cartridge Dual Seal

EVAC Commercial Marine Equipment TOILET TECHNICAL DATA EVAC 90, STAINLESS STEEL, FLOOR MODEL, *SHOCK TESTED. Fresh water.

Technical changes kept in reserve INSTALLATION, OPERATION & MAINTENANCE MANUAL. 0.- Description Handling Installation...

ANDERSON GREENWOOD SERIES 9290 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Maintenance Information

Volute Casing Centrifugal Pumps in In-line Design with Magnetic Drive. Series CNI-M

WARNING CAUTION. CAUTION Do not exceed 120 psig (8.3 bar) air-inlet pressure.

WARNING Carefully Read These Instructions Before Use

250L Dual Cartridge Seal

ATD-6810 SPRAY GUN W/CUP INSTRUCTION MANUAL

OPERATOR'S MANUAL FOR DOUBLE ACTING PISTON HAND PUMP

INSTALLATION, OPERATION & MAINTENANCE MANUAL Description Handling Installation Actuators...

Installation, Operation and Maintenance Instructions Series 608 Ball Valve

SERVICE MANUAL 200 SERIES MOTORIZED 20352, 20452, 20551, 20552, AND MODELS

WARNING: Only perform this installation if you are experienced, fully equipped mechanic.

Crispin Valves Operating Guide. Crispin

MAINTENANCE PROCEDURE FOR MK17

INSTRUCTION MANUAL INTERNAL GEAR PUMP TITAN G-4124A SERIES=> FLANGED TITAN G-124A SERIES => FLANGED MODELS:

Air Operated Diaphragm Pumps Operating and Maintenance Instructions

SISU DP-330 DRIVE GEAR. Maintenance Manual

INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D_-187, 218, 250 and 312 SERIES PUMPS

24-48 HP250II Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #: 2448HP250OOOM Revision Date: 1/10/11

INSTALLATION INSTRUCTIONS

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Guide

1/2" AIR DRIVEN DIAPHRAGM PUMP

SERVICE INSTRUCTIONS. Transfer Pump

Bray/Mckannalok Butterfly Valve Series 40/41/42/43/44/45 Installation Manual Technical Bulletin No Date: May 2004/Page 1 of 6

Maintenance and Service Instruction

INSTALLATION, OPERATION & MAINTENANCE MANUAL. 0.- Description Handling Installation Actuators Maintenance...

Audi-Larm TM Audible Alarm: AirHawk II Air Mask

Orifice Flange Union Assembly and Orifice Run Installation and Operation Manual

SERVICING INSTRUCTIONS

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

Installation Instructions Camaro ZL1 ( Z) ( ZB)

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Sentinel 250 Fire Hydrant

SERIES RSR PRESSURE RELIEF VALVE

Flow Control Valve IOM 770-U

Type 80 Wafer and Type 81 Bolt-Thru Isolation Rings. Installation, Maintenance and Safety Instructions

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

GH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS

Sealing flanges and flywheel/drive plate, removing and installing

Service Manual #67. Installation and Service Instructions 6000, 7000 & 8000 Series Magnetically Coupled Pumps

Series 2200/2220 Control Valve. Operation and Maintenance SCOPE OF MANUAL MAINTENANCE DESCRIPTION VALVE INSTALLATION

PRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS

NEECO INDUSTRIES INC. INSTRUCTION MANUAL 7 1/16 10K SLAB GATE BODY

225 CARTRIDGE DUAL SEAL

Transcription:

ONYX VALVE CO ISOLATOR RING Installation & Maintenance Operation: (03-2016) Obtaining accurate pressure readings on slurry lines is difficult because slurries, abrasives and solids clog pressure elements such as gauges, switches and transmitters. Onyx Isolator rings consist of rubber inner tube captured in a steel ring. The assembly is installed between flanges in the process pipe. Clear instrument oil behind the rubber membrane transmits pressure to the gauge Onyx Isolator ring are vacuum filled at the factory with high viscosity silicone fluid. (Other fluids available on special order.) After vacuum filling, the Isolator Ring is permanently sealed with our patented Module Seal. The Module Seal enables the users to remove or replace the gauges and other pressure instruments while the Isolator Ring remains in the process pipe without having to vacuum fill the rings. Onyx Isolator rings are usually supplied with instrumentation such as gauges, transducers, and pressure switches; refer to specific manufacturer s literature concerning maintenance for these accessories. Page 1

If you detect instrument oil weeping from under the Lock Ring, the Module seal may require minor adjustment. To adjust the Module Seal: a) Loosen the Lock Ring, and then carefully remove the pressure measuring instruments. b) Insert a 0.250 inch Allen key into the Module Seal Set Screw and turn clockwise 1/8 revolution. c) Reinstall the pressure measuring instruments and tighten Lock Ring. Turning the Module Seal Set Screw clockwise eliminates weeping but makes the fit around the needle tighter. Set Screw Integral Block Valve 1/4" Allen Key Module Seal Knurled Lock Ring Isolator Ring If the Module Seal is too tight to reinstall the pressure measuring instrument, do not force the needle in or you will risk bending or breaking the needle. Instead, loosen the Set Screw until the needle can be inserted easily. If fluid weeping persists, it may be necessary to tighten the Set Screw further. When tightening the Set Screw, turn clockwise 1/8 revolution at a time. STORAGE: Correct storage extends service life. Rubber is perishable. Ideal storage conditions are 50 F / 60% relative humidity. We recommend the following precautions for Isolators and spare parts stored for any length of time prior to installation. 1. Keep Isolators cool. They can be stored in an unheated area, but allow maximum ventilation in storage areas subject to high ambient temperatures. Trailers and storage sheds become incredibly hot during summer months. Avoid such locations. 2. Avoid sunlight. Ultra-violet light deteriorates rubber. Leave the Isolator in its box. 3. Avoid ozone. DO NOT STORE Isolator near active electrical equipment. 4. The Isolator may be supplied with sensitive instrumentation. Refer to specific manufacturer's literature concerning proper storage. Page 2

5. Separate instruments may be supplied with a stinger fitting attached. DO NOT REMOVE RUBBER TIP PROTECTOR FROM THE STINGER FITTING NEEDLE UNTIL ATTACHING THE FITTING TO THE ISOLATOR RING. INSTALLATION: 1. Safety Considerations: a) Isolators rings frequently handle chemically reactive and abrasive fluids; it is reasonable to expect the elastomer sleeve to eventually wear out. Instrument fill fluid must be compatible with the process liquid. Mixing incompatible fluids may cause a violent chemical reaction resulting in equipment damage or personal injury. b) Make certain that instruments such as gauges, pressure switches, etc, have pressure and temperature rating suitable for actual operating conditions. Exceeding manufacturer's design limits may result in equipment damage or personal injury. c) The rubber sleeve elastomer must be compatible with the chemistry and temperature of the process fluid. d) Do not use Onyx Isolator rings for oxygen service. 2. Inspect prior to installation. Onyx Isolator rings should not show any indication of leakage, and rubber sleeve should be free from cuts or punctures. 3. Onyx Isolator rings can be installed in any attitude with flow in either direction. For best sleeve life, install with 2 diameters of straight pipe on inlet. 4. Onyx Isolator rings may be installed without pressure instruments attached. This minimizes damage to gauges and sensitive pressure instruments during pipe fitting and construction. 5. Onyx Isolator rings are vacuum filled at the factory to insure high accuracy in operation. DO NOT DISASSEMBLE. 6. To install, sandwich the Isolator between two flanges in the process pipe line. Center as carefully as possible. Install gaskets on both sides of Isolator ring. Insert flange bolts. Tighten flange bolts in criss cross pattern. OPERATING INSTRUCTIONS: 1. Onyx Isolator Rings and pressure instruments are vacuum filled at the factory. They may be shipped assembled or shipped separately for field assembly. Page 3

a) Do not disassemble the ring. b) Do not break connections between the stinger fitting and pressure instruments. 2. To attach a pressure instrument to the Isolator Ring: Pressure measuring element and stinger fitting must be pre-assembled and vacuum filled prior to attaching to the Isolator ring!!! a) If you are installing an isolator ring without instrumentation attached close the integral block valve (#7). This valve MUST remain closed until the instrument package in mounted to the isolator ring. b) Instruments can be attached to an Isolator Ring installed in the pipe line while the system is pressurized. b) Hold the pressure instrument and stinger fitting assembly upright above the Isolator Ring. c) Remove the rubber tip protector from the stinger needle (#5F). (Save the rubber tip protector.) d) Gently push the needle through the rubber seal (#5) until it hits bottom. e) Thread the lock ring (#5C) onto the stinger fitting (#5E). f) Gauges can be rotated to face any direction by loosening the coupling ring, turning the gauge, and re-tightening the ring. g) After the instruments have been attached to the isolator ring, open integral block valve (#7). 3. To attach instruments which did not come with a stinger fitting, refer to instructions on attaching stinger fitting to instruments at the end of this booklet. 4. To remove pressure instruments from the Isolator Ring: A) It is NOT necessary to remove the Isolator Ring from the process pipe. B) In order to minimize fluid loss, reduce process pressure as low as possible before removing gauges or other instruments from the Isolator Ring. Turn off pump prior to removing instrument from the Isolator Ring (The interruption will be brief. Instruments can be removed from the Isolator in about 10 seconds.) C) Close integral block valve (#7). Page 4

D) Loosen knurled lock ring (#5C). E) Gently lift the gauge and stinger assembly out of the module seal. F) Immediately attach a rubber tip protector to the end of the stinger needle. G) Now your process can be re-pressurized without loosing fluid from the Isolator Ring. SLEEVE AND MODULE SEAL REPLACEMENT: 1. Remove Isolator Ring from process line. 2. Remove gauge or auxiliary instrument. 3. Remove end plate screws (#4A). 4. Remove end plates (#4). 5. Remove old sleeve (#1). 6. Use a 0.250 inch hex key to remove the module seal set screw (#5B). 7. Remove seal washer (#5D). 8. Use a packing extractor to remove the old rubber seal (#5). 9. Clean all components thoroughly. 10. Press new rubber seal (#5) into the module seal tube (#5A). Drive all the way to bottom of bore. Replace seal washer (#5D). Replace module seal set screw (#5B). Do not over tighten. 11. Collapse new sleeve (#l), push through center housing (#3) and work sleeve lips into housing grooves. Page 5

6 5E 5B 5 5D 5F ITEM 1 3 3A 4 DESCRIPTION SLEEVE CENTER HOUSING SENSING LIQUID, CENTER END PLATE 7 5C 7A 5A 4A 5 5A 5B 5C SCREW, END PLATE RUBBER SEAL TUBE, MODULE SEAL SET SCREW, MODULE SEAL LOCK RING, MODULE SEAL 3A 3 4A 5D 5E 5F 6 7 7A SEAL WASHER STINGER FITTING EXTERNAL RETAINING RING GAUGE BLOCK VALVE RETAINING RING, BLOCK VALVE 4 1 12. Reinstall end plates (#4). 13. Replace end plate screws (#4A). 14. Connect a separate stinger fitting (#5E), to vacuum filling system, evacuate air from the ring assembly, and refill with fresh instrument fluid. Use Onyx silicone fluid. 15. The Isolator Ring can now be returned to service. Page 6

TO ATTACH STINGER FITTING TO INSTRUMENTS: 1. Attach gauge or other instrument to the stinger fitting (#5E). 2. Connect an Onyx Vacuum Fill Tool Adapter, P/N #T75132-01-00, to your vacuum filling system. 3. Attach the instrument assembly to the adapter fitting. 4. Evacuate all the air from the instrument, and fill with silicone fluid. 5. Detach the instrument from the filling system. 6. The instrument can now be attached to an Isolator Ring, or stored for future use. Questions? Contact Onyx Valve Company Tel: 856-829-2888 Fax: 856-829-3080 E mail: david@onyxvalve.com Page 7