Lane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB)

Similar documents
PASSENGER DEMAND WEST CHECKPOINT November 2018 Scheduled Departing Passengers & Seats

Central Park Drives Traffic Management Overview

Capital Metro Downtown Multimodal Station

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

Emergency Episode Plan for Traffic Abatement

1 TO 2 2 TO 3 3 TO 4 11 TO TO 1

Alcohol Related Accidents in Mahoning County:

IC-Meter data: Monthly Statistics for Indoor Climate August Average values for the 6 active hours*

DRIVING AND OFF-DUTY TIME

Monthly STAR Report : Quality Inn Ashland For the Month of: December 2017 Currency: US Dollar / Competitive Set Data Excludes Subject Property

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017

FREQUENTLY ASKED QUESTIONS

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA

FREQUENTLY ASKED QUESTIONS

Purple Line Extension Updates on La Cienega and Rodeo Stations January 10, 2018

3. Place of work. This should be where you are usually based, and where we can send correspondence for your attention.

ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE

Traffic Impact Statement (TIS)

Jones Motor Group, INC

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

APPENDIX H. Transportation Impact Study

5. OPPORTUNITIES AND NEXT STEPS

1 TO 2 2 TO 3 12 TO 1 10 TO TO 12

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Arts House/ Victoria Theatre/ Victoria Concert Hall/ Asian Civilisations Museum GENERAL ROAD CLOSURE AND TRAFFIC DIVERSION PLANS

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION

Revised Strategy for Downtown Parking

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

2017 Adjusted Count Report February 12, 2018

Argon National Sales Meeting

Classroom Utilization Report For Fall 2018 Census

ROADWAY INJURY EXPERIENCE FOR PERSONS WHO HAD BEEN DRINKING AND/OR USING DRUGS

IV. REVISIONS TO THE DRAFT IS/MND

Site DNL Calculator. Guidelines:

2016 Congestion Report

Understanding the Astronomical Tide. John Brubaker Virginia Institute of Marine Science

Light switch timer 3 step Installation overview 3 minute quick programming guide. A police accredited product.

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:

APPENDIX A. OC Transpo Maps & Route Information

Metropolitan Freeway System 2013 Congestion Report

Study Area and Location District PSA Ward ANC Phase Description C Existing 100 Block Michigan Avenue Northeast Westbound

CITY OF BEVERLY HILLS STAFF REPORT

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

EAST-WEST BUS RAPID TRANSIT Service Plan and Operations and Maintenance (O&M) Cost Memo

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

Traffic Engineering Study

Purple Line Extension Section 1 Construction Community Meeting April 19, 2018

City of Howell - January 2019 Sun Mon Tue Wed Thu Fri Sat 1

December Individual Quality Review Calendar FY 18 FY 19. Mon Tues Wed Thu Fri Sat. Sun METRO1 SAMPLE TO REGION

Proposed CVS/pharmacy

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

MnDOT s Experience with IRI Specifications

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers. Rob Abbott Vice President of Safety Policy American Trucking Associations

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Purple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017

Exposition Light Rail Transit Project

Meter Insights for Downtown Store

V. DEVELOPMENT OF CONCEPTS

Driver Speed Compliance in Western Australia. Tony Radalj and Brian Kidd Main Roads Western Australia

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.

2.4 Build Alternatives

Central Area Redistricting Study -Committee Meeting 3- November 13, 2013

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

Study Area and Location District PSA Ward ANC Phase Description A Proposed Monroe Street Northeast Eastbound at Rhode Island Avenue

Existing Breakdown Count L eq L 10 Autos Med Heavy Bus

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Annual Statistical Report

City of Kingston Report to Council Report Number

Summary of Potential Target Formula Scenarios

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability

Operating & Maintenance Cost Results Report

DEMA 257C / 257CV PRO BATTERY DRAIN CHIEF INSTALLATION & OPERATING INSTRUCTIONS

STAR Report Add-ons. Want more from your STAR Report? Check out our great add-ons:

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019

Traffic Impact Analysis for 2171 Rosecrans Avenue

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO

INTERSECTION CONTROL EVALUATION

REAL-TIME ELECTRONIC SPEED FEEDBACK DISPLAYS EVALUATION:

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

Citizens Committee for Facilities

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Agenda Cover Memorandum

Lacey Gateway Residential Phase 1

Field Trip Pre / Post Trip Inspection Form

Existing Traffic Conditions

Service & Part Specials

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

Transcription:

Route Report Index: US1-A?A@ 15 %&'( 94?A@ 5?A@?A@ 95 +, 16 9?A@?A@ 47 %&'( 95 5?A@ 65 +, 8 +, 1 5 %&'( 94 %&'( 69 4 %&'( 5 W %&'( 5 E +, 61?A@ 95 %&'( %&'( 69 4 9 4 %&'( 94 %&'( 49 4 NOTE: Lane closures that overlap two or more adjacent report segments should be performed using the allowable lane closure guidelines from the most restrictive report segment overlapped. +, 1?A@ 19 +, 16 9?A@ 1 %&'( 5?A@ +, 5 +, 61 +, 6 US1- (WB) US1-1 (EB WB) US1- (EB) MnDOT Metro District Traffic Engineering Route Report Index: US1-A

Report: US1-1 Route: US1 EB WB From: WEST OF CORD9 Mile Point: 144 To: WAYZATA BLVD W Mile Point: 15.57?A@ 5?A@ 5 5 +, 1 +, 1 %&'( 9 4 %&'( 4 9 4 %&'( 9 4?A@ 6 5?A@ 4 7 %&'( 6 9 4 %&'( 5 W?A@ 6 7?A@ 6 1?A@ 1 +, 1?A@ 1 %&'( 5 E %&'( 5 US1-1 ( EB WB) Metropolitan Council MnDOT Metro District Traffic Engineering REPORT US1-1

Report 7//18 US1-1 Minnesota Department of Transportation Metro Traffic Engineering Road Segment Description US1 TH: True Mile: Begin 144 Dir: EB WB Description: End 15.57 Lanes: From WEST OF CORD9 to WAYZATA BLVD W Signals: YES Data Description A Site ID: Stations: 11-1 1-1 PM 1- - O FRI 6 U THU 5 T - WED 4 O Totals: 1- TUE N 11-1 1-1 AM D 1 4 5 6 7 8 9 MON SAT 7 SUN 1 48 48 Hours 1-1 AM 1- - C LL ON O S W U A LT B LE M ET LA R N O E T C RA LO F SU FIC R F E O TI R M ES Hours Average Weekday SE 11-1 1-1 PM 1- - 11-1 No lane closure allowed Average Prohibited Hours No lane closure within 5' of signal; otherwise 1 lane closure allowed Week 1 A 1 1 lane closure allowed Week Night 1 lane closure allowed Daily 4 US1-1

Report: US1-5?A@ 6 1 %&'( 9 4 %&'( 6 9 4 Route: US1 EB From: WAYZATA BLVD W Mile Point: 15.57 To: I494 Mile Point: 156.9 +, 1?A@ 4 1 +, 1 %&'( 4 9 4 %&'( 9 4?A@ 6?A@ 1 %&'( 5 W US1 - (EB) Metropolitan Council MnDOT Metro District Traffic Engineering REPORT US1-

7//18 Report Minnesota Department of Transportation US1- Metro Traffic Engineering Road Segment Description TH: US1 Dir: EB Description: From WAYZATA BLVD W to I494 True Mile: Begin 15.57 End 156.9 Lanes: Signals: NO Data Description Site ID: This report based on data collected between 9//17 and 1//17 Average Hours MON TUE WED THU FRI Weekday SAT SUN Hours 4 5 6 7 1 1 1-1 AM 8 7 89 9 11 9 5 85 1-1 AM 1-51 56 65 7 84 65 145 157 1- - 45 48 5 5 57 5 69 88-4 1 99 99 1 99 1 79 61 5 56 54 59 66 5 5 1 77 6 14 19 141 146 15 149 7 167 7 58 17 179 16 867 8 587 8 4689 4851 495 4798 45 479 199 6 9 4 448 476 419 79 497 1647 11 87 986 15 47 867 957 19 1584 4 4 49 4 58 49 1 6 199 11-1 4 5 515 557 677 54 1 61 8 11-1 1-1 PM 48 6 84 451 64 41 1 79 6 1-1 PM 1-178 8 6 99 5 9 1 67 8 1- - 6 1 69 466 551 86 1 5 6-54 55 64 71 71 61 1 471 9 51 754 8 74 666 695 1 9 17 8 587 599 646 488 54 1 189 171 96 111 151 159 46 1 197 178 115 1474 159 166 1456 1449 1419 157 86 171 11 1177 14 167 154 119 598 8 817 97 115 84 958 649 94 95 441 478 798 481 8 61 11-1 156 18 1 5 444 46 488 164 11-1 Totals: 4 464 481 4415 45 4949 15 69 No lane closure allowed Average Prohibited Hours 1 1 lane closure allowed Week lane closure allowed Week Night lane closure allowed Daily MnPASS Hours of Operation 6AM - 1AM M-F Stations: 165+166+167+168+169 US1-

Report: US1-5?A@ 6 1 %&'( 9 4 %&'( 6 9 4 Route: US1 WB From: I494 Mile Point: 156.9 To: WAYZATA BLVD W Mile Point: 15.57 +, 1?A@ 4 1 +, 1 %&'( 4 9 4 %&'( 9 4?A@ 6?A@ 1 %&'( 5 W US1 - (WB) Metropolitan Council MnDOT Metro District Traffic Engineering REPORT US1-

7//18 Report Minnesota Department of Transportation US1- Metro Traffic Engineering Road Segment Description TH: US1 Dir: WB Description: From I494 to WAYZATA BLVD W True Mile: Begin 156.9 End 15.57 Lanes: Signals: NO Data Description Site ID: This report based on data collected between 9//17 and 1//17 Stations: 185+186+187+184 Average Hours MON TUE WED THU FRI Weekday SAT SUN Hours 4 5 6 7 1 1 1-1 AM 15 15 164 181 1 17 66 86 1-1 AM 1-7 77 79 88 14 84 1- - 51 57 66 61 8 6 18 17-4 6 61 6 71 68 64 88 8 5 16 18 17 1 1 11 98 66 6 41 44 446 451 448 44 19 148 7 11 166 141 187 147 164 474 8 8 1969 1998 8 4 71 1 811 495 9 115 15 199 18 1 1461 865 1811 6 6 1 4 4 1 1711 11 1814 1946 1957 1 1 1988 1 187 11-1 16 1 5 67 587 9 1 451 16 11-1 1-1 PM 4 417 448 468 76 464 1 6 16 1-1 PM 1-56 55 655 67 996 641 1 664 1 1- - 9 17 15 1 47 175 1 661 8-767 44 968 999 997 954 86 48 45 4717 475 471 475 4588 64 98 468 484 4784 4714 447 4599 17 185 895 171 196 195 69 1 194 1777 17 1965 58 65 1799 1918 1 15 18 17 1554 1684 166 174 15 175 19 978 15 17 154 17 119 156 69 49 6 681 759 98 79 15 447 11-1 4 11 57 69 646 97 671 54 11-1 Totals: 4119 417 4899 4465 487 456 651 76 No lane closure allowed Average Prohibited Hours 1 1 lane closure allowed Week lane closure allowed Week Night lane closure allowed Daily US1-