ADVANCE ENGINEERING WORKS. Spare Parts

Similar documents
TECHNICAL BID T 3627

ON-THE-VEHICLE BRAKE LATHE

NATOLI ENGINEERING CO. MANUFACTURED REPLACEMENT PARTS FOR CADMACH TABLET PRESSES NATOLI ENGINEERING COMPANY, INC. PREMIUM

PARTS LIST. Reproduction. Not for. Models. Mfg. No. Description MH61900, Murray 9TP 24" Dual Stage Snowthrower, CE (2011)

HINDUSTAN BEARING TECHNOLOGIES. Manufacturer and Exporter of Ball & Roller Bearings. Company Profile. ISO Certified Company

Chain Box and Knife. Item # Description Part Number 180-D & GS

Contents. ECCO single-phase. 1. Scissors assy Thread guide and eccentric drive Tucker plate assy

Reproduction. Not for PARTS LIST. Models. Manual Part No

COMMISSION REGULATION (EU) No /.. of XXX

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

Contents SIGMA. 1. Scissors assy Thread guide and eccentric drive Tucker plate assy

FX65 Skidding Winch Parts Manual. Prior to S/N

MTAB. MACHINING CENTERS

Parts Manual. Models Mfg. No. Description Brute, 14.5TP 29" Dual Stage Snowthrower (2012)

No. CLMP05 January 11, Parts Price List Clausing Lathes & Mills P.O. BOX 877 GOSHEN, IN PHONE (574) FAX (574)

TECHNICAL BID T 3610

LIIKENNEVIRTA LTD GENERAL TERMS AND CONDITIONS FOR THE CHARGING SERVICE

Adopted: September 24, 2015 Version: Version 1.0

Exchange of rollers from the XTS-Mover

Original Operating Manual

FX65 Skidding Winch Parts Manual. S/N to S/N

PIÈCES DÉTACHÉES. Chasse-neige. Révision 10/

Reproduction. Not for PARTS LIST. Models. Manual Part No Mfg. No. Description ML761650, 16.5TP 30" Dual Stage Snowthrower, CE (2010)

FX140 & FX140R Skidding Winch Parts Manual

Vertabelo Academy. Terms of Service PLEASE READ ALL OF THE FOLLOWING TERMS OF SERVICE BEFORE USING THIS WEBSITE A. General Terms

Reproduction. Not for. Hybrid Frame Dual Stage Snowthrowers. Parts Manual

Model 58-93R Tubing Power Tong Installation, Operation, Service and Parts Book Manual

Spare parts manual. HPO Reciprocating compressor unit

INVITATION FOR QUOTATION. TEQIP-III/2018/ntst/Shopping/35

Reproduction. Not for. Mid Frame Dual Stage Snowthrowers. Parts Manual

E L L I O T T 14M, 18M & 24M. Contents OPERATORS INSTRUCTION HANDBOOK FOR THE HIGH SPEED SHAPING MACHINES MODELS. Also COMPONENT PARTS LIST.

CETOP POSITION PAPER PP 07

Tray Box Former. Parts List & Illustrations FIGURE 8-28A RAIL & FINGER ASSEMBLY AUTO LIDDER ~ = VARIABLE PART. W. E. Plemons Machinery Services, Inc.

Reproduction. Not for. Signature Pro Dual Stage Snowthrowers. Parts Manual. Attachment

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia.

Fortis Wind Energy dealer price list

Craftsman Snow Thrower Model PARTS LIST

REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) AUTHORIZED BY CEO DESCRIPTION OF REVISION APPROVAL

CS Stationary Engines

HORIZONTAL SPLIT CASING PUMP

David Brown NOS parts list List correct as of November 2016

Punch and Perforating Unit. Spare Parts Manual

Vehicle Management Policy and Procedure Document No: VMPol 001

Spare parts list Pentruder Modular Drilling System

Round Die Products. Check our website for the latest technical information.

Reproduction. Not for. Large Frame Dual Stage Snowthrowers. Parts Manual. Attachment

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

RZT TWIN STICK HYDRO DRIVE 250 Z 44" & 50" SERIES 0

NATOLI ENGINEERING CO. MANUFACTURED REPLACEMENT PARTS FOR MANESTY TABLET PRESSES NATOLI ENGINEERING COMPANY, INC. PREMIUM

Australian Standard. SAA Lift Code. Part 4: Service lifts Power operated. AS (Incorporating Amendment Nos 1 and 2)

WP235 Wood Processor Parts Manual

DieMax XL TM Maximum Life Springs

FX65 Skidding Winch Parts Manual S/N & After

Operating Instructions Thread Rolling Heads F 001, F 01, K 01-1

Original Operating Manual

KILIAN SPARE PARTS MANUAL

Illustrated Parts Manual

Reproduction. Not for. Large Frame Two-Stage Series Snowthrowers. Parts Manual

Reproduction. Not for. Mid Frame Dual Stage Snowthrower. Parts Manual

Contents. AMADA Quality Tooling

SIGMA-II. Contents SIGMA-II. 1. Scissor assembly Thread guide and eccentric drive Tucker plate assembly...

Hydraulic Fittings. Design, Manufacture, Distribution

Mining, mineral processing and cement industries Solutions for mills and crushers

REQUEST FOR QUOTATIONS

50 TONNE HYDRAULIC PRESS MODEL NO: CSA50FP

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

ABACO MACHINES OPERATION MANUAL STONE/STEEL/GLASS/WOODS LIFTER (ASSGWL20) ABACO MACHINES (USA)

AIR CHAMP PRODUCTS. User Manual. BW Clutch or Brake Sheave, Pilot and Coupling Mount FORM NO. L U-1209 FORM NO.

ABACO GLASS LIFTER (AGL38)

Reproduction. Not for. Large Frame Dual Stage Snowthrowers. Parts Manual. Attachment

Parts Manual. Reproduction. Not for. Manual Part No Revision 00 Rev. Date 10/2008 TP ST-J

Mechanical Training Systems

PULLEY ASSEMBLY DIAGRAMS

MEX (55) QRO (442) Web Controls

Spare parts list Pentruder 6-16

Stapler Folder Model 82 Spare Parts List

Resident Permit and Visitor Permit Guidelines

TERMS AND CONDITIONS

AIR CHAMP PRODUCTS. User Manual. DAP-625S and DAP-875S FORM NO. L D-0914

GALKIN GALKIN AUTOMATED PRODUCTS GAP FLANGE MACHINE PARTS LIST

MODEL EF Full Circle Tire Spreader

DI-ACRO #2 HAND PUNCH PRESS INSTRUCTION MANUAL

Basic Unit of Mechanical Drive Systems MDSU. Engineering and Technical Teaching Equipment INTRODUCTION GENERAL DESCRIPTION

REAR ENGINE RIDER 42 MOWER SERIES 22

AMULFED DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

Spare Parts List Ironman (Standard and LUL)

REQUEST FOR QUOTATION (RFQ) FOR PROCUREMENT OF FORKLIFT FOR CENTERAL WAREHOUSE -UNDP GLOBAL FUND

MODEL NO REPAIR PARTS FRAME

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

ACTUATOR ASSEMBLY EXPLODED VIEW - ALL SERIAL NUMBERS

Specifications & Parts Model 2.0/15 Crane

Declaration of Conformity

AIR CHAMP PRODUCTS. User Manual. Sheave & Pilot Mount Clutch-Brake Model BCB-275 FORM NO. L F-0414 FORM NO. L F-0414

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Mechanical Training Systems ( )

Key No. Part No. Description Key No. Part No. Description ENGINE

2008, K&M NEWSPAPER SERVICES, INC. INSERTER 2299 INSERTER

SIGNATURE SERIES FZAB ABDOMINAL. Customer Support Services PARTS LIST. Page 1

Technical Bulletin Neck Forming System. Maintenance Schedule

ITEM PART NO. DESCRIPTION QTY

Transcription:

Spare Parts For Rotary Tableting Machine Spare Parts.

8 stn. / 10 stn. & 12 stn. R & D Lab Press Machine SR.NO PART NAME QTY. 1 Pressure Roll 2 Nos. 2 Lower Cam Track 1 No 3 Wedge 1 No 4 Break Plug 10 Nos. 5 Die lock Screw 5 Nos. 6 Anti Turning Strip 5 Nos. 7 Scrapper Plate 1 No 8 Take Off Plate 1 No 9 V Belt A 24 (Match Pair) 2 Nos. 16 / 20 Stn. Single Side Rotary Tableting Machine Spare Parts Sr. No Part Name Qty. 1 WEDGE 1 No 2 Upper Cam Track (Lifting) 1 No 3 Upper Cam Track(Lowering) 1 No 4 Lower Cam Track 1 No 5 V Belt C-79 1 No 6 Feed frame Complete Assembly 1 No 7 Feed frame Setting Knob (Big) 1 No. 8 Feed frame Setting Knob (Small) 1 No. 9 Pressure Roll Assembly 1 No. 10 Upper Roll Pin 1 No. 11 Lower Roll Pin 1 No. 12 Worm 1 No. 13 Tapper Roller Bearing 32207 1 No. 14 Ball Bearing 6010 1 No. 15 Taper Roller Bearing 30208 1 No. 16 Oil Cup (Big) 1 No. 17 Safety Spring 1 No. 18 Die Lock Screw 6 No. 19 Anti-Turning Spring Strip 6 No. 20 Punch Adjusting Spring Strip 1 No 21 PU Tube OD ɸ6 X IDɸ4 6 Mtr. 22 Pressure Wheel Spring Strip 1 No. 23 Weight Dozers Spring Strip 1 No. 24 Take Off Plate(Inner) 1 No. 25 Take Off Plate(Outer) 1 No. 26 Powder Scrapper 1 No. 27 Break Plug 20 Nos.

Images for the All Rotary Tabeting Compression Machinery Spare Parts

RECOMMENDED SPARE FOR AE-DRT-27 /35/45 TOOLING MACHINE Sr. No. Name of the Part Unit Qty 1 Needle thrust Bearing AXK 100135 Miscellaneous 1 2 Angular Contact Bearing SKF 7208B Drive 1 3 Ball Bearing SKF 6207 Drive 2 4 Ball Bearing SKF 6208 Drive 1 5 Clutch Pad Drive 2 6 Worm Drive 1 7 Friction gear (With Farado Circle 10603008) Drive 1 8 72 Dia Internal Circlip Drive 1 9 12 Dia External Circlip Drive 2 10 Timing Belt A 420 H 100 Drive 1 11 Variable Speed Pulley Assembly Drive 1 12 V Belt C-79 Drive 1 13 Die locking Screw Assembly (27 & 35 STN) Std. Turret 15 17 Break Plug Turret 15 18 Anti Turning Strip (27 Stn) Turret 15 21 Lower Punch Scraper Seal (only for 27 & 35 Stn) Turret 15 22 Dozzer Assembly U&L Cam 1 23 Weight Adjusting Wheel Spring U&L Cam 2 24 Wedge U&L Cam 2 25 Lower Cam track (Std) U&L Cam 2 29 Upper Press Roll Assly Pressing 1 30 Lower Press Roll Assly Pressing 1 31 Upper Press Roll Pin Pressing 1 32 Lower Roll Pin Pressing 1 33 Pressure Adjusting Wheel Spring Pressing 2 34 Feed Frame With Scraper Assembly Feed & Discharge 2 35 Oil Cup (Big) Lubrication 1 36 Oil Cup (Small) Lubrication 1 37 Compression Spring for Dozzer Dozzer 2 nos 38 Helical Compression Spring Pressure 2 nos 39 Variable Pulley Spring Drive 2 nos 40 Compression Spring for clutch Lubrication 3 nos 41 Compression Spring for oil line Lubrication 10 no 42 4 dia Collar Lubrication 10 43 7 dia collar Lubrication 2 44 11/64 dia X 5/8 Adaptor Bolt Lubrication 2 45 9/32 dia X 5/8 Adaptor Bolt Lubrication 2 46 11/64 dia X 1/2 Adaptor Bolt Lubrication 5 47 9/32 dia X 1/2 Adaptor Bolt Lubrication 1 48 Elbow Lubrication 4 49 6 dia Nylon pipe Lubrication 10 Mtr. 50 7 dia Nylon Pipe Lubrication 1 Mtr.

Project Execution Project handling A project plan, time schedule and test protocols, as required, will be agreed with the customer after order placement. Project progress reports will be produced on a regular basis throughout the project. Progress and payment issues Changes to the project scope after the final design review will be handled using engineering change notices (ECN). Such changes will be quoted separately and only after customer written approval will Advance Engineering proceed with design and implementation. They will not affect the agreed payment schedule and will be invoiced separately. Advance Engineering will start project execution after receipt of the first payment. In the event of failure to keep to the agreed payment schedule, Advance Engineering reserves the right to withhold performance and to charge for all the costs incurred. Should the installation, testing and/or commissioning be delayed considerably by factors outside of Advance Engineering s control, necessitating additional visits and/or more time, then Advance Engineering reserves the right to charge the customer for any such additional costs incurred. Delays in acceptance and/or delivery for reasons outside Advance Engineering s control will not affect the agreed payment schedule. Responsibilities Additional customer responsibilities Include, but may not be limited to: Provision of a clear and electrically safe site, with unimpeded access during the installation Supply all of ladders, personnel and system lifts, scaffolding etc., required for the installation, if not differently agreed All system controls, including motor control, emergency stops, safety switches and functional responsibility for equipment supplied by others All civil works required to accommodate the system, including provision of a suitable floor and any sealing/finishing of the surface after the system is installed Provision of safe and secure material storage area To ensure personnel acquire proper training to safely operate and maintain the system

Time Plan Time plan is based on the information currently available and is provisional. A binding time plan will be provide with the project plan after order placement and design approval. Safety Safety standards All equipment scheduled as part of the supply from Advance Engineering complies with basic safety and health requirements. Guarding When required by the risk analysis, the system is completed with guarding solutions. Any sign required in accordance with regulatory requirements will be provided and securely fixed. The drive units will be fitted with slack protection plates. The system may not be operated unless all the guarding provided is attached firmly in position. Based on our previous experience and our knowledge of this application, Company considers this the extent of the guarding required for the system. This view is also reflected in many independent occupational OH&S inspections carried out by customers before similar equipment has been placed in their facilities. Purchase Orders are to be sent to the Ahmadabad Address, refer the footer below for the same. Exclusions Anything that is not specifically listed or mentioned in this quotation and its Appendices is excluded. Miscellaneous All the appendices are an essential part of this quotation. By referring in any way to this quotation in your purchase order, you automatically accept the content of all Appendices. This quotation, samples and drawings are covered by our copyright and cannot in any part be used against a third party without our permission. Advance Engineering values ongoing and long term relationships with it s customers and in accordance with this appreciates when opportunities to undertake joint and mutually beneficial marketing of project installations can be facilitated. (Manufacturer of all type of Formulation & Granulation machinery & Spares) F-29, First Floor, Karnavati Mega Mall, Near Karnavati Banglow, S.P. Ring Road, Vastral, Ahemadabad-382 418. Gujarat, India. Mfg. ADD: Shed 70, Vrundavan Cottage Industrial Estate, Near S.P. Ring Road, Ramol, Ahmadabad- 382 449. Gujarat. Contact No.: +91-97231 11833 / 84601 59849 / 97260 23499. E-mail.: Advanceengineering2014@gmail.com / Processadvance@gmail.com Website: www.advanceeng.net /@2014. www.indiamart.com/advanceengineeringworks/ In PDF format, the document is valid without handwritten signatures.