8 stn. / 10 stn. & 12 stn. R & D Lab Press Machine SR.NO PART NAME QTY. 1 Pressure Roll 2 Nos. 2 Lower Cam Track 1 No 3 Wedge 1 No 4 Break Plug 10 Nos. 5 Die lock Screw 5 Nos. 6 Anti Turning Strip 5 Nos. 7 Scrapper Plate 1 No 8 Take Off Plate 1 No 9 V Belt A 24 (Match Pair) 2 Nos. 16 / 20 Stn. Single Side Rotary Tableting Machine Spare Parts Sr. No Part Name Qty. 1 WEDGE 1 No 2 Upper Cam Track (Lifting) 1 No 3 Upper Cam Track(Lowering) 1 No 4 Lower Cam Track 1 No 5 V Belt C-79 1 No 6 Feed frame Complete Assembly 1 No 7 Feed frame Setting Knob (Big) 1 No. 8 Feed frame Setting Knob (Small) 1 No. 9 Pressure Roll Assembly 1 No. 10 Upper Roll Pin 1 No. 11 Lower Roll Pin 1 No. 12 Worm 1 No. 13 Tapper Roller Bearing 32207 1 No. 14 Ball Bearing 6010 1 No. 15 Taper Roller Bearing 30208 1 No. 16 Oil Cup (Big) 1 No. 17 Safety Spring 1 No. 18 Die Lock Screw 6 No. 19 Anti-Turning Spring Strip 6 No. 20 Punch Adjusting Spring Strip 1 No 21 PU Tube OD ɸ6 X IDɸ4 6 Mtr. 22 Pressure Wheel Spring Strip 1 No. 23 Weight Dozers Spring Strip 1 No. 24 Take Off Plate(Inner) 1 No. 25 Take Off Plate(Outer) 1 No. 26 Powder Scrapper 1 No. 27 Break Plug 20 Nos.
Images for the All Rotary Tabeting Compression Machinery Spare Parts
RECOMMENDED SPARE FOR AE-DRT-27 /35/45 TOOLING MACHINE Sr. No. Name of the Part Unit Qty 1 Needle thrust Bearing AXK 100135 Miscellaneous 1 2 Angular Contact Bearing SKF 7208B Drive 1 3 Ball Bearing SKF 6207 Drive 2 4 Ball Bearing SKF 6208 Drive 1 5 Clutch Pad Drive 2 6 Worm Drive 1 7 Friction gear (With Farado Circle 10603008) Drive 1 8 72 Dia Internal Circlip Drive 1 9 12 Dia External Circlip Drive 2 10 Timing Belt A 420 H 100 Drive 1 11 Variable Speed Pulley Assembly Drive 1 12 V Belt C-79 Drive 1 13 Die locking Screw Assembly (27 & 35 STN) Std. Turret 15 17 Break Plug Turret 15 18 Anti Turning Strip (27 Stn) Turret 15 21 Lower Punch Scraper Seal (only for 27 & 35 Stn) Turret 15 22 Dozzer Assembly U&L Cam 1 23 Weight Adjusting Wheel Spring U&L Cam 2 24 Wedge U&L Cam 2 25 Lower Cam track (Std) U&L Cam 2 29 Upper Press Roll Assly Pressing 1 30 Lower Press Roll Assly Pressing 1 31 Upper Press Roll Pin Pressing 1 32 Lower Roll Pin Pressing 1 33 Pressure Adjusting Wheel Spring Pressing 2 34 Feed Frame With Scraper Assembly Feed & Discharge 2 35 Oil Cup (Big) Lubrication 1 36 Oil Cup (Small) Lubrication 1 37 Compression Spring for Dozzer Dozzer 2 nos 38 Helical Compression Spring Pressure 2 nos 39 Variable Pulley Spring Drive 2 nos 40 Compression Spring for clutch Lubrication 3 nos 41 Compression Spring for oil line Lubrication 10 no 42 4 dia Collar Lubrication 10 43 7 dia collar Lubrication 2 44 11/64 dia X 5/8 Adaptor Bolt Lubrication 2 45 9/32 dia X 5/8 Adaptor Bolt Lubrication 2 46 11/64 dia X 1/2 Adaptor Bolt Lubrication 5 47 9/32 dia X 1/2 Adaptor Bolt Lubrication 1 48 Elbow Lubrication 4 49 6 dia Nylon pipe Lubrication 10 Mtr. 50 7 dia Nylon Pipe Lubrication 1 Mtr.
Project Execution Project handling A project plan, time schedule and test protocols, as required, will be agreed with the customer after order placement. Project progress reports will be produced on a regular basis throughout the project. Progress and payment issues Changes to the project scope after the final design review will be handled using engineering change notices (ECN). Such changes will be quoted separately and only after customer written approval will Advance Engineering proceed with design and implementation. They will not affect the agreed payment schedule and will be invoiced separately. Advance Engineering will start project execution after receipt of the first payment. In the event of failure to keep to the agreed payment schedule, Advance Engineering reserves the right to withhold performance and to charge for all the costs incurred. Should the installation, testing and/or commissioning be delayed considerably by factors outside of Advance Engineering s control, necessitating additional visits and/or more time, then Advance Engineering reserves the right to charge the customer for any such additional costs incurred. Delays in acceptance and/or delivery for reasons outside Advance Engineering s control will not affect the agreed payment schedule. Responsibilities Additional customer responsibilities Include, but may not be limited to: Provision of a clear and electrically safe site, with unimpeded access during the installation Supply all of ladders, personnel and system lifts, scaffolding etc., required for the installation, if not differently agreed All system controls, including motor control, emergency stops, safety switches and functional responsibility for equipment supplied by others All civil works required to accommodate the system, including provision of a suitable floor and any sealing/finishing of the surface after the system is installed Provision of safe and secure material storage area To ensure personnel acquire proper training to safely operate and maintain the system
Time Plan Time plan is based on the information currently available and is provisional. A binding time plan will be provide with the project plan after order placement and design approval. Safety Safety standards All equipment scheduled as part of the supply from Advance Engineering complies with basic safety and health requirements. Guarding When required by the risk analysis, the system is completed with guarding solutions. Any sign required in accordance with regulatory requirements will be provided and securely fixed. The drive units will be fitted with slack protection plates. The system may not be operated unless all the guarding provided is attached firmly in position. Based on our previous experience and our knowledge of this application, Company considers this the extent of the guarding required for the system. This view is also reflected in many independent occupational OH&S inspections carried out by customers before similar equipment has been placed in their facilities. Purchase Orders are to be sent to the Ahmadabad Address, refer the footer below for the same. Exclusions Anything that is not specifically listed or mentioned in this quotation and its Appendices is excluded. Miscellaneous All the appendices are an essential part of this quotation. By referring in any way to this quotation in your purchase order, you automatically accept the content of all Appendices. This quotation, samples and drawings are covered by our copyright and cannot in any part be used against a third party without our permission. Advance Engineering values ongoing and long term relationships with it s customers and in accordance with this appreciates when opportunities to undertake joint and mutually beneficial marketing of project installations can be facilitated. (Manufacturer of all type of Formulation & Granulation machinery & Spares) F-29, First Floor, Karnavati Mega Mall, Near Karnavati Banglow, S.P. Ring Road, Vastral, Ahemadabad-382 418. Gujarat, India. Mfg. ADD: Shed 70, Vrundavan Cottage Industrial Estate, Near S.P. Ring Road, Ramol, Ahmadabad- 382 449. Gujarat. Contact No.: +91-97231 11833 / 84601 59849 / 97260 23499. E-mail.: Advanceengineering2014@gmail.com / Processadvance@gmail.com Website: www.advanceeng.net /@2014. www.indiamart.com/advanceengineeringworks/ In PDF format, the document is valid without handwritten signatures.