UK Cost Reduc6on Pathways

Similar documents
Matthew Knight, Director Business Development UK Offshore Wind. The future of offshore renewables

An energy revolution is needed to achieve our energy security and climate goals

Renewable Energy Innovation Outlook: Offshore Wind Technology

Solar & Storage the Opportunity

Energy Bridge. Delivering Irish wind energy to GB before 2020

EnBW market entry offshore wind in Taiwan: - Acquisition of 37,5% stake in 2 GW pipeline - Joint development with Macquarie Capital & Swancor

2002/03 Interim Announcement 11 November

ENEL PUBLISHES 2018 SECOND QUARTER AND FIRST HALF GROUP OPERATING DATA REPORT

Inspirational Solar UK and Global Growth

Marine Current Turbines

Volatile wind and flexible demand: a balancing act?

Storage in the energy market

40KW Solar System for Apple Sauce Co

Technologies & Economics

Fabricação de Inversores Fotovoltaicos no Brasil: Oportunidades e Desafios GUILHERME SOUZA GENERAL ELECTRIC

This presentation is based on information currently available to management. The forward-looking statements contained herein could be substantially

World Energy Investment 2017

Example 1MW Solar System for Fosters Yatala

The impact of Electric Vehicles Deployment on Production Cost in a Caribbean Island Country

9M 2003 Financial Results (US GAAP)

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

160 MW Solar-Wind Hybrid project with BESS at Ramgiri, Andhra Pradesh

Innovative Axial Flux Air Cored Permanent Magnet Generator suitable for Slow, Medium Speed and Direct Drive Wind Turbines

Transmission Access Charges (TAC) Katie Ramsey Staff Attorney Clean Coalition mobile

EDPR s Offshore Wind activities. November 2015

Capital Markets Day. Global e-solutions. Francesco Venturini

DEVELOPMENTS & STATUS IN PAKISTAN WITH CASE STUDY OF

Wind Energy in the Southeast: Offshore and Land-Based Potential

Respect for customers, partners and staff. Service: another name for the respect that a company owes its customers, partners and staff.

Full-year Report 2009

Analysis of options for the future allocation of PV farms in South Africa

Joint presentation by: Lead investor EPC, O&M

Consumers, Vehicles and Energy Integration (CVEI) project

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies

Smart Energy Demand Coali2on

GE Renewable Energy. Unsubsidised Onshore Wind. Charles Haworth PhD Risk and Operations Leader EMEA & Asia. Imagination at at work.

Planning for smart ci?es A supplier s view ATSE NSW Symposium 2015 Adrian Clark

SS GEN-02 Business Focus with Simulation

WINDPARK PRESENTATION

The Energy Transition and Idea Creation: The energy transition perspective of a global energy operator

FOURTH QUARTER 2013 RESULTS

1H 2003 Financial Results (US GAAP)

RIIO-T2 Energy Scenarios

Role of solar PV prosumers in enabling the energy transition towards a fully renewables based power system for India

SolarPACE + Storage Expanding Opportunities and Improving Project Economics. Presented By:

Repowering or extended operation -Spain- Andreas Thomas, Managing Director Beaufort 9 GmbH

2Q06 Results. Investor Relations

Tidal lagoon snapshot

Engineering Offshore Wind

Calculating the levelised cost of energy (LCOE) Solar Energy UK Installer Roadshow

FISCAL YEAR MARCH 2014 FINANCIAL RESULTS

Published on Market Research Reports Inc. (

1Q08 Results Integration with ERG Renewable Activities Business Plan

UK Offshore Wind Cost Optimisation: Top Head Mass

Particularities of Investment Projects in the Romanian Biodiesel Industry

ABB Wind Care Service Offering

FISCAL YEAR MARCH 2015 THIRD QUARTER FINANCIAL RESULTS. Updated Mazda CX-5 (Japanese specification model)

Published on Market Research Reports Inc. (

Good demand in Hiab continued

SECOND QUARTER 2015 RESULTS

This is the Electric Power Grid

Months Investor Presentation

2017 NER 300 Info Day

Q Analyst Teleconference. 9 August 2018

The Role of Nuclear Power

Hywind Scotland status and plans

Evaluation of offshore HVDC grid configuration options

Market Perspective & Solutions

German-American Chamber of Commerce Offshore wind conference Jersey City, NJ October 18, 2011

Paving the way for Renewable Power-to-Gas (P2G) The case of non-individual transport

FISCAL YEAR MARCH 2015 FIRST HALF FINANCIAL RESULTS. New Mazda Demio

Proposed acquisition of Areva Distribution. December 2, 2009

Wind Power Applications & Supercapacitors

Introduction of the section about electricity production mix

Introduction to Charging: Which Parties Pay Which Charges?

A French company based in Paris

Q1 Report Joakim Olsson CEO and President April 23, Innovative Vehicle Technology

Community Level Solar Energy System Daniel Marticello

EIB experience in financing smart meter roll-outs

Electricity Transmission network charging

Tapfheim, Germany (770 kw); Gehrlicher Solar AG. Corporate Overview Q3 2008

Preface Who Should Read This Book 3 Organization and Content 4 Acknowledgments 5 Contacting the Author 5 About the Author 5

FISCAL YEAR MARCH 2018 FIRST QUARTER FINANCIAL RESULTS

Turners Auctions Limited. New Zealand Shareholders Association

Panel Discussion on Accelerating Large Scale Deployment of Rooftop SPV in India

FISCAL YEAR ENDED MARCH 2011 FINANCIAL RESULTS

BRE National Solar Centre - Associate Ray Noble. UK s Solar Strategy: Window of Opportunity

CPV Industry Overview

Click to edit Master title style

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

Smart Grid 2.0: Moving Beyond Smart Meters

ZF posts record sales in 2017; announces increased research and development activities

The Role of Offshore Wind

Energy Storage: A UK Perspective

FISCAL YEAR MARCH 2015 FIRST QUARTER FINANCIAL RESULTS. Mazda Roadster 25 th Anniversary Model

1 st Half 2018 Results. August 1 st, 2018

PV and Energy Storage at FSEC Buildings Paul Brooker

Operating Results Q Asian Insulators Public Company Limited

Electricity Technology in a Carbon-Constrained Future

Introduction to Veja Mate Offshore Project

Transcription:

Money Talks: Cost modelling and Cost Reduc6on Opportuni6es UK Cost Reduc6on Pathways Adrian Fox Programme Manager Technology and Supply Chain 23 February 2014

The Cost Reduc@on Agenda Supply chain advancement DECC Roadmap Offshore Wind Cost Reduc@on Pathways Cost Reduc@on Task Force Offshore Wind Demonstra6on Programme Offshore Wind Programme Board Jul 11 Jun 12 Jul 12 Feb 13 Mar 13

Cost Reduc6on is required to maximise deployment of offshore wind to 2020 and beyond 18GW by 2020 high end of central scenario (2011). 15 GW 8 GW 11GW by 2020 low end of central scenario. (2011) Year of opera@on DECC EMR delivery Plan December 2013 At the strike price for offshore wind, the modelling suggests that 10GW is achievable (within a range of 8-15GW in the modelling by Na@onal Grid)

LCOE model design (single site) LCOE ( /MWh) = total discounted cost/total discounted genera@on CAPEX OPEX AEP WACC Timing Consen@ng Development/ Project Mngmt. Turbine Support structure Array electrical Installa@on Opera@ons & Maintenance Insurance Transmission charges Other Gross AEP Losses Availability Net AEP to offshore substa@on Equity returns Debt margin Debt tenor Gearing Re- financing Phasing of CAPEX, OPEX and AEP over @me Re- financing / Changes in WACC 4 Decommission ing Insurance Includes Capex: Cost reduc6on covered in separate RUK sub group study for pathways team

Industry Stories High innova@on Finance & Supply Chain Incremental improvement 3: Supply Chain Efficiency 4: Rapid Growth 36GW in Europe by 2020 (17GW in UK) Incremental technology evolu@on (e.g. steady progress to 5-7MW turbines) Greater compe@@on, investment, project collabora@on and beher risk management Deeper financial markets, lower risk / lower cost of capital 1: Slow Progression 2: Technology Acceleration 31GW in Europe by 2020 (12GW in UK) Incremental technology evolu@on, progress limited by market size Limited compe@@on/economies of scale Modest developments in financing solu@ons, reduc@on in risk / cost of capital 43GW in Europe by 2020 (23GW in UK) High levels of technology evolu@on across all wind farm elements (e.g. turbines progress rapidly to 5-7MW+) Greater compe@@on, investment, project collabora@on and beher risk management Challenging volume of finance required 36GW in Europe by 2020 (17GW in UK) High levels of technology evolu@on across all wind farm elements (e.g. turbines progress rapidly to 5-7MW+) Fragmented supply chain with some improvement in collabora@on Limited improvement in cost of capital due to ongoing changes in technology Incremental improvement Technology * Note: all GW figures refer to total opera@onal capacity by 2020 High innova@on

Capacity Trajectories by Story Operating capacity in the UK (GW) Rapid Growth 43GW by 2020 (Europe) Including 23 GW in UK Technology Acceleration & Supply Chain Efficiency 36GW by 2020 (Europe) Including 17 GW in UK Slow Progression 31GW by 2020 (Europe) Including 12 GW in UK Each Story is tied to an assumption on build out rate in UK and Rest of Europe

Generic Site Types Specified for this project Represent range of projects/zones to 2020 Site Type Average Water depth (m) Distance to nearest port (km) Average wind speed (m/s) A 25 40 9 B 35 40 9.4 C 45 40 9.7 D 35 125 10

Pathway defini@on Industry Story (x4) Site Type (A,B,C,D) Pathway (x16) Product A in 2011 Product A in 2014 Product A in 2017 Product B in 2017 Product A in 2020 Product B in 2020 Industry mix of Products Product B in 2014 Product C in 2017 Product C in 2020 Pathway Time (based on year of FID)* * FID = Final Investment Decision

Baseline of 140-143/MWh 140/MWh 143/MWh

Study Framework 3 inter- related workstreams Finance Technology Health & Safety Supply Chain

RESULTS

Technology

Overall summary Element Number of Innova6ons Windfarm Development 7 Turbine Nacelle 13 Turbine Rotor 13 Support structure 8 Array Cables 5 Installa@on 14 Opera@on 8 Scheduled and unplanned maintenance 6 13

Turbines

Turbine cost reduc@ons

Turbine cost reduc@ons

Supply Chain

Levers Asset Growth and Economies of Scale Risk Contract Risk Uncontrollable Compe@@on EU Compe@@on Low Cost Entrants Ver@cal Collabora@on Horizontal Collabora@on

Supply Chain lever reduc@ons FID 2020, Story 3, By Element

Story 1 SC Lever reduc@ons By Lever

Finance

Capital Requirements by Story

Post- Tax nominal WACC

Cost Reduc@on Pathways 160 140 LCOE ( /MWh) 120 100 80 60 40 20 0 FID 2011 FID 2014 FID 2017 FID 2020 1 - Slow Progression 2 - Technology Accelera@on 3 - Supply Chain Efficiency 4 - Rapid Progression

Contribu@ons to LCOE reduc@on

Breakdown of 2020 cost reduc@on 0-9 Cost Reduc6on ( /MWh) - 10-20 - 30-40 - 50-8 - 8-33 - 5-4 - 21-18 - 6-32 - 18-3 - 60 Story 1 Story 2 Story 3 Story 4 Technology (& transmission) Supply Chain Finance

Headline Drivers of Cost Reduc@on Next genera@on turbines (rotor size, MW ra@ng, reliability, life) & structures Offshore installa6on op@mised for cost and risk (including speed) Capacity factor op@misa@on (increase to 40-50%) New entrant suppliers contribu@ng to compe66on and constraint avoidance Steadily increasing market with predictable project commitment @mings delivers economies of scale, learning/proving, skills- growth triggers @mely investment in technology and supply capacity facilitates essen@al pre- FID commitments by developers concentrates available financial & other resources onto chosen projects Risk and cost tackled coopera@vely and end to end, within ver6cal collabora6ons ini@ated early in pre- consent development Developers abrac6ng new equity, and third party finance, to construc@on phase Smooth recycling of capital once asset is opera@onal

Comparison of DE and UK study TCE (average site type C and D) S@sung (site type B) S@sung Scenario 1 S@sung Scenario 2

Assessment DE projects risk being up to 10% less cost effec@ve due to wake effects DE development and consen@ng costs 40% higher than UK Financing costs significantly lower in DE DE O&M costs benefit from greater shared costs between projects DE installa@on costs less op@mis@c than UK.

Further Informa@on hhp://www.thecrownestate.co.uk/energy- infrastructure/offshore- wind- energy/working- with- us/strategic- workstreams/cost- reduc@on- study/