Docket No , License No. NPF CFR 50.55a Request VR-1. Revision 1. Align Valve Testing Frequencies to

Similar documents
Nuclear L.L. C. 10 CFR 50.55a

Aoý. 0Constellation Nuclear. Calvert Cliffs Nuclear Power Plant. February 27, U. S. Nuclear Regulatory Commission Washington, DC 20555

April 23, U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC

5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS

References 2 and 3 provided additional information as requested. April 25, 2011

74 ow. 10 CFR 50.46(a)(3)(ii)

Revision 4, Maine Yankee s License Termination Plan

related Safety Evaluation is also enclosed. The notice of be included in the Commission's biweekly Federal Register

Nuclear. May 19, 2001 SVP U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C

STANDARD REVIEW PLAN

ams.t.andard REVIEW PLAN.

Sincerely, /s/ Victor Nerses, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/11. Office of Nuclear Reactor Regulation

DRAFT SONGS Units 2 and 3 Irradiated Fuel Management Plan

FENOC. March 9, 2001 PY-CEI/NRR-2551 L. United States Nuclear Regulatory Commission Document Control Desk Washington, D.C

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

ExeIoni. k f' a /A, Nuclear. August 8, Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Part 21 (PAR) Event# 47635

Airworthiness Directive

MSG-3 EASA AMC FAA NPRM Corrosion damage that does not require structural reinforcement or replacement.

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS

Airworthiness Directive

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

September 9, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, DC 20426

AIRWORTHINESS DIRECTIVE

DEPARTMENT OF TRANSPORTATION

Merger of the generator interconnection processes of Valley Electric and the ISO;

Entergy. July 25, 2001 IPN U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC SUBJECT:

BOMBARDIER, INC.

FISCHER, FRANKLIN & FORD Attorneys and Counsellors GUARDIAN BUILDING, SUITE GRISWOLD STREET DETROIT, MICHIGAN

Requirements for Alteration Design Registration Based on Fitness-for-Service

Outage dates (duration): March 2, 1993 to April 20, 1994 (1.1 years) Reactor age when outage began: 11.7 years

SUBJECT: ISSUANCE OF AMENDMENT FOR SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 2 (TAC NO. M94624) AND UNIT NO. 3 (TAC NO.

GE ABWR & ESBWR. Jeff Suggs ESBWR I&C April 17, Copyright 2006 by GE Energy / Nuclear

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

DEPARTMENT OF TRANSPORTATION. Commercial Driver s License Standards: Application for Renewal of Exemption; Daimler Trucks North America (Daimler)

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017

ASME BPV XI NUCLEAR INSERVICE INSPECTION STANDARDS COMMITTEE HANDOUT

TORONTO TRANSIT COMMISSION REPORT NO.

13917/18 CB/AP/add 1 ECOMP.3.A

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

Seabrook Substation Reliability Improvement Project

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2016-SW-004-AD; Amendment ; AD ]

Notice of proposed amendment to Service Charges for Regulatory Year ending 31 March 2019

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

Radiological Safety for the Design and Construction of Apparatus for Gamma Radiography. ANSI S3.6 Specifications for Audiometers 1969 NRC

SECTION GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

Docket No EI Date: May 22, 2014

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

1065 Woodman Drive Twelfth Revised Sheet No. T8 Dayton, Ohio Page 1 of 5

Proposal for amendments to UN Regulation No. 110 CNG/LNG vehicles

DISCUSSION DOCUMENT. New standards for off-road small spark-ignition engines under consideration

August 26, Project No Holt Project Turbine and Generator Nameplates by electronic filing

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

DEPARTMENT OF TRANSPORTATION. Agency Information Collection Activities; Approval of a New Information

[Docket No. FAA ; Directorate Identifier 2008-SW-44-AD; Amendment ; AD ]

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR )

PAPER NO "EMERGENCY DIESEL GENERATORS MANUFACTURED BY TRANSAMERICA DELAVAL, INC. PROBLEMS, THEIR RESOLUTION AND LESSONS LEARNED"

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

Re: Demand Side Management Plan, 2016 FEECA Annual Report

Re: Online Reporting of Backflow Assembly Tests and Updates to Backflow Tester Records

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

These regulations are created pursuant to and of the Colorado Revised Statutes.

Portland General Electric Company Fourteenth Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Thirteenth Revision of Sheet No.

APPLICABILITY This procedure applies to all Ogeechee Technical College employees who drive on State of Georgia business regardless of frequency.

Large Diameter Steel Flanges

San Joaquin Valley Air Pollution Control District Vapor Recovery Requirements for Permitted Agricultural Gasoline Storage and Dispensing Operations

DEPARTMENT OF TRANSPORTATION

TORONTO TRANSIT COMMISSION REPORT NO.

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA EXECUTE CONTRACT MODIFICATIONS FOR BUS INSPECTION SERVICES

DEPARTMENT OF TRANSPORTATION. Commercial Driver s License Standards: Application for Exemption; Daimler Trucks North America (Daimler)

Airworthiness Directive

Meeting of January 14, 2014 San Antonio, Texas

NRC Non-Destructive Examination Research

Bioprocessing Equipment

wameren UF January 18, 2001 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC ULNRC-04353

Gas Turbine Aircraft Engines

GC108: EU Code: Emergency & Restoration: Black start testing requirement

TECHNICAL INSTRUCTION HAC Rev N/C

Equivalency Certificate (Approval issued by the competent authority of Canada)

AN ACT. Be it enacted by the General Assembly of the State of Ohio:

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

San Joaquin Valley Iwo AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING'

REGULATORY CONTROL OF X-RAY SCANNING OF PASSENGER CARS

Special Condition. Approval of Turbofan Engine Take-off Thrust at High Ambient Temperature (TOTHAT) rating.

COMMISSION DELEGATED REGULATION (EU) /... of XXX

The North American Electric Reliability Corporation ( NERC ) hereby submits

SERVICE CLASSIFICATION NO. 7 LARGE GENERAL TIME-OF-DAY SERVICE

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

BWR Control Rod Drive Pump Flow Control Valves

TYPE CERTIFICATE DATA SHEET

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

TANK SYSTEM DESIGN ASSESSMENT REPORT FOR FAC POND 5 TANK T-9001

Energy Technical Memorandum

Transcription:

FENOC FirstEnergy Nuclear Operating Company 10 Center Road Perry, Ohio 44081 MarkB.Bezilla Vice President 440-280-5382 Fax: 440-280-8029 October 16, 2011 L-11-287 10 CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 SUBJECT: Docket No. 50-440, License No. NPF-58 10 CFR 50.55a Request VR-1. Revision 1. Align Valve Testing Frequencies to NUREG-1482 Provision By correspondence dated May 19, 2011 (Accession No. ML111050267), the Nuclear Regulatory Commission (NRC) issued Amendment 156 to Facility Operating License No. NPF-58 for the (PNPP). The amendment modified the frequency of Surveillance Requirement (SR) 3.1.4.2 from "120 days cumulative operation in MODE 1" to "200 days cumulative operation in MODE 1." Pursuant to 10 CFR 50.55a(a)(3), FirstEnergy Nuclear Operating Company (FENOC) is requesting NRC approval for a proposed alternative to certain requirements of the PNPP Inservice Testing Program (ISTP). Approval of the enclosed alternative would align the valve testing to the test frequencies in Technical Specification 3.1.4, "Control Rod Scram Times," making the ISTP consistent with NUREG-1482, "Guidelines for Inservice Testing at Nuclear Power Plants." FENOC is requesting approval of the proposed alternative by March 2, 2012. The proposed alternative would be implemented prior to the March 10, 2012 scheduled date to perform SR 3.1.4.2 for control rod scram time testing. There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil Lashley, Supervisor - Fleet Licensing, at (330) 315-6808. Sincerely, Mark B. Bezilla Enclosure:, 10 CFR 50.55a Request VR-1, Revision 1 cc: NRC Region III Administrator NRC Resident Inspector ' NRC Project Manager

10 CFR 50.55a Request VR-1, Revision 1 Page 1 of 4 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i) -Alternative Provides Acceptable Level of Quality and Safety- 1. ASME Code Componentfs) Affected Category B Valves (Typical of 177) 1C11-126, Scram Inlet Valve (Class 2) 1C11-127, Scram Exhaust Valve (Class 2) Category C Valves (Typical of 177) 1C11-114, Scram Discharge Header Check Valve (Class 2) [OPEN direction only] 1C11-115, Charging Water Header Check Valve (Class 2) [OPEN direction only] These valves operate as an integral part of their respective hydraulic control unit (typical of 177) to rapidly insert the control rods into the core in support of the reactor scram function. Specifically: Scram Inlet Valve (1C11-126) has a safety function to open and supply pressurized water to the bottom of the control rod drive piston to rapidly insert the control rod into the core. Scram Exhaust Valve (1C11-127) has a safety function to open and vent water from above the control rod drive piston to the scram discharge header allowing control rod movement during the scram. Scram Discharge Header Check Valve (1C11-114) has a safety function to close and prevent reverse flow from the scram discharge header back to the top of the control rod drive piston; during the scram, this check valve has a safety function to open and allow water from above the control rod drive piston to flow into the scram discharge header (with 1C11-127 open) allowing control rod movement. Charging Water Header Check Valve (1C11-115) has a safety function to close and prevent the loss of water pressure in the event supply pressure to the scram accumulator is lost; during the scram, this check valve opens to allow flow to the bottom of the control rod drive piston (with 1C11-126 open).

Page 2 of 4 2. Applicable Code Edition and Addenda American Society of Mechanical Engineers (ASME) OM Code-2001 Edition, Code for Operation and Maintenance of Nuclear Plants, with Addenda through OMb-2003. 3. Applicable Code Requirements ISTC-3510, Exercising Test Frequency states, "Active Category A, Category B, and Category C check valves shall be exercised nominally every 3 months, except as provided by ISTC-3520..." ISTC-5131(a), Valve Stroke Testing states, "Active valves shall have their stroke times measured when exercised in accordance with ISTC-3500." ISTC-5221(a), Valve Obturator Movement states, "The necessary valve obturator movement during exercising shall be demonstrated by performing both an open and a close test." The Nuclear Regulatory Commission (NRC) approved an alternative to these requirements [10 CFR 50.55a Request VR-1, Revision 0] in a safety evaluation dated October 22, 2009. 4. Reason for Request On May 19, 2011, the NRC issued Amendments 156 and 157 that modified the scram time testing frequency requirements of Technical Specifications (TS) 3.1.4, "Control Rod Scram Times." Approval of this proposed alternative to ISTC-3510 would align the testing frequencies of the specified ASME code components to the frequencies stated within TS Surveillance Requirement (SR) 3.1.4.1, SR 3.1.4.2, SR 3.1.4.3 and SR 3.1.4.4. The pneumatically operated scram inlet and exhaust valves are not provided with suitable position indication; therefore, to measure stroke times as required by ISTC-5131(a), special test methods or test equipment would be required. The check valves are not provided with position indication; therefore, to determine if the obturator has traveled to the proper position as required by ISTC-5221(a), special test methods or test equipment would be required. Approval of this proposed alternative would make the third 10-year inservice test program consistent with NUREG-1482, Revision 1, Section 4.4.6.

Page 3 of 4 5. Proposed Alternative and Basis for Use As discussed in NUREG-1482, Revision 1, Section 4.4.6, the rod scram test frequency identified in the facility's Technical Specifications may be used as the valve testing frequency to minimize rapid reactivity transients and wear of the control rod drive mechanisms. The scram inlet and exhaust valves are pneumatically operated valves that full-stroke in milliseconds and are not provided with suitable position indication. The check valves are not equipped with position indication. Verifying that the associated control rod meets the scram insertion time limits defined in the plant's Technical Specifications can be an acceptable alternative method of detecting degradation of these valves. The provisions of this request provide a reasonable alternative to the ISTC-3510, ISTC-5131(a) and ISTC-5221(a) code requirements. The proposed method of detecting valve degradation provides reasonable assurance of each valve's operational readiness, provides an acceptable level of quality and safety for monitoring the valves, and ensures the valves are capable of performing their control rod drive safety functions. The Technical Specification 3.1.4 surveillances place conservative limits on the control rod insertion times, ensuring the necessary quality of the control rod drive system and its components are maintained. Therefore, scram insertion timing per the requirements of SR 3.1.4.1, SR 3.1.4.2, SR 3.1.4.3 and SR 3.1.4.4, including their test frequencies, shall be substituted for individual valve testing. For check valves 1C11-114 and 1C11-115, this includes only OPEN direction testing. 6. Duration of Proposed Alternative The proposed alternative shall be utilized during the third 10-year inspection interval currently scheduled to expire on May 17, 2019. 7. Precedent Safety Evaluation of the Inservice Testing Program Second Ten-Year Interval for Pumps and Valves - (TAC No. MA3328), August 9, 1999. - Safety Evaluation of Relief Requests for Third 10-year Pump and Valve Inservice Testing Program (TAC Nos. ME0191 Through ME0198), October 22, 2009. Cooper Nuclear Station - Request for Relief No. RV-06 for the Fourth 10-Year Interval Inservice Testing Program Regarding Control Rod Drive System Valves (TAC NO..ME1521), April 26, 2010.

Page 4 of 4 8. References 1., Technical Specification 3.1.4, "Control Rod Scram Times." 2. NUREG-1482, Revision 1, "Guidelines for Inservice Testing at Nuclear Power Plants," U.S. Nuclear Regulatory Commission. 3., Refueling Outage Justification RO-31, Control Rod Drive Hydraulic System (C11), Valve 1C11-115. 4. U.S. Nuclear Regulatory Commission letter to FENOC, Subject: Perry Nuclear Power Plant, Unit No. 1 - Issuance of Amendment re: License Amendment to Revise Technical Specification (TS) 3.1.4, "Control Rod Scram Times," to Incorporate Technical Specification Task Force (TSTF) Change Traveler TSTF-460, Revision 0 (TAC No. ME5194), May 19, 2011. [Amendment 156] 5. U.S. Nuclear Regulatory Commission letter to FENOC, Subject: Perry Nuclear Power Plant, Unit No. 1 - Issuance of Amendment re: License Amendment to Modify Technical Specification (TS) 3.1.4, "Control Rod Scram Times," to Incorporate Technical Specification Task Force (TSTF) Change Traveler TSTF-222, Revision 0 (TAC No. ME5192), May 19, 2011. [Amendment 157]