Ph. No: Fax No: Website:

Similar documents
Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

No.: NERPC/COM/CC_Min/2016/ Dated: 13 th January 2017

List of Grid Disturbances above 10 MW. Page 1 of 8

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

ईट ड 16/ ट

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

Solutions for Full Length Test - 4

ईट ड 11/ ट

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

Agenda of 11 th System Studies Meeting in NER

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

ववषय ववद य त पक व ट र व ह ज म पक प वव (AIS 040:2015 प अमभन अमभग रहण )

य पक प रच लन मस द प स ड 25(2700) तकन क स म त प स ड 25

Government Of India Ministry of Power Central Electricity Authority New Delhi

STATION OWNER UNIT NO. UNIT CAPACITY (MW) TYPE

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

Government Of India Ministry of Power Central Electricity Authority New Delhi

सम मनत यहद प ई ह त ल हदए गए प र चपक म म ख प रपक च म खत पक त पक अध हस त क ष प भ ज

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018


क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

Automotive Vehicles Safety Belts, Restraint Systems and Safety Belt Reminder Installation Requirements

प र ख स ख य ववषय TED 27 (13009) W - II ववद य त पक व ट र व ह प पक व तथ 30 मम ट प अ पतम पक व म पक (AIS 041:2015 प अमभन अमभग रहण)

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power. Central Electricity Authority. New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

Government Of India Ministry of Power Central Electricity Authority New Delhi

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

North Eastern Regional Power Committee

/ Telefax : No: 1(2)2015-E/ Battery& Charger TVH/ Dated:


Rajasthan Public Service Commission 2016

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016

No. NERPC/SE (O)/PCC/2013/ Date: 16th August, 2013

ल ख षणस पन व य पकप रच लनमस द प स ड 3(12109)C

Government Of India Ministry of Power Central Electricity Authority New Delhi

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

DOCUMENT DESPATCH ADVICE. Technical Committee: Petroleum and Related Products Sectional Committee, PCD 3

इल क र क स लल ग प ख व वषक टट ( प न क ण)

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

ETD 39 (10038 ) ETD 39 (10039 ) ETD 39 (10040 )

File No.CEA-PS-13-17(14)/2/2018-PSPM Division. CEA /PS/PSPM/07/07/2018/ Dated:

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

(URL: F /KV Damoh/ / Date:

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 82/MP/2014

प 7 म, ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत

द क षण क ष तर य व त स म त

SOUTHERN REGIONAL POWER COMMITTEE

North Eastern Regional Power Committee Agenda For

Disclosure to Promote the Right To Information

Executive Summary on Power Sector. Jul-18

INDUSTRY SALES REVIEW. July 2017

म नक भवन, 9 बह द रश ह फर म ग, नई दद ल

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

North Eastern Regional Power Committee Agenda

Disclosure to Promote the Right To Information

पत स च/ Address List

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon,

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

भ रत य म नक य क इ ज नय र ग वभ ग फ़ न पर अन प कर : ; फ + : ; ईम ल

Remote Village Electrification

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI Phone: , , Extn 8406, ; Website:

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

भ रत य म नक य र य र क इ ज ननयरर ग व भ ग य पक पररच लन म मस द रल ख र षण स ञ पन

NATIONAL INSTITUTE OF WIND ENERGY

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

Technical Committee: Petroleum and their Related Products of synthesis or biological origin Sectional Committee, PCD 3

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

अपर नद शक (प रय जन ),प स क ल, क व र भवन, बगल र Additional Director (Proj.), PCKL, KaveriBhavan, Bengaluru.

Session IV ESMAP Approach and Pilot Overview

व द य त स रक ष व द य त स च म डण रचन / आर खड प रम णपत र अभ य सक रम स म न यत द ण य ब बत.

Disclosure to Promote the Right To Information

ट ईड 6/ TED 7/T

INDRA MARSHAL POWER TILLER

Disclosure to Promote the Right To Information

भ रत य म नक ब य र य त क इ ज ननयरर ग व भ ग. एम.ई.ड.20/ट March 2018

दय अन फ ध क स चन. Tender Ref. No.: SCIC/Tenders/2014/001, Date: 10 th Oct, 2014

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Application is to be sent to the undersigned in two sealed covers on or before 21st July 2018 by 1500 hrs. as under:

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

ट ईड 6/ TED 7/T

Disclosure to Promote the Right To Information

THE ASIAN SCHOOL, BAHRAIN MONTHWISE DISTRIBUTION OF SYLLABUS FOR THE YEAR

पत स च / Address List

THERMODYNAMIC AND HEAT TRANSFER STUDIES ON THERMOELECTRIC POWER GENERATION AND COOLING OPTIONS S.MANIKANDAN

Agenda for 6th Standing Committee Meeting on Power System Planning of NER

स त य; त, प रश सनक क य ष य,

Disclosure to Promote the Right To Information

Transcription:

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong Parmaw, Lapalang, Shillong - 793006, Meghalaya Ph. No: 0364 2534039 Fax No: 0364-2534040 Website: www.nerpc.nic.in No. NERPC/COM/REA/2018/5669-5714 17 th December, 2018 To 1. CMD, TSECL, Bidyut Bhawan, Agartala 799 001 2. Director (Distribution), MePDCL, Lumjingshai, S.R. Road, Shillong 793 001 3. Engineer-in-Chief (P&E), P&E Dept., Govt. of Mizoram, Aizawl 796 001 4. Chief General Manager (Comml), APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati 781 001 5. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar 791 111 6. Managing Director, MSPDCL, Keishampat, Imphal-795 001. 7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima 797 001 8. Chief Engineer, Loktak HE Project, Vidyut Vihar, Komkeirap, Manipur 795 124 9. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong 793 003 10. Executive Director, NERTS, POWERGRID, Lapalang, Shillong 793 006 11. Managing Director, OTPC, 6 th Floor, IFCI Tower, 61 Nehru Place, New Delhi 110 019 12. GM (Comml.), NTPC, 3 rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 वषय: नव बर 2018 क एब त आध रत स श धत आर. ई. ए Sub: ABT based Revised REA for November, 2018. मह दय, Sir, नव बर 2018 म ह क एब त आध रत स श धत य उज ल ख (आर.ई.ए) क त आव यक करव ई क लए स ल न ह आर.ई.ए ल ख उ.प.. व.स क व बस ईट www.nerpc.nic.in पर भ उपल ध कर दय गय ह A copy of Revised ABT based Regional Energy Accounting (REA) for the month of November, 2018 is enclosed herewith for necessary action. The Revised REA is also available on NERPC website www.nerpc.nic.in. The REA has been revised due to inadvertent error with respect to NEEPCO s power regulation to MePDCL w.e.f. 00:00 hrs of 20.11.2018. स घटक अपन अवल कन / ट प णय य द क ई ह त आर.ई.ए क ज र ह न क 15 दन क अ दर भ ज द य द स घटक स क ई प यवह र नह ह त ह त ज र कय गय आर.ई.ए क अ तम म न ज एग Constituents may send their observation/ comments, if any on the same within 15 days from the date of issue of REA. In case no communication is received from constituents, the REA as issued would be treated as final REA. स ल नक : उपर त न स र Encl.: As above. भवद य / Yours faithfully, ब. ल गख इ / B. Lyngkhoi नद शक / Director अध ण अ भय त / Superintending Engineer

Copy forwarded to: 1. CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi 110 066. 2. G. M., NERLDC, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 3. C.G.M (SLDC ) AEGCL, Kahelipara, Guwahati. 4. Gen. Manager (Comml.), NHPC Ltd., NHPC Office complex, Sector 33, Faridabad-121003. 5. G.M (Commercial) APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati - 781 001. 6. General Manager, Ranganadi HEP, NEEPCO, Yazlee, Ar. Pradesh 7. Project Manager, Doyang HEP, NEEPCO, Nagaland 8. Project Manager, AGBPP, NEEPCO Ltd., No. III, Vill. Bokuloni, Dibrugarh, Assam. 9. Project Manager, AGTPP, NEEPCO Ltd., Ramchandranagar, Agartala, Tripura West- 799008. 10. Dy. G. M (Elect.), Kopili HEP, NEEPCO Ltd., Umrangso, N.C. Hills, Assam. 11. Supdt. Engr. (System Management) MeECL, Lumjingshai, Short Round Road, Shillong. 12. Supdt. Engr. (Commercial) Deptt. of Electricity, Govt.of Manipur, Keisampet, Imphal. 795001 13. Executive Engineer, MSLDC, P & E Dept., Chaltlang, Aizawl- 796012. 14. Supdt. Engr. Dimapur Sub-station Deptt. of Power, Govt.of Nagaland, Dimapur. 15. Dy. G. M. (Commercial) NERTS, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 16. Dy. General Manager (ER), POWERGRID, Boring Road, Alankar Place, Patna - 800 001 17. DGM (Comml), OTPC, 6 th Floor, IFCI Tower, 61 Nehru Place, New Delhi 110 019 18. DGM (Comml.), NTPC, 3 rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 19. AGM (Comml.), NTPC, Bongaigaon Thermal Power Project, P.O Salakati, Kokrajhar-783369 20. Addl. General Manager,Comml & Sys.Opn., TSECL,Banamalipur,Agartala.-799001. 21. Ex. Engr., SLDC, Deptt. of Power, Itanagar, Ar. Pradesh 791 111 22. CEO, NVVNLtd., 7 th Floor, Scope Complex, Lodhi Road, N.Delhi- 110 003 23. Power Trading Corpn. of India Ltd., 2 nd Floor, NBCC Tower, 15-Bhikaji Cama Place, New Delhi 66. 24. DGM (Power Trading),Adani Exports Ltd,13 Palam Marg,Vasant Vihar, New Delhi- 110057. 25. ED,TPTCL,Block A,34,Sant Tukaram Road,Carnac Bunder,Mumbai-400 009. 26. Member Secretary, NRPC,18-A,Shaheed Jeet Singh Marg,Katwaria Sarai, NewDelhi-110016. 27 Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033. 28. Member Secretary, WRPC, Plot No F-3,MIDC Area, Opp Seepz,Marol,Andheri (E), Mumbai-400 093. 29. Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009. 30. Lanco Electric Utility Limited, LANCO House,141, Avenue,8, Banjara Hills, Hyderabad-500 034 31. Reliance Energy Trading Ltd., Reliance Energy Centre, Santa Cruz (E), Mumbai-400 055 32.Vice President, Indian Energy Exchange Limited, 10 th Floor, B Wing, Statesman House, Barakhamba Road, Connought Place, New Delhi - 110 001. 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon, Haryana 122 016. 34. RPTCL, Agrawal House, 2, St. George s Gate Road, 6 th Floor, Kolkata 700 022. ब. ल गख इ / B. Lyngkhoi नद शक / Director अध ण अ भय त / Superintending Engineer

A. HYDEL POWER STATIONS 1: KOPILI Station 1 Installed Capacity MW 200 2 Auxiliary Energy Consumption (AUX) in % 1 in % 79 4 Annual Design Energy (DE) GWh 1186.14 # 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 1043.803 7 Annual Fixed Charges in Cr. 120.2764 # 8 Energy Charge Rate (ECR) on ex-pp basis KWh 0.582 9 Scheduled energy (ex-bus) for the month kwh 29544023 10 Free Energy (ex-pp) of the month KWh 3545283 11 Saleable Energy (ex-pp) of the month KWh 25998740 12 Total Energy Charge payable for the month in 15130348 13 Cumulative scheduled energy including current month MWh 835989 14 Plant Availability Factor achieved during the month (PAFM) in % 89.09 15 Cumulative Plant Availability Factor achieved upto the month in % 90.87 16 Capacity charge inclusive of incentive payble for the month in 55742330 BILLING STATEMENT Beneficiaries Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule Billing Schedule Energy Charge payable by beneficiaries in Ar. Pradesh 5.19100 2893584.32722 1625.33604 1625.33604 Assam 53.45500 29797062.26379 16316.56070 14543.91935 Manipur 7.39500 4122145.27061 2292.45727 2292.45727 Meghalaya 17.39500 9696378.22615 4137.18024 2364.53889 Mizoram 4.61000 2569721.39250 1418.81962 1418.81962 Nagaland 6.14700 3426480.99776 1876.36118 1876.36118 Tripura 5.80700 3236957.07728 1877.30746 1877.30746 HVDC 0.00000 0.00000 0.00000 0.00000 REG MEG Total 100.00000 55742329.55531 1232.97703 30776.99954 25998.73981 # As per CERC order dated 13.01.2016 in petition No 46/GT/2015 945888.12230 8464046.95974 1334129.09767 1376078.05096 825702.86355 1091975.88278 1092526.57963 0.00000 15130347.55663 DATE: 12/17/2018 Page 1 of 14

2: KOPILI II Station 1 Installed Capacity MW 25 2 Auxiliary Energy Consumption (AUX) in % 1 in % 69 4 Annual Design Energy (DE) GWh 86.3 # 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 75.944 7 Annual Fixed Charges in Cr. 12.2577 # 8 Energy Charge Rate (ECR) on ex-pp basis KWh 0.815 9 Scheduled energy (ex-bus) for the month kwh 2060466 10 Free Energy (ex-pp) of the month KWh 247256 11 Saleable Energy (ex-pp) of the month KWh 1813210 12 Total Energy Charge payable for the month in 1478081 13 Cumulative scheduled energy including current month MWh 87498 14 Plant Availability Factor achieved during the month (PAFM) in % 95.22 15 Cumulative Plant Availability Factor achieved upto the month in % 88.80 16 Capacity charge inclusive of incentive payble for the month in 6950153 BILLING STATEMENT Beneficiaries Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule Billing Schedule Energy Charge payable by beneficiaries in Ar. Pradesh 5.99200 416536.48936 128.06374 128.06374 104394.23046 Assam 52.35500 3638090.31556 1105.62348 981.99555 800497.25657 Manipur 6.94500 482784.69937 147.89167 147.89167 120557.44876 Meghalaya 13.67500 950623.58011 230.10286 106.47492 86795.59011 Mizoram 6.04000 419873.23027 128.10826 128.10826 104430.52201 Nagaland 5.73500 398671.02245 121.05082 121.05082 98677.48028 Tripura 9.25800 643573.90162 199.62475 199.62475 162728.91153 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 REG MEG Total 100.00000 6950153.23874 60.53194 2120.99750 1813.20970 1478081.43971 # As per CERC order dated 22.02.2016 in ORDER NO. 45/GT/2015 DATE: 12/17/2018 Page 2 of 14

3: KHANDONG Station 1 Installed Capacity MW 50 2 Auxiliary Energy Consumption (AUX) in % 1 in % 69 4 Annual Design Energy (DE) GWh 277.61 # 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 244.2968 7 Annual Fixed Charges in Cr. 40.4858# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 0.837 9 Scheduled energy (ex-bus) for the month kwh 4903347 10 Free Energy (ex-pp) of the month KWh 588402 11 Saleable Energy (ex-pp) of the month KWh 4314946 12 Total Energy Charge payable for the month in 3611562 13 Cumulative scheduled energy including current month MWh 172441 14 Plant Availability Factor achieved during the month (PAFM) in % 68.34 15 Cumulative Plant Availability Factor achieved upto the month in % 79.24 16 Capacity charge inclusive of incentive payble for the month in 16479266 BILLING STATEMENT Beneficiaries Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule Billing Schedule Energy Charge payable by beneficiaries in Ar. Pradesh 4.19400 691140.41162 218.20886 218.20886 182638.42158 Assam 56.28500 9275354.80883 2831.69227 2537.49143 2123852.44519 Manipur 6.55500 1080215.87940 335.82139 335.82139 281078.81525 Meghalaya 16.90500 2785819.89950 688.53468 394.33384 330053.08877 Mizoram 3.94000 649283.07625 199.99430 199.99430 167393.03500 Nagaland 6.65300 1096365.55997 334.42766 334.42766 279912.28022 Tripura 5.46800 901086.25912 294.66821 294.66821 246634.05241 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 REG MEG Total 100.00000 16479265.89469 172.65252 5075.99990 4314.94570 3611562.13843 # As per CERC order dated 13.01.2016 in petition No 42/GT/2015. DATE: 12/17/2018 Page 3 of 14

4: RANGANADI Station 1 Installed Capacity MW 405 2 Auxiliary Energy Consumption (AUX) in % 1 in % 85 4 Annual Design Energy (DE) GWh 1509.69# 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 1328.5272 7 Annual Fixed Charges in Cr. 272.6449# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 1.037 9 Scheduled energy (ex-bus) for the month kwh 54966508 10 Free Energy (ex-pp) of the month KWh 6595981 11 Saleable Energy (ex-pp) of the month KWh 48370527 12 Total Energy Charge payable for the month in 50135177 13 Cumulative scheduled energy including current month MWh 949415 14 Plant Availability Factor achieved during the month (PAFM) in % 91.64 15 Cumulative Plant Availability Factor achieved upto the month in % 97.44 16 Capacity charge inclusive of incentive payble for the month in 120799513 BILLING STATEMENT Beneficiaries Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule Billing Schedule Energy Charge payable by beneficiaries in Ar. Pradesh 18.46200 22302006.02140 Assam 43.32800 52340012.83150 Manipur 8.37300 10114543.19235 Meghalaya 11.50500 13897983.92786 Mizoram 5.70000 6885572.21980 Nagaland 5.33500 6444653.99871 Tripura 7.29700 8814740.43647 HVDC 0.00000 0.00000 REG MEG Total 100.00000 120799512.62810 10576.88026 3980.89932 4126130.22972 24362.99215 24362.99215 25251801.27539 4803.98647 4803.98647 4979245.19959 4612.20703 4612.20703 4780469.27431 3245.81662 3245.81662 3364230.29044 2999.54566 2999.54566 3108974.88901 4365.07966 4365.07966 4524326.21317 0.00000 0.00000 0.00000 1977.64212 56944.14996 48370.52690 50135177.37164 # As per CERC order dated 05.01.2016 and corrigendum 07.03.2016 in petition No.40/GT/2015. DATE: 12/17/2018 Page 4 of 14

5: DOYANG Station 1 Installed Capacity MW 75 2 Auxiliary Energy Consumption (AUX) in % 1 in % 73 4 Annual Design Energy (DE) GWh 227.24# 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 199.9712 7 Annual Fixed Charges in Cr. 108.4121# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 2.738 9 Scheduled energy (ex-bus) for the month kwh 4354513 10 Free Energy (ex-pp) of the month KWh 522542 11 Saleable Energy (ex-pp) of the month KWh 3831972 12 Total Energy Charge payable for the month in 10492221 13 Cumulative scheduled energy including current month MWh 206376 14 Plant Availability Factor achieved during the month (PAFM) in % 54.24 15 Cumulative Plant Availability Factor achieved upto the month in % 66.96 16 Capacity charge inclusive of incentive payble for the month in 33100798 BILLING STATEMENT Beneficiaries Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of Beneficiaries Billing Schedule Energy Charge payable by beneficiaries in Ar. Pradesh 6.85200 2268066.67459 316.99752 316.99752 867962.53302 Assam 43.80800 14500797.55989 1963.42051 1963.42051 5375989.82155 Manipur 7.86500 2603377.75768 360.78794 360.78794 987863.93583 Meghalaya 11.45500 3791696.40359 334.23816 334.23816 915168.67383 Mizoram 5.25000 1737791.89165 238.57063 238.57063 653223.94338 Nagaland 17.96700 5947220.36520 813.28044 290.73884 796064.32379 Tripura 6.80300 2251847.28360 327.21816 327.21816 895947.39733 HVDC 0.00000 0.00000 0.00000 0.00000 0.00000 REG MEG Total 100.00000 33100797.93620 189.68638 4544.19974 3831.97176 10492220.62873 # As per CERC order dated 13.01.2016 and corrigendum dtd. 07.03.16 in petition No 43/GT/2015. DATE: 12/17/2018 Page 5 of 14

6: LOKTAK Station 1 Installed Capacity MW 105 2 Auxiliary Energy Consumption (AUX) in % 1 in % 85 4 Annual Design Energy (DE) GWh 448.00# 5 Free Energy for Home State (FEHS) in % 12 6 Annual Saleable Energy MU 394.24 7 Annual Fixed Charges in Cr. 150.2829# 8 Energy Charge Rate (ECR) on ex-pp basis KWh 1.925 9 Scheduled energy (ex-bus) for the month kwh 32608650 10 Free Energy (ex-pp) of the month KWh 3913038 11 Saleable Energy (ex-pp) of the month KWh 28695612 12 Total Energy Charge payable for the month in 55245789 13 Cumulative scheduled energy including current month MWh 489621 14 Plant Availability Factor achieved during the month (PAFM) in % 101.01 15 Cumulative Plant Availability Factor achieved upto the month in % 100.89 16 Capacity charge inclusive of incentive payble for the month in 73392865 BILLING STATEMENT Beneficiaries Share allocation for the current month (%) Capacity Charge Payble by beneficiaries (in ) Drawal Schedule of Beneficiaries Billing Schedule Energy Charge payable by beneficiaries in Ar. Pradesh 4.94000 3625607.53058 Assam 29.44500 21610529.09677 Manipur 42.50800 31197839.05062 Meghalaya 0.00000 0.00000 Mizoram 5.02000 3684321.82258 Nagaland 6.43500 4722830.86221 Tripura 11.65200 8551736.62882 HVDC 0.00000 0.00000 Total 100.00000 73392864.99158 1625.85132 1625.85132 3130145.44976 9535.20912 9535.20912 18357515.88865 13876.66236 9963.62437 19182315.81571 0.00000 0.00000 0.00000 1638.47069 1638.47069 3154440.69548 2088.32186 2088.32186 4020509.80912 3844.13455 3844.13455 7400861.39993 0.00000 0.00000 0.00000 32608.64990 28695.61192 55245789.05864 # As per CERC order dated 18.09.2015 in Order no. 228/GT/2014 DATE: 12/17/2018 Page 6 of 14

7: PARE Station 1 Installed Capacity MW 110 2 Free Energy for Home State (FEHS) in % 12 3 Scheduled energy (ex-bus) for the month kwh 18062024 4 Free Energy (ex-pp) of the month KWh 2167443 5 Saleable Energy (ex-pp) of the month KWh 15894581 6 Cumulative scheduled energy including current month MWh 305817 7 Plant Availability Factor achieved during the month (PAFM) in % 97.64 8 Cumulative Plant Availability Factor achieved upto the month in % 78.08 BILLING STATEMENT Beneficiaries Share allocation for the current month (%) Drawal Schedule of Beneficiaries Billing Schedule Ar. Pradesh Assam Manipur Meghalaya Mizoram Nagaland Tripura 18.87250 40.51000 8.35500 13.33000 5.76500 5.40000 7.76750 3546.52841 7490.46610 1572.62640 1865.78086 1078.00615 999.44201 1509.17417 1379.08552 7490.46610 1572.62640 1865.78086 1078.00615 999.44201 1509.17417 HVDC 0.00000 0.00000 0.00000 REG MEG Total 637.12846 100.00000 18699.15254 15894.58120 DATE: 12/17/2018 Page 7 of 14

B. THERMAL POWER STATIONS DATE: 12/17/2018 Page 8 of 14

1: AGBPP Station 1 Plant Availability Factor for current month in % 75.91 2 Cum. Plant Availability Factor upto current in % 61.93 in % 72.00 4 Plant Load Factor for current month in % 73.45 5 Cum. Plant Load Factor upto current month in % 58.66 6 NAPLF in % 85.00 Beneficiaries Wt. Schedule Energy for current month (MWh) Ar. Pradesh 5.694000 8488.213272 Cum. Schedule Energy upto current month (MWh) Unrequisitioned Energy for current month (MWh) Cum. Unrequisitioned Energy upto current month (MWh) 44255.866852 338.388240 14618.372615 Assam 56.503000 85374.232656 Manipur 8.105000 9910.155672 Meghalaya 11.815000 11929.940400 Mizoram 5.410000 8221.164048 Nagaland 5.805000 7878.164160 Tripura 6.668000 10323.174432 HVDC 0.000000 0.000000 REG MEG 6391.138920 85374.232656 3265.455384 51434.492461 9910.155672 2700.860256 7264.030411 11929.940400 0.000000 5127.097688 8221.164048 167.607696 419.032769 7878.164160 1123.905360 11069.731216 10323.174432 26.511792 4203.541078 0.000000 0.000000 0.000000 6391.138920 Total 100.000000 148516.183560 184283.837140 7622.728728 94136.298238 DATE: 12/17/2018 Page 9 of 14

2: AGTCCPP Station 1 Plant Availability Factor for current month in % 66.00 2 Cum. Plant Availability Factor upto current in % 55.19 in % 85.00 4 Plant Load Factor for current month in % 60.36 5 Cum. Plant Load Factor upto current month in % 51.31 6 NAPLF in % 85.00 Beneficiaries Wt. Schedule Energy for current month (MWh) Ar. Pradesh 6.702000 4034.387232 Assam 43.720000 20623.856064 Manipur 8.225000 4806.754656 Meghalaya 12.633000 4807.968792 Mizoram 6.000000 3611.995824 Nagaland 5.737000 3216.965040 Tripura 16.983000 10223.918328 HVDC 0.000000 0.000000 Cum. Schedule Unrequisitioned Cum. Unrequisitioned Energy upto Energy for current Energy upto current current month month (MWh) month (MWh) 24333.934115 2.526144 3175.095944 148995.049495 6699.620232 34704.945344 32965.732101 160.042968 756.937998 47426.752754 0.000000 1598.600732 24538.928664 2.275824 37.287246 20859.618924 238.778064 2773.388169 66698.307670 6.391248 3060.329508 0.000000 0.000000 0.000000 REG MEG 2801.767992 Total 100.000000 54127.613928 2801.767992 368620.091715 7109.634480 46106.584941 DATE: 12/17/2018 Page 10 of 14

3: PALATANA Station 1 Plant Availability Factor for current month in % 82.14 2 Cum. Plant Availability Factor upto current in % 79.85 in % 85.00 4 Plant Load Factor for current month in % 81.55 5 Cum. Plant Load Factor upto current month in % 69.91 6 NAPLF in % 85.00 Beneficiarie s Wt. Schedule Energy for current month (MWh) Cum. Schedule Energy upto current month (MWh) Unrequisitioned Energy for current month (MWh) Cum. Unrequisitioned Energy upto current month (MWh) Ar. Pradesh 3.030303 11712.240624 Assam 33.057851 136959.033552 Manipur 5.785124 23089.241904 Meghalaya 10.881543 45123.147288 Mizoram 3.030303 12565.939320 Nagaland 3.719008 15060.639864 Tripura 26.997245 111951.095712 HVDC 0.000000 0.000000 Total 86.501377 356461.338264 69214.846748 97.387560 12768.054332 947783.148589 112.933872 22702.345009 159966.314120 900.278856 9743.290271 314524.878514 0.000000 4669.345838 87031.510122 0.000000 1855.758838 97615.515051 90.823728 6113.180667 787215.833076 0.000000 4710.382523 0.000000 0.000000 0.000000 2463352.046220 1201.424016 62562.357478 DATE: 12/17/2018 Page 11 of 14

4: BGTPP NTPC Station 1 Plant Availability Factor for current month in % 86.66 2 Cum. Plant Availability Factor upto current in % 84.58 in % 85.00 4 Plant Load Factor for current month in % 67.49 5 Cum. Plant Load Factor upto current month in % 66.20 6 NAPLF in % 85.00 Beneficiarie s Wt. Schedule Energy for current month (MWh) Cum. Schedule Energy upto current month (MWh) Unrequisitioned Energy for current month (MWh) Cum. Unrequisitioned Energy upto current month (MWh) Ar. Pradesh 5.132500 14458.407144 Assam 57.420000 131945.324952 Manipur 7.505000 8883.514392 Meghalaya 11.480000 0.000000 Mizoram 5.415000 12353.721768 Nagaland 4.930000 9994.204872 Tripura 7.617500 18114.198696 HVDC BNC 0.500000 899.364408 REG. MEG 0.000000 782141.972712 78671.490688 113.713776 32124.768378 1014258.942489 73562.496250 41889.829200 12419.344368 297061.374056 90482.851838 0.000000 0.000000 0.000000 93659.956611 3134.972688 26911.307483 61846.077411 3721.757040 44214.731504 134013.764979 4502.192832 38279.580894 6866.511064 538.744584 4266.338196 2133704.041606 0.000000 0.000000 Total 100.000000 978790.708944 3596583.281098 66320.554488 533340.952349 DATE: 12/17/2018 Page 12 of 14

C. SHARE ALLOCATIONS % IN CS STATIONS FROM EASTERN REGION Sl No. Farakka I & II Farakka III Kahalgaon I Kahalgaon II Talcher 1 Ar.Pradesh 0.191917 0.000000 0.191747 0.000000 0.196898 2 Assam 2.455737 0.000000 2.104847 5.093479 2.095419 3 Manipur 0.000000 0.000000 0.000000 0.000000 0.000000 4 Meghalaya 0.000000 0.000000 0.000000 0.000000 0.000000 5 Mizoram 0.141736 0.000000 0.141610 0.000000 0.141736 6 Nagaland 0.429803 0.000000 0.424460 0.000000 0.424823 7 Assam (NVVN Coal Power) 0.091912 0.091912 0.091912 0.091912 0.091912 D. WEIGHTED AVERAGE ENTITLEMENT OF THE BENEFICIARIES FOR THE MONTH Beneficia ries Weighted Average Entitlement for the current month of ISGS in NER Weighted Average Entitlement for the current month of ISGS outside NER Total Entitlement for the current month of ISGS in MW in (%) in MW in (%) in MW in (%) Ar. Prades 193.1318 7.6502 6.6503 3.5842 199.7821 7.3719 Assam* 1182.6980 46.8484 159.3289 85.8710 1342.0269 49.5201 Manipur 227.6861 9.0190 0.0000 0.0000 227.6861 8.4015 Meghalaya 304.4122 12.0582 0.0000 0.0000 304.4122 11.2327 Mizoram 124.2713 4.9226 4.8747 2.6272 129.1459 4.7654 Nagaland 141.1428 5.5909 14.6905 7.9175 155.8334 5.7502 Tripura 348.6769 13.8116 0.0000 0.0000 348.6769 12.8660 HVDC 2.5000 0.0990 0.0000 0.0000 2.5000 0.0922 Total 2524.5190 100.0000 185.5444 100.0000 2710.0634 100.0000 *Includes entitlement for bundling with solar power. DATE: 12/17/2018 Page 13 of 14

CONCLUDED DATE: 12/17/2018 Page 14 of 14