Interface between Rail Vehicle Weights and Underline Bridges

Similar documents
Compatibility Between Electric Trains and Electrification Systems

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Controlling the Speed of Tilting Trains Through Curves

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Mechanical Trainstop Systems

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Risk Management of Rail Vehicle Axle Bearings

Signing of Permissible Speeds and Speed Restrictions

Guidance for Low Voltage Electrical Installations

Structural Requirements For Drawgear And Buffers On Railway Vehicles

Branding of Wheels,Tyres and Axles

Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure

Permissible Track Forces for Railway Vehicles

Control, Safe Use and Operation of Road-Rail Plant

Track Circuit Assister Configuration for Rail Vehicles

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Requirements for the Application of Standard Vehicle Gauges

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130

Requirements for the Application of Standard Vehicle Gauges

Lineside Signal Spacing and Speed Signage

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7)

Requirements for the Application of Standard Vehicle Gauges

Track System Requirements

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

Resistance of Railway Vehicles to Overturning in Gales

Low Voltage Power Supplies in Electrified Areas

Rail Safety and Standards Board

GORT3056 WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS

Rail Industry Standard for the Design of On- Track Machines in Travelling and Working Modes

Lineside Operational Safety Signs

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES

Operation of Trams and Light Rail or Metro Vehicles Over Railtrack Controlled Infrastructure

PS 127 Abnormal / Indivisible Loads Policy

Deviation from a Railway Group Standard

(Text with EEA relevance)

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

Permit Holder. Permitted Equipment

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Land Transport Rule Traction Engines [2008]

TOC Waiver. ARTC website

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Resistance of Railway Vehicles to Derailment and Roll-Over

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11

POSITION PAPER Version 3.0

Testing of Baier Plasterboard to AS/NZS (Electronic copy (PDF format) original signed by author) Materials Scientist.

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

TOPAS 2130A (Draft v3)

Access Management Standards

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Economic and Social Council

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Port of Oulu Ltd. 8 Dec PERIOD OF VALIDITY AND INFORMING OF CHANGES RAIL NETWORK... 2

National technical rules for vehicles Related Control Command and Signalling Requirements

Anchorage of Seats. TECHNICAL STANDARDS DOCUMENT No. 207, Revision 0R

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem

Comments to ECE/TRANS/WP.29/GRE/2011/29

Engineering Design of On-Track Machines in Running Mode

Guideline for the Queensland Rally Vehicle Registration Scheme

FAQ. Frequently Asked Questions on exhaust emission requirements for tractors. European Agricultural Machinery Association.

SUBSTATION INTERLOCKING SCHEMES

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Port of Oulu Ltd. 9 Dec 2016

SYNOPSIS OF PROPOSED GEORGIA DEPARTMENT OF PUBLIC SAFETY RULES CHAPTER TRANSPORTATION NETWORK COMPANIES AND TAXI SERVICES

Australian Standard. Cranes, hoists and winches. Part 6: Guided storing and retrieving appliances AS AS

Minimum Operating Standards for. Rolling Stock WOS 01

Network Safeworking Rules and Procedures

ARAI Date of hosting on website: 27 th October 2015 Last date for comments: 27 th November 2015

INVITATION TO BID. January 10, 2018

Learning Legacy Document

SECTION 23 CLASSIFICATION AND NUMBERING OF FREIGHT VEHICLES

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.1

Council of the European Union Brussels, 18 July 2014 (OR. en)

Guidance Note: The Design and Construction of Freight Wagons

(submitted by the Dutch delegation)

GM/RC2641. Recommendations for Vehicle Static Testing. Railway Group Recommendations for GM/RT2141. Uncontrolled When Printed.

SOUTH AFRICAN NATIONAL STANDARD. Plug and socket-outlet systems for household and similar purposes for use in South Africa

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

M&EE Networking Group

QUESTION / CLARIFICATION

First draft for Regulation 112 to demonstrate the application of the HRD. Regulation No. 112

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit

VALIDITY AND INFORMING OF CHANGES...

Microgeneration Installation Standard: MCS 023

LlSA Pathfinder PROPULSION MODULE MECHANICAL INTERFACE CONTROL DOCUMENT. UK EXPORT CONTROL RATING : 9E001 Rated By : K. Tomkins.

E/ECE/324/Rev.2/Add.141 E/ECE/TRANS/505/Rev.2/Add.141

E/ECE/324/Rev.2/Add.108/Rev.1/Amend.3 E/ECE/TRANS/505/Rev.2/Add.108/Rev.1/Amend.3

COMPONENT HOMOLOGATION POLICY AND PROCEDURE

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

AIRWORTHINESS NOTICE

KBA Kraftfahrt-Bundesamt

COMMISSION REGULATION (EU)

E/ECE/324/Rev.1/Add.38/Rev.2 E/ECE/TRANS/505/Rev.1/Add.38/Rev.2

E/ECE/324/Rev.2/Add.111/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.2/Add.111/Rev.2/Amend.1

Transcription:

Interface between Rail Vehicle Weights and Synopsis This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles Submitted by Signatures removed from electronic version Elizabeth Fleming Standards Project Manager Authorised by Signatures removed from electronic version Brian Alston Controller, s This document is the property of Railtrack PLC. It shall not be reproduced in whole or in part without the written permission of the Controller, s, Railtrack PLC. Published by Safety & Standards Directorate, Railtrack PLC, Evergreen House 160 Euston Road London NW1 2DX Copyright 2000 Railtrack PLC

This page has been left blank intentionally

Contents Page 1 of 15 Section Description Page Part A Issue Record 2 Technical Content 2 Responsibilities 2 Compliance 2 Health and Safety Responsibilities 3 Supply 3 Part B 1 Purpose 4 2 Scope 4 3 Definitions 4 4 Derivation, Recording, Publishing and Review of Assessed Capacity or Capacities of an Underline Bridge 5 5 Derivation, Recording, Publishing and Review of Assessed Capacity or Capacities of a Route 7 6 Derivation, Recording and Review of RA Number and Speed of a Rail Vehicle 7 7 Procedure for Permitting a Train to Operate 8 8 Communication of Restrictions and Changes 10 Appendices A Derivation of RA Numbers 11 B Example of Route Classification 13 C Flow Chart of Procedure for Permitting a Train to Run 14 References 15 R A I L T R A C K 1

Page 2 of 15 Issue Record Part A This Standard will be updated when necessary by distribution of a complete replacement. Issue Date Comments One December 2000 Original Document but replaces GC/TT0138 Route Availability System Technical Content Approved by: Derek Wolfendale Principal Track and Structures Engineer Railtrack S&SD Keith Rose Principal Vehicles Engineer Railtrack S&SD Richard Evans Principal Operations Railtrack S&SD Haydn Peers Principal Plant Engineer Railtrack S&SD Enquires to be directed to the Industry Safety Liaison Dept Tel: 020 7904 7518 Responsibilities s are mandatory on all members of the Railway Group * and apply to all relevant activities that fall into the scope of each individual s Railway Safety Case. If any of those activities are performed by a contractor, the contractor s obligation in respect of s is determined by the terms of the contract between the respective parties. Where a contractor is a duty holder of a Railway Safety Case then s apply directly to the activities described in the Safety Case. * The Railway Group comprises Railtrack and the duty holders of the Railway Safety Cases accepted by Railtrack. Compliance Compliance with section 4 is required by April 2001 for new and reconstructed underline bridges brought into use after 1 February 2001. For the derivation of route capacity or capacities, action plans for meeting the requirements of section 5 of this document shall be in place by June 2001 with a target date for achieving compliance by December 2006. Compliance with section 6 is required by April 2001 for all vehicles for which a design scrutiny certificate is signed after 1 February 2001. Compliance is required for the classification of vehicles by December 2001 where no RA classification is currently recorded (section 6). Any Railway Group member deviating from the requirements set out in this document shall ensure that the situation is regularised in accordance with the requirements of GA/RT6001, GA/RT6004, or GA/RT6006. 2 R A I L T R A C K

Page 3 of 15 Health and Safety Responsibilities Supply In issuing this Standard, Railtrack PLC makes no warranties, express or implied, that compliance with all or any s is sufficient on its own to ensure safe systems of work or operation. Each user is reminded of its own responsibilities to ensure health and safety at work and its individual duties under health and safety legislation. Controlled and uncontrolled copies of this document may be obtained from the Industry Safety Liaison Dept, Safety and Standards Directorate, Railtrack PLC, Evergreen House, 160 Euston Road, London, NW1 2DX. R A I L T R A C K 3

Page 4 of 15 1 Purpose 2 Scope Part B The purpose of this document is to manage the risk of overloading of underline bridges by rail vehicles. The overall scope of s is as specified in Appendix A of GA/RT6001. Specifically the contents of this document apply to all underline bridges on Railtrack controlled infrastructure and all rail vehicles running or proposed to run on Railtrack controlled infrastructure, with the limitations set out below. The scope is limited to: a) maximum speeds up to and including 125mph for all rail vehicles except freight vehicles, but including non-passenger carrying coaching stock (for example vehicles used for carrying parcels and / or mail); b) maximum speeds up to and including 75mph for freight vehicles; c) on-track machines in travelling mode (on-track machines operating within a track possession are excluded). This document contains requirements applicable to the duty holder of the following categories of Railway Safety Cases: a) Infrastructure Controller; b) Train Operator. 3 Definitions Assessed Capacity The safe load capacity of a bridge (including appropriate dynamic effects) as determined by assessment in accordance with GC/RT5100. Bridge A structure of one or more spans whose prime purpose is to carry traffic or services across an obstruction or gap. Bridge Related Speed Restriction A speed restriction less than the permissible speed imposed on certain types of rail vehicles at an underline bridge location because of the assessed capacity of the underline bridge. Loaded Length The loaded length for the structural member under consideration is the length of the appropriate influence line within which the loads produce adverse effects. Long Span Underline Bridge For the purposes of this document, an underline bridge of which one or more spans exceeds 50 metres in length. Where an underline bridge is supported on bearings the span is measured by reference to the length of track supported between bearings. For arch underline bridges, the span is measured between springings. Maximum Rail Vehicle Speed The maximum speed at which a rail vehicle is permitted to run as determined by the characteristics of the rail vehicle and as set out in the mandatory data for rail vehicles in GM/RT2211. 4 R A I L T R A C K

Page 5 of 15 Maximum Train Speed The maximum speed at which a train is permitted to run as determined by the lowest maximum speed of any rail vehicle which is included in the formation of the train. Permissible Speed The maximum permitted speed as shown in the Sectional Appendix. Route Availability Classification Route Availability (RA) Classification is a term used (but not defined) in Appendix A of GM/RT2211 and taken for the purposes of this document as having the same meaning as RA Number. Rolling Stock Library Rolling Stock Library (RSL) is the national central database of rail vehicle design, and operational data, which is maintained by the Infrastructure Controller s authorised agent (currently Sema Group for Railtrack). Route A section of track bounded by identified limits such as junctions, terminals. Route Availability Number Route Availability (RA) Number is the number derived in accordance with the provisions of this to express either of the following: a) the assessed capacity of an underline bridge or route in terms of its capacity to carry the vertical static and dynamic loads due to different types of rail vehicle; b) the static load characteristics of a rail vehicle type. For on-track machines, the static load characteristics of the rail vehicle are those applicable to the rail vehicle when in travelling mode. Rail Vehicle A single locomotive, on-track machine (including cranes), freight wagon or passenger coach or a number of wagons or coaches which normally operate coupled together in fixed formation (eg, passenger multiple-units or cranes). Underline Bridge A bridge carrying one or more operational railway tracks. 4 Derivation, Recording and Review of Assessed Capacity or Capacities of an Underline Bridge 4.1 Assessment of GC/RT5100 gives general requirements for assessment of bridges including underline bridges. 4.2 Derivation of RA Number(s) of an Underline Bridge except Long Span The assessed capacity of an underline bridge in terms of the RA Number shall be derived in accordance with the provisions of Appendix A. For each underline bridge (except as given below for long span underline bridges), the Infrastructure Controller shall determine the assessed capacity in terms of the RA Number at the permissible speed. In addition, the Infrastructure Controller shall determine the assessed capacity of each underline bridge at speeds of 60mph, 75mph and 90mph where these speeds are less than the permissible speed and where the RA Number of the relevant route at the permissible speed is less than RA10. R A I L T R A C K 5

Page 6 of 15 It is permissible for the Infrastructure Controller to determine the assessed capacity of underline bridges in terms of the RA Number at other speeds. Where no assessed capacity of an underline bridge exists, it is permissible for the Infrastructure Controller to assign an RA Number or RA Numbers to an underline bridge based on current knowledge of its condition, use and behaviour. The justification for the RA Number assigned shall be recorded. The assigned RA Number(s) shall be reviewed when an assessment of the underline bridge in accordance with GC/RT5100 has been carried out. 4.3 Recording of RA Number(s) and Associated speeds of Underline Bridges except Long Span The Infrastructure Controller shall record the RA Number of each underline bridge in a form that clearly identifies the RA Number of the route at the permissible speed and at other speeds as identified in section 4.2 (for example in tabular form). 4.4 Derivation of RA Number(s) of a Long Span Underline Bridge In the case of long span underline bridges, the assessed capacity shall be determined as in section 4.2 except that the assessed capacity shall be determined in terms of the rail vehicles that are permitted to cross the underline bridge and not in terms of the load model set out in Appendix A. 4.5 Recording of Assessed Capacity or Capacities and Associated Speed(s) of Long Span The assessed capacity of a long span underline bridge shall be recorded in terms of a train of the heaviest rail vehicle type(s) that is permitted to cross the long span underline bridge. The rail vehicles shall be positioned so as to give the most severe effect for the underline bridge element being considered. It is permissible for the static load effects of rail vehicles to be assessed using an envelope representing the static load effects of a class or category of rail vehicles so long as the envelope has been validated by the Infrastructure Controller for all relevant spans. In all cases however the assessed capacity of the long span underline bridge shall include the dynamic effects of the rail vehicles. For such underline bridges the assessed capacity shall be recorded in the form RA(LS), where (LS) indicates that the assessed capacity has been derived in terms of rail vehicles and not in terms of the RA Number. The record shall set out the details of the rail vehicle type(s) and speeds, and/or rail vehicle envelope(s) and speed(s) to which the assessed capacity relates. 4.6 Review of the Assessed Capacity of an Underline Bridge The Infrastructure Controller shall review the assessed capacity of an underline bridge as derived in accordance with sections 4.2 and 4.4 and amend it if necessary in the following circumstances: a) whenever it is proposed to change the permissible speed at the underline bridge location; b) whenever the assessed or assigned capacity of the underline bridge has changed. 6 R A I L T R A C K

Page 7 of 15 5 Derivation, Recording, Publishing and Review of Assessed Capacity or Capacities of a Route 5.1 Derivation of RA Number(s) of Routes where there are no Long Span For each route, except those containing long span underline bridges, the Infrastructure Controller shall determine the RA Number for the route at the permissible speed and at the speeds identified in section 4.2 where applicable. The RA Number of the route at the permissible speed shall be the minimum RA Number of any underline bridge on the route calculated or assigned at the permissible speed. The RA Number of the route at other speeds shall be the minimum RA Number of all underline bridges on the route calculated or assigned at the speed being considered (ie, 60mph, 75mph or 90mph as appropriate). The Infrastructure Controller shall record the RA Number of each route in a form that clearly identifies the RA Number of the route at the permissible speed and at other speeds identified in section 4.2 (for example in tabular form). 5.2 Additional Derivation of Assessed Capacity or Capacities of Routes containing Long Span Where a route contains one or more long span underline bridges, the RA Number of the route shall be recorded as above except that in addition the record shall include: a) a reference to the presence of the long span underline bridge(s); b) details appropriate to each long span underline bridge of the rail vehicle type(s) or envelope(s) and speed(s) recorded in accordance with section 4.5. 5.3 Accessibility of RA Number(s) and Other Capacity or Capacities of a Route The Infrastructure Controller shall publish in the Sectional Appendix, and make available to the relevant train operator(s), a register of the RA Numbers of all routes as identified in sections 5.1 and 5.2. 5.4 Review of the Assessed Capacity of a Route The assessed or assigned capacity of a route as derived in sections 5.1 and 5.2 shall be reviewed and amended if necessary in either of the following circumstances: a) whenever it is proposed to change the permissible speed at any underline bridge location on the route; b) whenever the assessed or assigned capacity of any of the underline bridges on the route as derived in accordance with either section 4.2 or 4.4 has changed. 6 Derivation, Recording, Publishing and Review of RA Number and Speed of a Rail Vehicle 6.1 Derivation of RA Number of a Rail Vehicle For each type of rail vehicle running or proposed to run on Railtrack controlled infrastructure, the relevant train operator shall ensure that the RA Number of the rail vehicle type is derived in accordance with the provisions of Appendix A. R A I L T R A C K 7

Page 8 of 15 The train operator shall have procedures in place to establish the RA Number and the maximum speed of a rail vehicle where this information is not previously recorded. 6.2 Maximum Speed of a Rail Vehicle For each type of rail vehicle running or proposed to run on Railtrack controlled infrastructure, the relevant train operator shall ensure that the maximum speed of the rail vehicle is established. 6.3 Vehicle Details to be Established For each type of rail vehicle running or proposed to run on Railtrack controlled infrastructure, the relevant train operator shall ensure that the following information relating to the rail vehicle type is established when required in accordance with sections 7.1.2 and 7.2: a) details of spacings between the axles and distance between each end of the rail vehicle and the adjacent axle; b) the maximum static tare weight on each axle; c) the static weight on each axle when the rail vehicle is loaded to its authorised limit (as set out in the mandatory data for the vehicle required by GM/RT2453); d) maximum height of the centre of gravity of the loaded rail vehicle. The end of the rail vehicle shall be taken as the face of the buffers or, for rail vehicle ends with no buffers, midway between the headstock of the rail vehicle and the headstock of a rail vehicle of the same type coupled to it (the coupling plane). 6.4 Accessibility of Rail Vehicle Information The train operator shall publish and make available to the infrastructure controller the information required in sections 6.1, 6.2 and 6.3. GM/RT2453 requires that, for all rail vehicles, the RA Classification (RA Number) and maximum speed be included in the rail vehicle data to be maintained in the Rolling Stock Library database. 6.5 Review of Rail Vehicle Information GM/RT2000 sets out the requirements for reviewing rail vehicle information in the following circumstances: a) whenever it is proposed to change the maximum authorised axle load of the rail vehicle; b) whenever it is proposed to alter the maximum speed of the rail vehicle. 7 Procedure for Permitting a Train to Operate 7.1 Procedure for Routes where there are no Long Span Underline Bridges 7.1.1 Provided that there are no long span underline bridges on the proposed route of a train and provided that either or both of the following conditions apply: a) the maximum RA Number of every rail vehicle in the train is equal to or less than the RA Number of the route at the permissible speed; 8 R A I L T R A C K

Page 9 of 15 b) the maximum RA Number of every rail vehicle in the train is equal to or less than the RA Number of the route quoted at a particular speed and the maximum speed of the train is equal to or less than this particular speed; it is permissible for the train to run as regards the assessed or assigned capacity of underline bridges. 7.1.2 Where the conditions set out in section 7.1.1 are not met, the train operator shall supply the Infrastructure Controller with the information identified in section 6.3 and apply to the Infrastructure Controller for an assessment to be made of whether the rail vehicle(s) is/are permitted to pass over the route as regards the assessed or assigned capacity of underline bridges. When the Infrastructure Controller receives a request from a train operator for such an assessment to be made the following shall be taken into account: a) any bridge related speed restrictions that are necessarily imposed at certain underline bridges in order to reduce dynamic loading effects; b) any limitations on the loading of the rail vehicles which are necessarily imposed; c) any other operating restrictions (for example, the use of barrier vehicles). For the train to be permitted to run as regards the assessed or assigned capacity of underline bridges, the following conditions shall apply: a) the assessed or assigned capacity of every underline bridge on the route shall equal or exceed the loading (including dynamic effects as appropriate) due to the rail vehicles making up the proposed train; b) an exceptional load form in accordance with GO/RT3407 shall be issued by the Infrastructure Controller to the train operator and shall identify any restrictions in speed, limitations on the loading of the rail vehicles or other requirements that apply; c) the train operator shall communicate any relevant restrictions to the driver as set out in section 8.1. 7.2 Additional Procedure for Routes where there are Long span Underline Bridges 7.2.1 Where the proposed route of a train contains one or more long span underline bridges, the train operator shall supply the Infrastructure Controller with the information identified in section 6.3 to enable an assessment to be made of whether the rail vehicle(s) is/are permitted to pass over the long span underline bridge(s). Provided that either or both of the following conditions apply: a) the maximum load effect of every rail vehicle in the train is equal to or less than the load effect of the rail vehicle or rail vehicle envelope that has been recorded in accordance with in section 4.5 at the permissible speed; b) the maximum load effect of every rail vehicle in the train is equal to or less than the load effect of the rail vehicle or rail vehicle envelope that has been recorded in accordance in section 4.5 quoted at a particular speed and the maximum speed of the train is equal to or less than this particular speed; it is permissible for the train to run as regards the assessed or assigned capacity of long span underline bridges. R A I L T R A C K 9

Page 10 of 15 7.2.2 Where the conditions set out in section 7.2.1 are not met, the procedure set out in section 7.1.2 shall be applied. 7.3 Action when the Conditions in Section 7.1 or 7.2 are not Met If the assessed or assigned capacity of any underline bridge on the route is less than the load effects (taking into account dynamic effects as appropriate and any limitations identified in section 7.1.2) due to the rail vehicles making up the proposed train, the Infrastructure Controller shall not permit the train to run. 7.4 Requirements of GO/RT3270 GO/RT3270 sets out requirements in respect of information to be recorded regarding the route acceptance of rail vehicles, including the equipment configuration, operational requirements and limitations and route constraints. 8 Communication of Restrictions and Changes 8.1 Requirements on Infrastructure Controller GO/RT3407 sets out the requirements for the Infrastructure Controller (Railtrack) to determine route availability conditions and the supply to the train operator of conditions of travel. 8.2 Requirements of Train Operator GO/RT3407 sets out the requirements for the train operator to apply conditions of travel imposed by the Infrastructure Controller (Railtrack) with advice to its train crews. GO/RT3253 sets out the requirements for the train operator to check the speed of trains. GM/RT2453 sets out the requirements for changes to the rail vehicle information as identified in section 6.5 to be recorded in the RSL. 10 R A I L T R A C K

Appendix A Derivation of RA Numbers Page 11 of 15 A.1 Derivation of RA Number of an Underline Bridge The load model shown in Figure A (or its metric conversion shown in Figure B) shall be applied to the underline bridge and positioned such as to give the most severe effect for the underline bridge element being considered. Unless otherwise justified, for continuous bridges, the load model shown in Figure A shall be applied separately and simultaneously to the parts of the spans that produce unfavourable effects only. The load model shall be positioned to give the most severe effects on each loaded length. The maximum number of units of such loading which the underline bridge has the assessed or assigned capacity to carry shall be determined (taking into account the dynamic effects of such loading at the selected speed). This number shall be rounded down to the next smaller integer and ten shall be subtracted. The resulting integer shall be called the RA Number of the underline bridge at that speed. (Example: if the maximum number of load model units which the underline bridge has the assessed capacity to carry at a given speed is 18.7, the RA Number of the underline bridge for that speed is 18 10 = 8.) A.2 Derivation of RA Number of a Rail Vehicle Rail vehicles of the type being considered shall be taken as coupled together into trains at least 50 metres long. In the case of rail vehicles with asymmetric axle spacing or axle loads and in the case of fixed-formation multiple-unit trains including cranes, rail vehicles and multiple-units shall be taken as coupled together in the orientation giving the most severe effect for the underline bridge span length under consideration. The maximum bending moment and end shear shall be determined for the static train loading acting on simply-supported underline bridge spans varying in length from 1 to 50 metres. Using these values, an Equivalent Uniformly Distributed Load (EUDL) shall be determined for each span from 1 to 50 metres using the same units as those used to define the load model set out in Figure A or B. Similarly the maximum bending moment and end shear force shall be determined for the static load model shown in Figure A or B acting on simply supported spans varying in length from 1 to 50 metres. Using these values, an EUDL shall be determined for each span from 1 to 50 metres. This EUDL represents 1 unit of the load model set out in Figure A or B. For each span length, the EUDL values derived from applying the rail vehicle shall be divided by the EUDL values for 1 unit of the load model specified in Figure A or B to derive the number of load model units which the train represents. The maximum number of load model units thus derived shall be rounded up to the next larger integer and ten shall be subtracted. The resulting integer shall be called the RA Number of the rail vehicle type (or multiple-unit type). (Example: if the rail vehicle train represents 18.3 load model units, the RA Number of the rail vehicle type is 19 10 = 9.) R A I L T R A C K 11

Page 12 of 15 Units of load per track (1 unit = 1 imperial ton) (general load model) 1 1 1 1 0.75 0.75 0.75 0.75 1 1 1 1 0.75 0.75 0.75 0.75 0.1 per foot 8 5 5 5 9 6 6 6 13 5 5 5 9 6 6 6 5 218 spacing in feet (extent of uniformly distributed load in feet) Load Model for other than Short Loaded Lengths 1.25 1.25 6 spacing in feet Load Model for Short Loaded Lengths Figure A Load Model for Deriving RA Number using Imperial Units 9.967kN 9.967kN 9.967kN 9.967kN 7.475kN 7.475kN 7.475kN 7.475kN 9.967kN 9.967kN 9.967kN 3.270kN per metre 9.967kN 7.475kN 7.475kN 7.475kN 7.475kN 2.438m 1.524m 1.524m 1.524m 2.743m 1.829m 1.829m 1.829m 3.962m 1.524m 1.524m 1.524m 2.743m 1.829m 1.829m 1.829m 1.524m 66.446m (extent of uniformity distributed load in metres) spacing in metres Load Model for other than Short Loaded Lengths 12.459 12.459 1.829 spacing in metres Load Model for Short Loaded Lengths Figure B Load Model for Deriving RA Number using Load Model in Figure A converted to Metric Units (kilonewtons, metres) 12 R A I L T R A C K

BRIDGE 6 PERMISSIBLE SPEED Appendix B Example of Route Classification 60mph 80mph BRIDGE ASSESSMENT BRIDGE 6 RA10/60 Page 13 of 15 ROUTE RA NOS RA6 RA6/90 RA8/75 RA10/60 BRIDGE 5 BRIDGE 5 RA8/80 RA10/60 BRIDGE 4 110mph 60mph BRIDGE 3 40mph BRIDGE 4 RA6/110 RA8/90 RA10/60 BRIDGE 3 RA10/40 VEHICLES PERMITTED TO RUN WITHOUT EXCEPTIONAL LOAD FORMS ALL RA6 VEHICLES (LIMITED BY BRIDGES 2 AND 4) ALL RA8 VEHICLES MAX SPEED 75 ( LIMITED BY BRIDGE 2) ALL RA10 VEHICLES MAX SPEED 60 (LIMITED BY BRIDGE 2) 90mph BRIDGE 2 BRIDGE 2 RA6/90 RA8/75 RA10/60 40mph BRIDGE 1 20mph BRIDGE 1 RA10/20 R A I L T R A C K 13

Page 14 of 15 Appendix C Flow chart of Procedure for Permitting a Train to Run The diagram below illustrates the typical procedure for permitting a train to run over a given route as set out in sections 7.1 and 7.2. Action headed TO is for the Train Operator to take; otherwise all action is for the Infrastructure Controller (IC). TO: propose train with details to IC for operation over a route Are there any long span bridges on the route? Yes TO: supply IC with vehicle information as given in sec 6.3 NO Is max vehicle RA < RA of route at permissible speed? Yes NO Yes Is max vehicle effect < effect of vehicle envelope recorded as in sec 4.5 at permissible speed? NO Is max vehicle RA < RA of route quoted at a particular speed S? Yes NO Yes Is max vehicle effect < effect of vehicle envelope recorded as in sec 4.5 quoted at a particular speed S? Is max allowable speed of vehicles < speed S? NO NO Yes TO: supply IC with vehicle information as given in sec 6.3 TO: apply to IC for assessment of actual vehicles for route Assess if all actual vehicles can pass over route Can route accept vehicles with or without speed or other restrictions? NO Permit train to run without restriction Yes Issue exceptional load form as in sec 7.1.2 and permit train to run with restrictions, as necessary Do not permit train to run 14 R A I L T R A C K

References Page 15 of 15 GA/RT6001 GC/RT5100 GM/RT2000 GM/RT2211 GM/RT2453 GO/RT3206 GO/RT3253 GO/RT3270 GO/RT3407 s Change Procedures Safe Management of Structures Engineering Acceptance of Rail Vehicles Mandatory Data for Rail Vehicles Registration of Rail Vehicles and Mandatory Data Requirements Format and Content of the Sectional Appendix Checking the Speed of Trains Route Acceptance of Rail Vehicles Train Operation Exceptional Load Documentation The Catalogue of s and the s CD-ROM give the current issue number and status of documents published by the Safety & Standards Directorate. R A I L T R A C K 15