Assembly and disassembly instructions for WP-Dynamic

Similar documents
1. Remove the parking brake assembly. 2. Remove the 4 bolts holding the yoke flange and drum. Remove the yoke flange and drive.

ZTM AND ZTMB ZENNER TURBINE METERS INSTALLATION, MAINTENANCE AND SERVICING

Drive shaft left-hand side, replace

Gearbox sectional drawing

Maintenance Information

Maintenance Information

Industrial Turbo Meters, Sizes 2" through 6"

Disassembling and assembling transmission

Maintenance Information

Differential, Disassembling and Assembling Special tools

PSA MA gearbox. INA GearBOX

920 Remote Control Switches

Installation Instructions COMPETITION/PLUS SHIFTER Ford Mustang MT82 6-Speed Manual Transmission Catalog#

Betico SB1 Compressor. Unloader Kit Installation Manual

AmTryke Adult Recumbent Model HP1000 #50-HC-1000

J125. Service Regulator Inlet Pressure up to 8.6 bar

rings used in the TuckAway Electric Monitor (#3352)

Drum Brake System: Service and Repair REMOVAL

Maintenance Information

Maintenance Information

Husqvarna Hedgetrimmers 325HS/ 325HE/ 325HDA. Workshop manual

Maintenance Information

Maintenance Information

(english) technical manual. part#

Installation Manual TWM Performance Short Shift Kit 2006 and up Toyota Yaris

Sachs shock manual. ( ) 2 & 4 Stroke RR Enduro. ( ) RS Dual Sport

DELTA O-RING CARTRIDGE SEAL ASSEMBLY AND INSTALLATION INSTRUCTIONS INTRODUCTION:

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

Logo/Company Name 4 w x.75 h. Assembly Instructions. 1) Remove base, back/back bar, pneumatic cylinder, casters/glides, and seat from box.

Series 100 Slam Shut Valve

A-320 Balanced 1st Stage

Maintenance Information

2620 Series Flex Drive Shaft Kit Installation Instructions P/N for SRM-2620T

Oreck Magnesium Series Service Manual. The Oreck Manufacturing Company

Tool Description. Heim Joint Press Tool Usage Date: Sept 22, Author: MW


Steeda S550 Mustang Street Short Throw Shift Lever Installation Instructions: &

THIS GUIDE IS INTENDED FOR DEALERS AND SOLAR COMFORT TECHNICIANS ONLY AND IS NOT MEANT OR INTENDED TO BE REPRODUCED OR DISTRIBUTED TO THE CONSUMER

Repair Manual 11/99 PS-34. Page 1

Maintenance Information

Great Wall V200/V240 (2011 Production Onwards)

BRAKE SYSTEM Toyota Celica DESCRIPTION DRUM BRAKES ADJUSTMENTS BRAKE PEDAL HEIGHT ADJUSTMENTS BRAKE PEDAL FREE PLAY ADJUSTMENTS

Bulb Replacement REPLACING BULBS

MailStar Maintenance and Adjustment March 2002

Section X STEERING DATA AND SPECIFICATIONS. 21 degrees 45 minutes -f- or 1 degree (inner wheel when outer wheel is 20 degrees)

SERVICE PARTS LIST. M18 FUEL ONE KEY SAWZALL Reciprocating Saw H31A BULLETIN NO

Q15P. Mitsubishi MQ Triton Dual Cab

70001 and Clutch Rebuild Instructions

Disassembling and assembling isave 21

TECHNICAL INFORMATION

Vane pump upgrade kit 180F4161 isave 21 ERD Disassembling and assembling

SE RV I CE MANUAL. Page 1 of 13

AmTryke Adult Recumbent Model JT2000 #50-FC-2000

HYDRAULICS. TX420 & & lower. Hydraulic Tandem Pump Removal. 4. Remove the LH side panel (Fig. 0388).

Volkswagen New Beetle Body - Exterior 64 Glass, Window regulators (Page GR-64)

WORK INSTRUCTION READ FIRST. IF IN DOUBT

CHAS FRONT FORK FRONT FORK LEGS 4-45 FRONT FORK. Order Job/Part Q ty Remarks

9.1 Assembled Planetary Gearbox

Steering Damper MX SD 2.1. Workshop Manual

Logo/Company Name 4 w x.75 h. Assembly Instructions. 1) Remove base, back/back bar, pneumatic cylinder, casters/glides, and seat from box.

Mandatory X Information Recommended Change. Series/Parts Affected: LS40D, LS40TD, LS50TD and LS60TD Concrete Pumps

SISU DP-330 DRIVE GEAR. Maintenance Manual

POWER STEERING PUMP REBUILDING SPK101 Read instructions completely before removal & disassembly

NOTE: Visit our website at for video repair procedures, under the Tools section.

InstalL Instructions. trail-creeper 4.70 transfer case gear kit ( KIT and KIT) kit contents

IMPORTANT!!!! Read this manual before attempting any installation, wiring or operation.

PD Rotary Vane Meters Double Case/3 Bladed

Manual 28ST Version 1.2

Maintenance Information

MAINTENANCE ROAD 2013 WHEELS TECHNICAL MANUAL

UOW Series Repair Manual UOW-11 & UOW-T60 Series

BRAKES. Section III REAR AXLE DATA AND SPECIFICATIONS HAND BRAKE CHRYSLER SERVICE MANUAL BRAKES 17

Maverick American 3085 Bluff Street Boulder, CO Tel: Fax: ML7.0 SHOCK SERVICE MANUAL

Rear seat. Rear seat, removing and installing. - Using screwdriver -2-, carefully lift headrest guides -3- out of rear backrest -1-.

ORIGA SYSTEM PLUS Guides, Brakes and Valves for Modular Linear Drive Systems OSP Appendix to the Operating Instructions

3D PRINTER. Pack 09. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN

Generator, removing and

Discount-Equipment.com

REPAIR PROCEDURES MANUAL

Service Manual Air Tech Second Stage

Side panel, replacing

1. Get fork mounted in stand. You can leave it in the bike, but you must remove the wheel and front brake.

Second Stage Regulator - 1/4 Turn

225 CARTRIDGE DUAL SEAL

Discount-Equipment.com

DESCRIPTION Acura TSX SUSPENSION Front - TSX. NOTE: For system description and component location, see Fig. 1.

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2

Mamod SL1K Locomotive Assembly Instructions

BATH FILLER & BATH / SHOWER MIXER Installation & aftercare instructions

SERIES II WALVIT + CUBE. 1.28/0.8 Gal (4.8/3 Litre)

Installation Manual TWM Performance Toyota GT86 / Scion FRS / Subaru BRZ Direct Replacement Short Shifter

REPAIR MANUAL 5 HP - 30 ZF GETRIEBE GMBH SAARBRÜCKEN

BROOKS STAIRLIFTS SUPERGLIDE 120

Compressor - Install (E.40.C.31 - F.10.A.15)

Dismantling and assembling transmission

Steeda S550 Mustang Street Short Throw Shift Lever Installation Instructions For Part:

Gate Valve Maintenance & Adjustment Procedures

Zeiss ZAT Cube Assembly Procedure

C. Steering Columns. 1. Non-Folding Steering Column

Return to Instruction Sheet index TCI Torqueflite Trans-Scat Kit

Transcription:

Assembly and disassembly instructions for WP-Dynamic 40... 125 Tools required: Size 19 open-ended or ring spanner (WPD DN40 125) Size 7 open-ended spanner Size 4 Allen key Flat screw-driver with 4mm blade Phillips screw-driver (Size 1) Auxiliary materials: Non-toxic grease MB 1102 INT page 1 of 5 07/2010

Exploded view: WP-Dynamic 40... 125 MB 1102 INT page 2 of 5 07/2010

Disassembly of the WP-Dynamic 40... 125 01. Remove the lead seal and wire from screw (29). 02. Remove screws (28) and (29) from the meter body (30). 03. Remove the measuring insert from the meter body (30). 04. Remove the lead seal and wire from the sliding ring (5). 05. Remove the locking pin (32) from the sliding ring (5). Push the centre part of the locking pin inwards about 10mm with a 1mm Jeweller s screwdriver. Then lever out the outer part of the pin with the screwdriver. The locking pin can be re-used. 06. Hold the head ring (2) firmly and turn the sliding ring (5) all the way to the right. 07. Turn the entire register assembly until head ring (2), register (3) and the centre ring (4) can be lifted off vertically. 08. Push register (3) on the glass out of the head ring (2). 09. Remove the register (3) from the centre ring (4) by gently pulling the clips apart. 10. Turn the sliding ring (5) until it can be lifted off the cover flange (13). 11. Remove the calibration lock nut (8) with a size 7 spanner 12. Push the adjusting bolt (9) out from the bottom of the cover flange (12). 13. Remove the measuring chamber securing screw M3 (20) from the underside of the cover plate 14. Turn the measuring chamber to the left to release it from the bayonet fitting and remove 15. Remove the labiate seal (25) from the cage (24) (does not apply to DN 125) 16. Remove the screws (19) from the top of the measuring chamber (24) 17. Push the calibration linkage (11) in all the way in. 18. Remove the front nose cone (23) (calibration vane side) by turning clockwise and gently pulling away from the cage (24) 19. Remove the calibration vane (22) from the nose cone (23) by turning it all the way to the left and pulling it off. 20. Remove the linkage (11) 21. Remove the turbine (21) 22. Remove the magnetic coupling (14) 23. Remove the gear (15) from the transmission shaft (16) 24. Push the protection tube (17) out of the nose cone (27) and pull from below to remove 25. Remove the transmission shaft (16) 26. Remove the rear nose cone (27) by turning clockwise and gently pulling it away from the cage (24) 27. Remove the retarding disc (26) from the rear nose cone (27) 28. Remove the transmission shaft bearing pin (18) by pushing it out of the nose cone (27) from below with a screw driver MB 1102 INT page 3 of 5 07/2010

Assembly of the WP-Dynamic 40... 125 01. Insert the bearing pin (18) for the transmission shaft (16) in the rear nose cone (27) 02. Fit the retarding disc (26) in to the rear nose cone (27) Note: - Align the lip of the retarding disc with the slot on the nose cone - The retarding disc part number must be visible after assembly 03. Fit the rear nose cone (27) to the cage (24) by turning anti-clockwise on side of the cage where the securing screw is fitted to the cover flange 04. Insert the transmission shaft (16) into the rear nose cone (27) from the underside 05. Slide the protection tube (17) over the transmission shaft (16) in the cage (24) 06. Fit the gear (15) to the transmission shaft (16) making sure it seats properly 07. Fit the turbine (21) with the worm gear first into the rear nose (27) 08. Fit the calibration ring (22) into the front nose cone (23) Note: - The circular indentations on the calibration ring should be visible after installation - The linkage nib must be turned all the way to the left to align correctly - After installation turn halfway to the right 09. Insert the linkage (11) with the larger hole first all the way into the cage (24) 10. Fit the front nose cone (23) into the cage (24) and turn anti-clockwise to lock Note: The nib on the calibration ring must align with the large hole on the linkage 10. Lock the front and rear nose cones to the cage (24) with screws (19) 11. Turn the calibration vane (22) so that it is completely hidden behind the nose cone ribs (23) (zero setting). The linkage will now protrude from the cage 12. Fit the magnetic coupling (14) to the bearing pin on the cage (24) 13. Fit the cage onto the cover flange (12) and lock by turning to clockwise Note: The hole for the M3 locking screw (20) must align with the M3 thread in the cover plate 14. Screw in the M3 screw (20) 15. Push the adjusting bolt (9) all the way in from the top of the cover flange (5) Note: The pin must align with the linkage 16. Fit the lock nut (counter screw) (8) 17. Fit the register (3) to the centre ring (4). Note: the nibs on the copper register cup must correspond with the holes on the centre-ring. 18. Fit the register (3) and centre ring (4) into the head ring (2). Note: The lid hinge must be positioned at the top of the register 19. Fit the sliding ring (5) onto the cover flange (12) and turn until the nibs on the sliding ring (5) catch on the grooves of the cover flange (12). 20. Fit the serial number plate (6) into the sliding ring (5). MB 1102 INT page 4 of 5 07/2010

21. Fit the head ring (2) with the register (3) into the sliding ring (5). Note: The triangles on the sliding ring and head ring must align 22. Turn the sliding ring (5) clockwise until it stops while firmly holding the head ring (2) 23. Insert the locking pin (32) into the sliding ring (5) and push the centre part of the locking pin in until flush with the locking pin head 24. Seal the measuring element 25. Fit the labiate seal (25) to the cage (does not apply to the DN 125) Note: The ends of the seal must be inserted into the slot on the cage to secure it Lightly lubricate the seal to ease assembly into the body 26. Fit the O-Ring (13) into the seat on the cover flange (12) Note: Lightly lubricate the seal to ease assembly into the body 27. Insert the measuring element into the meter body (30) Note: - Do not pinch or misalign the O-Ring - To prevent damage to the o-ring, fit the o-ring to the cover flange before inserting the measuring element into the meter body - Ensure that the arrow on the body and on the cover flange correspond 28. Screw the bolts (28) and (29) into the body (30) and tighten in a cross formation to a torque of approx. 80 120 Nm 29. Seal the meter between the cover flange (12) and bolt (29) with a lead or aluminium seal and sealing wire Note: The parts (23) and (27) are identical. In the instructions they are referred to as front and rear nose cones. Bearings must NOT be lubricated! MB 1102 INT page 5 of 5 07/2010