Superintendent Rig Checklist

Similar documents
ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

Oil Rigs Now Houston, Texas

Oil Rigs Now Houston, Texas

McKissick 200mt. Stabbing board

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

OilRigsNow.com Houston,TX USA (713)

Schede tecniche Corsair 300 PDB

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig Inspection Report

VDD 200 Super Single Rig - Automated Pipehandling System

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

VDD 370 Super Single Rig - Automatic Pipehandling System

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

NATIONAL 110 UE 1500 HP SCR

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS

JSAP - AC - Main MCC - Shutdown.doc JSAP - AC - Main MCC - Start Up - REV1.doc JSAP - AC - MCC Feeder - Shutdown.doc JSAP - AC - MCC Feeder - Start

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?

PORTABLE DRILLING RIG ***NEW LISTING*** Make an Offer Drill Depth to 6,000'

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

Ideco - H25 Information Document

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

CLASSIFICATION: 1300 H.P. Land Rig rated to 13,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

Drillmec HH-300 spec.

HH102. Hydraulic with Caterpillar engine, for drilling oil and gas wells up to 2,000 m. 100 tf hook capacity HP triplex pumps.

2 (two units) NEW MOBILE DRILLING AND WORKOVER RIG in REFURBISH For Oil, Gas and Water boring. Made in Germany. As in attached technical description.

VDD 400 Offshore Super Single - Automated Pipehandling System

CLASSIFICATION: 1300 H.P. Land Rig rated to 13,500

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

Rotary Snubbing Technology Option for Long Reach

DRILLING BARGE SS AMEQ CASPIAN SEA

LAGO Energy Presents,

Services. Rental Equipment RENTAL DIVISION PRODUCT LINES. LOAD RESTRAINTS Load Binders (Lever & Ratchet) Truck Tie-down Assemblies Boomer Chains

LOC 400 Drilling Rig

19,683 8,

ENERGY DRILLING AUSTRALIA. Rig 1. Foremost Explorer III-65

INSP Aerial Periodic Inspections

contents iii Figures and Table vi Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Conventional Rotating System 3

RIG 32. Rig 32. Page 1 of 13

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Pi PK Information Document

contents iii Figures and Tables Foreword Acknowledgments Units of Measurement xii

1 CLEAN BELT TABLES Apr CLEAN UNDER MOVING CONVEYOR Apr CLEAN PRODUCT CHUTES Apr CLEAN TRUCK PITS Apr-08

SAFETY GUIDANCE MATERIAL

Document Number: HSE May 1, 2014 LADDERS. Author: A Holland. Rev Date Rev # Description Revised By 05/01/14 1 Reformat A.

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

Element C7.2 Lifting Work Equipment

Rig 90. Rig 97. Future Technology From NOV

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Section 25 Project Surplus Packages - Sales Item

Monthly Checklist For Depot

PAGE # SHIPPING UNITS # 2 # 3 REVISED. 1 CLEANING BELT TABLES UNITS # 2 & # 3 Apr CHANGING PRODUCTS IN SYSTEM UNIT # 2 Apr-08

Top Drive System Installation and Commissioning Manual

October 03, Steve Smith Safety Director Best Company 1234 Main Street Kansas City, MO General Industry Safety Survey Omaha, NE.

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Vehicle-mounted elevating and rotating work platforms 29CFR

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D.

* To satisfy our costumers, employees, and society with trust, dedication, and performance

Plug & Abandonment Light Drilling Workover Well Intervention

INSPECTION AND MAINTENANCE CHECKLIST

Pump and Tank Unit 438

TOUGH, COMPACT, AND DURABLE

Rig Specifications Support Capabilities Personnel Qualifications. (a division of Velseis Pty Ltd)

TABLE OF CONTENTS DESCRIPTION PAGE

LSU University Safety Manual Section IV, Part C Stairs and Ladders. C. Stairs & Ladders

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

Fast, Effective Blowout Protection

The Predator Drilling Rig. 220,000 lb Hook Load (100,000 kg)

VP, Facilities and Construction Management

Superior Guardian 6x20 3-Deck Tandem Screen Plant, Unit #838

ISOLATION/UNIVERSAL TOOLS

TELESCOPIC BOOM CRAWLER CRANE 30 TON CAPACITY

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

XL3100. This valve operates the gates and is equipped with a manual over ride. This valve is normally closed.

Lifting height 5.5" - 72" with adapters " Height overall 165" Width between columns 122" Drive through 109" Width overall 151.

CUSTOMIZED SERVICE & REPAIR SOLUTIONS

SECTION 1 LUBRICATION

ENERGY DRILLING AUSTRALIA. Rig 2. Schramm TXD 200

Table of Content 1 Technical Description... 3

COMMITMENT TO EXCELLENCE

Chemical Hazards, Biological Hazards, and Harmful Substances

1. Cranes. 3. Hazardous Chemicals. 4. Signs. 2. Trenching and Excavations

Deep Drilling Equipment

D-25 Drill Rig. 700 Hicks Drive, Elburn, IL Phone:

Course 904 Course 816. Oil and Gas Well Inspection

Transcription:

Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time: Crown-o-matic function tested: Pre-tour Safety Meeting Topic: Thrust limiter set and tested: J.S.A. available for present task: Authorized Personnel Sign Posted at entrance to site: DRILL SITE/LOCATION Visible rig identification sign erected at entrance to site road: And at all directional changes on site road: Hard Hat/Safety Glasses/Steel Toe Shoe Signs Posted at entrance to site and other prominent locations on site: No Smoking Area s Designated & Posted: Hard hats & Safety glasses available for visitors: Tool pusher s trailer Clean and organized: Tool pusher at rig location: Primary Muster area designated: Secondary Muster area designated: Supply storage house clean and organized: Crew change house clean: Work area s are maintained clean and free of debris and tripping hazards: Tool pusher shack clean and organized Hands living quarters clean All belts, gears, shafts and drives guarded Mud pump KEVLAR belt tightened correctly Pony rods seals in good shape and installed properly Pony Rods guards in place (DOWN) Pulsation dampeners charged to 650-700psi Proper nails installed in pop offs Ends of relief lines, high pressure lines, etc secured MUD PUMP AREA PUMP 1 PUMP 2 Y or N Y or N 1

Ends of mud vibrator hose snubbed Radiators clean and full of antifreeze Bolts on WPT s tight and all in place All lights working and not damaged WPT properly greased and reliefs verified to expel grease Module bolts torqued to spec with torque multiplier Torque Multiplier on site Liner washer pumps working and plumbed per SOP Oil level in Gear End Date oil last changed in gear ends Oil pressure on gear oil pumps psi psi WPT air pressure psi psi Mud pit gate closed with proper pins Mud pit gate in good shape Adequate personal protective equipment available: Employees using all required PPE Personal protective equipment properly stored PPE required warning signs erected Chemical hazard warning signs erected MUD PITS Eye wash station full and charged Eye wash station/emergency shower in a clean & sanitary condition All valves working and in good shape Centrifugals working with no leaks All pit agitators working and properly maintained All pit grating in good shape All pit access points covered with proper lids and not left open Adequate lighting provided General housekeeping kept clean and organized Adequate stairs with handrails Walkways free from obstruction and/or damage Shale shakers working properly Desander/Desilter working properly ALL Stairways and ladders secured All unused floor holes covered All electrical EP BOXES closed with ALL bolts in place 2

Electric wiring in good condition All handles, agitator boxes and floor obstructions painted with HIGH VIS paint Generators properly grounded GENERATORS Cover panels on electrical control boxes installed and closed. Insulating mats available at electrical panels Electrical wires properly strung Air compressors properly guarded Air storage tanks equipped with pop-off valve Lockout/Tag out devices available Adequate lighting installed General Housekeeping Wires not running along the ground Fire extinguishers located properly and not obstructed BOP stack properly stabilized All hydraulic lines connected Accumulator function tested tourly Accumulator unit properly located BLOW-OUT PREVENTER/KUMMY Accumulator bottles labeled with contents and pressured up Accumulator valves in appropriate position Accumulator free of leaks Accumulator remote properly hooked up Choke line secured Choke manifold accessible Choke manifold valves handles in place Kill line system connected and functional Derrick assembly pins in place Assembly pins secured with keepers Substructure assembly pins in place Substructure assembly pins secured with keepers Condition of derrick ladder DERRICK & SUBSTRUCTURE 3

SRL (Sala Block) in place and line retracted with rope tie off when not in use Climb assist device in place and used by derrickman. Full body harness with lanyard available and kept in good condition Derrick latching dog extension/retraction device working properly Crown section in proper position (Drilling or Moving) Latch dog visually inspected prior to loading derrick Crown sheave guards in place Crown sheaves greased Crown light working Dead line properly anchored Adequate lighting provided Derrick emergency escape line installed Derrick escape device on-line and ready for immediate access Emergency escape line adequately anchored All gauges working properly Wiggle steer working properly Filter warning lights on Blinds / Rams open & closed sign All safety papers posted OSHA poster in place Kill Sheet properly filled out Pipe handler controls operating properly Camera s and monitor in place and operating Drill Shack Clean and organized Rotary floor in good condition Driller at or near controls while in operation Weight indicator installed and visible Weight indicator visible to Driller DRILL SHACK & DRILL FLOOR Driller s controls properly labeled/identified Pipe slips & Dies in good condition, keepers in good condition Hydraulic hoist line in good condition and slings utilized when not in use Kelly cock wrench and safety valve accessible Disk assist brakes being used properly and not as a Hydromantic Drill Floor s General housekeeping Non skid material used around rotary 4

Hand rails installed and in good condition TOP-DRIVE Tourly inspection being conducted All rollers in good shape and adjusted properly All hydraulic lines in good shape Socks in place around hoses, secured at both ends and in good shape Free of Oil leaks Swivel packing not leaking and installed with big nut on top Proper Air pressure to brakes Carrier sheaves greased daily Wiggle steer working properly Working properly All safety cables in place Roll cylinders in good shape All bushings & pins greased All hydraulic pipe rack controls working Lined up properly with Top-drive Dies ground down Free of leaks Properly roped off Pipehandler tub drained and free obstructions Pipehandler being kept clean PIPE HANDLER Ends of pipe racks properly chocked Spacers used to separate layers of pipe Layers of pipe properly chocked Pipe racks are level and stable Employees not permitted on top of pipe Adequate lighting provided PIPE RACK AREA 5

6