When I did reach the facility, a train was sitting on track 3 just having completed loading.

Similar documents
Module 3.5 Limited Spaces Lesson Plan

IMPORTANT DLS PARKING LOT INFORMATION

Animals Angels Investigation into the transport and slaughter of American horses in Mexico External report

BNSF 2185, an END GP 38, was doing flat switching in the Yard during our visit.

The equipment manufacturing division of one of the

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal

Revised August 2018 COLONSAY PLANT DRIVER ORIENTATION

Summer Safe Vehicle Inspection And Driving Practices

HAULING EQUIPMENT with TRUCK and TRAILER COMBINATION

Powered Industrial Truck Written Test

Issue Date: May 25, 2016 Next Review Date: May 2021 Area: Grains Receiving

LOGS Logs Auditor, extension 143

Coupling & Uncoupling of Trailers Tool Box Talk

Male Semi-Truck Driver Killed In Rollover Crash On County Road Incident Number: 05KY008

This publication is designed for use the FRA Wood Yard Safety Video to facilitate discussion during safety training for log truck operators and wood

200 TRIPS THE D 42 MAMMOET WORLD Issue

ASHPRINGTON ROAD Part 1

GUIDE FOR DETERMINING MOTOR VEHICLE ACCIDENT PREVENTABILITY

Mr. Freeze QUALITATIVE QUESTIONS

The Queen Bee Gives XOJET Her Approval

The platform. Insights from HS2 online panel

Heavy Truck Conflicts at Expressway On-Ramps Part 1

CHECKLIST TO TRAILER SAFELY

BCA Bus Information. Stop Locations. Bus stop locations are selected by BCA, subject to final approval by the School Leader.

*Unit shown with optional Off-Road Package

Industrial Truck (Forklift) Safety Program

Morris Mine (Bob Ciminel 2012)

Request for Collision Evaluation

QUESTION/ANSWER FORUM: DOMESTIC SHIPPING 101

Roster: Variable *10 days on/4 off *11 days on 3 off *12 days on 2 off

For Immediate Release

6 Things to Consider when Selecting a Weigh Station Bypass System

TRAIN, BUS & TRANSIT

SECTION 18 BODY JACK / SUPPORT POINTS

UCSD Photo Trip to Borrego Springs Desert Bloom

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Ohio Department of Transportation. Special Hauling Permits Section West Broad St. Columbus, Ohio Third Floor Mailstop #5140

Orientation Safety Test

Montour No. 10 (Bob Ciminel 2012)

APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY

David W. Salter Collection Gainesville Midland Railroad Photographs MS P

Online Shopper: New Car Intenders

MDOT Tow Plow USAGES AND EFFECTIVENESS FOR RIGHT OF WAY SNOW CLEARING

SERVICE CENTER VISIT TELEPHONE ANSWERING PROCEDURES 75% (15/20) Jiffy Lube: Z_CB Squared # 1698 Evaluation

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

1

CHAPTER 69 PARKING REGULATIONS

To: All Tractor Owners/Drivers Fm: Patrick Gottsch Re: Details for World s Record Parade of Classic Tractors. Dear Friends,

REX8+ COVERT MAGMOUNT TRACKING UNIT

ROHRBACK COSASCO SYSTEMS TEST REPORT

LOADING THE TDRT WARNING LOADING/UNLOADING OPERATION

b. take a motorcycle-riding course taught by a certified instructor.

SAM-1 Fan Kit Installation Into HENG S Range Hood Model #R C David Jeffs June 2015

INTRODUCTION: INITIAL TRUCK OBSERVATIONS AND RECOMMENDATIONS:

Globus family of brands Disability Accommodations

CLEARWATER FIRE & RESCUE TRAINING BUREAU

Folding Shopping Cart Design Report

We photographed it as well as a UP eastbound doublestack lead by UP #8638 (SD70ACe).

David W. Salter Collection

Loading gauge enhancement studies

Abstract. Executive Summary. Emily Rogers Jean Wang ORF 467 Final Report-Middlesex County

#6 IN A SERIES SHARING THE ROAD. How to stay safe.

Battery Technology for Data Centers and Network Rooms: Site Planning

Dave Matthews Band 25 th Anniversary Show

The Israeli revolution of the internal combustion engine

TABLE OF CONTENTS SECTION TITLE PAGE NUMBER

CHAPTER 9 PARKING REGULATIONS (SEE CHAPTER 7 FOR DEFINITIONS, SCOPE AND APPLICATION RELATING TO THIS CHAPTER)

Commercial Driver s License Manual SECTION 7. Section-7 Doubles and Triples

Five Popular Car Options That Barely Get Used By Owners

Choose the correct word from the box and complete the sentences below.

Advice and safety instructions. for Trafikverket track areas

A car-free world? Name:... Date:... Car-free Day comprehension. The Development of Cars

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

2010 CICA Lift of the Year Awards

Equipment tug collision with BAe , EI-CMS, 24 May 1999 at Dublin Airport, Ireland.

Getting a Car J. Folta

You have received information on the most technologically advanced mirror in the world.

BACKING BEST MANAGEMENT PRACTICES

Danish models from. Sample. Torben Ziegler

Friday 2 December PM 3.15 PM Time Allowed: 2 hours 15 minutes

Corris railway. Copyright Dovetail Games 2016, all rights reserved Page 1

Introduction and Background Study Purpose

CHAPTER 69 PARKING REGULATIONS

Skills and Sequences for In-Car Instruction

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

Reflective Decal Film for Model Trains and more

Our Mobility Scooter Policy: A guide to taking mobility scooters on our trains

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

Part 8: Mill Layouts and Yards

1. Name some things you should check on the front of your vehicle during the walk around inspection.

Presentation Overview. Stop, Station, and Terminal Capacity

Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being slurry sealed?

Roll Handling. Slitting and Rewinding Fundamentals for Converters Ontario, CA November 15-16, 2005

Construction Realty Co.

Chapter 5 Vehicle Operation Basics

DFS gains long engine life, customer trust and projected savings of $213,500 CDN per year.

This is an easy to read report.

The Re:Queen and Sparks Traffic Brief - Addendum #2

********************PROJECT OWNER******************** **** River Crossing West Siphon Horizontal Directional Drilling Operations. TIME: 4:30 p.m.

AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS

Transcription:

On Sept. 13, while Jim O and I were in Switzerland, I took a side trip from Basel up to Freiburg, Germany to see the Hupac rolling highway operation there. I arrived at the Freiburg railroad station around noon, and after consulting a city map at the Deutchesbahn info counter and a meandering walk about 20 mins. north from the station, I estimate I arrived at the Hupac facility about 12:40. It is readily visible from an overhead road bridge (Kaiserwaldstrasse, or some such thing), but hard to figure how to get to. I had to go through a parking lot, down a residential alley, and up some steps to reach the area without trespassing on the truck roadways. When I did reach the facility, a train was sitting on track 3 just having completed loading. It consisted of 17 tractor-trailers on individual flatcars permanently affixed as a single platform, plus one passenger car, already occupied by the trucks' drivers. After a Swiss electric locomotive coupled on,

the train departed at 1:32. There are 3 tracks in the Hupac terminal, and this first train left from track 3. Another empty equipment set sat on track 2, and track 1 was empty at the time of my arrival. Next I observed the arrival of a loaded train from Navarro, Italy at 1:40 on track 1. The passenger car was uncoupled, a portable ramp positioned,

the drivers walked to their rigs, and unloading commenced at 1:47.

At 2:03 the last of the 17 trucks had paraded forward to the unloading end. The drivers chock and unchock their own trucks, with minimum supervision or involvement of Hupac employees. About 2:20 a new set of equipment was spotted on track 3, so now all 3 tracks were full of empty sets ready to load. At 2:32 loading began of the trainset on track 2.

Loading finished at 3:02. I left about 3:15 to return to the bahnhof for a 4 o'clock departure, so do not know what time this loaded train on track 2 left, but a locomotive was standing by to be coupled on. My visit was facilitated by advance e-mail correspondence with Hupac's rolling highway manager Simone Croci-Torti, but everyone at the site was friendly and I had no trouble walking around and taking all the photos I wanted. The Italian truck drivers were a riot -- all mugging for the camera and wanting their pictures taken.

My initial conclusions from the visit are: 1. It works! This is important. The trucks load and unload with no difficulty and in reasonable time, around the clock, day in a day out. 2. It is significant that Hupac has conceived and designed this equipment/ service/terminal package. The equipment is different from anything else operating today, with some significant design elements that permit its decks to be low enough to accommodate large trucks without interfering with the overhead catenary and to permit loading the 17-car block from either end with only a small portable ramp. 3. This does not mean it is the way we would want to do it in the U.S. Swiss railroads are completely scheduled, so no doubt Hupac has specific times blocked for its trains. This can explain why a loaded train would have to sit so long before leaving. Trucks had to wait a long time in general to load. There was a lot of queuing up. All the trucks were weighed and measured before loading.. Drivers had to go into the terminal office and complete paperwork.

The sleeping car was primitive, converted from a European style coach with sections. One of the seats in each section had been removed and replaced by a bunk bed, so presumably each section accommodates two drivers. The passenger car was not airconditioned. It was a warm sunny day when I visited, and the car had been sitting in the yard, so the first thing drivers did when they boarded was open all the windows. The drivers boarding and leaving the trains carried their own pillows and bedrolls in addition to their grips. The trains are turned once in route so they arrive with the trucks ready to drive off. Jim O thinks they are turned in Basel on this route. He photographed the train I saw depart Freiburg at 1:32 in Olten, Switzerland, well south of Basel, at 5:25 the same afternoon.

The trucks were facing forward on the train as opposed to facing backwards when they left Freiburg. The sleeping car was on the head end instead of the rear. This makes it easy for the locomotive to remove it when the train arrives and unloading begins, as I had seen. Significantly, it does work and trains are loaded and unloaded around the clock. I doubt, though, if U.S. truckers would tolerate the delay in loading or the primitive on board accommodations. David L. Foster Executive Director RAIL Solution 342 High Street Salem, VA 24153 (540) 389-0407 www.railsolution.org (Revised10/10/07) 2007 RAIL Solution