Marine Technology Society

Similar documents
The Benefits of Podded Propulsion in the Offshore Market

Feasibility of Electric Propulsion for Semi-submersible Heavy Lift Vessels

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

Optimization of Power and Station Keeping Installations by a Total System Design Approach

Ekip Link logic- zone discrimination protection system

DYNAMIC EFFICIENCY - Propulsors with Contra-Rotating Propellers for Dynamic Positioning

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

RISK, FMEA AND RELIABILITY. Machinery System for DP Vessels with Increased Efficiency and Reliability

Optimizing Energy Efficiency for DP Vessels for Variable Operational Risks

A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

DP INNOVATION. A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

POWER SESSION. DP3 Class Power System Solutions for Dynamically Positioned Vessels

The step forward Onboard DC Grid

DP Conference, Houston October 17-18, Challenges related to propulsion equipment and their interface to the Dynamic Positioning System

POWER. Improving Engine Utilization in DP Vessels

Appendix A. Power Management System Test Guidelines

Power Management Control of Electrical Propulsion Systems

Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone

Propulsion Options for the Modern Short Voyage Ferry. The Ferry. A vehicle and passenger ferry. Short. BMT Nigel Gee and Associates Ltd

Kevin Duffin - Martime Assurance & Consulting John Flynn- Stena Drilling

Fuel Efficient Power Plant Featuring Variable Speed Generation Systems for DP Drilling Units

Model Tests for the DP System of a Drilling Semi-Submersible

Underwater Retrofit of Steerable Thrusters

Towards Safer, Smarter and Greener Ships Using Hybrid Marine Power Plants. Introduction. Authors:

Alf Kåre Ådnanes; ABB BU Marine & Cranes, 2010-November Energy efficiency and fuel consumption of marine and offshore vessels Technical possibilities

STUDY ON PROPULSION ALTERNATIVES FOR WINMOS ACTIVITY 2.2

PRESS RELEASE TEU ULTRA LARGE CONTAINER VESSEL

MARINE ELFA Equipment Management Conference. Van C. Dewitt Sea Mar

Nobert Bulten Petra Stoltenkamp Wärtsilä Propulsion Technology

Control. Fuel Consumption and Emission Predictions Applications to a DP-FPSO Concept

Onboard DC Grid. Jan Fredrik DP Conference 2011; Houston. for enhanced DP operation in ships

G R O UP. Port of Liverpool. Towage Information for the. Port of Liverpool

IHC Holland BV IHC WFSV Brief Specifications

Wärtsilä HY TUG propulsion system

ROTATING MACHINERY, GENERAL

Designed for customers

Design. Model Tests for the DP System of a Drilling Semi-Submersible

Navis NavDP 4000 Series

EPROX. Energy-saving electric propulsion system

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power

Keynote Address. DPPS A Petrobras DP Safety Program

From academia to industry Commercializing research on propulsion and hydrodynamics. Øyvind Smogeli Chief Operating Officer

GPA 670 PSV Series DP2 Diesel-Electric Platform Support Vessel Exceptional Maneuverability

characteristics, including the ability to turn through 180 degrees for an increase in backing thrust.

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC

About TECO-Westinghouse

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

(Chapter II-1, Regulations 29.1, , 29.3, 29.4, , 29.14, 28.2 and 28.3 and 30.2)

HYDRAULIC TUNNEL THRUSTER

(Chapter II-1, Regulations 29.1, , 29.3, 29.4, , 29.14, 28.2 and 28.3)

Deck Mounted Electric Rotatable Propeller Drives

Power Generation Stability and Response in DP Applications An Overview of Modern Diesel Engine Performance

GEARBOXES CUSTOM PROPELLERS, SHAFTS AND RUDDERS TUNNEL THRUSTERS AZIMUTH THRUSTERS CONTROLLABLE PITCH PROPELLER SYSTEMS

PLUG : the shore power solution you can afford!

Condition Based Maintenance for Maximized. October 13-14, 2009

UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY, AND ENVIRONMENT RELATED CONVENTIONS

CHAPTER 3. Basic Considerations and Distribution System Layout

Offshore Application of the Flywheel Energy Storage. Final report

(Chapter II-1, Regulations 29.1, , 29.3, 29.4, , 29.14, 28.2 and 28.3)

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

Vaasa Conference April 2016

CHARACTERISTICS OF POLLUTION RESPONSE VESSELS FOR THE GULF OF FINLAND

GPA 654 PSV Series D-P2 Diesel Electric Platform Support Vessel Low Emissions Crew Safety

PROJECT RESOLUTE. Canadian Coast Guard Icebreaker Support Program Government of Canada solicitation number: F /A

YOUR PROPULSION EXPERTS

ELECTRICAL INSTALLATIONS

SIEM MARLIN - MT 6017 MK II

Reduction of Network Peak Power and Power Swing Demand in Mine Hoist Applications

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

Contra-Rotating Propellers Combination of DP Capability, Fuel Economy and Environment

ELECTRICAL INSTALLATIONS

Efficient and flexible solution

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING THE ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology.

Review paper on Fault analysis and its Limiting Techniques.

By Edmund Hughes, Technical Officer, Marine Environment Division, IMO

New diesel electric propulsion system. BLUEDRIVE PlusC.

P-899 WINMOS SUB-ACTIVITY 2.3

Marine product guide. Engines and generator sets

Low Loss Concept Comparison Study

AIR LUBRICATION SYSTEM INSTALLATION

copyright c 2014 Hyundai Heavy Industries A Jan. 2014

Author s Name Name of the Paper Session. PDynamic. Positioning Committee. Marine Technology Society

Cost Benefit Analysis of Faster Transmission System Protection Systems

Offshore Oil Exploration & Transportation Logistics

CATERPILLAR 3516B DP2 System

Kongsberg Maritime Simulation and Training. The power to excel in Dynamic Positioning training

Poulsen Hybrid Monorotor

PRIME MOVER CONTROLS INC. MARINE PROPULSION CONTROLS. Series MPC-CP SYSTEM

Electric Drive - Magnetic Suspension Rotorcraft Technologies

For Yachts Innovative Gear Solutions in Naval Propulsion Systems

HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE

INTEGRATED HYBRID PROPULSION SYSTEMS FOR VEHICLE FERRIES

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Alf Kåre Ådnanes Vice President Technology. A Concept of Environmentally Friendly Propulsion System

E-15 Uninterruptible Power Systems (UPS)

ABB POWER SYSTEMS CONSULTING

Merchant Ships Determined From. Model Tests and Full Scale Trials. Stuart B. Cohen Principal Investigator. for. Hydronautics, Inc. Project Coordinator

Chapter 6 Generator-Voltage System

RUBBER BELLOWS TYPE 1A & 1S SERIES

Transcription:

Marine Technology Society Dynamic Positioning Conference 21-22 October, 1997 Session 7 Power Plant Electrical Power Plant and Thruster Systems Design Considerations for Dynamically Positioned Vessels By: Amrik Kallah Cegelec (Rugby, U.K.) Session Planner Pete Fougere: Transocean (Houston) DP Conference Houston October 21-22, 1997 Session 7 Page 1

Electrical Power Plant and Thruster Systems Design Considerations for Dynamically Positioned Vessels Abstract The quest for more oil is taking hydrocarbons exploration to much deeper waters offshore. To satisfy this need, a number of semi-submersible rigs are currently being converted and new innovative ships are being built around the world. During drilling, these vessels are required to be held on station in a reasonably tight watch circle and under very difficult environmental conditions. They thus have a large complement of high capacity thrusters, complex electrical power plant and distribution systems. This paper first discusses the impact of classification society requirements on the design and layout of DP systems and then presents solutions for their optimal and cost effective operation. Introduction Hyrdocarbon reserves have been discovered in numerous deepwater locations worldwide, notably West of the Shetlands, Norway, Brazil and Gulf of Mexico. The premier deepwater area is Brazil s Campos Basin where oil reserves of over 3 billion barrels are located in water depths of 400m-1000m and over 2 billion barrels in water depths greater than 1000m. In the Gulf of Mexico, reserves exceeding 4 billion barrels have been identified in water depths of 500m-1800m and approximately 700 blocs have been leased in greater than 1500m of water. The above deepwater exploration activity has resulted in a significant increase in the demand for rigs capable of drilling in deep water. Hence the reason for the recent large number of mobile offshore drilling unit conversions, upgrades and new builds (mostly semi-submersibles and monohulls). Many of the new generation drill ships are multipurpose vessels based on an oil (shuttle) tanker hull with facilities for drilling as well as processing, storing and offloading of crude produced during wellhead testing. Most of these vessels are designed for drilling up to about 3000m (10,000 ft) of water and are DP (Dynamically Positioned) Drillships. A typical example of the new generation of DP Drill ships is the Transocean (formerly Sonat) `Discoverer Enterprise Class with many innovative features in the drilling methodology. The vessel is described elsewhere (Ref. 1) but its single line electrical diagram is shown in Figure 1. There are six thrusters, each rated at 5222kW and producing a thrust of 89 tonnes approximately. The power for the thrusters, drilling equipment and ship s services is generated at 11kV by six diesel driven generators, four rated at 7030kW each and two at 4690kW each. The medium voltage switchboard consists of two completely independent sections each housed in a separate compartment but connected by a cable tie with breakers at each end. The number of thrusters, generators, switchboard sections and their physical location are determined by the Class Notation required for the vessel as described in the next Section. DP Conference Houston October 21-22, 1997 Session 7 Page 2

Class Notation and Classification Society Requirements When a vessel is equipped with a dynamic positioning system (designed, built and tested in accordance with Ship Rules and Rules for Mobile Offshore Units), it is assigned an additional Class Notation; DYNPOS by (DNV), DPS (by ABS), DP (by LRS). Depending upon the technical design, physical arrangement and redundancies that are incorporated in various sub-systems, control panels and back-up systems of the dynamic positioning system, the Class Notation DYNPOS (for DNV) will be complemented with the letters T, AUTS, AUT, AUTR, AUTRO. The equivalent Class Notations by other Classification Societies are listed in Table 1. Table 1 - Class Notation equivalence between different Classification Societies DNV ABS LRS DYNPOS T DYNPOS AUTS DYNPOS AUT DYNPOS AUTR DYNPOS AUTRO DPS-0 Not applicable DPS -1 DPS - 2 DPS - 3 DP (CM) Not applicable DP (AM) DP (AA) DP (AAA) Exact definitions of various Class Notations, as given by various Classification Societies, for the above Class Notations are reproduced in Appendix A. The classification of systems for dynamic positioning comprises the following sub-systems, control panels, and back-up systems: power system controller measuring system thruster system remote thrust control system control panels The minimum requirements for system arrangement by DNV for different notations T, AUTS, AUT AUTR, and AUTRO are summarised in Table 2 and form the basis of electrical power plant and thruster system design. Similar requirements are also stipulated by ABS and LRS. A single line diagram of an electrical power plant/thruster system satisfying the highest Class Notation of AUTRO, DPS-3 or DP (AAA) is given in Figure 2. DP Conference Houston October 21-22, 1997 Session 7 Page 3

Table 2 - System Arrangement Subsystem or component Power system Thrusters Minimum requirements for group T AUTS AUT AUTR AUTRO Generator and prime Nonredundanredundanredundant Non- Non- Redundant Redundant separate movers compartments Main Switchboard 1 1 1 1 with bustie 2 with normally open bus-ties in separate compartments Redundant, through separate compartments Bus-tie breaker 0 0 0 1 2 Distribution system Nonredundanredundant Non- Nonredundant Redundant Power management No No No Yes Yes Arrangement of Nonredundanredundanredundant Non- Non- Redundant Redundant, in thrusters separate compartments 0 1 1 2 2-1 in alternative control station Yes No Yes Yes Yes Control Auto control: no. of computer systems Manual control: joystick with auto heading Single levers for Yes Yes Yes Yes Yes each thruster Sensors Pos. ref. Systems 0 1 2 3 3 whereof 1 in alternative control station External sensors Wind 0 1 1 2 2 Whereof 1 in alternative control station VRS 0 1 1 2 2 Gyro 1 1 1 2 3 compass Other necessary sensors n/a 1 1 2 2 UPS 0 0 1 1 1-1 in separate compartment Alternative control station for back-up unit No No No No Yes DP Conference Houston October 21-22, 1997 Session 7 Page 4

Electrical Power Plant System Design The reliability of the DP system is dependant to a large extent on the electrical power generation and distribution system. Whilst thruster units may have their own dedicated diesel prime movers, most ships have electrically driven units with centralised electrical generation to minimise fuel consumption and engine maintenance. Although it is possible to mix successfully diesel and gas turbine generating sets in a vessel s centralised power plant (Ref 2), this combination is generally best avoided because of their different governor and load take up characteristics. The number and rating of the installed generating sets and complexity of the distribution arrangements are then dependent upon the specified operational modes of the vessel and the associated redundancy requirements by the Society. Although the minimum number and rating of the generating sets is dependant upon the required thruster power to maintain position and heading of the vessel under the specified most severe environmental conditions, ship s services load and the auxiliary systems e.g. drilling or cargo handling loads etc, the actual number and total installed capacity is governed by the available power after a single fault. The most onerous single fault, although very rare, is the busbar fault which can reduce the available power generation and thruster capacity to half for a two section switchboard with one or two bus-tie breakers (see Fig.1). In this case therefore the vessel will qualify for DPS-3 or equivalent Class Notation provided there are enough generators and thrusters left after the fault to hold position and meet other redundancy requirements in physical arrangement. Loss of installed generating and thruster capabilities can be reduced to 33% or 25% by subdividing the switchboards into three or four sections each located in separate compartments. It should be noted that the generating sets as well as thrusters and their auxiliaries/services will have to be housed in separate compartments also thus adding to the overall ship cost. Depending upon whether open or closed bus-tie systems are used, (discussed later), the open bus-tie arrangement with further sub-divisions of the switchboard will invariably result in the installation of a larger number of generating sets thereby increasing the initial cost of the vessel even further. It is for these cost reasons that many owners/operators choose the low cost option of DPS-2 Class Notation on the assumption that switchboard bus-bar faults, fire or flooding of compartments are rare occurrences. DP Conference Houston October 21-22, 1997 Session 7 Page 5

Thrusters and Thruster Systems Dynamically positioned vessels usually employ a variety of thruster types. The following are available: a) Lateral thrust units or tunnel thrusters with fixed or controllable pitch propellers. b) Azimuth (rotatable) thrust units with either fixed or controllable pitch propellers, controlling both magnitude and direction of thrust. c) Gill jet thrust units. d) Cycloidal propellers. e) Fixed or controllable pitch main propellers (used also for transit purposes). f) Water jets. g) Podded azimuthing thrusters The debate between controllable pitch propellers (CPP) and fixed pitch propellers (FPP) is an ongoing one but most of the new build vessels have azimuthing type thrusters with fixed pitch propellers driven by variable speed electric motors. When thrusters are used for transit, the propellers will absorb the rated power at different rotational speeds depending upon the ship speed. Therefore the propeller prime mover must be capable of providing reducing torque as the shaft RPM increases and this is easily achieved by weakening of the field of an electric motor. Typically 10% field weakening (constant HP) range is provided for thrusters to be used in transit. The location of the thrusters requires careful consideration. Obviously the prime objective is to produce the maximum vessel turning moment possible for the available thrust, which in simple terms would require the thrusters to be as far apart as possible. This objective cannot always be achieved because account must always be taken of a) t he available structural space within the hull in view of the Class Notation redundancy requirements in technical design and physical arrangement redundancy; b) the effect of the wash of one thruster upon the other (often referred to as thrusterthruster interaction); c) the effect of the wash from a thruster on the hull (referred to as thruster-hull interaction) and the possible detrimental effects that thrusters could have on the drilling operation or on position feedback sensors. DP Conference Houston October 21-22, 1997 Session 7 Page 6

System Operation In a diesel electric ship, the Central Power Plant concept for generating power is of fundamental importance as it brings with it the following advantages: a) Increased vessel safety: Redundancy in the power generation plant and propulsion/thruster drives enable the system to continue supplying power to propellers and other critical auxiliary or operational loads in the event of multiple failures. b) Higher Flexibility: In addition to facilitating flexible machinery layouts, for example to contain fire and flood damage, the concept allows the power plant to be electrically configured to suit the vessels operating profiles. c) Lower Operating Costs: Achieved from savings in fuel and maintenance costs by running the minimum number of generating sets at their optimum loads. d) Enhanced availability, reliability and maintainability: Achieved by operating the inherently robust plant most efficiently and by carrying out preventative maintenance work during voyages. From the above it therefore follows that in order to take best advantage of the vessel s diesel electric power and propulsion plant, the main switchboard should be operated as a single bus-bar system i.e. all bus-ties closed. However, there are owners/operators, and even classification societies, who believe that a two section switchboard system should run with the bus-ties open so that a busbar short circuit would, in the worst case, result in the loss of one section of the HV switchboard only leaving the generators on the other switchboard unaffected. The advantages and disadvantages of the open bus-tie arrangement are given in Table 3 (Ref 3). DP Conference Houston October 21-22, 1997 Session 7 Page 7

TABLE 3: OPEN BUS-TIE ARRANGEMENT ADVANTAGES DISADVANTAGES In a correctly designed system, no single failure should result in a total loss of power. Increased generation required for redundancy purposes Less economical High risk of half blackout on failure of one machine Starting of largest electrical drive may not be possible with split bus, consequently the systems have to be paralleled for starting periods and then split - synchronising across the bussection when both sides have fluctuating loads is fraught with potential difficulties and can lead to operator error More reliance on the availability of all machines Increased running hours and maintenance of all machines Complete system is far less flexible It can be seen that the main advantage of the open bus-tie arrangement is that no single failure will result in total loss of power. The main disadvantage of this arrangement arises from the fact that to avoid half blackouts from diesel generator failure, governor failure or AVR failure both sides of the switchboard must have spare capacity. DP Conference Houston October 21-22, 1997 Session 7 Page 8

The advantages and disadvantages of the closed bus-tie arrangement as outlined in (Ref 3) are given in Table 4. TABLE 4: CLOSED BUS-TIES ARRANGEMENT ADVANTAGES DISADVANTAGES More flexible: - any engine can be assigned to whole system rather than dedicated to one side Very small risk of a single point failure causing total loss of power Less vulnerable to the effects of control failures: - voltage regulator (over and under excitation) - governor (over and under frequency) More economical: - generally less engines required for spinning reserve Less susceptible to transient voltages and frequency problems during starting of large machines Load shedding is not normally necessary on one machine failure Less running hours on each machines, therefore reduced maintenance cycles Generally one machines is available for maintenance DP Conference Houston October 21-22, 1997 Session 7 Page 9

Successful operation of the closed bus-tie arrangement requires that on the rare occasion that the bus-ties are required to operate, they do so correctly. The protection must be properly designed, tested and checked regularly as part of the planned maintenance. The inter-relationship between the Power Management System and the DP System is important since in environmental conditions worse than calm weather the electrical load is predominantly propulsive. If the on-line generation capacity is matched to demanded load to minimise fuel consumption, then large/sudden changes in demand leading to the loss of a running generator will result in system overload where the preference tripping (if installed) of non-essential loads will be insufficient to prevent the total system failure. Accordingly the control system must be arranged to provide thrust limitation in the event of increasing load or thrust reduction in the event of loss of supply capability. In the event of thrust reduction the vessel will slowly drift off station, usually with heading priority, giving the operator time to make a decision and take corrective action. The Power and Thruster Alarms are usually set by the operator at about 80% of MCR. leaving 20% reserves for transient variations. In modern DP systems, help is however at hand for the operator because all DP systems complying with DPS-2 and DPS-3 Class Notation incorporate a computer system based Consequence Analyser that monitors the vectorial thrust necessary to maintain position under the prevailing environmental conditions and performs calculations to verify that in the event of a single failure there will be sufficient thrust to maintain position in steady state and during transients. A warning is given to the operator when a failure will cause loss of position in present weather conditions. A typical single failure may be a single thruster, a complete switchboard, one engine room or group of thrusters which is subject to a common failure mode. More sophisticated Consequence Analysis Programs have a very useful function which allows the operator to check what thrust and power reserves he will have in the event of a worst case failure in worsening weather conditions before they actually occur. The operator manually inputs the expected or anticipated weather trend or changes in thrust and/or turning moment and the system carries out normal consequence analysis. This facility is very useful for operations which require long lead time for them to be terminated safely; thereby allowing the power generation plant to run with smaller spinning reserve margins than would be possible otherwise. Conclusions The Class Notation and system reliability requirements of the new generation of the dynamically positioned vessels deployed in ultra-deep water oil exploration and production are such that no single fault may cause total loss of DP capability. They are therefore leading to more complex power generation, propulsion and distrubution arrangements in order to satisfy Class Notation requirements. Although the initial cost of such vessels DP Conference Houston October 21-22, 1997 Session 7 Page 10

might be high but their operating costs can be reduced by running the generating plant as a single switchboard with all bus-ties closed provided the protection philosophy is properly designed, tested and checked regularly as a part of the planned maintenance. For DP vessels, the Power Management System is an important sub - or co-system and should form an integral part of the DP system so that the power/propulsion/auxiliary plants can be operated optimally but stably under all operating conditions. Extra monitoring and prediction features in the modern DP system will enable the operator to manage the electrical power plant confidently and safely without the excessive and expensive redundancy margins. REFERENCES 1. JC Cole, Drilling Rig for deep waters, The Journal of Offshore Technology, Vol 5, No. 2, May 1997, pp 19-21 2. H Rush and P H Craig, The BP Swops Vessel, Trans I Mare, Paper 22, Vol 98 (April 1986). 3. Reliability of Electrical Systems on DP Vessels, Report GM - 1611/14-0195- 21345, DP Vessel Owners Association, 1995. APPENDIX A: Various Class Notation Definitions for DP Systems A.1 Classification Society - ABS (American Bureau of Shipping) Rules - Guide for Thrusters and Dynamic Positioning Systems 1994 ABS Class Notations are as follows: DPS-0: DPS-1: Vessels are to be fitted with a dynamic positioning system with centralized manual position control and automatic heading control to maintain the position and heading under the specified environmental conditions. Vessels are to be fitted with a dynamic positioning system which is capable of automatically maintaining the position and heading of the vessel under specified maximum environmental conditions having an independent centralized manual position control with automatic heading control. DP Conference Houston October 21-22, 1997 Session 7 Page 11

DPS-2: DPS-3: ` Vessels are to be fitted with a dynamic positioning system which is capable of automatically maintaining the position and heading of the vessel within the specified operating envelope under specified maximum environmental conditions during and following any single fault excluding a loss of compartment or compartments. Vessels are to be fitted with a dynamic positioning system which is capable of automatically maintaining the position and heading of the vessel within a specified operating envelope under specified maximum environmental conditions during and following any single fault including complete loss of a compartment due to fire or flood. A.2 Classification Society - LRS (Lloyds Register of Shipping) Rules - Rules and regulations for the Classification of Ships Part 7, Chapter 4, January 1997 - Rules for Construction and Classification of Dynamic Positioning Systems Installed in Ships. LRS Class Notations are as follows: DP(CM) DP(AM) DP(AA) DP(AAA) This notation may be assigned when a ship is fitted with centralized remote manual Controls for position keeping with position reference system(s), environmental sensor(s), and specified machinery arrangements. This notation may be assigned when a ship is fitted with automatic and standby controls for station keeping and with reference position system(s), environmental sensor(s) and specified machinery arrangements. This notation may be assigned when a ship is fitted with automatic and automatic standby controls for station keeping and with reference position system(s), environmental sensor(s), and specified machinery arrangements. This notation may be assigned when a ship is fitted with automatic and automatic standby controls for position keeping together with an additional/emergency control unit located in a separate compartment and with position reference system(s), environmental sensor(s) and specified machinery arrangements. A.3 Classification Society - DNV (Det Norske Veitas) Rules - Rules for Classification of Ships, Part 6, Chapter 7, January 1990 - Dynamic Positioning Systems DNV Class Notations are as follows: DP Conference Houston October 21-22, 1997 Session 7 Page 12

DYNPOS T: DYNPOS AUTS: A semi-automatic position keeping system without redundancy. An automatic position keeping system without redundancy. DYNPOS AUT: DYNPOS AUTR: DYNPOS AUTRO: An automatic position keeping system with a remote thrust control back-up and a position reference back-up. An automatic position keeping system with redundancy in technical design*. An automatic position keeping system with redundancy in technical design and physical arrangement**. * Redundancy in technical design is intended to compensate for single failures in components and systems. ** Redundancy in physical arrangement is intended to compensate for incidents of fire and flooding in addition to the typical technical failure. DP Conference Houston October 21-22, 1997 Session 7 Page 13

DIESEL GENERATOR 4.69 MW,11kV, 60 Hz, 0.8 pf DIESEL GENERATOR 7.03MW, 11kV, 60 Hz, 0.8 pf DIESEL GENERATOR 7.03MW, 11kV, 60 Hz, 0.8 pf DIESEL GENERATOR 7.03MW, 11kV, 60 Hz, 0.8 pf DIESEL GENERATOR 7.03MW, 11kV, 60 Hz, 0.8 pf DIESEL GENERATOR 4.69MW, 11kV, 60 Hz, 0.8 pf G G G G G G 11 KV MAIN SWBD PORT 60Hz, 3ph, 3W, 1250A 11 KV MAIN SWBD STBD 60Hz, 3ph, 3W, 1250A M M M M M M 5220kW THURSTER E SYCHDRIVE 5220kW THURSTER D SYCHDRIVE 5220kW THURSTER B SYCHDRIVE TOPSIDE 11/0.48kV 11kV/0.48 kv 2.5/3.25MVA 480V MAIN SWBD PORT AFT 11kV/0.48 kv 2.5/3.25MVA 480V MAIN SWBD STBD AFT 11/0.48kV TOPSIDE 5220kW THURSTER A SYCHDRIVE 5220kW THURSTER C SYCHDRIVE 5220kW THURSTER F SYCHDRIVE EMERGENCY GENERATOR 2.34MW, 480V, 60 Hz, 0.8 pf G 11kV/0.48 kv 2.5/3.25MVA 11kV/0.48 kv 2.5/3.25MVA 480V MAIN SWBD PORT FWD EMERGENCY SWITCHBOARD 480V MAIN SWBD STBD FWD Fig 1. - Typical electrical power plant for a DPS-2 vessel Transocean ' Discoverer Enterprise' class drill ships DP Conference Houston October 21-22, 1997 Session 7 Page 14