Shaping our utility to do the best, for the most, for the longest.

Similar documents
YUKON DEVELOPMENT CORPORATION

Information Meeting Transfer Station Options. September 30, 2014

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

Peninsula Corridor Electrification Project (PCEP)

Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging Station

Merger of the generator interconnection processes of Valley Electric and the ISO;

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

Appendix C. Parking Strategies

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Car Sharing at a. with great results.

Late Starter. Tuesday, November 6, 2018

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

2018 Program Manual CoolSaver

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM

Decision on Merced Irrigation District Transition Agreement

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Energy Northwest launches public power-focused Demand Response Pilot Project

Final Report Community Waste Reduction and Recycling Grant (CWRAR) 2015 City of Asheville, NC

City of Palo Alto (ID # 6416) City Council Staff Report

Evaluating Stakeholder Engagement

City Transfer Stations: Loading Services and Fees

Transit Project Delivery Status Report. Significant Issues

2019 NWHA Annual Conference Cryptocurrency Mining

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM-Customer Resources. From: Kelly Birdwell Brezovec Approved by: /s/

Waco Rapid Transit Corridor (RTC) Feasibility Study

New York s Mandatory Hourly Pricing Program

Electric Vehicle Programs & Services. October 26, 2017

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resources Planning. From: Sarah Liuba Approved by: /s/

Travel Action Plan De Montfort University

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board.

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

Town of Holliston Board of Selectmen 703 Washington Street Holliston, MA 01746

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

,ILLS CITY OF BEVERLY HILLS TRAFFIC AND PARKING COMMISSION. July 12, 2018 TO: Traffic and Parking Commission FROM: Transportation Staff SUBJECT:

Change to the Arlington County Code prohibiting the parking of commercial vehicles and recreational vehicles on residential streets

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

Multi-Family Recycling

Purpose of Presentation

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Transportation Electrification Public Input Workshop. August 3, 2016

Sean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016

Denver Car Share Permit Program

The Regional Municipality of York. Purchase of Six Battery Electric Buses

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

HOUSE AMENDED PRIOR PRINTER'S NOS. 13, 30, 47, PRINTER'S NO , 56 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL

Executive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico

EV Permitting Project Update

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

Contents. Solar Select TM Frequently Asked Questions

Too Good to Throw Away Implementation Strategy

WELLMAN LAKE CABIN UPDATE Mar 2019

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS

Overview of Plug-In Electric Vehicle Readiness. Coachella Valley Association of Governments

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

What We Heard Report - Metro Line NW LRT

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

Public Works Department, Capital Improvement Program Project Tracking

Off-Road Vehicle Recreation Report

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

Bus Stop Optimization Study

Final Administrative Decision

Yukon s Independent Power Production Policy

Electric Vehicle Charging Station Installation and Eco-Pass Updates. Report Prepared by: A. Rolston, Parking Operations Coordinator

WASHINGTON STATE ROAD USAGE CHARGE ASSESSMENT

Feasibility of Establishing an E85 Fuelling Station in Oshawa

REMOVE II VANPOOL VOUCHER INCENTIVE PROGRAM

State/Local Governance

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES

9/1/2011. Trash to Treasure Catherine Chertudi Boise Idaho Public Works September Boise City. Population 206,000 69,300 Households.

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

Please visit the stations to provide your input: EV Charging Location Map EV Adoption ZEV Drivers Other Ideas

Mobilehome Park Utility Upgrade Program

SECTION ONE: ADMINISTRATION AUTHORITY PARKING REGULATIONS DISABLED PARKING PARKING CITATION AUTHORITY...

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

POSTING OFFICIAL DAY AND DATE MEETING TIME: 3. Unanticipated. 6. New Businesss. 7. Old Business. a. Financials. 9. Correspondence

Request for Expressions of Interest (Phase I - Preliminary) PUBLIC-PRIVATE PARTNERSHIP. for the. Big Chino Water Delivery System

EXECUTIVE SUMMARY. Introduction

2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION

Creating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

2013/2014 Strategic Priorities Fund Application Overview

Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

Mississauga Bus Rapid Transit Preliminary Design Project

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

CPUC Transportation Electrification Activities

SWANTOWN MARINA MARINE FUELING FACILITY. Ed Galligan Executive Director

Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU) Frequently Asked Questions

Transcription:

2016-2017 Public Power Benefit Projects October 17, 2016 - BOARD UPDATE Shaping our utility to do the best, for the most, for the longest.

Public Power Benefit Projects (Approved projects) 1. Fiber Expansion 2. Horan Area Rehabilitation Work 3. Waive Day-Use Park Fees 4. Beebe Bridge Park Camping Pilot 5. Install Electric Vehicle Chargers 6. Electric Economic Analysis Tool 7. Study Utility Infrastructure 8. Combined Hydro/Energy Research and Electrification Research and Collaboration Study 9. Rocky Reach Visitor Counts Study 10. Plain Substation Site Safety Improvements Project 11. Regional Water/Wastewater Study 12. Utility-Focused Education Program 13. Splash Pad Technical Feasibility Study

Public Power Benefits Allocated 2016 Balance available for 2016 $6,869,700 Total Allocated Forecast Spent to Date 1-Fiber expansion $2,686,000 5,800,000 5,800,000 1,430,529 2-Horan area rehabilitation work 100,000 100,000 81,000 11,421 3-Waive park fees pilot study 30,000 235,500 210,000 144,188 4-Beebe Bridge Camping Pilot 0 30,000 30,000 0 5-Install vehicle chargers 60,000 65,000 65,000 34,269 6-Electric economic analysis tool 40,000 40,000 39,190 39,190 7-Study electric infrastructure 100,000 100,000 25,000 0 8a-Combined energy institute study 250,000 250,000 250,000 0 8b-Electrification research/collaboration 120,000 120,000 120,000 0 9-Rocky Reach Visitors Count Study 200,000 200,000 171,000 8,147 10-Plain substation site improvements 200,000 200,000 200,000 23,123 11-Study of Water/Wastewater services 150,000 150,000 150,000 0 12-Utility-focused education programs 41,000 41,000 41,000 0 13-Splash-pad technical feasibility study 140,000 149,000 140,000 43,341 Total allocated $4,117,000 $7,408,500 $7,322,190 $1,734,208 Remainder for 2016 pending studies $2,752,700

1 Fiber Expansion Amount funded: $5,800,000 Projected spending of approved funds: $5,800,000 Mike Coleman Continued expansion of the broadband network in 2016 and 2017, while preparing construction plans for expansion in 2018. The expansion started in 2016 in Cashmere, Manson and the Chumstick areas. Work is in progress for both expansion areas and extension (in-fill) areas with Fiber and Customer Utilities coordinating preparatory work in accordance with National Electrical Safety Code standards. Customerowners are being notified as work starts and when it is complete so they can order service through one of the service providers.

2 Horan Area Rehabilitation Work Amount funded: $100,000 Projected spending of approved funds: $81,000 Justin Fletcher Public input obtained during the development of the 2015 2019 Strategic Plan was used by the Board of Commissioners to allocate a portion of the public power benefit funding to conduct a feasibility study to investigate alternatives for delivering a permanent water supply to the ponds in the Horan Wildlife Area. On June 20, 2016 the Board authorized planning and execution of two alternatives, which are to work with the City of Wenatchee (City) regarding discharge of stormwater from North Wenatchee into the Horan Wildlife Area and rehabilitate the ditch receiving stormwater from the Number 1 Canyon drain. A $70,000 grant application submitted by the City for feasibility and design work was denied with adoption of the state budget in May. But, the project manager for the City did receive internal funding approval in August. The City is anticipating hiring a consultant before the end of 2016 and finish design in 2017. Following completion of the design, the City will be applying for a grant through the Department of Ecology to fund 75% of the project. For the District, a team will be assembled to evaluate the City s stormwater alternatives and determine what work needs to be accomplished in the Horan Wildlife Area before receiving the stormwater. The Number 1 Canyon drain rehabilitation project is in the design and permitting phase and is on schedule.

3 Waive Day-Use Park Fees Amount funded: $235,500 Projected spending of approved funds: $170,000 - $210,000 Michelle Smith Based on public input obtained during the development of the 2015 2019 Strategic Plan, the Board of Commissioners dedicated a portion of the public power benefit funding to conduct a pilot study during 2015 and 2016 for waiving or reducing day-use fees for Chelan County residents who use Chelan PUD parks operated by State Parks. The Day Use Parking Pass Pilot Study offers Chelan County residents and Chelan PUD residential electric customers free vehicle parking access to Wenatchee Confluence, Lincoln Rock, and Daroga state parks. The parking costs are paid by Chelan PUD to Washington State Park and is related to the operations of those three state parks. On June 20, 2016, the Board authorized the continuation of the Day Use Parking Pass in 2017. Since July 15, 2015, nearly 2,400 passes have been distributed. Of that total, about 800 passes were distributed in 2016. The cost estimate for 2017 program is expected to range from $30,000 to $71,000. The purpose of providing a cost range is to anticipate potential pass distribution numbers and continued discussion with State Parks on whether the cost per pass can be reduced to account for the restricted use at only three state parks. Staff continues to discuss a reduced rate with State Parks and will advise the Board prior to budget approval on the final outcome. My Public Power benefit PARKING PASS This pass required for motor vehicle access to: CONFLUENCE LINCOLN ROCK DAROGA P L A T E # 1 P L A T E # 2 P L A T E # 3 P L A T E # 4 Day use parking only Valid - July 15, 2015 - Dec. 31, 2016 # 00001

4 Beebe Bridge Park Camping Pilot Amount funded: $30,000 Projected spending of approved funds: $30,000 Michelle Smith On June 20, 2016, the Board authorized the Beebe Bridge Park Camping Pilot Study to serve as a trial offering to Chelan County PUD residential electric customers for free camping at Beebe Bridge Park during 2017. The pilot study will begin April 1, 2017 and run through the park season ending Sept 30, 2017. The pilot will evaluate the camping pass concept and provide the Board of Commissioners with information to help determine if any adjustments to the program need to be made, gage resident/customer-owner use of the program, and determine costs of the program, if the program is offered in future years. Chelan PUD manages and operates Beebe Bridge Park. The park contains 46 campsites and camping reservations are on a first come/first serve basis. The pilot study proposes to use three (3) of those sites for the Public Power Benefit Camping Pilot Study, with a budgeted cost of $30,000. Planning is underway for implementation of the pilot by April 1, 2017. Each Chelan County PUD customer household will be able to obtain vouchers up to two (2)-nights camping. Staff are working to implement a reservation system for the camping pilot using Booking Bug, software currently used by Chelan PUD for reserving park picnic shelters. Available camping dates are subject to site availability on a first come first serve basis. Applications are anticipated to be available on-line and in-person at all three PUD office locations. An on-line calendar will be viewable by the public. All applications will be processed at the headquarters office and will be mailed to or picked up by the customer. An early application period, along with advertising and marketing for the program is being planned to begin early 2017. BEEBE BRIDGE PARK CAMPING COUPON a Public Power Benefit PILOT PROGRAM Camping coupon rules: 1. Campground is open for camping season April 1 Oct. 31. 2. Available camping dates are subject to site availability on a first come first serve basis. 3. Site must be reserved at least 7 days in advance of stay. 4. Two coupons per customer verified by address/household 5. A maximum of 8 people or 3 vehicles per campsite? Tents in designated tent areas only. 6. Campsite coupon includes the use of the boat launch, day-use parking, RV waste dump, and shower facilities. 7. Failure to comply with the Park rules and regulations can result in the loss of campsite(s), eviction. PLACE ON RECEIVER BOX NAME DATE SITE # 0001 www.chelanpud.org

5 Install Electric Vehicle Chargers Amount funded: $65,000 Projected spending of approved funds: $65,000 Andrew Grassell The District has installed two stations and is installing 3 more stations. The locations are Rocky Reach Dam, Confluence Technology Center, Walla Walla Point Park, and Chelan PUD s headquarters building. These locations were chosen through stakeholder discussions and public input. The charging stations have been ordered and are being installed during the month of September. Chelan PUD is partnering with Plug-In North Central Washington who will pay for the electricity at the charging stations.

6 Electric Economic Analysis Tool Amount funded: $30,000 Projected spending of approved funds: $30,000 *An additional $9,000 was needed to complete the project. Andrew Grassell This goal of this project was to develop a tool to assess the benefits and impacts to the County of new businesses coming into Chelan County. The model takes into account the lost opportunity to Chelan PUD of not being able to sell the energy into the wholesale market while also accounting for the benefits of new businesses coming into the County. These benefits take the form of increased tax revenue, increased jobs, etc. The model was developed by FCS Consulting with input from external and internal stakeholders The model is essentially complete. Some final updates are currently being made to one of the functions in the model. Additional information on this project will be presented on November 21.

7 Study Utility Infrastructure Amount funded: $100,000 Projected spending of approved funds: $25,000 Andrew Grassell The goal of this project is to document in one place the estimated costs of building infrastructure at locations ahead of need to potentially stimulate economic development. This will provide the senior team and Board of Commissioners with information when/if decisions are requested that ask for infrastructure to be built prior to a need, which is counter to current operations. Information is in the process of being gathered and consolidated into one document.

8 Combined Hydro/Energy Research and Electrification Research and Collaboration Study Amount funded: $370,000 Projected spending of approved funds: $370,000 Andrew Grassell The project consists of two components: 1. Provide matching funds for ideas that advance hydropower and the electrification of the transportation sector. As part of the funding requirements, Chelan PUD will want a portion of the research conducted within Chelan County. This will bring in bright and highly trained experienced personnel to the area while also providing for training opportunities for Chelan PUD staff. 2. Fund a position that actively looks for research and design collaboration opportunities. Chelan PUD could either hire a resource or contract with a research and design or academic group. Some foundation work has been done such as having meetings with Pacific Northwest National Laboratory and Western Washington University. The project is scheduled to be initiated and implemented in 2017.

10 Plain Substation Site Safety Improvements Project Amount funded: $200,000 Projected spending of approved funds: $200,000 John Goodwill The Plain Substation Site Safety Improvements project utilizes property owned by the District to develop a parking area and safe river access. The Plain Substation property is adjacent to the upper Wenatchee River on River Road just outside the town of Plain. The upper Wenatchee River above Tumwater Canyon doesn t presently offer approved/developed public river access. The area near Plain Substation is a popular river access location. However, river users are parking near the bridge and alongside Beaver Valley Road in areas that are not suited for parking, making it a dangerous situation. This public power benefit project was selected by the District s Board of Commissioners to improve safety for river access. Construct a parking area that is separated from the existing substation, with a perimeter of boulders to define a parking area and concrete pad to support trash containers and public sanitary facilities. Develop as much water access as permitting and budgeting will allow. Phase 1 is a parking lot. Phase 2 is the river access. Design was completed in September 2016. Construction for Phase 1 may occur in 2016, assuming that contract development, permitting and weather allow. However, this work may move to 2017, along with Phase 2. Construction for Phase 2 is planned for late Spring/Summer 2017. I River Rd Plain Substation River Access Project Map PARKING LOT PHASE 1 RIVER ACCESS PHASE 2 RIVER ACCESS PHASE 2 Beaver Valley Rd 200 FEET FROM RIVER Objectives Provide gravel parking lot for 40 cars with large boulder perimeter and river access to bank across on PUD land. Sanitation provided with sani-cans and garbage cans.maintain substation clearances. Coordinate planning, design, and execution with the internal and external stakeholders. Recommended Action - Scope *Permitting *Clearing and grubbing for parking lot, access, and bank *Site grading for parking lot *Large boulders for parking lot perimeter *Parking lot gravel *Concrete pad for sani-cans and garbage cans *Tree Removal *Parking lot access (Phase 2) *Bank access (Phase 2) 0 50 100 200 300 400 Feet

11 Regional Water/Wastewater Study Amount funded: $150,000 Projected spending of approved funds: $150,000 Ron Slabaugh Chelan PUD, Cashmere and Leavenworth own water and wastewater systems along the Wenatchee River. Each entity individually plans, improves, operates, maintains and manages its respective utilities. Issues facing these utilities are complex including water resource planning (water rights), source water treatment, wastewater treatment and aging infrastructure. An opportunity exists to more efficiently provide these services through regionalization. This project will evaluate the feasibility and customer benefits of transferring ownership and operations of the Leavenworth and Cashmere water and wastewater utilities to Chelan PUD. Chelan PUD, Cashmere and Leavenworth have begun developing a work plan for executing this project in 2017. Items discussed to date include assembling a topic team consisting of community members from each entity, developing a stakeholder communication and engagement plan, and hiring a qualified independent utility financial consultant to prepare the study.

12 Utility-Focused Education Program Amount funded: $41,000 Projected spending of approved funds: $41,000 Lorna Klemanski Focus shift on providing student mentoring and education opportunities. 2017 Work plan: Hire a dedicated position to develop a program and provide mentorship / internship opportunities Conduct a community needs assessment to guide future efforts. Develop a set of criteria and guidelines to facilitate District contributions of resources for community education efforts. Participate in Apple STEM Network Provide student learning/work opportunities Education and Community Engagement Coordinator position: Start date October 24 Training needs assessment: Survey was sent to local employers August 31 Follow-up interviews will be conducted during October Results will be compiled and summarized November to mid-december Mid-December develop action plan for 2017 Criteria / guideline development: Draft being refined based on input from internal audit Student work/learning opportunities 14 student positions in 2016 2 additional opportunities in 2017