Kasold Drive 15 th Street to Clinton Parkway Road Reconstruction Project

Similar documents
Rolling Road (Route 638) Widening Project

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS

Construction Staging Area 4 Avenue Road

ANDERSON PROPERTY SITE ANALYSIS

City of Lawrence Traffic Safety Commission Agenda June 1, :00 PM City Commission Room, City Hall

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

City of Houston Fondren Road Paving and Drainage

Traffic Engineering Study

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

CITY OF STEVENS POINT AGENDA

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

ACTION TRANSMITTAL No

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

Lake County Building Department

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

STH 60 Northern Reliever Route Feasibility Study Report

Wentzville Parkway South Phase 2 & 2A

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

Construction Noise Memorandum

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

No Thoroughfare. Gated Private Road Ahead

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

2.0 Development Driveways. Movin Out June 2017

Public Information Workshop

EMERGING REQUIREMENTS

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits

Purpose: General Provisions:

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

CHAPTER 2 ZONING AND DEVELOPMENT

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

STANDARD DRAWING INDEX

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

800 Access Control, R/W Use Permits and Drive Design

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Attachment D Environmental Justice and Outreach

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

TRAFFIC CALMING PROGRAM

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

HIGHWAY 28 FUNCTIONAL DESIGN

DESIGN STANDARDS SECTION DS 3 STREETS

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

June 8, Prepared by Urban Systems Ltd.

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

PUBLIC INFRASTRUCTURE PROJECTS

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Crestmont Development Update 2017 AGM

Committee Report. Transportation Committee. Business Item No

IH 35 FEASIBILITY STUDY

Business Advisory Committee. July 7, 2015

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

CITY of NOVI CITY COUNCIL

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018

Harlem Avenue between 63 rd and 65 th

Construction Realty Co.

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

Access Management Standards

City of Grand Forks Staff Report

4 Circulation & Transportation

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

A presentation to the Cobourg Town Council

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

POWER COMMISSION BOARD MEETING MEETING MINUTES JANUARY 9, 2018

Public Services Alderman Pat Baeske, Chairman

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

METRO Orange Line BRT American Boulevard Station Options

REPORT ON TRAFFIC IMPACT FOR THE LEGITIMISATION OF EXISTING SHORT TERM & TENT SITES KIOLOA BEACH HOLIDAY PARK

STAFF REPORT # CHANGE OF ZONING

Brent Spence Bridge Design Exceptions - Alternative I

US 67 WIDENING PROJECT

Summary of the Alcoa Highway Redevelopment Project

URBANA TRAFFIC COMMISSION Tuesday, May 3, 2005

South Lexington Transportation Study Lexington, Massachusetts

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

COUNTY ROAD SPEED LIMITS. Policy 817 i

Regular Meeting and Public Hearing of the Zoning Subcommittee

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

A Line Bus Rapid Transit July 24, 2014 page 1 MnDOT SP , SP MT Project #61217

K-10 and E Road Near-Term Alternatives

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Exposition Corridor Transit Project

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

CROSSING RAIL PROJECT (P4) RAIL

ZEV COHEN & ASSOCIATES. INC. Main Office: Ormond Beach St. Augustine Amelia Island Edgewater


COUNTY ROAD SPEED LIMITS. Policy 817 i

Pace Bus Depot Location Analysis

SOUTH COVE PARK MULTI-COURT IMPROVEMENTS FOR OCONEE COUNTY PARKS, RECREATION AND TOURISM SENECA, SOUTH CAROLINA FEBRUARY 2018

Stoughton Center Parking

Transcription:

Kasold Drive 15 th Street to Clinton Parkway Road Reconstruction Project Public Information Meeting When: Where: Monday, August 23, 2004, 7:00 p.m. Police Department Training Room 4820 W. 15 th Street Lower Level West Entrance This notice is being sent to those residents directly adjacent to Kasold Drive between 15 th Street and Clinton Parkway. If you know of others that are interested, please share this information with them. For more information contact: Joseph G. Caldwell, P.E. Bartlett & West Engineers 785-749-9452 joe.caldwell@bartwest.com

8/23/04 PUBLIC INFORMATION MEETING ATTENDEES LIST 15 TH STREET TO CLINTON PARKWAY Project No. 14251.001 Joe Caldwell Bartlett & West Eng. 749-9452 Chuck Soules City of Lawrence 843-3124 1 James Anderson 3308 W. 22nd St. 838-9394 2 George & Sherry Catt 2022 Camelback 842-1439 3 Jim & Kathy Colson 3224 W. 22nd Ct. 842-5750 4 Charles Gabel 3301 W. 22nd Terr. 841-7410 5 The Gaitos 2106 Kasold 843-3578 6 Carol Gilmore 3424 Doral Ct. 842-2534 7 M.D. Guthrie 1621 Kasold 842-9733 8 Paul & Mary Kincaid 2104 Kasold 843-5937 9 Paul Kincaid, Jr. 2104 ½ Kasold 832-1369 10 Christine & Jim Kraft 2014 Kasold 841-9552 11 Wally & Jimmie Kraft 2022 Kasold 749-2492 12 Ron Liebman 3400 Tam O'Shanter 312-7049 13 Ken Martinez 1505 Kasold 841-8194 14 Desui & Xianna Miao 1909 Kasold 841-3239 15 Les & Betty Mitscher 1913 Kasold 842-9334 16 Jay Paradies 1709 Kasold 749-5704 17 Luke Rahjes 3228 W. 22nd Ct. 832-8739 18 David & Margaret Springe 3302 W. 22nd Terr. 749-1569 19 Darryl Stone 1800 Kasold 749-1238 20 Juan A. Talavera, Jr. 1840 Kasold 393-1625 21 Bob & Pat Timmons 2006 Kasold 842-2571 22 Bob Walden 1617 Kasold 840-0428

PUBLIC INFORMATION MEETING AUGUST 23, 2004 15 TH STREET TO CLINTON PARKWAY Project No. 15-CP4-404(C) On Monday, August 23, 2004, Joe Caldwell, Bartlett & West Engineers, and Chuck Soules, Director of Public Works, met with the residents along Kasold Drive between 15 th Street and Clinton Parkway to discuss the reconstruction project. Joe provided an overall summary of the project and included the following issues: 1. We discussed the existing right-of-way and a typical section that would fit within this right-of-way. The City has indicated from the beginning of the project that they do not want to purchase additional right-of-way if at all possible. The right-of-way varies from the south end to the north end. Perhaps the most critical area is between Augusta Drive and Scioto Drive where there is only 85' of right of way available. The typical section in this area will be 4-12' lanes, a 4' concrete median, a 2' curb and gutter on each side, and a 10' recreation path on the west side. In addition, there will need to be retaining walls on both sides of the roadway throughout much of this stretch. So, as a minimum, the typical section will require at least 75' of the available 85'. To complicate matters, there is landscape screening on east side of the road, which we are trying to save. 2. The existing grassed median will be removed to accommodate additional width needed for a 10 recreation path to be installed on the west side. 3. Due to adjacent grades, some retaining walls will be necessary. 4. The group discussed the likely closing of Scioto Drive. During the peak hour, there are 4 turning movements for this sideroad. The low turning movements, in conjunction with the 17 percent approach grade, makes Scioto a great candidate for road closure. The intent is to remove the access to Kasold Drive and tie Scioto to the frontage road. The 17 percent approach grade at Scioto makes this a pretty dangerous intersection for drivers, and probably renders the street useless during winter weather periods. In addition, the closure of Scioto Drive allows us to move the road section as far to the west as possible between Augusta and Scioto, which provides added benefits to the residents on the east side of Kasold Drive. The fire department and police department have approved the closure of this sideroad. 5. We discussed the impact that is going to occur for the utilities, which are discussed individually below. A copy of the plans showing the topographical survey were sent to the individual utility companies on July 12 th for their review and comment. Bartlett & West asked the utility companies to respond with their comments - to date we have heard from the City Utilities Department, Westar, and Southwestern Bell. Since it has been a month, we will begin contacting the rest of the utilities that have not responded to get their feedback. 6. The Utilities Department presently has a 40 year old cast iron 12" low pressure line located in the northbound lanes/median area. In addition, a 6" high pressure line exists over about half of the route. Due to the age, the Utilities Department thinks it is wise to replace this line, because there are no guarantees at this point as to when major maintenance will have to occur for the waterlines. We discussed many possibilities related to the future location of the waterlines. The Utilities Department is going to determine which of the residents on the east side are tied into the 12 low pressure line and which one's are tied into the 6" high pressure line. This will be

imperative to any waterline relocations, so we can be sure that the appropriate water pressures can be maintained for the individual homeowners service lines. A proposed alignment between Tam O'Shanter and Augusta is unknown. Most of the right-of-way is paved in this area, and therefore, there really isn't a preferable location within the section to place the waterline. However, the general consensus was to locate the waterline under the recreation path on the west side in areas where it is anticipated that the majority of the right-ofway will be covered with pavement. 7. Westar has major overhead lines located on the east side of the project from Clinton Parkway to just north of Scioto. Between Scioto Drive & Tam O'Shanter, the overhead lines cross Kasold Drive and exist on the west side of the roadway for the remainder of the project. The overhead lines include transmission and distribution lines. There is a strong potential that some of these poles will need to be relocated so that the desired typical section can be used. Bartlett & West and Westar are presently working together to determine when the Westar easements were written, so we can determine who has first rights to the ground, which will determine who will bear the cost of relocation. The typical section and/or road alignment may need to be modified to address this utility, especially if the cost to relocate falls on the City. Finally, the request was made to get a cost to place the overhead lines underground. All indications are this cost would be outrageous, but Westar will be asked to provide information for this possibility. 8. Bartlett & West met with Southwestern Bell on Wednesday, August 4 th to discuss the future of their facilities. We discussed many potential alignment options. However, SBC would not commit to any particular location until they had final plans. In particular, we discussed the use of a 7.5 Utility Easement on the west side of Kasold Drive between Augusta Drive & Scioto Drive. We discussed the possibility of having them relocate their lines while the contractor was working on other portions of the project - they seemed receptive, but lukewarm to the idea. They indicated that they would need 6 months from the time they got plans to the time their lines would be relocated. We have not heard from Aquila or Sunflower Cable yet. However, the gas line was briefly discussed during our meeting. Essentially, the same concerns were expressed about where they might locate, which is going to fall primarily on the individual utility. However, we are attempting to work with each of them to coordinate locations. 9. The City Commission has been told that the goal is to complete the construction in one season, particularly during 2005. The goal is to bid the project in early 2005. The biggest issue that would cause a delay to the schedule is going to be utility relocations. The budget was also mentioned as being a critical item and that additional dollars could not be afforded for the project. Specific items that might affect the construction budget include the retaining wall, pavement materials, and construction sequencing methods. We briefly discussed the asphalt vs. concrete pavement cost issues. Asphalt pavement would cost less to construct. However, taking into account future maintenance, including overlays, the cost of asphalt or concrete will be relatively comparable. In addition, we discussed the costs of the relocation of the waterline. One possibility would be to just leave the waterline in it's existing location and relocate only the portions that need to be adjusted for the grade changes. The other possibility is to relocate the entire waterline. This would eliminate the probable maintenance issues that will arise on a 40 year old waterline. In addition, the new alignment would most likely

be moved out from under the pavement reducing the impact future maintenance would have on the roadway. 10. We discussed the options for construction sequencing. The cheapest way is to close the road to traffic, even if in phases. However, this is probably not the preferred solution since that would mean that 20,000 vehicles per day would be displaced to Iowa, Wakarusa, or local residential streets. Constructing the project one half at a time probably is a more realistic solution - this would allow at least one lane in each direction to be open during construction. While there is a lot of information to digest here, it is important that everyone understands the issues involved for this project, so that we can all make collective and informed decisions as we move forward. If you have any questions or comments relating to the items discussed in the email, please do not hesitate to contact me. If anyone sees an item that needs correction or clarification, please email me the information, and I will make sure and send it to the entire group. Discussion followed with specific questions from adjacent owners including: 1. There was a general consensus that truck traffic is excessive. Soules responded that Kasold is an arterial road and designated as a truck delivery route. Review of this issue would need to be requested of the Traffic Safety Commission. 2. A question with respect to if traffic volumes would increase. Soules reported that future volumes were expected to increase. The improvements were needed to repair the current condition and address both immediate and future needs. 3. Traffic control and access was discussed. No specified traffic control plan had been determined at this time. 4. Being able to make a u-turn at Augusta for the residents on the east side of Kasold was desirable. 5. Properties along the east side would like to maintain their landscaping. At this time the City is trying to complete the improvements within the existing right-of-way. The meeting concluded with the announcement that a pre-design memo would be presented to the City Commission on September 28, 2004.

Kasold Drive 15 th Street to Clinton Parkway Road Reconstruction Project Public Information Meeting When: Where: Monday, August 23, 2004, 7:00 p.m. Police Department Training Room 4820 W. 15 th Street Lower Level West Entrance This notice is being sent to those residents directly adjacent to Kasold Drive between 15 th Street and Clinton Parkway. If you know of others that are interested, please share this information with them. For more information contact: Joseph G. Caldwell, P.E. Bartlett & West Engineers 785-749-9452 joe.caldwell@bartwest.com

8/23/04 PUBLIC INFORMATION MEETING ATTENDEES LIST 15 TH STREET TO CLINTON PARKWAY Project No. 14251.001 Joe Caldwell Bartlett & West Eng. 749-9452 Chuck Soules City of Lawrence 843-3124 1 James Anderson 3308 W. 22nd St. 838-9394 2 George & Sherry Catt 2022 Camelback 842-1439 3 Jim & Kathy Colson 3224 W. 22nd Ct. 842-5750 4 Charles Gabel 3301 W. 22nd Terr. 841-7410 5 The Gaitos 2106 Kasold 843-3578 6 Carol Gilmore 3424 Doral Ct. 842-2534 7 M.D. Guthrie 1621 Kasold 842-9733 8 Paul & Mary Kincaid 2104 Kasold 843-5937 9 Paul Kincaid, Jr. 2104 ½ Kasold 832-1369 10 Christine & Jim Kraft 2014 Kasold 841-9552 11 Wally & Jimmie Kraft 2022 Kasold 749-2492 12 Ron Liebman 3400 Tam O'Shanter 312-7049 13 Ken Martinez 1505 Kasold 841-8194 14 Desui & Xianna Miao 1909 Kasold 841-3239 15 Les & Betty Mitscher 1913 Kasold 842-9334 16 Jay Paradies 1709 Kasold 749-5704 17 Luke Rahjes 3228 W. 22nd Ct. 832-8739 18 David & Margaret Springe 3302 W. 22nd Terr. 749-1569 19 Darryl Stone 1800 Kasold 749-1238 20 Juan A. Talavera, Jr. 1840 Kasold 393-1625 21 Bob & Pat Timmons 2006 Kasold 842-2571 22 Bob Walden 1617 Kasold 840-0428

PUBLIC INFORMATION MEETING AUGUST 23, 2004 15 TH STREET TO CLINTON PARKWAY Project No. 15-CP4-404(C) On Monday, August 23, 2004, Joe Caldwell, Bartlett & West Engineers, and Chuck Soules, Director of Public Works, met with the residents along Kasold Drive between 15 th Street and Clinton Parkway to discuss the reconstruction project. Joe provided an overall summary of the project and included the following issues: 1. We discussed the existing right-of-way and a typical section that would fit within this right-of-way. The City has indicated from the beginning of the project that they do not want to purchase additional right-of-way if at all possible. The right-of-way varies from the south end to the north end. Perhaps the most critical area is between Augusta Drive and Scioto Drive where there is only 85' of right of way available. The typical section in this area will be 4-12' lanes, a 4' concrete median, a 2' curb and gutter on each side, and a 10' recreation path on the west side. In addition, there will need to be retaining walls on both sides of the roadway throughout much of this stretch. So, as a minimum, the typical section will require at least 75' of the available 85'. To complicate matters, there is landscape screening on east side of the road, which we are trying to save. 2. The existing grassed median will be removed to accommodate additional width needed for a 10 recreation path to be installed on the west side. 3. Due to adjacent grades, some retaining walls will be necessary. 4. The group discussed the likely closing of Scioto Drive. During the peak hour, there are 4 turning movements for this sideroad. The low turning movements, in conjunction with the 17 percent approach grade, makes Scioto a great candidate for road closure. The intent is to remove the access to Kasold Drive and tie Scioto to the frontage road. The 17 percent approach grade at Scioto makes this a pretty dangerous intersection for drivers, and probably renders the street useless during winter weather periods. In addition, the closure of Scioto Drive allows us to move the road section as far to the west as possible between Augusta and Scioto, which provides added benefits to the residents on the east side of Kasold Drive. The fire department and police department have approved the closure of this sideroad. 5. We discussed the impact that is going to occur for the utilities, which are discussed individually below. A copy of the plans showing the topographical survey were sent to the individual utility companies on July 12 th for their review and comment. Bartlett & West asked the utility companies to respond with their comments - to date we have heard from the City Utilities Department, Westar, and Southwestern Bell. Since it has been a month, we will begin contacting the rest of the utilities that have not responded to get their feedback. 6. The Utilities Department presently has a 40 year old cast iron 12" low pressure line located in the northbound lanes/median area. In addition, a 6" high pressure line exists over about half of the route. Due to the age, the Utilities Department thinks it is wise to replace this line, because there are no guarantees at this point as to when major maintenance will have to occur for the waterlines. We discussed many possibilities related to the future location of the waterlines. The Utilities Department is going to determine which of the residents on the east side are tied into the 12 low pressure line and which one's are tied into the 6" high pressure line. This will be

imperative to any waterline relocations, so we can be sure that the appropriate water pressures can be maintained for the individual homeowners service lines. A proposed alignment between Tam O'Shanter and Augusta is unknown. Most of the right-of-way is paved in this area, and therefore, there really isn't a preferable location within the section to place the waterline. However, the general consensus was to locate the waterline under the recreation path on the west side in areas where it is anticipated that the majority of the right-ofway will be covered with pavement. 7. Westar has major overhead lines located on the east side of the project from Clinton Parkway to just north of Scioto. Between Scioto Drive & Tam O'Shanter, the overhead lines cross Kasold Drive and exist on the west side of the roadway for the remainder of the project. The overhead lines include transmission and distribution lines. There is a strong potential that some of these poles will need to be relocated so that the desired typical section can be used. Bartlett & West and Westar are presently working together to determine when the Westar easements were written, so we can determine who has first rights to the ground, which will determine who will bear the cost of relocation. The typical section and/or road alignment may need to be modified to address this utility, especially if the cost to relocate falls on the City. Finally, the request was made to get a cost to place the overhead lines underground. All indications are this cost would be outrageous, but Westar will be asked to provide information for this possibility. 8. Bartlett & West met with Southwestern Bell on Wednesday, August 4 th to discuss the future of their facilities. We discussed many potential alignment options. However, SBC would not commit to any particular location until they had final plans. In particular, we discussed the use of a 7.5 Utility Easement on the west side of Kasold Drive between Augusta Drive & Scioto Drive. We discussed the possibility of having them relocate their lines while the contractor was working on other portions of the project - they seemed receptive, but lukewarm to the idea. They indicated that they would need 6 months from the time they got plans to the time their lines would be relocated. We have not heard from Aquila or Sunflower Cable yet. However, the gas line was briefly discussed during our meeting. Essentially, the same concerns were expressed about where they might locate, which is going to fall primarily on the individual utility. However, we are attempting to work with each of them to coordinate locations. 9. The City Commission has been told that the goal is to complete the construction in one season, particularly during 2005. The goal is to bid the project in early 2005. The biggest issue that would cause a delay to the schedule is going to be utility relocations. The budget was also mentioned as being a critical item and that additional dollars could not be afforded for the project. Specific items that might affect the construction budget include the retaining wall, pavement materials, and construction sequencing methods. We briefly discussed the asphalt vs. concrete pavement cost issues. Asphalt pavement would cost less to construct. However, taking into account future maintenance, including overlays, the cost of asphalt or concrete will be relatively comparable. In addition, we discussed the costs of the relocation of the waterline. One possibility would be to just leave the waterline in it's existing location and relocate only the portions that need to be adjusted for the grade changes. The other possibility is to relocate the entire waterline. This would eliminate the probable maintenance issues that will arise on a 40 year old waterline. In addition, the new alignment would most likely

be moved out from under the pavement reducing the impact future maintenance would have on the roadway. 10. We discussed the options for construction sequencing. The cheapest way is to close the road to traffic, even if in phases. However, this is probably not the preferred solution since that would mean that 20,000 vehicles per day would be displaced to Iowa, Wakarusa, or local residential streets. Constructing the project one half at a time probably is a more realistic solution - this would allow at least one lane in each direction to be open during construction. While there is a lot of information to digest here, it is important that everyone understands the issues involved for this project, so that we can all make collective and informed decisions as we move forward. If you have any questions or comments relating to the items discussed in the email, please do not hesitate to contact me. If anyone sees an item that needs correction or clarification, please email me the information, and I will make sure and send it to the entire group. Discussion followed with specific questions from adjacent owners including: 1. There was a general consensus that truck traffic is excessive. Soules responded that Kasold is an arterial road and designated as a truck delivery route. Review of this issue would need to be requested of the Traffic Safety Commission. 2. A question with respect to if traffic volumes would increase. Soules reported that future volumes were expected to increase. The improvements were needed to repair the current condition and address both immediate and future needs. 3. Traffic control and access was discussed. No specified traffic control plan had been determined at this time. 4. Being able to make a u-turn at Augusta for the residents on the east side of Kasold was desirable. 5. Properties along the east side would like to maintain their landscaping. At this time the City is trying to complete the improvements within the existing right-of-way. The meeting concluded with the announcement that a pre-design memo would be presented to the City Commission on September 28, 2004.

CITY OF LAWRENCE STREET & STORM SEWER PROJECT 15th STREET TO CLINTON PARKWAY WELCOME AGENDA INTRODUCTION OF TEAM MEMBERS OBJECTIVES OF THE PROJECT EXISTING CONDITIONS PROJECT DESIGN & ISSUES CONSTRUCTION ISSUES & SCHEDULE SUMMARY & WRAP-UP QUESTIONS & ANSWERS

CITY OF LAWRENCE STREET & STORM SEWER PROJECT 15th STREET TO CLINTON PARKWAY INTRODUCTION OF TEAM MEMBERS BARTLETT & WEST ENGINEERS JOE CALDWELL CITY OF LAWRENCE CHUCK SOULES

CITY OF LAWRENCE STREET & STORM SEWER PROJECT 15th STREET TO CLINTON PARKWAY OBJECTIVES TO THE PROJECT IMPROVE THE PAVEMENT IMPROVE SAFETY IMPROVE PEDESTRIAN ACCESS IMPROVE VEHICULAR ACCESS LIMIT DISTURBANCE TO ADJACENT OWNERS BALANCE PROJECT AMENITIES & COST COMPLETE THE PROJECT IN A TIMELY MANNER

CITY OF LAWRENCE STREET & STORM SEWER PROJECT 15th STREET TO CLINTON PARKWAY EXISTING CONDITIONS TRAFFIC COUNTS PAVEMENT FAILURE INTERSECTION AT CLINTON PARKWAY EXISTING MEDIAN ISSUES STEEP GRADES LIMITED SIGHT DISTANCES

CITY OF LAWRENCE STREET & STORM SEWER PROJECT 15th STREET TO CLINTON PARKWAY PROJECT DESIGN & ISSUES PROPOSED LANE CONFIGURATIONS TYPICAL SECTIONS PROPOSED PROFILE UTILITIES OVERHEAD POWER TELEPHONE WATERLINES GAS CABLE

CITY OF LAWRENCE STREET & STORM SEWER PROJECT 15th STREET TO CLINTON PARKWAY CONSTRUCTION ISSUES & SCHEDULE CONSTRUCTION ISSUES CONSTRUCTION SEQUENCING PROFILE ELEVATION DIFFERENCES 15th STREET & CLINTON PARKWAY UTILITY RELOCATIONS CONSTRUCTION SCHEDULE BID PROJECT - FEBRUARY 2005 COMPLETION - NOVEMBER 2005

CITY OF LAWRENCE STREET & STORM SEWER PROJECT 15th STREET TO CLINTON PARKWAY SUMMARY PROJECT IMPROVES SAFETY PROJECT IMPROVES ACCESS PROJECT COMPLETION BY END OF 2005 CONTACT INFORMATION JOE CALDWELL BARTLETT & WEST ENGINEERS 628 VERMONT STREET LAWRENCE, KS 66044 (785) 749-9452