Des. by R.N. HSR RQ_South_08

Similar documents
This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

HSR Vancouver WA to Camas Commuter Des, by R.N.

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

The South Waterfront District and the Portland Aerial Tram

Chapter 2. Alternatives Considered. Portland-Milwaukie Light Rail Project SOUTH CORRIDOR PROJECT

ANNUAL REPORT AN UPDATE FOR OUR RIDERS AND THE COMMUNITY

REFINEMENT PHASE PRELIMINARY REPORT BRIEFING PAPER. DRAFT November 28, 2011

FACT SHEET. US 192 Alternatives Analysis Modal Technologies. Alternative Description/Overview

Denver Metro Association of Realtors

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Chicago St. Louis High-Speed Rail. Braidwood Construction Public Meeting. August 7, 2014

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Chapter 4 : THEME 2. Transportation

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Presentation Overview. Stop, Station, and Terminal Capacity

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

Bridging the Columbia: 100 Years Young

Appendix. Statistical Profile

DART Priorities Overview

IMPROVEMENT CONCEPTS

Sequence, Synergy, and Subsidy

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

Central Loop Bus Rapid Transit

EXCEPTION TO STANDARDS REPORT

Community Meeting Station Elements

ANDERSON PROPERTY SITE ANALYSIS

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Bridge Types Discussion. January 18, 2008 Oversight Team Meeting

Transportation Improvement Program (TIP) Candidate Project List for Public Review

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Multnomah County Commission December 15, 2016

Chapter 4. Transportation. Portland-Milwaukie Light Rail Project SOUTH CORRIDOR PROJECT

Southern California - CHSRA

3.15 SAFETY AND SECURITY

Southwest Corridor High Capacity Transit Mode Comparison

PERFORMANCE ACTIVITY 603 SIGNS

COST ESTIMATES: Curb-Running

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

OVERVIEW ENVIRONMENTS. Structures

Technology Evaluation Scorecard Suitability

9/24/2015. BNSF Railway Company. It Happens Every Day. h o t o. Phillip Foster Regional Manager Field Safety Support

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030

Population Trends. US 12 Corridor Performance

Welcome. Please Sign In

SAN MATEO COUNTY TRANSIT DISTRICT BICYCLE PARKING RULES & REGULATIONS. (Penal Code 640 and Vehicle Code 21113)

TECHNICAL MEMORANDUM

Corridor Sketch Summary

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Hudson-Bergen Light Rail Transit System Joint Occupancy-Joint Use

Winnipeg Transit Bus Maintenance Garage Expansion Project

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Appendix. Statistical Profile

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

vision42

10-10 TEMPORARY PARKING PROHIBITION FOR SNOW PLOWING AND REMOVAL. Brighton Avenue Both Between Route NJ 71 (Norwood Avenue) and Railroad Avenue.

The Design-Builder shall meet local road criteria provided by the local governing agencies.

RTID Travel Demand Modeling: Assumptions and Method of Analysis

Pace Bus Depot Location Analysis

Technical Information

WELCOME TO OUR PUBLIC OPEN HOUSE Eglinton Crosstown Light Rail Transit (LRT)

IH 35 FEASIBILITY STUDY

Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014

Brent Spence Bridge Design Exceptions - Alternative I

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

The $600 Million Rebirth of San Diego Trolley

Develop ground transportation improvements to make the Airport a multi-modal regional

CONCEPTUAL ENGINEERING REPORT

SERVICE DESIGN GUIDELINES

ALTERNATIVES ANALYSIS/ ENVIRONMENTAL IMPACT STATEMENT SCOPING BROCHURE

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

American Association of State Highway and Transportation Officials. June Dear Customer:

What is the Connector?

Midtown Corridor Alternatives Analysis Initial Screening Analysis

Regional Transportation Plan: APPENDIX P

New Haven-Hartford-Springfield Rail Project Gateway to New England. Program Update March 14, 2011 Revised & Updated March 31, 2011

Streetcar Level Boarding Background Memo

PUBLIC TRANSPORTATION

Technical Information

STANDARD DRAWING INDEX

annual report AN UPDATE FOR OUR RIDERS AND THE COMMUNITY

Chicago Milwaukee Intercity Passenger Rail Corridor

Clifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016

Mobility Management: Caltrain

Design of the High Speed Rail System in California. Orange County to Los Angeles Segment

Gauging the Future: Passenger Gauge 3, Locomotive Gauge, W13

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Stakeholders Advisory Working Group Traffic and Transit Group Meeting #4, October 10, 2007

The Winona Railroad. Presentation at Three Rivers Railroad Heritage Council Meeting Baker Street Station Fort Wayne, Indiana May 18, 2008

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016

Transcription:

The Cascadia High-Speed Rail corridor from the Rose Quarter Transportation Hub to Tualatin/Bridgeport will have stops at the Oregon Museum of Science and Industry Transit Center. This stop will connect to MAX, Portland Streetcars and buses. There will be CHSR/Commuter Express stops at the Barbur Transit Center on I-5 to buses and park and ride. The next stop is at Tualatin/Bridgeport, at I-5 and Boones Ferry Road. This will be a transfer station for the Cascadia High-Speed Rail Inter-City and Commuter Express and WES. Des. by R.N. HSR RQ_South_08

x Legend = Closed RR Crossings Elv. = Rail Elevation E = Ground surface Elevation R = Radius CHSR Stations Sheltered commuter platforms Flyovers Cuts Fills Tunnels Roadway over or under passes Revised Roadways On ground Freight Railroads (BNSF) (UPRR) existing Freight Railroads modified HSR_Legend

E 67' E 77' E 61' E 35' CHSR Elv 103' CHSR Elv 99' Elv 74' RQN_08ea Elv 95' E 35' CHSR Elv 99'

R Q S_02ba CHSR Elv 102' El. 76' Burnside Bridge

I-5 CHSR Elv 90' Cross Section R Q S_03ba E 35' Espalande El. 33' Elv 62'

Morrison Bridge Af CHSR Elv 88' E 62' Elv 90' R Q S_04ba

CHSR above the Hawthorne Bridgehead and below the Marquam Bridge El. 69' R 6800' 0.85 Grade 0.1% Af R Q S_06c HSR to double track

CHSR side view at Hawthorne and Marquam Bridge Single Track, deck width is 16' with emergency escape Platform and Shrub Trough Bank to reduce visual and noise impact, see insert. Emc Platform is 30"< high 4' + wide. This platform can also be used for temporary snow removal storage Pier R Q S_06d Shrub/ Vine Trough Bank 1'6'' w 2'6" h

CHSR over Morrison Bridge Roadway El. 62' CHSR Elv 88' CHSR above Hawthorne Bridge Roadway El. 46' CHSR single track El. 69' HSR RQ_A_02a CHSR to double track OMSI transit center El. 67' for CHSR light rail busses and streetcar D.S. RR El. 45'

CHSR from OMSI to Willamette River Bridge OMSI Platform E 49' Elv. 75' Elv. 72' MAX Orange Line, OMSI platform, with streetcar, bus and CHSR connections CHSR CHSR is next to the D.S. private RR Elv. 60' HSR_Barbur Rt_02 Eye 1450'

Elv 60' E 40' X r 6200' grade 0.6% HSR RQ_A_05a

.92 HSR RQ_A_05b E 260' Elv 110'

CHSR Tunnel below I-5 Terwilliger curve area HSR_Barbur Rt_07a

Barbur Transit Center E 550' Rail grade 1.3% Elv 400' Elevator shaft depth 150' HSE_Barbur Rt_08aa

Barbur Transit Center with elevator to Commuter Express Barbur Transit Center To below ground Elevator Shaft depth 150' Walkway to under ground Station 140' (42m) To Center Platform 28' (8.5m) HSR_Barbur Rt_08b

15' CHSR tunnel cross section with platform gates Guide channel detail Walkway to Elevator 140 feet long (43m) Escalator/Elevator 10' Platform Elv. 212' 29.88' dim 32' (9.7m) 13.5' (4.1m) Entrance Floor Elv. Stadler Electric Double-Deck Kiss Train Safety Gate 8' Trolley 15.5' 13.5' Elv. 183'8" 10.4' Elv. 180' 32' (9.7m) 28' 32' 9.7' (2.95m) _08c 92'

CHSR tunnel cross section with platform gates; now used in London Click link below Top view STADLER Electric Double-Deck Kiss Train Train doorways 9'2" (2.8m) Full Gate Platform ledge Door Gate closed Door Gate open Guide channels Trolley to move full gate to line up with train car doors Des. by R.N. HSR_Barbur Rt_08d Commuter train platform length 525' (160m) Side View Train Car 15' Door Gate closed Door Gate open Gate opening 8' 82' (25m) 6' (1.8m)

R 6450' Elv 510' Elevator shaft depth 120' E 630' PCC Silvania HSR_Barbur Rt_09a

HSR_Barbur Rt_10a E 347' E 294' Elv 250' R 7550' E 250'

Elv. 250' E 207' E 199' E 206' Kruse Way New WES Shuttle HSR_Barbur Rt_11a

CHSR/Bridgeport Transit Station @ I-5 and SW Lower Boones Ferry Rd WES Shuttle Line CHSR Line HSR_Barbur Rt_13 CHSR/Bridgeport Transit Station Elv. 198' E 172'

CHSR re-enters the I-5 median P&W RR Elv. 164' E 120' E 160' Elv. 198' HSR_Barbur Rt_14

Flyover SW Nyberg Street to just north of Sagert Street, and then in to trench cut HSR_Barbur Rt_15 E 208' I-5 Elv. 223' HSR Elv. 215' Grade 0.8%

CHSR in the median of I-5, below the 205 on ramp and above the I-5 off ramp

South of I-205 and in the median of I-5 Possible future station SW Norwood Rd to SW Boones Ferry Rd HSR Wob_02

r 5280' speed 110 mph "2" HSR Wob_03_condenced

Wilsonville area, CHSR will now leave the I-5 corridor HSR Wob_06 I-5 E 174' CHSR Elv. 200'

E 152' CHSR Wilsonville Station and Willamette River Crossing Possible Wilsonville Station 40' above ground Elv. 200' HSR Wob_08 E 63' E 137'

Barbur Transit Center/SW Capitol HWY, with Tunnel, Platform, Escalator/Elevator and Walkway Passage Walkway to Elevator 140 feet long Elv. 212' Escalator/Elevator Platform Elv. 183'8" Elv. 180' 32' 28' 32' _08c 92'

Platform with movable safety gate fence to prevent track intrusion. Gates will open for stopped trains but will be closed for passing trains. Top view STADLER Electric Double-Deck Kiss Train Train doorways 9'2" (2.8m) Full Gate Platform ledge Door Gate closed Door Gate open Guide channels Trolley to move full gate to line up with train car doors Des. by R.N. HSR_Barbur Rt_08d Commuter train platform length 525' (160m) Side View Train Car 15' Door Gate closed Door Gate open Gate opening 8' 82' (25m) 6' (1.8m)

Trains can be as chosen. Piers can be off different designs for aesthetics. Typical twin track on ground to tunnel Rails from tunnel directly to bridge

http://www.globalconstructionreview.com/news/siem ens-signs-15bn-order-london-tube-trains/