DETAILS OF CONTRACTS AWARDED DURING THE MONTH ELECTRICAL DEPARTMENT (KAWR) Type of Bidding (Single/ Two Bid System) Last date of receipt of tender

Similar documents
DETAILS OF CONTRACTS AWARDED DURING THE MONTH ELECTRICAL DEPARTMENT (KAWR)

ELECTRICAL DEPARTMENT

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Reliable Reduction of Chemical Usage in Field Injection Pumps

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Research Partnership Platform 8th meeting. Uber - The Competition Killer or The Competition Trigger?

Glendale Water & Power Smart Grid Project

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP)

Implementation Status & Results India Mumbai Urban Transport Project (P050668)

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

SYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions

soc-april13.xls BANK OF BARODA DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH OF APRIL 2013 Nos and names of parties qualified after technical

INTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation.

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

BC Hydro System 2017 Annual Progress Report

Mobility Management: Caltrain

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

ABB Wind Power Solution

PRODUCT BROCHURE. ABB Ability Wireless Monitor for surge arrester Enabling reliability and availability of power supply

PRAGATI ENGINEERING COLLEGE

3) The water conductor system consisting of RCC, partly cut and cover, conduit of size 10.5m x 7m and m long to lead the water to the forebay.

Power IT MV Live Tank Vacuum Circuit Breaker Model VBF

Energy Produced by PV Array (AC):

100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD

Solar PV systems Roof Tops, Ground Mounted & Floating Platform, Grid Tied & Standalone. Solar PV Rooftop 140 kwp at BCP Mumbai

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

SIAM Viewpoint for improved Inspection & Maintenance in India GITE Regional Workshop on Transport Sector Inspection & Maintenance Policy

CABLE INSTALLATION PROJECTS

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

Detail of Contracts Concluded during the month of February 2015 by TBMM, Noida

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

Reference List B: High frequency Motor-Generator Sets: (Capacity above10kva) Ref.No Customer name Equipment supplied/motor kw Date of supply

SIPRO TECH. A-502,Yasho Narayana Building, Near Panvel Railway Station, Old Panvel, NaviMumbai Ph.no: / ,

NJ Solar Market Update As of 6/30/15

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

Business opportunities and major projects in India

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Subway Modernisation

ABB Innovation & Technology Day

[Amounts in millions of dollars] Nondurable. Total. goods. equipment 34,415 30,717 24,506 8,868 9,566 8,981

Yield Reduction Due to Shading:

ALLAHABAD CITY RAILWAY STATION Allahabad (Uttar Pradesh)

Pacific Gas and Electric Company s Revised 2016 Annual Progress

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

KANPUR ELECTRICITY COMPANY LIMITED

Generation Interconnection Facilities Study For

Overview of Mitsubishi Electric's Transportation Business & Power Device Technology January, 2017 Mitsubishi Electric Corporation

CHAPTER 9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF

JayBee List of major contracts in O&G sector executed/executing

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)

Power IT MV Live Tank Vacuum Circuit Breaker. Model OVB-SDB

S.No Name and Address of the Bidder Qualified Not Qualified Reasons / Remarks. 5 HP A/C - Submersible

Compressor Enclosures. Motorised Sliding Doors. Air Handling Units, Ventilation Systems & Ducting. IP56 Genset Enclosures for offshore application

NOVAE MANUFACTURING SOLUTIONS PRIVATE LIMITED

ANCR CRU Statistics February 2007 to December 2007

SUBSTATION DESIGN TRAINING

Onix Structure Private Limited. Solar PV Power Generation System Detailed Project Report

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Procurement Plan ECSEE APL3 - Republic of Macedonia Project. Procurement Method [**] Scope [***] Bid Docs sent. Total cost. G & Supervision ICB

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

NIT for Tender No. GCO 8644P13

3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009

` Table 1: Status of Kuthur PHC... 2 Table 2: Source and Quality of Power at Kuthur PHC... 2 Table 3: Average Metrological Data of the Site at Kuthur

Motor Protection Circuit Breaker

Application and Prospect of Smart Grid in China

Example printout. Building project. SDC Example. Dyfi Eco Park SY20 8AX Machynlleth UK. Mr C. Laughton Phone:

Small Scale Generation Connections

TVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies. Gerald Johns, P.E. Power Utilization Engineer, TVA

SELECTION OF TRACTION SYSTEMS & ENERGY CONSERVATION IN METRO SYSTEMS. BY BRIJESH DIXIT MANAGING DIRECTOR Nagpur Metro Rail Corporation Ltd.

Tackling Power Theft through Meter Data Management and Quality Analysis. Results from NPCL s AMR roll out and AMI trial

Yield Reduction Due to Shading:

Indian Railways Becoming Greener & Sustainable By Sudhir Garg Joint Secretary, Ministry of Small & Medium Enterprises(MSME)

Copyright 2016 Boeing. All rights reserved.

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

Microgrid solutions Delivering resilient power anywhere at any time

Overview Gas Insulated Switchgear Modular and flexible, kV. ABB Group April 17, 2009 Slide 1

Master Class on PVsyst Solar Project Designing Tool 7 th June 2013

TABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3.

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014

List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007

Overview Gas Insulated Switchgear Modular and flexible, kV. ABB Group May 15, 2013 Slide 1

The $600 Million Rebirth of San Diego Trolley

MECHMAARK GROUP OF COMPANIES MECHMAARK RENEWABLE ENERGIES PVT.LTD.

enincon consulting llp, 2018 Visit: httpss://enincon.com E-REP Market Research Series

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

MSU Mankato and Ameresco. GESP Project. August 29, Ameresco, Inc. 2017, All Rights Reserved

Peninsula Corridor Electrification Project (PCEP)

NJ Solar Market Update As of 2/29/16

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

POWER SYSTEM CONSULTANTS POWER-LINKER

Micro-Grid and Battery Energy Storage Technologies for Large Scale Renewable Energy Integration

MERCRUISER AND MERCURY RACING (STERNDRIVE) SERVICE MANUAL INDEX

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

Inverse-Time Overcurrent & E/F Relays. Type ICM 21, ICM 21B

Distribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014

Formerly known as The Calcutta Tramways Co.(1978) Ltd. (Government of West Bengal Undertaking )

NOVA Gas Transmission Ltd. Appendix 2: 2013 Facility Status Update (December)

Transcription:

DETAILS OF CONTRACTS AWARDED DURING THE MONTH Month : Jan ELECTRICAL DEPARTMENT (KAWR) 2 KR/KW/EL/AMC/T/17/14 Annual maintenance of pumping On Website, By 14.11.2014 Limited 08.12.2014 2 02 (I)M/s Power Nil Yes LOA M/s R.D.Electricals, 13,83,436/- 12.01.2017 installations and siren motors between notice Electric Service, Udupi, KR/KW/EL/ MAO. Asnoti station to Thokur station (both and (ii)m/s AMC/T/17/14 inclusive) plus RRM's camp office, R.D.Electricals, MAO. Dt:13.01. Mangalore under Karnataka section of Karwar Region of Konkan Railway. 4 KR/KW/EL/T/22/14 1. Provision of energy efficient split type airconditioners On Website, By 18.12.2014 Limited 09.01. 3 03 (i)m/s J.J. Nil Yes LOA M/s Kiran 8,46,390/- 22.03. for SM's cabin at 1st floor, notice Refrigeration, Mumbai, KR/KW/EL/T Enterprises, Madagon station. (ii)m/s J.K. Electricals, /22/14 Bhatkal. 2. Provision of energy efficient split type airconditioners Madgaon and (iii)m/s Dt:23.01. for extended portion of Officers's Kiran Enterprises, rest house (ORH), Madgaon & replacement Bhatkal. of old window ACs with energy efficient split type air-conditioners at ORH,Madgaon. 3.Provision of energy efficient air-conditioners at Konkan Railway Academy (KRA) Bhatkal. 5 KR/KW/EL/T/20/14 1.Power supply arrangement & On Website, By 10.12.2014 Limited 02.01. 4 04 (i)m/s Alpha Nil Yes LOA M/s Devidas M. 17,93,412/- 27.05. electrification of additional loop line notice Techno KR/KW/EL/T Ramawat, Thane. (phase II) at Thivim Railway station under Mumbai, (ii)m/s Nirakar /20/14 Karwar Region. 2.Power supply Engineering, Goa, Dt:28.01. (iii)m/s Devidas M. arrangement & electrification for Holiday Home at Karmali under Karwar Region. (iv)m/s Mahamaya 3.Power supply arrangement & electrification for second pitline (phase II) at Madgaon under Karwar region. 4.Power supply arrangement for 150 HP compressor at DRSD shed, verna under Mechanical Head. s Whether & er/ 1 KR/KW/EL/T/15/14 Modification of SCADA system of Barcem On Website, By 14.11.2014 Limited 08.12.2014 1 01 (i)m/s Infiniti Nil Yes LOA M/s Infiniti Digitech 5,81,198/- 12.03. tunnel to incorporate feedback of DG and notice Digitech Pvt. Ltd., Pvt. Ltd., Mumbai. lighting parameters. Mumbai. KR/KW/EL/T /15/14 Dt:13.01. 3 KR/KW/EL/T/19/14 Provision of power supply arrangement On Website, By 24.11.2014 Limited 16.12.2014 3 03 (i)m/s Mahamaya Nil Yes LOA M/s Om Electricals, 10,01,556/- 19.05. & electrification of proposed High level notice Elecricals, Karwar, KR/KW/EL/T Karwar. platform on west side of existing main line /19/14 at Mookambika Road Byndoor station & Dt:20.01. Provision of 11KV GOS for alternate power Mumbai and (iii)m/s Om supply arrangement at Gokarna station. Page 1

Month : Feb 3 KR/KW/EL/AMC/T/18/14 Annual maintenance of pumping installations On Website, By 05.12.2014 Limited 29.12.2014 3 03 (i)m/s Om Nil Yes LOA M/s Om Electricals, 13,01,696/- 09.02.2017 and electrical motors between Pernem notice KR/KW/EL/ Karwar. station to loliem station (both inclusive) under (ii)m/s Mahamaya AMC/T/18/14 Goa section of Karwar region of Konkan Electricals, Karwar and Dt:10.02. Railway. (iii)m/s R.D.Electrical Woks, Madgaon. 4 KR/KW/EL/T/25/14 Power supply and electrification of escalator On Website, By 22.12.2014 Limited 13.01. 3 03 (i)m/s Nirakar Nil Yes LOA M/s Devidas M. 4,35,156/- 09.05. at Madgaon station. notice Engineering, Goa, KR/KW/EL/T Ramawat, Thane. (ii)m/s Devidas M. /25/14 Dt:10.02. (iii)m/s Mahamaya Month : Mar 1 KR/KW/EL/T/21/14 Provision of power supply arrangement On Website, By 08.01. Limited 30.01. 2 02 (i)m/s Alpha Nil Yes LOA M/s Alpha Techno 25,24,721/- 01.06.2016 & electrification for Sarzora station notice Techno KR/KW/EL/T building along with lighting arrangement Mumbai and (ii)m/s /21/14 Mumbai. for platform & circulating area, Kitchen & Nirakar Engineering, Dt:02.03. Dinning at KRA Madgaon, 3 rd floor of KRA Madgaon, 4 rooms at KRA Bhatkal, Toilets at LC 43, 45, 46, 47, 72, 89 & 92, & converted type-ii qtrs from type-iii (UD- 2 nos, BTJL- 2 nos, THVM - 4 nos) and provision of power supply arrangement for airconditioners at to two class rooms at KRA Bhatkal. 2 KR/KW/EL/T/27/14 1. Electrical works associated with On Website, By 23.01. Limited 16.02. 3 03 (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 16,33,765/- 01.07. improvement to existing passenger amenity notice KR/KW/EL/T facilities i.e widening of PF 1 at Udupi /27/14 railway station. Dt:02.03. 2. Provision of power supply arrangement Mumbai and (iii)m/s & electrification for escalator at Udupi Shanthi Electricals, railway station. Udupi. s Whether & er/ 1 KR/KW/EL/T/23/14 Provision of ON GRID solar power system On Website, By 12.12.2014 Limited 05.01. 3 02 (i)m/s Olympus 01 M/s Power Yes LOA M/s Shree Aditya 18,80,800/- 04.04. at Karmali Railway station in Karwar Region notice Power Pvt. Ltd., Pune Engineering and KR/KW/EL/T Solar System, and (ii)m/s Shree Aditya Automation Pvt. Ltd., /23/14 Panvel. Solar System, Panvel. Bangalore Dt:05.02. (Unsolicited ) 2 KR/KW/EL/T/24/14 Provision of escalator at Madgaon railway On Website, By 22.12.2014 Limited 13.01. 1 01 (i)m/s Johnson Nil Yes LOA M/s Johnson Lifts 73,00,000/- 09.07. station. notice Lifts Pvt. Ltd., Chennai. KR/KW/EL/T Pvt. Ltd., Chennai /24/14 Dt:10.02. s Whether & er/ 3 KR/KW/EL/T/1/15 Provision of escalator from ground level to On Website, By 23.01. Limited 16.02. 1 01 (i)m/s Johnson Nil Yes LOA M/s Johnson Lifts, 71,80,000/- 08.09. RCC ramp in front of Udupi Railway station. notice Lifts, Mumbai. KR/KW/EL/T Mumbai. /1/15 Dt:09.03. Page 2

Month : Apr 1 KR/KW/EL/AMC/T/3/15 AMC for maintenance contract for 2 years for On Website, By 11.03. Limited 02.04. 2 02 (I)M/s Devidas M. Nil Yes LOA M/s Devidas M. 58,33,408/- 28.04.2017 lighting arrangements provided for notice KR/KW/EL/ Ramawat, Thane. tunnels, substations, platforms, approach (ii)m/s Illumination AMC/T/3/15 roads & circulating areas from Enterprises, Mumbai. Dt:29.04. Asnoti to Thokur of Karnataka section under Karwar Region. 2 KR/KW/EL/AMC/T/4/15 AMC for maintenance contract for 2 years for On Website, By 11.03. Limited 02.04. 2 02 (I)M/s Devidas M. Nil Yes LOA M/s Devidas M. 64,45,562/- 28.04.2017 lighting arrangements provided for tunnels, notice KR/KW/EL/ Ramawat, Thane. substations, platforms, approach roads & (ii)m/s Illumination AMC/T/4/15 circulating areas from Pernem to Loliem Enterprises, Mumbai. Dt:29.04. of Goa section under Karwar Region. s Whether & er/ Month : May 1 KR/KW/EL/T/13/14 Replacement of outlived / corroded GI lighting On Website, By 17.03. Limited 08.04. 4 04 (i)m/s Apsara Nil Yes LOA M/s Apsara 4,86,072/- 20.08. poles at pitline Madgaon. notice KR/KW/EL/T Electrical /13/14 Engineering Works, Dt:21.05. Karwar. Mumbai, (iii)m/s Nirakar Engineering, Goa and (iv)m/s Mahamaya 3 KR/KW/EL/T/7/14 Replacement of outlived overhead LT line by On Website, By 13.04. Limited 05.05. 4 04 (i)m/s Om Nil Yes LOA M/s Apsara 8,37,298/- 26.07. under ground cable at RRM's office, Karwar. notice KR/KW/EL/T Electrical (ii)m/s Mahamaya /7/14 Engineering Works, Dt:27.05. Karwar. (iii)m/s Apsara Electrical Engineering Works, Karwar and (iv)m/s Nirakar Engineering, s Whether & er/ 2 KR/KW/EL/T/2/15 Replacement of conventional type visibility On Website, By 13.04. Limited 05.05. 3 03 (i)m/s Span Nil Yes LOA M/s Infiniti Digitech 6,92,932/- 26.08. sensors by motorised type visibility sensors at notice Systems, Mumbai, Pvt. Ltd., Mumbai. Karwar & Barcem tunnels. (ii)m/s Infiniti Digitech Pvt. Ltd., Mumbai and (iii)m/s Jain System Mumbai. KR/KW/EL/T /2/15 Dt:27.05. Month : June Nil s Whether & er/ Page 3

Month : July 3 KR/KW/EL/T/11/14 Replacement of conventional lightning On Website, By 01.06. Limited 22.06. 2 02 (i)m/s Mark Energy Nil Yes LOA M/s JMV LPS 7,14,708/- 26.10. arrester by complete lightning & surge notice Solutions Pvt. Ltd., KR/KW/EL/T Limited, Noida. protection system for tunnel ventilation control Mumbai and (ii)m/s JMV /11/14 room & substation at Barcem tunnel. LPS Limited, Noida. Dt:27.07. s Whether & er/ 1 KR/KW/EL/T/7/15 1.Upgradation of power supply On Website, By 12.05. Limited 04.06. 4 04 (i)m/s Nirakar Nil Yes LOA M/s Devidas M. 41,31,447/- 19.11. arrangement for 6 th line at Madgaon notice Engineering,Goa, (ii)m/s KR/KW/EL/T Ramawat, Thane. Mahamaya Electricals, /7/15 station. Karwar. (iii)m/s Alpha Dt:20.07. 2.Provision of power supply Techno Electricals, arrangement & electrification for C- Mumbai, and (iv)m/s schedule building at Madgaon. Devidas M. Ramawat, 3.Provision of power supply Thane. arrangement & electrification of parcel room at Madgaon station. 2 KR/KW/EL/AMC/T/5/15 Comprehensive Maintenance of Train On Website, By 15.04. Open 15.05. 2 02 (i)m/s Dhara Rail Nil Yes LOA M/s Devidas M. 99,55,177/- 27.07.2016 Lighting (TL) Systems and Train Lighting (TL) notice KR/KW/EL/ Ramawat, Thane. Equipments in 108 Nos Train Lighting & 18 News AMC/T/5/15 Paper. Dt:24.07. Nos. Air Conditioned coaches at Madgaon Coach care Centre of Konkan Railway. Projects Pvt. Ltd., Mumbai and M/s Devidas M. Ramawat, Thane. Month : Aug 3 KR/KW/EL/T/6/15 Replacement of main LT control panel at On Website, By 01.06. Limited 22.06. 3 03 (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 4,29,000/- 09.11. 11KV substation, Verna. notice KR/KW/EL/T /6/15 Dt:10.08. Mumbai and (iii)m/s Nirakar Engineering s Whether & er/ 1 KR/KW/EL/AMC/T/9/15 Annual maintenance of AC units and water On Website, By 05.06. Limited 29.06. 2 02 (i)m/s J.J. Nil Yes LOA M/s J.J. 15,36,598/- 02.08.2017 coolers in Goa section (Pernem station to notice Refrigeration, Navi KR/KW/EL/ Refrigeration, Navi Loliem station both inclusive) Mumbai and (ii)m/s J.K. AMC/T/9/15 Mumbai. Electricals, Madgaon. Dt:03.08. 2 KR/KW/EL/T/8/15 Provision of standby DG set for 11KV On Website, By 01.06. Limited 22.06. 2 02 (i)m/s Alpha Nil Yes LOA M/s Alpha Techno 33,75,000/- 04.11. substation at Madgaon and Konkan Railway notice Techno KR/KW/EL/T Academy (KRA) at Bhatkal. Mumbai and (ii)m/s Fuji /8/15 Mumbai. technical Services Pvt. Dt:05.08. Ltd., Navi Mumbai. Page 4

Month : Sept 2 KR/KW/EL/T/16/15 Provision of ground mounted type single jet On Website, By 07.08. Limited 31.08. 1 01 (i)m/s Color Design Nil Yes LOA 01 (i)m/s Color 5,05,291/- 08.10. illuminated fountain near North bank of river notice India, New Delhi. KR/KW/EL/T Design India, New Zuari bridge (in Goa state) of Konkan /16/15 Delhi. Railway. Dt:14.09. 3 KR/KW/EL/T/13/15 Lighting arrangement for 50 Nos. Of modular On Website, By 29.07. Limited 20.08. 2 02 (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 5,80,251/- 21.12. shelters at various stations under Karwar notice Electricals, Karwar and KR/KW/EL/T Region. (ii)m/s Nirakar /13/15 Engineering, Dt:22.09. Month : Oct Month : Nov s Whether & er/ 1 KR/KW/EL/T/15/15 Provision of Solar steet light at Off way side On Website, By 12.08. Limited 03.09. 2 02 (i)m/s Shree Nil Yes LOA M/s Popular Solar 3,32,100/- 13.10. platform at various station under Karwar notice System, Sirsi. region. s Adittya Solar Systems, Panvel and (ii)m/s Popular Solar System, Sirsi. KR/KW/EL/T /15/15 Dt:14.09. Whether & er/ 1 KR/KW/EL/T/17/15 Hiring of utility vehicle for day to day electrical On Website, By 13.08. Limited 07.09. 2 02 (i)m/s Santhosh l. Nil Yes LOA M/s Santhosh L. 12,38,400/- 30.10.2017 maintenance activities under electrical depot notice Bandekar, Karwar. (KW-3 section) at Karwar. s Bandekar, Karwar and (ii)m/s Pramod S Naik, Karwar. KR/KW/EL/T /17/15 Dt:28.10. Whether & er/ 1 KR/KW/EL/T/19/15 Electrical works associated with construction On Website, By 05.09. Limited 28.09. 3 03 (i)m/s Shanthi Nil Yes LOA M/s Megarail Power 15,13,099/- 08.02.2016 of ROB at Km 739/093 at Thokur. notice Electricals, Udupi, KR/KW/EL/T Projects LLP, (ii)m/s Nirakar /19/15 Thane. Engineering, Goa and Dt:09.11. (iii)m/s Megarail Power Projects LLP, Thane. Page 5

2 KR/KW/EL/T/11/15 Replacement of outlived and defective On Website, By 13.08. Limited 07.09. 2 02 (i)m/s ABB India Nil Yes LOA M/s Mark Energy 20,10,000/- 12.02.2016 Vaccum circuit breakers of Barcem & notice Solutions Pvt. Ltd., Karwar ventilated tunnels Pune. 4 KR/KW/EL/T/18/15 1.Power supply arrangement for Food On Website, By 27.08. Limited 18.09. 3 03 (i)m/s Mahamaya Nil Yes LOA M/s Mahamaya 18,27,660/- 12.02.2016 court at Madgaon. notice KR/KW/EL/T 2.Provision of power supply arrangement (ii)m/s Om Electricals, /18/15 & electrification for Holiday Home for staff Karwar and (iii)m/s Dt:13.11. Nirakar Engineering, at Karmali. 3.Provision of power supply arrangement & electrification of stores depot at Verna Phase 1 & II. 4. Electrical works for conversion of existing sky bus electrical sub-station into exhibition hall at Madgaon. 5 KR/KW/EL/AMC/TLAC/10/15 Comprehensive Maintenance of Air On Website, By 24.06. Open 24.07. 1 01 (i)m/s Sidwal Nil Yes LOA M/s Sidwal 80,21,447/- 30.11.2016 Conditioned (AC) Systems and Air notice Refrigeration Industries, KR/KW/EL/ Refrigeration Conditioned (AC) Equipments in 20 Nos. AC News New Delhi. AMC/TLAC/10/1 Industries, New coaches at Madgaon Coach Care Centre of Paper. 5 Dt:26.11. Delhi. Konkan Railway and Escorting of AC Coaches between Madgaon & Mumbai CST. Month : Dec 1 KR/KW/EL/T/12/15 Relocating of transformer center along with On Website, By 06.07. Limited 28.07. 2 02 (i)m/s Nirakar Nil Yes LOA M/s Nirakar 8,49,751/- 27.01.2016 overhead line for development works at notice Engineering, Goa and KR/KW/EL/T Engineering, Thivim station. (ii)m/s Mahamaya /12/15 Dt:28.12. Limited and (ii)m/s Mark Energy Solutions Pvt. Ltd., Pune. NO.KR/KW/EL/ T/11/15 Dt:13.11. 3 KR/KW/EL/T/20/15 Replacement of old & outlived 70W HPSV On Website, By 05.09. Limited 28.09. 2 02 (i)m/s Illumination Nil Yes LOA M/s Megarail Power 15,04,844/- 13.02.2016 fittings with energy efficient 24W LED fittings notice Enterprises, Mumbai KR/KW/EL/T Projects LLP, in Barcem tunnel. and (ii)m/s Megarail /20/15 Thane. Power Projects LLP, Dt:14.11. Thane. s Whether & er/ Page 6