APPENDIX 4-F. Construction Equipment Peak Analysis

Similar documents
Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400

B.6 Construction Equipment Utilization and Workforce

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Electric Vehicle Appendix Notes

Construction Noise Worksheets

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

INTERIM CONSTRUCTION RECORD REPORT TAILINGS POND 4 STAGE 3 RAISE

Buffer Stops and Restraining Devices for Dead End Tracks

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description

APPENDIX 30-A. Marine Vessel Incidence Prediction Inputs to the Quantitative Risk Assessment

INSTALLATION GUIDELINES

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

September 2016 Water Production & Consumption Data

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

METRO NORTH TRANSMISSION STUDY ELECTRIC AND MAGNETIC FIELD PROFILES (VILLAGE OF ANMORE)

: Anandro Amellonado. Alternatives of Dredging Method Based on Interpretation of Soil Investigation in The North Kalibaru Project

Appendix F-1 Description of the Long-Term Alternatives

Maine Turnpike Authority

NJ TRANSIT West Trenton Rail Line Passenger Service Rail Study West Trenton, NJ to Manville, NJ 10/26/2007 PREFERRED ALTERNATIVE CAPITAL COST ESTIMATE

DESCRIPTION QUANTITY PRICE TOTAL

On-the-Job Training Program. Overview of Training Programs

Environmental Permit No. FEP-01/457/2013/C. Central Kowloon Route. Independent Environmental Checker Verification

Revision Tailings Management Plan Minto Mine, YT

Minnesota Avenue Station Parking Garage Repair Project

Cost to extending KC Streetcar north approximately ½ mile

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ASSESSMENT

Pipex px PROTECTION SYSTEMS Pipex px Subsea Cable Protection Systems

UTILITY CROSSING DETAIL

Hydraulic impact Hammers product range

Infrastructure & Power. FP M c Cann. Tel: +44(0) Fax: +44(0)

Berth [TraPac] Container Terminal Project Environmental Impact Report Addendum #2 [SCH No , APP No ]

1 GENERAL Project Description Labrador Island Transmission Link (LIL) Language and Units Site Climate Data...

SITE PLANS ASSISTED LIVING REDEVELOPMENT

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

Clark Public Utilities Commercial Electric Service Handbook. This page left blank intentionally.

Technical Report 8. Astral Aviation Consultants Construction Aeronautical Study

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP)

Maine Turnpike Authority

Construction Emissions Estimates ICTF Modernization Project Long Beach, California

CT Consultants, Inc.

The Extension of the Pointe Noire Breakwater Congo

Maine Turnpike Authority

T.A.T Minimum Wage Scale

ALL AMERICAN CANAL LINING PROJECT. CM Status as of July 31, 2008

Concrete Pipes 62 Traditional Manholes Sealed Manholes 66 Retaining Walls 67 Boc Culverts / Gully Pots 68 Inspection Chambers 69

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

Horseshoe Bay Terminal Open House

TABLE OF CONTENTS 1. GENERAL LABOUR COSTS EQUIPMENT COSTS...2

CPM Technical Guide / Load Configuration. Load configuration for customers. Concrete Safety for Life

MoDOT 2016 UNIT BID PRICES Northwest District

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD

Total Production by Month (Acre Feet)

4.2 Series Station Option Description

FALL 2017 ADVERTISING SCHEDULE

Glendale Water & Power Smart Grid Project

APPENDIX G. Towing Survey for Concrete Floats

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

Why? Faster To reduce the duration of the process

The Peoples Gas Light and Coke Company

Automated Yard Systems Compared

Minto North Access Design

Virginia Offshore Wind Port Readiness Study

Appendix 10. Implementation of Electrification Options. December 2010

ANCR CRU Statistics February 2007 to December 2007

Update of noise database for prediction of noise on construction and open sites

ANCR CRU Statistics Februa.. to December 2007

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

Hydraulic Impact hammers

29 CFR Material handling equipment

ADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY-OCEAN CITY: WICOMICO REGIONAL AIRPORT SALISBURY, MARYLAND

JIG Inspectors Workshop. Teddington. September 28,2012

Hydraulic power is the key to the utility of many excavators.

Theory Test Questions Contents

Appendix H: Construction Impacts H-3 Air Quality

SEWER AND WATERMAIN CONSTRUCTION

Hydraulic Impact hammers

STANDARD DRAWING INDEX

Titel, Arial fett, 24 Punkt, Göteborg, 11 Nov Building Bybanen Bergen Light Rail. Frank Maier Göteborg, 11 Nov 2014

Occupations (Construction)

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Used Oil Management Associations. Consultation to Update the Initial Fill (OEM) Category Summary

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

Progress Report Sounder Program

Value of Lower Mainland commercial property transactions climbs in third quarter

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

OTTAWA LIGHT RAIL TRANSIT PROJECT:

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

Comparison of price incentive models for locally matched electricity networks. Appendix C: Private Wires - Legal Definitions

Construction Noise Memorandum

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

Introduction. Increase the rate of output through work progress with the best effective and efficient methods.

Mississauga Bus Rapid Transit Preliminary Design Project

Position Paper. Telehandler Use: Lifting Suspended Loads

Transcription:

APPENDIX 4-F Construction Equipment Peak Analysis

PORT METRO VANCOUVER Roberts Bank Terminal 2 This page is intentionally left blank

Container Capacity Improvement Program - Roberts Bank Terminal 2 Construction Equipment Peak Analysis 2015-03-10-01-20000-TAB-0025-Rev0-PMV- RBT2 Construction Equipment-Peak Analysis March 10, 2015

PORT METRO VANCOUVER Roberts Bank Terminal 2 Technical Report/Technical Data Report Disclaimer The Canadian Environmental Assessment Agency determined the scope of the proposed Roberts Bank Terminal 2 Project (RBT2 or the Project) and the scope of the assessment in the Final Environmental Impact Statement Guidelines (EISG) issued January 7, 2014. The scope of the Project includes the project components and physical activities to be considered in the environmental assessment. The scope of the assessment includes the factors to be considered and the scope of those factors. The Environmental Impact Statement (EIS) has been prepared in accordance with the scope of the Project and the scope of the assessment specified in the EISG. For each component of the natural or human environment considered in the EIS, the geographic scope of the assessment depends on the extent of potential effects. At the time supporting technical studies were initiated in 2011, with the objective of ensuring adequate information would be available to inform the environmental assessment of the Project, neither the scope of the Project nor the scope of the assessment had been determined. Therefore, the scope of supporting studies may include physical activities that are not included in the scope of the Project as determined by the Agency. Similarly, the scope of supporting studies may also include spatial areas that are not expected to be affected by the Project. This out-of-scope information is included in the Technical Report (TR)/Technical Data Report (TDR) for each study, but may not be considered in the assessment of potential effects of the Project unless relevant for understanding the context of those effects or to assessing potential cumulative effects.

50 45 40 35 30 25 20 15 10 5 0 Concurrent Construction Activities (#) 01-Jul-18 01-Oct-18 01-Jan-19 01-Apr-19 01-Jul-19 01-Oct-19 01-Jan-20 01-Apr-20 01-Jul-20 01-Oct-20 01-Jan-21 01-Apr-21 01-Jul-21 01-Oct-21 01-Jan-22 01-Apr-22 01-Jul-22 01-Oct-22 01-Jan-23 01-Apr-23 01-Jul-23 01-Oct-23 01-Jan-24 KCB / AECOM Equipment Activities Delcan Equipment Activities Date (dd-mmm-yy) Peak Day June 8, and 9, 2022 46 Concurrent Construction Activities

Area/WBS Sub Area/WBS Description Description of Major Construction Equipment For Each Activity (For Acronym definition Refer to Table 2) Marine Terminal/ 1100 Dredging and Reclamation/ 1102 Native Soil Improvement (below dykes, land based, 3.0m c/c ) TUG DB PROBE-Lx3 FEL-C x 3 TRUCK CRANE x 3 Preload 5 Relocation (to Preload 7 ) FEL-C x 3 ORT x 6 Preload 5 Relocation (to Apron Fill) FEL-C x 3 ORT x 6 Preload 6 Relocation (to Preload 8) FEL-C x 3 ORT x 6 Preload 6 Relocation (to Apron Fill ) FEL-C x 3 ORT x 6 Apron Preload Stage 7 (relocated from Preload 5 ) EXC-B DOZER-B Apron Preload 7 Relocation (to Preload 8 ) FEL-C x 3 ORT x 6 Apron Preload Stage 8 (relocated from Preload 6 ) EXC-B DOZER-B Apron Preload Stage 8 (relocated from Preload 7 ) EXC-B DOZER-B Apron Preload 8 Relocation (to Apron Fill ) FEL-C x 3 ORT x 6 Apron Preload Stage 9 (imported granular base ) DBC TUG FEL-B ORT x 2 DOZER-B Apron Preload 9 Relocation (to Stockpile of Terminal Granular Base ) FEL-C x 3 TRUCK x 6 DOZER-B Mattress Rock for End Caissons (includes supply, install, and relocate temporary overbuild )- DB CLAM TUG Mattress Rock Densification (under end caissons )- West Basin DER PROBE-M DB FEL-B TUG Levelling Course (supply and install at end caissons )- West Basin DB FEL-B CLAM SCREED TUG Toe Scour Protection - Test Panel (tremie concrete ) CD CP TREMIE TENDER Berth Scour Protection Rock DB CLAM SCREED TUG Rock Berm (behind caissons ) DB CLAM TUG BDB Berm Filter (behind caissons ) DB CLAM TUG General Fill at Apron (sand from Preloads 2-5-6-8 ) FEL-C x 2 ORT x 5 DOZER-B EXC-B General Fill and Berm Densification (behind caissons ) CRANE x 2 PROBE-Lx2 FEL-B TRUCK Steel Sheet Piling (behind Caissons 1A ) DB DER PD TUG Geotextiles (behind precast keys ) TRUCK Geotextiles (at cover slabs and connecting slabs ) TRUCK Precast Concrete Keys (at main caissons ) CD CP CV CRANE TRUCK In-situ Concrete Crane Power Pits (adjacent to rear crane beam ) CD x 2 CP CRANE CV EXC-A In-situ Concrete Fender Support Pads (at marine fenders ) CD CP CRANE CV Causeway Widening/ Dredging and Reclamation/ 1202 Preload Area 2 Relocation (to Apron Fill ) ORT x 8 DOZER-B FEL-C x 2 Marine Terminal/ 1100 Container Yard Structures/1105 ASC Rail and Foundation CD CRANE CP Bollards TRUCK x 4 Marine Terminal/ 1100 Intermodal Yard Structures/1106 RMG Rail and Foundation CD CRANE CP Marine Terminal/ 1100 Civil Utilities/1108 Container Yard West (incl. pipe, manholes, chambers, hydrants) EXC-A x 4 FEL-C x 8 TRUCK x 8 DDRx1 Causeway Area CRANE EXC-A x 2; EXC-B x 1 FEL-C x4 TRUCK x4 DDRx2 Marine Terminal/ 1100 Trackworks/ 1110 Causeway Rail Trackage FEL-C x 2 EXC-A x 2 TRUCK x 2 TAMP x 2 DOZER-A x 2 ROLLER x 2 W-TRUCK x 2 FLAT DECK x 4 SPEED SWING x 2 Marine Terminal/ 1100 Terminal Buildings/1112 CP x 2 CRANE BOOM-LIFT x 4 POWER-F x 4 GEN x 6 Maintenance and Repair Building EXC-A x 2 TRUCK x 6 CP x 2 Main Substation EXC-A x 2 TRUCK x 6 CRANE x 2 CP x 2 BOOM-LIFT x 4 POWER-F x 4 GEN x 6 Reefer Service Access Platform( Steel St.+Foundations) EXC-A TRUCKS x 4 CRANE CP BOOM-LIFT Phase 4 T-Yard and Repair Yard Construction (Earliest Start Date 2022-04-01) 1 Lay Track Lay Proposed Track Including Associated Turnouts, Crossovers and maintenance roads, Connecting to Head Land: b1 Aggregate supply train AGG TRAIN b Lay Track T-Yard T2 FEL C (2) TRUCK (2) TAMP (2) DOZER A (2) ROLLER (2) W TRUCK (2) FLAT DECK (4) SPEED SWING (2) c Lay Track T-Yard T3 FEL C (2) TRUCK (2) TAMP (2) DOZER A (2) ROLLER (2) W TRUCK (2) FLAT DECK (4) SPEED SWING (2) d1 Aggregate supply train AGG TRAIN d Lay Track T-Yard T4 FEL C (2) TRUCK (2) TAMP (2) DOZER A (2) ROLLER (2) W TRUCK (2) FLAT DECK (4) SPEED SWING (2)

TUG DB PROBE-Lx3 FEL-C x 3 TRUCK CRANE x 3 TUG 9 FEL-C x 3 ORT x 6 DB 8 FEL-C x 3 ORT x 6 PROBE-L 5 FEL-C x 3 ORT x 6 PROBE-M 1 FEL-C x 3 ORT x 6 FEL-C 48 EXC-B DOZER-B FEL-B 4 FEL-C x 3 ORT x 6 TRUCK 51 EXC-B DOZER-B W-TRUCK 8 EXC-B DOZER-B CRANE 15 FEL-C x 3 ORT x 6 CLAM 5 DBC TUG FEL-B ORT x 2 DOZER-B BDB 1 FEL-C x 3 TRUCK x 6 DOZER-B CD 7 DB CLAM TUG CP 13 DER PROBE-M DB FEL-B TUG CV 3 DB FEL-B CLAM SCREED TUG ORT 51 CD CP TREMIE TENDER DOZER-B 7 DB CLAM SCREED TUG DOZER-A 8 DB CLAM TUG BDB EXC-A 14 DB CLAM TUG EXC-B 5 FEL-C x 2 ORT x 5 DOZER-B EXC-B DBC 1 CRANE x 2 PROBE-Lx2 FEL-B TRUCK DDR 3 DB DER PD TUG BOOM-LIFT 9 TRUCK POWER-F 8 TRUCK GEN 12 CD CP CV CRANE TRUCK FLAT DECK 34 CD x 2 CP CRANE CV EXC-A TREMIE 1 CD CP CRANE CV TENDER 1 ORT x 8 DOZER-B FEL-C x 2 SCREED 2 CD CRANE CP DER 2 TRUCK x 4 PD 1 CD CRANE CP AGG TRAIN 2 EXC-A x 4 FEL-C x 8 TRUCK x 8 DDRx1 SPEED SWING 8 CRANE EXC-A x 2; EXC-B x 1 FEL-C x4 TRUCK x4 DDRx2 ROLLER 8 FEL-C x 2 EXC-A x 2 TRUCK x 2 TAMP x 2 DOZER-A x 2 ROLLER x 2 W-TRUCK x 2 FLAT DECK x 4 SPEED SWING x 2 TAMP 8 CP x 2 CRANE BOOM-LIFT x 4 POWER-F x 4 GEN x 6 TOTAL 363 EXC-A x 2 TRUCK x 6 CP x 2 EXC-A x 2 TRUCK x 6 CRANE x 2 CP x 2 BOOM-LIFT x 4 POWER-F x 4 GEN x 6 EXC-A TRUCKS x 4 CRANE CP BOOM-LIFT AGG TRAIN FEL C (2) TRUCK (2) TAMP (2) DOZER A (2) ROLLER (2) W TRUCK (2) FLAT DECK (4) SPEED SWING (2) FEL C (2) TRUCK (2) TAMP (2) DOZER A (2) ROLLER (2) W TRUCK (2) FLAT DECK (4) SPEED SWING (2) AGG TRAIN FEL C (2) TRUCK (2) TAMP (2) DOZER A (2) ROLLER (2) W TRUCK (2) FLAT DECK (4) SPEED SWING (2)

400 350 300 250 200 150 100 50 0 Concurrent Equipment Usage (#) 01 Jul 18 01 Oct 18 01 Jan 19 01 Apr 19 01 Jul 19 01 Oct 19 01 Jan 20 01 Apr 20 01 Jul 20 01 Oct 20 01 Jan 21 01 Apr 21 01 Jul 21 01 Oct 21 01 Jan 22 01 Apr 22 01 Jul 22 01 Oct 22 01 Jan 23 01 Apr 23 01 Jul 23 01 Oct 23 01 Jan 24 KCB/AECOM Pieces Of Equipment Delcan Pieces Of Equipment Date (dd mmm yy) Peak Day June 8, and 9, 2022 363 Pieces Of Equipment In Use