NATIONAL IMPLEMENTATION PLAN FOR THE TSI 'CONTROL COMMAND AND SIGNALLING SUBSYSTEMS OF THE RAIL SYSTEM IN THE EUROPEAN UNION'

Similar documents
Please find enclosed a letter from François Bellot, Minister for Mobility, regarding the above matter. [complimentary close]

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

PRIORITY AXIS 22 IN THE PLANNING FRAMEWORK OF A HIGH PERFORMANCE NETWORK IN SE EUROPE (AND EXPERIENCES FROM INITIATIVES 1996 TODAY)

In the report various scenario s are presented, which have been investigated. The figure below shows the scope of the three (main) senario s:

HyLAW. HyDrail Rail Applications Assessment. Main Author(s): [Dainis Bošs, Latvian Hydrogen association] Contributor(s):

ETCS Technical Snapshot From Baseline 2 to Baseline 3 creating a stable framework for ERTMS investments

(Text with EEA relevance)

Advantages of ERTMS for Sweden

ERTMS Platform Steering # 15 Brussels, 2 Dec Update on ERTMS MoU activities and on ERTMS implementations in Europe (from UIC data base)

POSITION PAPER Version 3.0

Infrastructure investment

siemens.com/mobility Trainguard Full interoperability for rail traffic

DRAFT RECOMMENDATION N. 006REC1072

Council of the European Union Brussels, 18 July 2014 (OR. en)

New Europe with new railway passenger services

Ministry of Transport and Communications Ministry of Transport and Communications of the Republic of Latvia

National implementation plan for France. (Version as of 27 June 2017) 1. General description of the signalling systems on the French network in 2017

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

AŽD Praha. ATO system type AVV. in everyday operation at Czech railway network. Vladimír Kampík. European Affairs Director, AŽD Praha

High Speed Passenger Rail Interoperability in North America

Signalling Programme. Presentation of Banedanmarks ERTMS programme Programme Diretor Morten Søndergaard

The Voice of European Railways POSITION PAPER. Revision of Appendix T of TSI OPE (decision /EU) January 2013

(Text with EEA relevance)

Manufacturing operating and maintaining different rolling stock

The Signalling Programme

RESULTS OF THE CROSS BORDERS SURVEY

Aspects of cross-border train operations. Chris Mineur

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

Version / Status V 2.0 Date Author. Wagon Markings

National technical rules for vehicles Related Control Command and Signalling Requirements

(Non-legislative acts) DECISIONS

Annex A. to Technical Specification "Operations and traffic management" adopted by

Overview of Railway Noise Control in Europe

Lake Balaton Recreational Area

Application Guide for the European Register of Authorised Types of Railway Vehicles (ERATV)

Introduction of High Speed trains in Poland and Rail Baltica

Need, Strategy and Implementation of ERTMS

COMMISSION REGULATION (EU) No /.. of XXX

Intermediate results

How do you make your vehicles fit for the future?

Vehicles for Cross-Border Rail Transport

Delegations will find attached document D036128/02.

The ECORailS Guidelines in use Examples from the pilot application Berlin-Brandenburg Technology Innovation Agency Berlin (TSB)

The fact that SkyToll is able to deliver quality results has been proven by its successful projects.

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions

INFORMATIVE TRANSLATION OF EXECUTIVE ORDER no 1465, DATED 5 DECEMBER 2016

The Project North West Electrification Programme

Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference

REPORT BUS TENDER STRUCTURE 3EDITION INCLUDING TENDERING FOR E-BUSES UITP TENDER STRUCTURE 1

OTIF. Uniform Technical Prescription UTP LOC&PAS Applicable to the Rolling Stock subsystem: LOCOMOTIVES AND PASSENGER ROLLING STOCK

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

Electromobility and Smart Grids

(Non-legislative acts) DECISIONS

The SHIFT2RAIL Joint Technology Initiative Presentation to the Rail Forum Europe 15 November 2011

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS

Is it worth the candle?

Hamburg moving towards Electromobility. Dr. Sicco Rah Hanse-Office, Joint Representation of Hamburg and Schleswig-Holstein to the EU

ETCS in Switzerland Views and Learning from an early Investor

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

COMMISSION REGULATION (EU) / of XXX

QUESTION / CLARIFICATION

APTU Uniform Rules (Appendix F to COTIF 1999) Uniform Technical Prescriptions (UTP) applicable to the Rolling Stock subsystem:

for TECHNICAL ADVICE OF THE EUROPEAN UNION AGENCY FOR RAILWAYS THE EUROPEAN COMMISSION regarding ERA/AD V/ running gear - design of structural

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 December /3/06 REV 3 ADD 1. Interinstitutional File: 2003/ 0153(COD) ENT 84 CODEC 561

COMMISSION IMPLEMENTING DECISION

EBRD Transport & Energy in Serbia

Opening statements EUROPEAN TRUCK PLATOONING CHALLENGE 21 MARCH Jack Martens BRUSSELS. Chairman of ACEA task-force platooning

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

World R ail Marke t Study

National Implementation Plan for ERTMS in Austria

Pametno gospodarenje cestovnom infrastrukturom Smart Management of Road Infrastructure Christophe Nicodème, ERF

Hybrid ERTMS/ETCS Level 3

January 18, ZERO-SUM,LTD. TOYOTA InfoTechnology Center Co., Ltd.

The criteria of choice for new High Speed fleet

Respecting the Rules Better Road Safety Enforcement in the European Union. ACEA s Response

Shaping the Future of Railway Industry Student Engagement Event 20 th September 2016

The Global Evolution of HSR. Lessons from the Spanish Experience. Application to U.S. High Speed Rail Acknowledgements CONTENT

Sustainable Railway Solutions

Railway Development of ASEAN: Readiness for AEC in 2015

Sofia Urban Transport challenges and strategies

Smart Islands Smart Networks European Forum on Clean Energy for Islands Naxos, 9-11 of July 2018

Regulation Study for Interoperability in the Adoption the Autonomous Driving in European Urban Nodes AUTOCITS DEMO. November 2017 INNOVACARRETERA

CMP294: National Grid Legal Separation changes to CUSC Section 14. CUSC Modification Proposal Form

COMMISSION RECOMMENDATION. of XXX

HELLENIC REPUBLIC MINISTRY OF DEVELOPMENT DIRECTORATE-GENERAL FOR ENERGY DIRECTORATE FOR RENEWABLE ENERGY SOURCES AND ENERGY-SAVING EXTENSIVE SUMMARY

How GSM-R serves railways globally. Norman FRISCH Business Development Railway Solutions

Challenges for sustainable freight transport Maritime transport. Elena Seco Gª Valdecasas Director Spanish Shipowners Association - ANAVE

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

FTAs with Japan and the US A perspective from the European rail industry. Philippe Citroën, UNIFE Director General 9 July 2013

Connecting Europe Facility. Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes

Financing by International Finance Institutions the Sofia case. Metodi AVRAMOV Public Transport Company - Sofia

CONNECTING THE REGION

The German Tolling Prospects

INTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation.

PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015

2014 ERA FOLLOW UP OF ERTMS EU FUNDED PROJECTS ERA Follow Up of ERTMS EU- funded projects FINAL REPORT /9

URBAN FUTURE SOME LEADS FOR LEEDS. Véronique Ramadi, Leeds,

DRAFT Subject to modifications

Collision A shunting locomotive with 6 wagons collided into 48 wagons loaded with timber

Transcription:

NATIONAL IMPLEMENTATION PLAN FOR THE TSI 'CONTROL COMMAND AND SIGNALLING SUBSYSTEMS OF THE RAIL SYSTEM IN THE EUROPEAN UNION'

I. INTRODUCTION In accordance with Commission Regulation (EU) No 206/99 of 27 May 206 on the technical specification for interoperability (TSI) relating to the control-command and signalling subsystems of the rail systems in the European Union, the Member States shall notify the European Commission of an approved National Implementation Plan (NIP) for the above-mentioned TSI with a view to the progressive implementation of interoperability in the EU rail network. This matter comes within the framework of Greece's above-mentioned obligation, and is updated at the latest within five years of its adoption. The following legal framework was taken into account when drawing up the NIP: Commission Regulation (ΕU) No 206/99 of 27 May 206 on the technical specification for interoperability relating to the 'control-command and signalling' subsystems of the rail system in the European Union; Commission Implementing Regulation (ΕU) 207/6 of 5 January 207 on the European Rail Traffic Management System European deployment plan. The following bodies contributed to/were consulted for the NIP:. The Regulatory Authority for Railways (RAS), which performs the duties of National Security Authority; 2. The Hellenic Railways Organisation (OSE A.E.), which performs the duties of Infrastructure Manager; 3. ERGA OSE (ERGOSE A.E.), a subsidiary of the OSE for the management of OSE projects; 4. The Railway Property Management Company (GAIAOSE A.E.), responsible for the management of rolling stock; 5. ΤRΑΙΝΟSE Transport Transport Services for Passengers and Cargo Limited Railway Company (TRAINOSE A.E.), a rail transport supply company; 6. Urban Railways (STASY A.E.), a railway transport supply company. 2

In Greece, the Hellenic Railways Organisation (OSE AE) manages the railway infrastructure and its subsidiary company ERGA OSE AE., and has undertaken the modernisation of the railway network, including the installation of modern ΕRTMS - European Rail Traffic Management System systems (ETCS - European Train Control System and GSM-R - Global System for Mobile communications-rail). In particular, ERGOSE has made it a priority to install ERTMS on the basic railway axis in Greece, namely the Patras Athens Thessaloniki Eidomeni Promachonas (PATHEP) axis with the necessary branches (to the International Airport Εl. Venizelos, freight port of Piraeus Ikonio, Chalkida, Kalambaka). This axis is a section of the core TEN-T network (in accordance with Regulation 35/3) and also a section of the Orient-East Med Corridor, the aim being to complete its modernisation by 2030. 3

II. DESCRIPTION OF THE EXISTING SITUATION ) SIGNALLING A two-way signalling system with remote administration has already been established on the basic Greek rail axis Kiato Σιδηροδρομικό Κέντρο Αχαρνών - Acharnon Railway Centre - SKA Thessaloniki Eidomeni/Promachonas (PATHE/P) (also including the Inoi-Chalkida section) with the exception of the Tithorea-Domokos section under construction. Due to extensive failures and sabotage after first being commissioned, this system now has major problems. The restoration/upgrading of the signalling system for the SKA Thessaloniki Promachonas section (except Tithorea - Domokos) started in 204 and is programmed for completion at the start of 209, when it will become operational again. To date, the signalling system has been restored over the Acharnai Inoi and Plati Thessaloniki sections, and has been put into use without remote administration. Over the SKA-Κiato, Thessaloniki Eidomeni and Inoi-Chalkida sections, the system already installed is presenting similar problems, due to extensive damage/sabotage. However, there are plans to redevelop it. 2) ΤELECOMMUNICATIONS OSE's existing communications network (fixed and wireless) is analogue. Communication between stations with remote administration takes place via a public network, while wireless communications are either via wireless transceivers at VHF frequencies (class B system), or through rental of the TETRA public system. 3) 'CONTROL-COMMAND AND SIGNALLING' TRACKSIDE SUBSYSTEM CLASS A TRAIN PROTECTION SYSTEM (ΕTCS) From 2002, ERGOSE had already installed (over 202.7 km of line) and is continuing to gradually install the class A train protection system, ETCS level on the PATHE/P railway system (over 674.5 km of line), as a superstructure over the conventional signalling system. 4

Specifically, to date the works to install the ETCS system on the Kiato - SKΑ Airport Treis Gefyres, Thriasso Ikonio, and Plati Thessaloniki sections have been. The ETCS level system is not yet operational anywhere on the line since the necessary regulatory procedures (i.e. tests, certification, etc.) have not been. As already mentioned, the ETCS system already installed on the SKA Kiato section is not yet operational due to extensive sabotage and vandalism. The OSE network has never used a national automatic train protection system (class B system). Transfer from the existing class B system to the class A ETCS system is therefore not an issue. VOICE RADIO COMMUNICATION SYSTEM, CLASS Α (GSM-R) The GSM-R radio system (class A system), which at this stage ensures voice radio communication, has already been installed and is operational over 707 km of the PATHE/P railway, except for the Tithorea- Domokos, Kiato-Patra and Thessaloniki/Eidomeni sections. There are 03 base stations and 70 station terminals at stations and remote administration centres. The commissioning/use of the system will take place after a transitional period of parallel operation with the existing Class B radio system CH-Greek Railways radio system, and upon completion of the required regulatory procedures. The above-mentioned system was established on the basis of specifications FRS 7 and SRS 5. 4) CONTROL-COMMAND & SIGNALLING ON-BOARD SUBSYSTEM TRAIN PROTECTON SYSTEM (ETCS) The ETCS level equipment (version 2.3.0.d) in 94 power units has already been installed under contracts managed by ERGOSE and is operational. Furthermore, the ERTMS system compatible with the European specifications adopted in 2003 has been installed in the dual-voltage metro trains running between 'DOUKISSIS PLAKENTIAS AIRPORT' (in total 7 trains, 4 driver's cabs). 5

The automatic train protection system (ETCS) is compatible up to level 2 (Level 2, baseline ). The above-mentioned subsystem is not yet operational, and a series of tests will be necessary in a section of the line with a functioning signalling system and an operational ETCS trackside system, in parallel with completing staff training & the Infrastructure Manager approving the new Traffic Regulation and the National Safety Authority approving the adoption and operation of the new subsystem. Annex ΙΙΙ indicates the number and type of engine units which have been equipped with the ETCS level train protection system. VOICE RADIO COMMUNICATION SYSTEM (GSM-R) Principally in order to cover the checks and tests necessary for the GSM-R system, GSM-R rolling stock has been established in 20 power units, under the contract managed by ERGOSE, with the supply of 90 mobiles (handhelds). In addition to this, the above-mentioned 7 dual-voltage metro trains are equipped with the GSM-R voice radio communication system which operates in E-GSM and R-GSM frequency bands and is compatible with the MORANE 2 specifications. 6

ΙΙΙ. AIM OF THE TSI NATONAL IMPLEMENTATION PLAN CCS STRATEGY The aim of the current National Implementation Plan under Regulation 206/99 on the Technical specification for interoperability relating to the 'control-command and signalling' subsystems of the rail system in the European Union is: rolling out the ETCS level trackside system over a total length of 2 04 km, i.e.: on all the PATHE/P railway axes and on their major sections (namely Inoi - Chalkida, Thriasio - Ikonio, suburban railway of Attica, Palaiofarsalos-Κalambaka, Larissa-Volos), 46 km in length on the Strimonas Alexandroupoli Ormenio (border with Bulgaria), Patra-Pirgos Κalamata (with the sections to Αncient Olympia and Katakolo), Plati-Florina and Koropi-Lavrio sections, 958 km in length; bringing into operation the ETCS level on-board system which has been installed on trains running on the OSE network; installing and bringing into operation the GSM-R voice communication system: on the entire PATHE/P line including its main branches, total length 46 km; on the Strimonas Alexandrououpoli Ormenio and Plati Florina sections, length 64 km. The timing for bringing the above systems into operation is set below by subsystem. ) 'CONTROL-COMMAND & SIGNALLING' TRACKSIDE SUBSYSTEM CLASS Α TRAIN PROTECTION SYSTEM, (ETCS) Except for the sections in which the installation of ETCS level system has already been, or which are currently at the installation stage, under contracts already signed, ETCS level is to be installed in the following sections under new contracts which will be the subject of a call for tenders: 7

ATHENS-PATRA AXIS SΚΑ - Kiato Since the signalling system and ETCS level that have already been installed have been damaged/sabotaged, this section is scheduled to be tendered out for reconstruction and upgrading the ETCS on baseline 3. It is estimated that this section will become operational by 2025. Rododafni - Patra On this section, over a total of approximately 36 km, the signalling system and ETCS level will be installed under new works contracts that are in the tender/tender programming preparatory phase. It is estimated that this section will become operational by 2030. ΑTHENS-THESSALONIKI AXIS Treis Gefyres S.S. Athens - Piraeus Section On the above section, the signalling system and ETCS level is scheduled for installation by means of future tendering, and is expected to become operational in 2030. THESSALONIKI-EIDOMENI (BORDERING FYROM) SECTION On this section, over a total length of 77 km, a signalling system and ETCS level is to be installed under a new works contract which is currently in the tender preparation phase. It is estimated that this section will be operational by 2025. PALAIOFARSALOS-KALAMBAKA BRANCH This section, which is 80 km in length, is in the tender completion phase for new contract work, which will include the installation of the signalling system and ETCS. It is estimated that this section will be operational by 2025. LARISA-VOLOS BRANCH Similarly, this section, which is 6 km in length (part of the detailed TEN-T network), is in the tender preparation phase for a new works contract, which will include the installation of the signalling system 8

and l ETCS. It is estimated that this section will be operational by 2025. STRIMONAS ALEXANDROUPOLI ORMENIO SECTION This section of the existing line, 485 km in length, is to be upgraded, and the signalling system and ETCL level are to be installed. It is estimated that this section will be operational after 2030. PATRA-PYRGOS-ΚALAMATA SECTION The existing railway line on this section, which is 285 km in length, and also includes the branches for Ancient Olympia and Katakolo, is to be upgraded, and the signalling system and ΕΤCS level installed. It is estimated that this section will be operational after 2030. KOROPI-LAVRIO SECTION The Attica suburban railway is to be extended from Koropi to the port of Lavrio, 32 km in length, with installation of signalling and ETCS level. It is estimated that this section will be operational after 2030. PLATI - FLORINA SECTION OSE will examine the installation of the ETCS system on the Plati Lorina section. For the implementation of the relevant plan, ΟΣΕ will draw up the appropriate studies and try to include it in EU co-financing programmes. Otherwise, funding will be needed from the Public Investment Programme to ensure that project implementation, without co-financing, is within the set timetable. Annex I shows a supervisory diagram which presents the operating times of ETCS level on the network sections. It should be noted that these times also include estimations for the completion of all the necessary procedures after the completion of the system installation required for the infrastructure manager to render it operational. Please note that the ETCS system to be installed under future contracts will be level, baseline 3 (x=), to ensure: 9

technical compatibility with the ETCS train system (baseline 2) which has already been installed on 94 trains, full compliance with Commission Regulation (ΕU) 206/99 and Implementing Regulation (ΕU) No 207/6 on the ERTMS European Deployment Plan. VOICE RADIO COMMUNICATION SYSTEM, CLASS Α (GSM-R) A GSM-R voice radio communication system is to be installed on the following sections: o Tithorea-Domokos (06 km) o Κiato-Patra (08 km) o Thessaloniki-Eidomeni (77 km) o Palaiofarsalos-Kalambaka (80 km) o Sepolia underground,.9 km long (on the section from the exit S.S. Athens Treis Gefyres) The system should be operational in: - 2023, for the Tithorea-Domokos section, and - 2030, for the remaining sections. Moreover, the OSE is to examine the installation of the GSM-R voice communication system on the Larisa Volos and Plati Florina sections. To draw up the relevant plans, OSE will undertake the relevant studies and endeavour to have them included in the EU co-financing programmes. Otherwise, funding from the Public Investment Programme will be necessary in order to carry out the works, which would not be co-financed, within the set timetable. Annex II presents a supervisory diagram showing the GSM-R operation times on the various sections of the network. 2) 'CONTROL-COMMAND AND SIGNALLING' ON-BOARD SUBSYSTEM TRAIN PROTECTION SYSTEM, CLASS Α (ETCS) Apart from the 94 power units in which ERGOSE has installed the ETCS, GAIOSE is planning to install ETCS in another 26 units (Level, Baseline 2, version 2.3.0.d) within the next 5 years, as outlined in Annex ΙΙΙ. 0

VOICE RADIO COMMUNICATION SYSTEM, CLASS Α (GSM-R) Apart from the 90 mobiles (handhelds) and the 20 power units in which ERGOSE has installed GSM-R, GAIOSE is not planning to install GSM-R in additional units. The information provided in Chapters ΙΙ & ΙΙΙ is set out in the following table:

Network section Length (km) Type of line Rododafni Patra 36.8 dual Kiato Rododafni 7 Dual Korinthos Kiato 24.4 Dual Thriasio Korinthos 66.6 Dual SKA - Thriasio 3.0 Dual / ETCS Level ETCS Baseline Version phase 2 3 3, Χ= Future installation 2 2.2.2 2 2.2.2 quadruple 2 2.2.2 Under construction ( )/ΧΑ ( )/ΧΑ ( )/ΧΑ GSM-R Estimated Estimated Observa entry into tions entry into phase operation operation 2030 Future installation 2030 2025 Future installation 2030 2025 2025 2025 2 2 2 2020 Observations SKA Plakentias 0 Dual 2 Plakentias Athens International Airport 'Εl. Venizelos' 22 Dual 2 2.2.2 2020 & 3 2020 Thriasiou Pediou - Ν.Ε.L. Piraeus (Neo Ikonio) 7.0 Single 2 2020 2020 Inoi Chalkida Piraeus S.S. Athens 22.0 0.0 Single Dual 2 3 3, Χ= Future installation Under construction 2020 2030 2020 2

ETCS GSM-R Network Section Length (km) Type of line Level ETCS Baseline Version phase Estimated entry into operation Observa tions phase Estimated entry into operation Observations S.S. Athens Τreis Gefyres (ground) 3.8 Dual 3 3, Χ= Future 2030 2020 4 S.S. Athens Treis Gefyres (underground).9 Quadruple 3 3, Χ= Future 2030 Future 2030 4 Τreis Gefyres SKA 5.4 Quadruple SKA Tithorea 45.5 Dual Τithorea Domokos 06 Dual Domokos Plati 87 Dual Plati - ΤΧ 37.3 Dual ΤΧ - ΤΧ5/ 7 Multiple Thessalonliki Single Palaiofarsalos 80.0 Kalambaka Larisa Volos 6.0 Single 2 2 2 2 2 2 3 3, Χ= Future 3 3, Χ= Future Under 2020 Under 2023 Under 2020 2025 Future 2025 Future Future 2023 2030 >2030 Thessaloniki - Strimonas - Promaxonas 43.0 Single 2 Under 2020 2020 3

ETCS GSM-R Network Section Length (km) Type of line Level ETCS Baseline Version phase Estimated entry into operation Observa tions phase Estimated entry into operation Observations Strimonas Alexandroupoli Alexandroupoli- Οrmenio 30.5 Single 74.0 Single 3 3, Χ= Future 3 3, Χ= Future >2030 Future >2030 Future >2030 >2030 Plati Florina 56.6 Single 3 3, Χ= Future >2030 Future >2030 Thessaloniki - Eidomeni 77.0 Single 3 3, Χ= Future 2025 Future 2030 Observations:. The infrastructure manager has to complete the necessary regulatory procedures for the on board ΕΤCS to become operational. 2. ETCS Level will be restored and the older version of its baseline will be replaced by the interoperable baseline 3, X= version. 3. The Plakentias - Athens International Airport Eleftherios Venizelos section has been equipped with 2004 ETCS level, version 2.2.2. The Infrastructure Manager will put the system into operation, as ETCS v2.3.0.d has been tried out on rolling stock. 4. Please note that GSM-R has already been installed in the section of the line that is aboveground from the S.S. Athens exit to Treis Gefyres. It is also planned to install it in the underground section, which is.9 km long, once installation has been. 4

Annex I Timetable for bringing the ETCS trackside system into service but not yet operational ΕIDOMENI PROMACHONAS ΟRMENIO Under construction Future installation THESSALONIKI STRIMONAS ALEXANDROUPOLI FLORINA PLATI LARISA VOLOS ΚALAMBAKA PALAIOFARSALOS DOMOKOS TITHOREA ONOI CHALKIDA PATRA RODODAFNI KIATO THRIASIO SKA KOROPI AIRPORT TREIS GEFYRES ΑTHENS LAVRO KALAMATA IKONIO PIRAEUS 5

Annex II Timetable for bringing the GSM-R trackside system into service but not yet operational ΕIDOMENI PROMAXONAS ΟRΜΕNIO Under construction STRIMONAS ALEXANDROUPOLI Future installation THESSALONIKI FLORINA PLATI LARISA VOLOS KALAMBAKA PALAIOFARSALOS DOMOKOS OINOI PATRA ΚIΑΤΟ THRIASIO SΚΑ ΚΟROPI ΑIRPORT LAVRO (exempt) KALAMATA (exempt) IΚΟΝIΟ PIRAEUS 6

ANNEX III: INSTALLATION OF THE ETCS SYSTEM (LEVEL, BASELINE 2, VERSION 2.3.0.D) IN ENGINE UNITS Type of engine units Number of units which have installed ETCS Number of units which will install ETCS Railbus (STADLER) DMU for local and suburban trains 5 ΜΑΝ 2000 (MAN) DMU for local and suburban trains 2 2 Adtranz class 220 (BOMBARDIER) Diesel Loco for passenger and freight trains 24 9 Intercity (AEG & LEW) DMU for Intercity trains 7 High Performance Locomotive 20 (SIEMENS) Electric Loco for passenger and freight trains 23 6 EMU DESIRO (SIEMENS) EMU for local and suburban trains 7 3 Series II/Double Voltage metro- EMU metro-trains train (MITSUBISHI/ROTEM) 7 - LEVEL 2, BASELINE 7