Appendix No. 3 Hydrometric Data

Similar documents
Appendix E Hydrology, Erosion and Sediment Transport Studies

CVRP: Market Projections and Funding Needs

Appendix I. Canning River Fan Stream Data

Appendix 5. Cost Estimation Borne by the Recipient Country

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Appendix E Water Supply Modeling

Action Requested From AMWG

TABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3.

Element #2: Additional analysis of Tuolumne River below La Grange Dam (USGS # );

Price Category Breakdown - February 2010

Climatography of the United States No

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008

National Routing Number Administration p-ani Activity and Projected Exhaust Report

Climatography of the United States No

Excel 10 (240 VAC, 1-phase, 60 Hz)

Port Wallace Development: Safety and Traffic Concerns. April 12, 2018

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007

Algebra II Pacing Guide

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Design Criteria Data

Analysis of IEC Recommendations in Selected APEC Economies

NASHVILLE DISTRICT UPDATE TRVA ANNUAL CONFERENCE

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

Units of Instruction MISD Pacing Guide Days Date Range Test Date

Updated: April 1, Releases Reported by Trans Mountain February 2017 (Updated: April 1, 2017)

Vunivau, Bua Province Vanua Levu, Fiji Solar Home System Design. Luis A. Vega, Ph.D.

RIDERSHIP TRENDS. March 2017

ElPower script. Contents. ElPower script diagnostics of the engine starting and charging system

OECD unemployment rate down to 6.4% in March 2016

ANCR CRU Statistics February 2007 to December 2007

40KW Solar System for Apple Sauce Co

Table of Contents. The Waste Audit. Methodologies A. Weight-based Assessments B. Volume-based Assessments C. Considering Costs

Annual Statistical Report

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

Arctic Freshwater Flux and Change

Memorandum October 5, 2017

Commuter Rail Update. October 25, 2018

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization...

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT

increase of over four per cent compared to the average of $409,058 reported in January 2010.

Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows

Federal Road Development Project 2011 Procurement Plan.

2017 Adjusted Count Report February 12, 2018

Transmitter CSA-591 Instruction Manual

Transmission Planning Attachment K Public Input Meeting

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Water side Economizer WC chiller

Climatography of the United States No

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

/ PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April

/ PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May

A Sustainable Scenario for Energy and Water in Bahrain

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Task Force Meeting January 15, 2009

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND

Design Criteria Data

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound>

2019 Tide Tables. Volume 1 of 2

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

NJ Solar Market Update As of 10/31/15

Design Criteria Data

Design Criteria Data

CVRP: Projected Funding Need and Program-Change Scenarios

Meteorology of Monteverde, Costa Rica 2005

Design Criteria Data

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT

Design Criteria Data

Final Technical. Memorandum

Design Criteria Data

All Annual Operating Plan Recipients

Design Criteria Data

Design Criteria Data

Design Criteria Data

Design Criteria Data

Design Criteria Data

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

12/14/07 Table 2.1 NANRICH WATER MANAGEMENT CONSULTANTS LTD STATION ANALYSIS. Station Name MATTHEW CREEK ABV DIVERSIONS Station No.

INTECH AUGUST QHSE PERFORMANCE

INTECH JUNE QHSE PERFORMANCE

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Presented by Eric Englert Puget Sound Energy September 11, 2002

Design Criteria Data

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 31, 2007 GROSS DOMESTIC PRODUCT: FOURTH QUARTER 2006 (ADVANCE)

AVM Series. Voice Coil Actuators

Civil Works Construction Cost Index System (CWCCIS)

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

September 2016 Water Production & Consumption Data

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation

Operational Opportunities to Minimize Renewables Curtailments

NTPC RENEWABLE ENERGY PROJECTS SUCCESS, CHALLENGES AND PERSERVERANCE

DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016

Transcription:

Study to Address Flooding on the Dunkellin River & Aggard Stream Appendix No. 3 Hydrometric Data iv

STATION NAME RATHGORGIN 22-Oct-09 STATION No. 29001 RAFORD Annual Maximum Series of Recorded Water Levels & Estimated Flows YEAR (maod - Poolbeg) (m) FLOW (m3/s) 1957 33.48 1.84 N/A 30/10/1957 1958 32.77 1.13 N/A 14/10/1958 1959 33.51 1.87 N/A 28/12/1959 1960 33.39 1.75 N/A 05/12/1960 1961 33.46 1.85 13.37 01/12/1961 1962 33.28 1.67 11.68 06/11/1962 1963 33.46 1.85 13.37 12/05/1964 1964 33.98 2.37 18.68 08/10/1964 1965 33.38 1.77 12.61 19/11/1965 1966 33.34 1.73 12.23 01/03/1967 1967 33.95 2.34 18.35 10/10/1967 1968 33.76 2.15 16.36 25/12/1968 1969 33.33 1.72 12.14 26/04/1970 1970 33.33 1.72 12.14 29/11/1970 1971 33.36 1.75 12.42 03/04/1972 1972 32.93 1.29 8.39 13/12/1972 1973 33.84 2.20 16.87 02/12/1973 1974 33.66 2.02 15.03 23/01/1975 1975 33.26 1.62 11.23 16/01/1976 1976 33.44 1.80 12.89 08/02/1977 1977 33.73 2.09 15.74 10/11/1977 1978 N/A N/A N/A N/A 1979 33.55 1.91 13.94 16/12/1979 (1) 1980 33.46 1.82 13.08 28/10/1980 1981 33.10 1.46 9.81 10/03/1982 1982 33.38 1.74 12.33 02/02/1983 1983 33.73 2.09 15.74 10/12/1983 1984 33.57 1.93 14.14 16/08/1985 1985 33.59 1.95 13.37 07/08/1986 1986 33.38 1.74 11.41 26/11/1986 1987 33.30 1.66 10.69 03/01/1988 1988 33.68 2.04 14.24 24/12/1988 1989 33.91 2.27 16.56 08/02/1990 1990 33.52 1.88 12.70 20/03/1991 1991 N/A N/A N/A N/A 1992 N/A N/A N/A N/A 1993 N/A N/A N/A N/A 1994 34.20 2.56 19.66 29/01/1995 (1) 1995 33.56 1.92 13.08 29/10/1995 1996 33.76 2.12 15.03 19/02/1997 1997 33.65 2.01 13.95 08/03/1998 1998 33.90 2.26 16.46 22/09/1999 1999 33.96 2.32 17.08 24/12/1999 2000 34.06 2.42 18.14 06/11/2000 2001 34.00 2.36 17.50 11/02/2002 2002 33.61 1.97 13.56 10/11/2002 2003 33.38 1.74 11.41 03/02/2004 2004 34.16 2.52 19.22 09/01/2005 (1) 2005 33.74 2.1 14.84 23/09/2006 2006 33.88 2.24 16.25 06/12/2006 k.f. 2007 34.26 2.624 20.37 29/12/2007 2008 34.13 2.492 18.92 25/08/2009 2009 34.51 2.877 23.25 20/11/2009 (2) WL Max = 34.26 2.624 WL Med = 33.56 1.92 WL Min = 32.77 1.138 Limit of Reliable Rating 13 m3/s - Flow estimates above this are extrapolated and should be treated with caution (1) Recorder malfunction - Estimated peak, recorder malfunction (2) Incomplete hydrometric year to 16/03/2010 Current Staff Gauge Zero = 31.636 maod (Poolbeg)

STATION NAME CRAUGHWELL 18-Jan-09 STATION No. 29007 L.CULLAUN Annual Maximum Series of Recorded Levels & Estimated Flows YEAR WATER LEVEL STAFF GAUGE ESTIMATED DATE (HYDROMETRIC) (maod - Malin Head) READING (m) FLOW (m3/s) 1983 20.90 2.20 27.71 10/12/1983 1984 20.91 2.21 27.93 16/08/1985 1985 20.65 1.95 22.35 07/08/1986 1986 20.82 2.12 25.95 19/12/1986 1987 20.74 2.04 24.23 04/02/1988 1988 20.51 1.81 19.53 12/01/1989 1989 21.12 2.42 32.76 08/02/1990 1990 20.79 2.09 25.30 26/12/1990 1991 20.72 2.02 23.81 07/01/1992 1992 20.86 2.16 26.82 15/06/1993 1993 20.96 2.26 29.06 09/12/1993 1994 21.40 2.70 39.60 29/01/1995 1995 20.72 2.02 23.81 27/10/1995 1996 20.82 2.12 25.95 20/02/1997 1997 20.83 2.13 26.17 07/03/1998 1998 20.98 2.28 29.51 22/09/1999 1999 21.12 2.42 32.76 25/12/1999 2000 21.11 2.41 32.52 07/11/2000 2001 21.19 2.49 34.42 12/02/2002 2002 20.64 1.94 22.14 11/11/2002 2003 20.38 1.68 17.03 03/02/2004 2004 21.53 2.83 42.93 09/01/2005 2005 20.53 1.83 19.92 24/09/2006 2006 20.93 2.23 28.38 08/12/2006 2007 21.47 2.77 41.38 29/12/2007 2008 20.94 2.24 28.58 25/08/2009 2009 22.34 3.64 65.74 20/11/2009 (1) WL Max = 22.34 3.64 WL Med = 20.90 2.20 WL Min = 20.38 1.68 Limit of Reliable Rating 55 m3/s - Flow estimates above this are extrapolated and should be treated with caution Current Staff Gauge Zero = 18.70mAOD (Malin) (1) Incomplete hydrometric year to 18/01/2009

STATION NAME AGGARD BRIDGE STATION No. 29010 AGGARD LOUGHREA HYDROLOGY AND 19-Mar-10 Annual Maximum Series of Recorded Water Levels and Estimated Flows YEAR (maod - Poolbeg) (m) FLOW (m3/s) 1982 21.62 0.76 4.10 02/04/1983 1983 21.60 0.74 3.88 16/01/1984 1984 21.63 0.77 4.21 15/08/1985 1985 21.54 0.68 3.25 22/01/1986 1986 21.75 0.89 5.74 18/12/1986 1987 21.60 0.89 2.87 19/01/1988 1988 21.81 1.10 5.20 11/01/1989 1989 22.12 1.41 10.27 06/02/1990 1990 21.84 1.13 5.60 26/12/1990 1991 21.79 1.08 4.94 13/11/1991(1) 1992 21.95 1.24 7.15 02/12/1992 1993 21.68 0.97 3.66 08/12/1993 1994 22.06 1.35 9.12 27/01/1995 1995 21.67 0.96 3.56 11/02/1996 1996 21.74 1.03 4.33 19/02/1997 1997 21.74 1.03 4.33 09/01/1998 1998 21.78 1.07 4.82 20/09/1999 1999 22.10 1.39 9.88 22/12/1999 2000 21.98 1.27 7.72 05/11/2000 2001 22.00 1.29 8.06 04/02/2002 2002 21.88 1.17 6.17 10/11/2002 2003 21.70 0.99 3.88 15/01/2004 2004 22.17 1.46 11.29 07/01/2005 (1) 2005 21.65 0.94 3.35 13/01/2006 2006 21.76 1.05 4.57 07/12/2006 2007 21.80 1.085 5.01 28/12/2007 2008 21.86 1.147 5.84 25/10/2008 2009 22.57 1.855 21.46 20/11/2009 (2) WL Max = 22.57 1.855 WL Med = 21.79 1.075 WL Min = 21.54 0.83 Limit of Reliable Rating 2.4 m3/s - Flow estimates above this are extrapolated and should be treated with caution (1) Water backed up behind both archesof bridge (2) Incomplete hydrometric year to 16/03/2010 Current Staff Gauge Zero = 20.71 maod (Poolbeg)

STATION NAME Rahasane Turlough STATION No. 29002 Dunkellin Dunkellin 19-Mar-10 Annual Maximum Series of Recorded Water Levels and Estimated Flows YEAR (maod - Poolbeg) (m) FLOW (m3/s) 1970 16.82 1.00 0.35 12/09/1971 (1) 1971 18.47 2.65 13.72 04/04/1972 1972 18.71 2.89 17.40 14/12/1972 1973 19.13 3.31 24.97 09/09/1974 1974 19.48 3.68 32.82 25/01/1975 1975 18.84 3.04 19.94 12/01/1976 1976 18.88 3.08 20.65 10/02/1977 1977 19.55 3.75 34.44 11/11/1977 1978 19.20 3.40 26.78 16/12/1978 1979 19.30 3.50 28.86 17/12/1979 1980 18.79 2.98 18.91 29/12/1980 1981 18.87 3.06 20.29 13/03/1982 1982 19.17 3.36 25.96 25/11/1982 1983 19.07 3.26 23.99 19/10/1983 1984 19.34 3.53 29.50 17/08/1985 (2) 1985 19.11 3.30 24.77 30/01/1986 1986 19.21 3.40 22.29 18/12/1986 1987 19.21 3.40 22.29 05/01/1988 1988 18.93 3.12 17.40 15/01/1989 1989 19.49 3.68 27.81 31/10/1989 1990 19.41 3.60 26.17 06/01/1991 1991 19.29 3.48 23.80 09/01/1992 1992 18.83 3.02 27.50 16/06/1993 1993 18.82 3.01 25.56 07/12/1993 1994 19.93 4.13 52.95 06/02/1995 1995 18.68 2.87 22.85 13/02/1996 1996 19.10 3.29 31.47 21/02/1997 1997 19.09 3.28 31.25 09/01/1998 1998 19.11 3.30 31.70 23/09/1999 1999 19.90 4.09 46.73 25/12/1999 2000 19.50 3.70 36.69 08/11/2000 2001 19.63 3.82 39.64 04/02/2002 2002 18.98 3.17 25.07 13/11/2002 2003 18.47 2.66 16.05 02/02/2004 2004 20.13 4.32 53.25 10/01/2005 (3) 2005 18.40 2.59 14.97 26/09/2006 2006 19.62 3.81 39.39 09/01/2007 2007 19.63 3.82 39.67 11/12/2007 2008 19.33 3.52 32.57 26/08/2009 2009 20.81 5.00 75.14 20/11/2009 (4) Limit of Reliable Rating 22.5 m3/s up to 1993 - Flow estimates above this are extrapolated and should be treated with caution Limit of Reliable Rating 39.5 m3/s from 1993 - Flow estimates above this are extrapolated and should be treated with caution (1) Incomplete year, records begin 01/08/1971 (2) Estimated Level (3) Flood mark leveled due to AR malfunction (4) Incomplete hydrometric year to 20/01/2010, WL estimated from survey Current Staff Gauge Zero = 15.80 maod (Poolbeg)

STATION NAME KILCOLGAN BRIDGE STATION No. 29011 16-Mar-10 Annual Maximum Series of Recorded Water Levels & Estimated Flows YEAR (maod - Malin head) (m) FLOW (m3/s) 1983 2.57 1.38 26.21 08/02/1984 1984 2.65 1.46 29.16 18/08/1985 1985 2.51 1.32 24.09 24/01/1986 1986 2.64 1.46 29.01 20/12/1986 1987 2.57 1.38 26.21 07/01/1988 1988 2.46 1.27 22.37 14/01/1989 1989 2.93 1.74 40.61 09/02/1990 1990 2.74 1.55 32.66 29/12/1990 1991 2.63 1.44 28.40 10/01/1992 1992 2.64 1.45 28.78 16/6/93 1993 2.62 1.43 28.03 24/12/93 1994 3.01 1.82 44.34 30/01/1995 1995 2.51 1.32 24.09 14/02/1996 1996 2.68 1.49 30.30 21/02/1997 1997 2.67 1.55 28.40 11/01/1998 1998 2.63 1.51 26.93 25/09/99 1999 2.95 1.83 39.81 26/12/1999 2000 2.75 1.63 31.47 08/11/2000 2001 2.80 1.69 33.67 06/02/2002 2002 2.56 1.44 24.44 13/11/2002 2003 2.36 1.25 18.13 05/01/2004 2004 2.94 1.82 39.37 11/01/2005 2005 2.43 1.31 20.13 26/09/2006 2006 2.85 1.73 35.52 09/12/2006 2007 2.75 1.63 31.47 11/12/2007 2008 2.70 1.58 29.42 26/08/2009 2009 3.70 2.58 79.37 21/11/2009 (1) WL Max = 3.007 1.82 WL Med = 2.643 1.456 WL Min = 2.363 1.176 Limit of Reliable Rating 46.7 m3/s - Flow estimates above this are extrapolated and should be treated with caution (1) Incomplete hydrometric year to 16/03/2010 Current Staff Gauge Zero = 1.187 maod (Malin head) Levels given are max fluvial levels and do not include tidal peaks.