Scope. Applicability. Caution. I & M CV3000 Series. Storage. Installation & Maintenance Instructions for Marwin CV3000 Series Three Piece Ball Valves

Similar documents
GT-200 GATE VALVES PN16, Screwed end

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

I & M Mark 708ME. Ideal Installation. Start-Up Procedure. Installation & Maintenance Instructions for Mark 708 & Motor Actuator

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1/2-1 )

I & M Mark 708. Ideal Installation. Start-Up Procedure. Installation & Maintenance Instructions for Mark 708 & 14M Actuator and Motor Valve

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1-1/2-2 )

I&M UT Series (2003 Design)

I & M MK96 & MK96C. Ideal Installation. Start-Up. Maintenance PROTECT VALVES WITH LINE STRAINERS

Installation, Operation, and Maintenance Manual

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

E818/828 Series Fugitive Emissions 150# and 300# Flanged 2" - 8" Two-Piece Ball Valves Installation, Operation and Maintenance Instructions

COMMERCIAL. BV & BVM Series Installation Instructions 06/29/15

Installation, Operation and Maintenance Instructions Series 608 Ball Valve

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

REACTOR DISCHARGE VALVES S & DIGESTER BLOW VALVES SB & 5300SB B FLANGED BALL VALVES

3L/T-2P/Q33 Series 3 Way Ball Valves

3, 4 & 6 (DN 80, 100 & 150) CLASS 150 & 300 STANDARD BORE SERIES 7150, 730S & 7300 FLANGED BALL VALVES EQUIPPED WITH KEROTEST HANDLE ASSEMBLIES

INSTALLATION & MAINTENANCE MANUAL

PFA LINED BALL VALVES Installation, Operation and Maintenance Manual

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Baumann Sanitary Diaphragm Angle and Inline Control Valve

V-SEGMENT SERIES V-Port Segment Control Valves (VS/VV/VM) Installation & Maintenance Manual

Railroad Ball Valves Series 5REB3

OPERATION AND MAINTENANCE MANUAL 2-66 SERIES 2500 RESILIENT WEDGE GATE VALVE

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

VSI INDUSTRIAL BALL VALVES SERIES 7100 SERIES 8100 SERIES 7200 SERIES 8300 SERIES 7400 SERIES 8400 SERIES 8000 SERIES 8500

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

26 Series Stainless Steel 2-way Ball Valves

Fisher D2T FloPro Control Valve

3 AND 4 CLASS 300 STANDARD BORE SERIES 730S AND 7300 REACTOR DISCHARGE VALVES. Installation, Maintenance and Operating Instructions

Power-Seal High Performance Butterfly Valve: Series P1 Installation & Maintenance Manual

Butterfly valves Figure 56 Installation & Maintenance Instructions

1451 Control Valve. General Instructions. Table of Contents

F8/FB8 Series Ball Valves IOM-F8/FB8

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

ICV & ICVA Flanged Injection Control Valves 2 (DN 50) Type Installation, Maintenance and Operating Instructions

I & M UT Series (2003 Design)

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

3-Piece Ball Valves Series 4000 Model A

Tool-less Hinged Closure Installation, Operation, & Maintenance

Baumann 24000F Wafer Control Valve

McCannalok HIGH PERFORMANCE BUTTERFLY VALVE OPERATION AND MAINTENANCE MANUAL. The High Performance Company

Standard Bore Flanged Ball Valves Series 7150, 730S & , 4 & 6 (DN 80, 100 & 150) Class 150 & 300

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Guide

MAINTENANCE GUIDELINES FOR NIBCO ¼ THROUGH 3 CLASS 125, 150, 200 & 300 BRONZE SWING CHECK VALVES FIGURE NUMBERS

K-LOK Installation, Operation, Maintenance and Troubleshooting

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

Installation Operation Maintenance. LSSN Butterfly Valve AGA Approved 50MM - 150MM. QAD#IM6055.REVA

HIGH PRESSURE CONTROL VALVE R2L ACTUATOR

MERIDIAN, 2 or 3 PIECE, TRUNNION MOUNTED BALL VALVES

TBV OPERATION AND MAINTENANCE MANUAL SERIES 1800: FLANGED BALL VALVE. For technical questions, please contact the following:

I & M Mark 96AA Series

Delayed Coker Switch Ball Valve

METERING VALVE 2" STEM GUIDED

/2" 2" Series 94 and FZ94 Three-Piece Ball Valves, 1

Metal Characterized-seated Control Valve 1. /4" 4" CPT 44 and 1 /2" 4" CPT 51/52 Installation, Operation and Maintenance Instructions

I-795/906. Series 795 and 906 Installation-Ready Knife Gate Valves WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS

Baumann Mikroseal Control Valve

INSTALLATION - MAINTENANCE MANUAL Severe Service Series M4 Ball Valve

SERVICE KITS REBUILD KIT DESCRIPTION CHART MODEL DESCRIPTION CHART SPECIFICATIONS X X 1 - B X - X X X - B

MEMORY SEAL BALL VALVES MAINTENANCE MANUAL 2 12, Class 150 & 300, Regular Port, Flanged Unibody

Keystone K-LOK Series 360/362 and 370/372 Installation, Operation, Maintenance and Troubleshooting

Fisher 657 Diaphragm Actuator Sizes and 87

INSTRUCTION MANUAL. for BUTTERFLY VALVES

VALUE-LINE 3-Piece Ball Valves Series 3A & 3C 1/2 2 (DN15-50) Installation, Maintenance and Operating Instructions

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

Bray/McCannalok High Performance Butterfly Valve Operation and Maintenance Manual

Installation, Operation, and Maintenance Manual

K-LOK Installation, Operation, Maintenance and Troubleshooting

INSTALLATION, OPERATION, MAINTENANCE MANUAL

for ½" thru 2" 800 lb. Piston Lift Check Valves with Resilient Seat Option

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

Series A Floating Ball Valve Installation, Operation & Maintenance XXXX - X X X X X X X. Base Part Numbers. Trim Option Suffix Code

Val-Matic QuadroSphere Trunnion Mounted Ball Valve

Model DF269 Control Valve

Double Offset High Performance Butterfly Valve

Baumann Sanitary Angle Control Valve

FIGURE 310AM, 310AMSW & 311AM 3-PIECE BALL VALVE

USER INSTRUCTIONS. NAF Trunnball DL Ball Valves. Installation Operation Maintenance. Experience In Motion FCD NFENIM A4 01/15

Kimray reserves the right to modify or improve the designs or specifications of such products at any time without prior notice Kimray Inc.

Ver Trunnion Ball Valve INSTALLATION, OPERATION AND MAINTENANCE MANUAL FBV/IOM/BA02

IOM-CleanFLOW TM. CleanFLOW Series Ball Valves. SV F Flow Controls I N C O R P O R A T E D

High Lift Transmission Jack

DOUBLE OFFSET BUTTERFLY VALVE

Newco / OIC / Cooper Forged Valves. Operation & Maintenance. Manual

CLINCHER 2-Piece Thread-end Ball Valves Series 2000

Installation, Operation, and Maintenance Manual

Fisher D4 Control Valve Assembly

IOM Manual. IOM Manual. Series 76/77.

Keystone K-LOK Series 360/362 and 370/372 Installation, Operation, Maintenance and Troubleshooting

Baumann Way Control Valve

Model DFR 070/156/220 Rotary Actuator

INSTALLATION OPERATION AND MAINTENANCE MANUAL

Air Assist Bottle Jack Max. Capacity: 12 Tons (4313C) & 20 Tons (4321C) Operating Range: psi

Operating & Maintenance Manual For Steam Conditioning Valve

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

MAINTENANCE GUIDELINES FOR NIBCO 2" THROUGH 10" CLASS 125, 150 & 250

Transcription:

I & M CV3000 Series 3170 Wasson Road Cincinnati, OH 45209 USA Phone 513-533-5600 Fax 513-871-0105 marwin@richardsind.com www.marwinvalve.com Installation & Maintenance Instructions for Marwin CV3000 Series Three Piece Ball Valves Warning: Marwin Valve ball valves must only be used, installed and repaired in accordance with these Installation & Maintenance Instructions. Observe all applicable public and company codes and regulations. In the event of leakage or other malfunction, call a qualified service person; continued operation may cause system failure or a general hazard. Please read these instructions carefully! Your Marwin Valve product will provide you with long, trouble-free service if it is correctly installed and maintained. Spending a few minutes now reading these instructions can save hours of trouble and downtime later. When making repairs, use only genuine Marwin Valve parts, available for immediate shipment from the factory. Scope This manual is intended as a guide to assist customers in the storage, installation, and maintenance of Marwin CV3000F/R Series ball valves. Subsequent additions or special instructions will be provided for special valves, critical service or customer requirements. Applicability 2. Always depressurize the line with the valve in the open position before disassembly. Cycle valve in depressurized line before removing valve. 3. After depressurizing line, cycle valve open and closed to depressurize valve before removal from line. 4. Wear protective equipment and take appropriate precautions to safeguard against injury caused by the discharge of trapped fluids. 5. Use only Marwin recommended spare parts for maintenance. 6. To ensure safety and maintain warranty, never modify valve in any way without prior approval from Marwin. Storage A petroleum-based oil (silicone free) is used as lubrication on all internal surfaces. This may be removed with a solvent if found objectionable. All valves are adequately packed in a strong cardboard case in such a way as to avoid any possible damage during transport and storage. Caution: if ball valves are not destined for immediate use, the following precautions should be taken: 1. If possible, leave the ball valves in their packing cases during the period of storage. 2. Ball valves must remain in open position during this time. This manual is applicable to the CV3000F/R Series Marwin three piece ball valves. Caution To help prevent injury to personnel or damage to equipment, please read this section completely before performing any operations. 1. Valve pressure ratings are based on many variables, including valve series and size, as well as body, seat and bolt material. Verify that application does not exceed the pressure or temperature rating on the nameplate. 3. In order to prevent damage, protective plastic covers on valve ends should not be removed until immediately prior to installation. 4. It is advisable to store the valves in waterproof conditions. Ball valves should be protected to safeguard against humidity, moisture, dust, dirt sand, mud, salt spray and seawater. 5. All valves complete with actuators are to be stored in dry conditions. 6. Valves to be stored for a long period of time should be checked by the quality control personnel every six months; every three months when valves are automated.

Maintenance During Storage Period Internal surface should be inspected to check for dust or other foreign objects. Rust or dust must be removed by cleaning with proper solvent. After cleaning, ball valves must be lubricated with an adequate lubricant. Ball valves should be operated for at least two complete cycles before installing or returning to storage. Installation The ball valves may be installed in any position using standard pipe fitting practices. Caution: Before installation of the valve: 1. Pipe must be free of tension both during and after installation. 2. Pipe must be flushed to clean dirt, welding residues, etc. which would damage ball or seats. 3. The valve should be kept in OPEN POSITION during installation and protective plastic covers must be removed only at the moment of installation. 4. Before shipment, the ball is lubricated with a pure Vaseline oil. This can be easily removed with an application compatible solvent if required. 5. If the valve was specified to be tested per ASME 16.34, there may be some trapped water between the ball and the body cavity. This can be removed by partially opening the valve, thereby exposing the cavity to the through port of the ball. 6. Special care should always be taken when installing automated ball valves that the ball is in the proper position. The CV3000 is a directional valve, and must be installed so that flow is in the direction of the arrows on the side on the valve. Installation of Threaded-Ends 1. Unless otherwise specified, pipe threads are American National Standard Taper Pipe Threads (NPT) per ANSI B1.20.1, and require that a pipe sealant be used. 2. Use an anti-seize thread sealant to seal and prevent galling. a. Marwin recommends PTFE-based liquid sealant or Grafoil tape as thread sealants. b. Notes: 1.Use all pipe sealant products in accordance with the manufacturer s instructions and good piping practices. 2. Correct lubrication of stainless steel pipe threads in especially important to prevent galling. -2-3. To prevent distortion or damage to the valve, do not apply torque through the valve. When tightening valve, use wrench on the end nearest the pipe being tightened. 4. Always leak test the system before using. Installation of Short Welded-End Ball Valves (or Low Temperature Seats) 1. Tack weld in four points on both end caps. 2. Lift out the valve body and seat per disassembly section in this procedure and complete the welding. 3. Allow welds to cool. 4. Reassemble valve per section in this procedure and inspect for easy operation. Installation of Extended Welded-End Ball Valves 1. Extended end valves may be welded into place without disassembly using the following guidelines: a. Valve must be in the full open position b. Limit continuous weld time to one minute. c. Direct moving air across finned area or wrap extended end with wet cloth. d. Check body bolts for proper torque after welds have completely cooled per Assembly Section of this procedure. Note: Guide for extended valve installation does not apply to UHMW-PE or Delrin seats or standard EPDM or Nitrile body seals due to the low tolerance to high temperatures of these materials. Installation of Flanged Ends 1. Verify valve is in the full open position. 2. Use the appropriate size bolt and heavy hex nut (not included) as recommended for flange size and class. 3. Flange connection requires gasket (not included). 4. Follow gasket manufacturer s recommended practice for tightening flange bolts. Manual Operation 1. Open and close the valve by turning the handle onequarter turn (90 ). 2. Valve is in open position when handle is in line with the pipe. 3. Valve is in closed position when the handle is perpendicular to the pipe. Maintenance Before starting maintenance, please read information contained in the Caution Section of the manual. 1. Open and close the ball valve at least once to release the pressure completely from valve body. 2. Ball valves, if correctly used, normally do not need any internal lubrication and maintenance.

However, when necessary, ball or seats can be replaced by qualified personnel following the instructions of this manual. 3. For further information, please refer to SPARE PARTS LIST. Valve Disassembly A. To inspect and/or Replace Body Seals, Seats, Packing & Ball Reference cross section for part identification 1. Valve must be in the open position. 2. Remove valve from line (with end caps if possible). 3. Remove bolts (12) securing the end caps (2) from body (1). 4. If end caps (2) have not been removed from pipeline, it will be necessary to spread the pipe slightly to remove body (1). 5. Close the valve and remove ball (3), seats (4), body seals (6), secondary body seals (7), characterized plate (24), and index pin (25). 6. Remove nut (22), lockwasher (8), second nut (22), Belleville washers (21), stem gland (20), and packing (18). 7. Push the stem (5) into the body (1). Remove o-ring (23) and thrust washer (17) from stem. B. Inspection and Replacement With the valve completely disassembled, clean and examine all components. 1. The surface of the ball should be free from any defect. If any are found, the ball should be replaced. Using a defective ball will be extremely detrimental to valve performance. 2. Seats. Replacement of seats is recommended. 3. Stem seals and body seals. Should be discarded and replaced. 4. Remaining components of the valve. After cleaning, carefully examine for wear, corrosion and mechanical damage. Replace all defective parts. 5. Clean inside of body and stem housing. Light grease, compatible with line fluid, can be used on ball, seals and stem surface. Note: A spare parts list is available for this valve. Please refer to explosion view below for identification. Please specify specific valve number to ensure proper parts are ordered. Marwin Valve does not take responsibility for incorrectly ordered spare parts. 7 18 23 17 4 Spare Parts List Item # Quantity Part Name 18 2 Packing Ring 17 1 Thrust Washer 23 1 "O"-Ring Stem 4 2 Seat 6 2 Body Seal 7 2 Secondary Body Seal Re-Assembly A. Stem 1. Replace thrust washer (17) and O-Ring (23) lubricate, then insert the stem from inside of body. 2. Install stem packing (18), gland (20), Belleville washers (21), and stem nut (22) and tighten until snug, then one-half turn. Install lockwasher (8) and second stem nut (22). To avoid rotation of stem, insert a non-marking object thru the ID of the ball. B. Ball, Seats, and Seals 1. Place the stem (5) in closed position and insert the ball (3), aligning groove in ball with bottom of stem. 2. Position the ball in the open position. Note: For steps 3 through 6, the downstream (DS) end of the body is indicated by the head of the flow arrow on the body, and the upstream (US) end by the tail. 3. Insert a body seal (6) and secondary body seal (7) on the downstream (DS) end of the body. Insert a seat (4) in the DS end cap (2A), and insert the DS cap on the DS end of the body (1). 4. Install and hand tighten the DS body bolts (12). 5. With the ball still in the open position, insert a body seal (6) and secondary body seal (7) on the upstream (US) end of the body. Insert the index pin (25) in the locating hole in the US end cap (2B), and insert the characterized plate (24) in the US end cap, so the hole or slot of the plate locates on the pin. Insert a seat (4) into the US end cap over the plate, and insert the US cap on the US end of the body (1). 6. Install and hand tighten the US body bolts (12). 7. Tighten bolts to recommended torque values using an alternating / opposing pattern with no more than 1/4 turn on each bolt before alternating. Testing 1. After completing the reassembly, check that valve operates smoothly by opening and closing valve several times. 2. If entire valve was removed from line and if facilities area available, test the ball valve to appropriate specifications. 6-3-

A. Stem Leakage Troubleshooting 1. Leakage in the stem packing area may be eliminated by increasing the torque on the stem nut (22) in one-quarter turn increments. Some size valves may require a thin wall socket (or turned down equivalent). If leakage persists, replace stem packing (18) and stem o-ring (23). B. Body Seal Leakage 1. Check the torque of the body bolts (12) according to Torque Table. Replace body seals (6 & 7) if leakage persists. C. In Line or Seat Leakage 1. Check to be sure line flow is in same direction as across side of valve body. 2. Check to be sure valve is in fully closed position. If leakage persists, the valve must be disassembled and damaged parts replaced. Packing Adjustment Socket Hex Socket O.D. Valve Size Socket O.D. Max Socket Hex 1/4"F - 3/4"F 0.66" 13 mm 3/4"F -1-1/4"R 0.91" 17 mm 1-1/4"F - 2"R 22 mm 2"F - 2-1/2"R 1" 2-1/2"F - 3"R 1-1/4" 3"F - 4"R 1-1/2" Body Bolt Torque Valve Table (ft/lbs) Series/Size Bolt Information Bolting Material 3000 Bolt Size Bolt Qty (per end cap) BD Steel B7M Nace B8 St STl 1/4" - 1/2"R 5/16-18 4 20 10 8 3/4"R - 1/2"F 5/16-18 4 20 10 8 1"R - 3/4"F 3/8-16 4 25 21 14 1-1/4"R - 1"F 7/16-14 4 33 30 23 1-1/2"R - 1-1/4"F 1/2-13 4 54 42 33 2"R - 1-1/2"F 9/16-12 4 60 52 47 2-1/2"R - 2"F 1/2-13 6 54 42 33 3"R - 2-1/2"F 1/2-13 9 54 42 33 4"R - 3"F 9/16-12 8 60 52 47-4-

Exploded View 8 8 5 21 18 17 3 22 20 23 2A 12 4 24 2B 25 1 6 7 12 Item # Quantity Part Name Item # Quantity Part Name 1 1 Body 12 8 Bolts, Body 2A 1 End Cap, Downstream 17 1 Thrust Washer 2B 1 End Cap, Upstream 18 1 Packing Rings 3 1 Ball 20 1 Gland 4 2 Seat 21 2 Belleville Washers 5 1 Stem 22 2 Nut, Stem 6 2 Body Seal 23 1 "O" Ring, Stem 7 2 Secondary Body Seal 24 1 Characterized Plate 8 1 Lock Saddle Washer 25 1 Index Pin Bulletin IM-CV3000-0214 3170 Wasson Road Cincinnati, OH 45209 USA Phone 513-533-5600 Fax 513-871-0105 marwin@richardsind.com www.marwinvalve.com