N605ML DUE LIST Total projection: 11-Dec-2018 / Hrs 2,011 / Ldg 1,393 / APUH 2,010 / APUS 2,616

Similar documents
MAINTENANCE RECORD (THIS FORM IS TO BE RETAINED IN THE AIRCRAFT LOG)

VH-DBT. Maintenance Due List Sort By Earliest Due Date Include only mandatory service information not yet accomplished. Projected Through: 5746.

CESCOM 20 - Projected Maintenance Due

SUPER KING AIR B300 (350) S/N FL-492 N726TT

N416WM. Maintenance Due List Sort By Earliest Due Date Include only mandatory service information not yet accomplished. Projected Through:

CURRENT STATUS LOG DATE Nov Analyst: Mike Marrero-STD Phone: Direct Line

SUPER KING AIR B200C Registration : PK - YGT Total Time : 9116

11/15/ Right S/N FWA-3829 TSN TSO TIME/CALENDAR LIMIT HOURS HOURS HOURS HOURS HOURS HOURS

LANCAIR LEGACY PRE-TEST FLIGHT INSPECTION (8-04)

A Simplified Index of Mooney M-18 Drawings at the NASM

#1 ENG. 6/4/ apu APU HOURS HOBBS

ARIANA AFGHAN AIRLINES MPD Tally Sheet - Routine Jobs

LAD Inc. Beechcraft King Air 200 Series Technical Ground School Syllabus Material Covered

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

A.M.M. Revision Status AMM B30 May-14 C OF A 23-May-03 A.L.M. Revision Status ALM B Mar-14 AFM Revision Status AFM B3 Jul-05

Falcon 50 AIRCRAFT MAINTENANCE MANUAL

SD3-60 AIRCRAFT MAINTENANCE MANUAL. This chapter includes information on dimensions, areas, zoning, etc. and is presented as follows:

N100YC PC12/45/47 STATUS REPORT

MINIMUM EQUIPMENT LIST

1 search parameters. 75 results. Exact Match. Model. Engine Fuel & Control - Installation of Improved Carburetor Airboxes

Status Report ALERION AVIATION 4310 DONALD DOUGLAS DRIVE LONG BEACH CA LAST ACTUALS LAST ACTUALS LAST ACTUALS LAST ACTUALS LAST ACTUALS

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

AD COMPLIANCE LIST SAAB340A 1/5

Status Detail Report

Models AA-5, AA-5A & AA-5B Annual or 100-hour Inspection

PIPER AIRCRAFT PA NOTE- Perform all inspections or operations at each oj the inspection. 1. Inspectspinnerandbackplate

Revision Status AMM C3 2/1/2009 C OF A 7/15/2002 Revision Status AFM C6 12/1/ INSPECTION REQUIREMENT

SCHEDULED MAINTENANCE

The tie to tube front windshield was rounded to avoid a distorted by this point.

Dimensions And Areas. 1. General. A. Airplane Dimensions and Areas

CHAPTER 1 AIRCRAFT GENERAL

Seabee Annual Inspection Procedures

MODEL 95 PARTS CATALOG ALPHABETICAL INDEX , 21, 21A 31 3, 4, 4A , 58A 60 61A, 61B, 61C

Mooney Mite M-18X Plans and Drawings Index Arranged by Group Miscellaneous Group

CESCOM 20 - Projected Maintenance Due

Aircraft Maintenance Compliance Report (GN-7002)

CIRRUS AIRPLANE MAINTENANCE MANUAL

CESCOM 20 - Projected Maintenance Due

Seabee Annual/100-Hour Inspection

BARON 58 DGCANO SUBJECT REFERENCE COMPLIANCE APPLICABILITY

DASSAULT FALCON 7X SYSTEMS SUMMARY

King Air 200 Series Report - Title Page

SD3-60 AIRCRAFT MAINTENANCE MANUAL PROTECTION DESCRIPTION & OPERATION

1995 Beechjet 400A. RK-104 N401ML 6,520 Hours Since New 5,064 Landings Since New. Engine Total Time: 6,520 Hours Engine Total Time: 6,520 Hours

AA-5 SERIES MAINTENANCE MANUAL MODELS AA-5, AA-SA & AA-5B HOUR INSPECTION PROCEDURE ANNUAL OR 100 HOUR INSPECTION PROCEDURE GUIDELINE

Cycles values Cycle Name Value Cycle Name Value Cycle Name Value Cycle Name Value

SUPER KING AIR 200 SERIES MAINTENANCE MANUAL SCHEDULED INSPECTION PROGRAM (PHASE 1)-MAINTENANCE PRACTICES A. NOSE SECTION ATA/GAMA REFERENCE

Aeroplane Aerodynamics and Flight Controls 1 2

Operator Make & Model Serial No Date Hours Landings PT6A-66B PT6A-66B HC-E5N-3A HC-E5N-3AL. Group/Tracked. Installed 17-AUG-2012 H: 332.

ATR72 DGCANO SUBJECT REFERENCE COMPLIANCE APPLICABILITY

ATP Aircraft Registration Profile

~eechcraft. Twin-Bonanza TABLE OF CONTENTS

CESSNA SECTION 4. Unless otherwise noted, the following speeds are based on a maximum weight of 2550 pounds and may be used for any lesser weight.

CESSNA 182 CHECKLIST. LEFT WING Trailing Edge 1. Aileron CHECK freedom of movement and security

WORK PACKAGE INSTRUCTIONS

DASSAULT AVIATION Proprietary Data

BOMBARDIER CHALLENGER 601-3A/ER SERIAL NUMBER 5120 EQUUS GLOBAL AVIATION +1 (954)

P68 Observer 2 STANDARD EQUIPMENT LIST V

Accident Prevention Program

CIRRUS AIRPLANE MAINTENANCE MANUAL

Maintenance Status Report (GN-7002) Maintenance Status Report

OPERATIONS MANUAL FTO SECTION : 06.04

NORMAL CHECKLIST ATTENTION!

Unscheduled Maintenance Checks

Piper Archer II (PA )

Preflight Inspection Cabin EMPENNAGE RIGHT WING Trailing Edge RIGHT WING NOSE

Issue 0/Rev.00-0 Aug Page /

SR22 Airplane Flight Manual (AFM) Temporary Change

AUTOMATED LAST/NEXT DUE 1/6

TEMPORARY REVISION NUMBER

Cessna 550/551/560 (PWC JT15D) Initial Aircraft Type Training Course MAINTENANCE INITIAL

AIRCRAFT RECORDS RESEARCH REPORT

The application of ACF-50 compound

I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK

I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK

Vr V STANDARD EQUIPMENT LIST

Cessna 172P PPL Checklist Page 1

N398CM. RC-3 Serial Number 387 Zero Timed Restoration Details

TEMPORARY REVISION NUMBER

N123AX Piper Saratoga II HP (PA-32R-301) Checklist (v23 - Revision 3 April 2011) AIRSPEEDS FOR SAFE OPERATIONS. Best Rate of Climb (gear up, flaps up)

Cessna 172RG WARNING. Maximum Demonstrated Crosswind. Takeoff or landing..15 KTS

Dassault Aviation FALCON 7 X. for Jet CAT P160. Assembly Manual. AVIATION Design

CIRRUS AIRPLANE MAINTENANCE MANUAL

M-4-180V S2 M-4-180V S4. MAULE AIR, INC GA Hwy 133 South, Moultrie, GA / Phone (229) /

T-51 Mustang - 3/4 Scale Kit

Page 1 of 6 MAI RECORDS - MEB MECH INITIAL. Changes Made to Approved Limitations Registration: N139MH By: SBS Initials

Preflight Inspection. Table of Contents. Left Main Landing Gear... 2A-15 Left Fuselage... 2A-16. Left Wing Trailing Edge... 2A-13

Airworthiness Physical Survey Report

LIST OF MANDATORY BULLETINS FOR L 410 UVP AIRCRAFT

/200/300/400/500 SERIES FLAMMABLE MATERIAL LOCATIONS

Perform all inspections or operations at each of the inspection intervals as indicated by a circle (O) Inspector. Inspector DESCRIPTION DESCRIPTION

PIPER AIRCRAFT CORPORATION

4A.2 AIRSPEEDS FOR NORMAL OPERATING PROCEDURES

1/271. Millennium Aviation Millennium Aviation. Owner: Operator: Airframe Eng 1 Eng 2. Learjet 55 TFE731-3CR-3B TFE731-3CR-3B

Airworthiness Directive Schedule

L 298/70 Official Journal of the European Union

Offers for Sale Q Series: Q400 Aircraft MSN 4064

HOUR OR ANNUAL LONG FORM INSPECTION

Cessna Citation XLS - Electrical

Transcription:

Owner: Operator: JSM Holdings, LLC (tyn Law Firm) Airframe Eng 1 Eng 2 APU 1 Hawker 75 FE731-5BR FE731-5BR GCP36-15[W] HB-6 P-95 P-9 P-92 11-Oct-217 11-Oct-217 17-Aug-217 1,65 Enc Enc 2,256 APUS Flt 1,62 (APU) Earliest due: OVD DAYS, 6 HRS, 1,967 LDG,,35 APUHRS Cost: Man : 3+ Analyst: Frank Neal fneal@traxxall.com 319 Galley Water System - Clean 3 A/F Days 3 16-Nov-217 OVD 3191 Lavatory Water System - Clean Custom ask 3 A/F Days 3 16-Nov-217 OVD Cabin Portable Fire Extinguisher Inspection 26 A/F Days 3 3-Nov-217 OVD Cockpit Portable Fire Extinguisher Inspection 26 A/F Days 3 3-Nov-217 OVD 37 Ice and Rain Protection - Purging of Ice Protection System 3 A/F Alias1:-3- (NOE: Applicable if the airframe de-icing system has not been operated during the last calendar month. Ref. AMM -3- Page 31) 1 3-Nov-217 OVD 26 Fire Protection - Functional est of Smoke Detection System 26 A/F Alias1:26-11- (NOE: MMA 26-11- Page 51) 6 2-Dec-217 Days (+9) 269 Fire Protection - Functional est Baggage Pannier or External Baggage Unit Smoke Detection System (if fitted): 26 A/F Alias1:26-11- (NOE: MMA 26-11- Page 51) 6 2-Dec-217 Days (+9) 2-AFMS-1 Capacity est (Concord Battery) 2 A/F No.1 RG-39E 2627 (ol. Adjustment: -9d) 3 25 7-Jan-21 1,91 27 Days (+31) 25 (+1) 1/

2-AFMS-1 Capacity est (Concord Battery) 2 A/F No.2 RG-39E 6692 (ol. Adjustment: -9d) 3 25 7-Jan-21 1,91 27 Days (+31) 25 (+1) 23-AFMS-3 Underwater Locator Beacon - est 23 A/F CVR DK SC615 Inspected Date 25-Jan-216 25-Jan-216 1,157. 776 2 31-Jan-21 51 Days FAR 91.27 Emergency Locator ransmitter Inspection and est per FAR 91.27 (d) 2 53-56 252-33 9-Jan-217 1,5.2 939 31-Jan-21 51 Days 1 Do any 2 hour lubrication requirements for ALL Area's, refer to Part 7 - LUBRICAION. AFMS Part 1, AFMS Part 7 23-Feb-21 A/F (ol. Adjustment: -5.3 ) 2-1/+ 1,776.9 5.9 (+) 2-AFMS-2 Engine (Main) Starter/Generator - Overhaul 13-Mar-21 2 A/F No.2 23-6 P137 3-Aug-21 1, 1, 16 PKG 15/25 Hour Engine - 15 to 25 Hour Inspection 16-Mar-21 5 ENG1 25-Aug-217 15 +1 1,6.1 155.1 (+1) Enc 1,2 PKG 15/25 Hour Engine - 15 to 25 Hour Inspection 16-Mar-21 5 ENG2 25-Aug-217 15 +1 1,6.1 155.1 (+1) Enc 1,2 23 Function est Cabin Inverter (115 Vac) System (If fitted) 17-Apr-21 2 A/F SPS-167A 13 2 1,31.2 1.2 2-AFMS-16 Preventative maintenance activity - Battery replacement (Securaplane) 2 A/F No. 1-5- 91313 3-Aug-21 [3-Apr-21].7 Months 2-AFMS-16 Preventative maintenance activity - Battery replacement (Securaplane) 2 A/F No.5 1-5- 91653 3-Aug-21 [3-Apr-21].7 Months 2-CUS-16 Preventative maintenance activity - Battery replacement (Securaplane) 2 A/F No.7 1-5- 2215 3-Aug-21 77 [3-Apr-21].7 Months 2/

2-2-1 est 115/23 VAC GFI Outlets 2 A/F (NOE: Do a function test of the Cabin Inverter (115 VAC) system (Ref. MMA 2-2-1, 21).) 1-Sep-217 1,665.9 1,31 2 SC - ICA 1,65.9 22-May-21 21.9 2-AFMS-16 Preventative maintenance activity - Battery replacement (If Installed) 2 A/F No.6 1-5- 91653 3-Aug-21 [31-May-21] 5.7 Months 2-AFMS-16 Preventative maintenance activity - Battery replacement (Securaplane) 2 A/F No.3 1-5- 916132 3-Aug-21 [31-May-21] 5.7 Months 21 Electrical Power - Removal Engine Starter Generator and Inspection of Brushes, Fan, Splines, Engine Drive for Wear 2-Jul-21 2 A/F No.1 23-6 P251 Alias1:2-3-21-1, 2-3-21-61 (NOE: AMM 2-3-21 Page 1, AMM 2-3-21 Page 61) 3 +1 1,931.2 2.2 (+1) 21 Electrical Power - Removal Engine Starter Generator and Inspection of Brushes, Fan, Splines, Engine Drive for Wear 2-Jul-21 2 A/F No.2 23-6 P137 Alias1:2-3-21-1, 2-3-21-61 (NOE: AMM 2-3-21 Page 1, AMM 2-3-21 Page 61) 3 +1 1,931.2 2.2 (+1) 2-AFMS- Engine A.C. Generator - Overhaul 2 A/F No.1 BA21-1 366 Overhaul Date 3-Aug-21 3-Aug-21 3, 3-Aug-21 3, 7. Months 1,39 2-AFMS-5 Engine A.C. Generator - Overhaul 2 A/F No.2 BA21-1 37 Overhaul Date 3-Aug-21 3-Aug-21 3, 3-Aug-21 3, 7. Months 1,39 322 Area W1, W2: Wing - Inspection of Main Landing Gear Fairing Strut 32 A/F Alias1:32-1-13 [3-Aug-21] 7. Months (+91 FAR 91.11 Air Data Unit (ESIS) - Inspection/test per FAR 91.11 3 A/F 2711-1-1 M255 Certified Date 11-Aug-216 -Aug-216 1,39 55 2 11-Aug-21.1 Months 5319 Area F: Rear fuselage - Detail Inspection of PAS APU GCP36-15W Support Structure External to the Fire Enclosure 53 A/F (ol. Adjustment: -13d) (NOE: If any of the inspections show an abnormal indication or requires the replacement of structural parts, do asks 5322 and 5323.) 25-Aug-217 11-Aug-21.1 Months (+37 1,2 3/

PKG 3/ Hour Engine - 3 o Hour Inspection 16-Aug-21 5 ENG1 25-Aug-217 3 +1 1,956.1 35.1 (+1) Enc 1,2 PKG 3/ Hour Engine - 3 o Hour Inspection 16-Aug-21 5 ENG2 25-Aug-217 3 +1 1,956.1 35.1 (+1) Enc 1,2 55 Routine Inspection - E (ol. Adjustment: -6d) 25-Aug-217 1-Aug-21.3 Months (+31 1,2 551 Inspection E1 (ol. Adjustment: -6d) 55 25-Aug-217 1-Aug-21.3 Months (+31 1,2 552 Inspection E2 (ol. Adjustment: -6d) 55 25-Aug-217 1-Aug-21.3 Months (+31 1,2 55 Inspection E (ol. Adjustment: -6d) 55 25-Aug-217 1-Aug-21.3 Months (+31 1,2 556 Inspection E6 (ol. Adjustment: -6d) 55 25-Aug-217 1-Aug-21.3 Months (+31 1,2 557 Inspection E7 (ol. Adjustment: -6d) 55 25-Aug-217 1-Aug-21.3 Months (+31 1,2 22 Electrical Power - Remove and Inspect APU Starter Generator Brushes, Fan, Splines, Engine Drive for Wear 21-Aug-21 2 A/F 23-6 P113 Alias1:2-3-21 (NOE: 2-3-21 Page 1, 2-3-21 Page 61) (APU) 16-Jan-217 1,93.5 92 1,56 5 2,6 (APU) 2-AFMS-15 Energy Level est (Capacity est) (If Installed) 2 A/F No.6 1-5- 91653 25-Aug-217 1,2 1 25-Aug-21.6 Months /

2-AFMS-15 Energy Level est (Capacity est) (Securaplane) 2 A/F No.3 1-5- 916132 25-Aug-217 1,2 1 25-Aug-21.6 Months 2-AFMS-15 Energy Level est (Capacity est) (Securaplane) 2 A/F No. 1-5- 91313 25-Aug-217 1,2 1 25-Aug-21.6 Months 2-AFMS-15 Energy Level est (Capacity est) (Securaplane) 2 A/F No.5 1-5- 91653 25-Aug-217 1,2 1 25-Aug-21.6 Months 2-CUS-15 Energy Level est (Capacity est) (If Installed) 2 A/F No.7 1-5- 2215 25-Aug-217 1,2 1 25-Aug-21.6 Months 563 Routine Inspection - F (ol. Adjustment: 17d) -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 566 Inspection F3 563 (ACCESS: F1, F221, F2, F222, F3, F223) (ol. Adjustment: 17d) -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 567 Inspection F (ol. Adjustment: 17d) 563 -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 569 Inspection F6 (ol. Adjustment: 17d) 563 -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 57 Inspection F7 (ol. Adjustment: 17d) 563 -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 571 Inspection F (ol. Adjustment: 17d) 563 -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 5/

572 Inspection F9 563 (ol. Adjustment: 17d) -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 573 Inspection F1 563 (ACCESS: W36, W311, W313) (ol. Adjustment: 17d) -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 575 Inspection F (ol. Adjustment: 17d) 563 -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 576 Area W2: Wing - Inspection of Flap Skin Protection Panels (if fitted) for Corrosion and Deterioration of the Protective reatment 573 (ACCESS: W311) (ol. Adjustment: 17d) (NOE: Applicable to Mod. 25971A airplanes only.) -Aug-216 1,39 2 29-Aug-21.7 Months (+61 55 FAA RVSM FAA - RVSM Height Monitoring FAR91 -Aug-216 1,39 2 31-Aug-21. Months 55 32 Navigation - Draining and Leak est of Pitot Static Drain raps 3 A/F Alias1:3-11-19 (NOE: Leak test is not needed for Post SB 3-322. Do this task in conjonction with FAR pitot/static system checks (task 36). Ref. AMM 3-11-19 Page 51) -Aug-216 1,39 55 2 +2 31-Aug-21. Months (+61 36 Navigation - Pressure, Suction est of Pitot, Static And Stall Warning Systems 3 A/F Alias1:3-11-19 (NOE: Do this task in accordance with FAR requirements. Ref. AMM 3-11-19 Page 51) -Aug-216 1,39 2 +2 31-Aug-21. Months (+61 55 FAR 91.11 Air Data Computer tests and inspections per FAR 91.11 Appendix E of Part 3 3 A/F No.1 22-119-15 39LGG Inspected Date 11-Aug-216 -Aug-216 1,39 55 2 31-Aug-21. Months FAR 91.11 Air Data Computer tests and inspections per FAR 91.11 Appendix E of Part 3 3 A/F No.2 22-119-15 21VPN Inspected Date 11-Aug-216 -Aug-216 1,39 55 2 31-Aug-21. Months FAR 91.11 Altimeter Standby Indicator tests and inspections per FAR 91.11 3 A/F -Aug-216 1,39 55 2 31-Aug-21. Months 6/

FAR 91.11 Altimeter test and inspect per FAR 91.11 Appendix E part 3 3 A/F Copilot -Aug-216 1,39 Inspected Date 11-Aug-216 55 2 31-Aug-21. Months FAR 91.11 Altimeter test and inspect per FAR 91.11 Appendix E part 3 3 A/F Pilot Inspected Date 11-Aug-216 -Aug-216 1,39 55 2 31-Aug-21. Months FAR 91.11 Pitot/ Static Systems Leak check per FAR 91.11 Appendix E of Part 3 3 A/F Certified Date 11-Aug-216 -Aug-216 1,39 2 31-Aug-21. Months 55 FAR 91.11 Pitot/ Static Systems Leak check per FAR 91.11 Appendix E of Part 3 3 A/F Inspected Date 11-Aug-216 -Aug-216 1,39 2 31-Aug-21. Months 55 FAR 91.13 AC ransponder test and inspections per FAR 91.13 Appendix F of Part 3 3 A/F Left 622-921- 3LRVY Inspected Date 11-Aug-216 Brand A:353, Brand C:353 -Aug-216 1,39 55 2 31-Aug-21. Months FAR 91.13 AC ransponder test and inspections per FAR 91.13 Appendix F of Part 3 3 A/F Right 622-921- 3LRWB Inspected Date 11-Aug-216 Brand A:35, Brand C:35 -Aug-216 1,39 55 2 31-Aug-21. Months 211 Area F3: Vestibule, Passenger Cabin and oilet Compartment - Cleaning of Left Pressure Regulator Filter Screens 21 A/F 576 Alias1:21-3-55 (ACCESS: F29,F3,F31,F32,F33,F3,F35, F16,F37,F3,F39,F61A) (ol. Adjustment: 15d) (NOE: Access panel (continued); F61B, F6A, F6B, F6A, F6B, F71A, F71B, F72, F7A, F7B, F7C, F76, F7,F2A, F2B, F3, F7 Airplanes without the digital pressurization control system Mod. 25G726A/C or Mod. 25G726B/C) 3-Aug-21 1-Sep-21 9.2 Months (+61 211 Area F3: Vestibule, Passenger Cabin and oilet Compartment - Cleaning of Right Pressure Regulator Filter Screens 21 A/F 576 Alias1:21-3-55 (ACCESS: F29,F3,F31,F32,F33,F3,F35, F16,F37,F3,F39,F61A) (ol. Adjustment: 15d) (NOE: Access panel (continued); F61B, F6A, F6B, F6A, F6B, F71A, F71B, F72, F7A, F7B, F7C, F76, F7,F2A, F2B, F3, F7 Airplanes without the digital pressurization control system Mod. 25G726A/C or Mod. 25G726B/C) 3-Aug-21 1-Sep-21 9.2 Months (+61 216 Fuel - Visual Inspection of Low Pressure Fuel Valve Support Strut 2 A/F 576 (ol. Adjustment: 15d) (NOE: Part No. 25 PF361, 25 PF361-5A (Mod. 25G31A) and 25 PF363.) 3-Aug-21 1-Sep-21 9.2 Months (+61 7/

576 Routine Inspection - G 3-Aug-21 [15-Sep-21] 9.3 Months (+61 217 Area F: Rear Equipment Bay and Rear Fuselage - Inspection, Check of Earth Stations *16, *17, *1, And *19 2 A/F (ACCESS: Hydraulic Box Cover) 96 15-Sep-21 9.3 Months (+61 519 Area F3: Vestibule, Passenger Cabin and oilet Compartment - Detail Inspection of Entry Door Surround 51 A/F (ACCESS: F66A, F66B, F66C) 15-Sep-21 15-Sep-21 531 Area F1: External Fuselage, Nose Cone, ail Cone, Wing-to-Fuselage Fairings - Detail Inspection of Skin Exterior Under he Dorsal Intake, Forward of Frame 19 53 A/F (ACCESS: Dorsal Intake Removed) 15-Sep-21 15-Sep-21 532 Area F1: External Fuselage, Nose Cone, ail Cone, Wing-to-Fuselage Fairings - Visible Inspection of Fuselage Skin Under Wing-o-Fuselage Fairings 53 A/F (ACCESS: F, F22) 15-Sep-21 15-Sep-21 5311 Area F3: Vestibule, Passenger Cabin and oilet Compartment - Inspection of Front Face Of Rear Pressure Bulkhead (Frame 19) - Inspect left-hand side of bulkhead with soundproofing blankets removed. 53 A/F (NOE: Airplanes without the digital pressurization control system Mod. 25G726A/C or Mod. 25G726B/C) 3-Aug-21 [15-Sep-21] 53 Area F3: Vestibule, Passenger Cabin and oilet Compartment - Inspection of Front Face Of Rear Pressure Bulkhead (Frame 19)- Inspect right-hand side of bulkhead with soundproofing blankets removed. 53 A/F (NOE: Airplanes without the digital pressurization control system Mod. 25G726A/C or Mod. 25G726B/C) 15-Sep-21 15-Sep-21 551 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Detail Inspection of Elevator And ab 5 Alias1:27-3-22 (NOE: AMM 27-3-22 Page 1) 3-Aug-21 [15-Sep-21] 552 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Inspection, Lubrication of Elevator rim abs, Connecting Rods 5 Alias1:27-3- (NOE: AMM 27-3- Page 31) 3-Aug-21 [15-Sep-21] /

Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Inspection of Elevators 5 Alias1:55-2-11, 55-2-12 (ACCESS: Refer to relevant NM echnique.) 15-Sep-21 55 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Detail Inspection of Rudder And ab 5 Alias1:27-2-23-1 (NOE: AMM 27-2-23 Page 1) 3-Aug-21 [15-Sep-21] 555 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Inspection Rudder Connecting Rods, Rudder rim ab And Anti-Servo ab 5 3-Aug-21 [15-Sep-21] 556 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Inspection of Rudder. 5 Alias1:55--11 (ACCESS: Refer to NM echnique) 15-Sep-21 15-Sep-21 557 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Detail Visual Inspection of Rudder Hinge Brackets And Attachments 5 (NOE: Note: Rudder and rudder hinge bracket cover plates removed) 15-Sep-21 15-Sep-21 559 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Detail Inspection of Horizontal Stabilizer 5 Alias1:55-13- (ACCESS: 21R,22L,23R,2L,25R,26L,5) (NOE: AMM 55-13- Page 31 Note: Fairing panels L,R,5,6L,7R,L,9R,13 removed.) 15-Sep-21 15-Sep-21 5515 Area 1: Horizontal and Vertical Stabilizers, to Include Elevators and Rudder - Inspection Elevator Mass Balance Weights Side Plates, Spigots and Installation for Corrosion 5 Alias1:27-3-91 (NOE: AMM 27-3-91 Page 61) -Aug-216 1,39 2 +2m [15-Sep-21] 9.3 Months (+6 55 577 Area W1, W2: Wing - Inspection of Wing Bottom Skins And Stringers Between the Front tnd Rear Spars, Rib to Rib 1 tnd Between the Center Spar tnd Rear Spar from Rib 1 to Rib Alias1:57-3-11, 57-3-12 (ACCESS: Refer to NM echnique.) 15-Sep-21 57 Area W1, W2: Wing - Detail Inspection of Main Landing Gear And Sidestay Attachment Fittings (ACCESS: W23, W2 removed) 15-Sep-21 9/

571 Area W1, W2: Wing - Detail Inspection of Wing Front Spar, Forward Face (ACCESS: Wing leading edge removed), 15-Sep-21, 3,19 (+) 5711 Area W1, W2: Wing - Inspection of Wing Rear Spar, Rear Face (ACCESS: Aileron, aileron shrouds, flap & airbrake removed), 15-Sep-21, 3,19 (+) 57 Area W1: Wing - Detail Inspection of Airbrake Lower - Left (ACCESS: Airbrakes removed), 15-Sep-21, 3,19 (+) 57 Area W1: Wing - Detail Inspection of Airbrake Upper - Left (ACCESS: Airbrakes removed), 15-Sep-21, 3,19 (+) 57 Area W2: Wing - Detail Inspection of Airbrake Lower - Right (ACCESS: Airbrakes removed), 15-Sep-21, 3,19 (+) 57 Area W2: Wing - Detail Inspection of Airbrake Upper - Right (ACCESS: Airbrakes removed), 15-Sep-21, 3,19 (+) 5713 Area W1, W2: Wing - Detail Inspection of Ailerons Alias1:27-1-31 (NOE: AMM 27-1-31 Page 1, AMM 5/H-2 : 2-9-22 Page 21) 3-Aug-21 2, [15-Sep-21] 3,197 1,56 (+2) 571 Area W1, W2: Wing - Lubrication of Connecting Rods, Aileron rim And Servo abs Alias1:2-9-22 (NOE: AMM 5/H-2 : 2-9-22 Page 21) 3-Aug-21 2, [15-Sep-21] 3,197 1,56 (+2) 5715 Area W1, W2: Wing - Detail Inspection of Ailerons hinge brackets Alias1:57-5-17 (ACCESS: Refer to NM echnique), 15-Sep-21, 3,19 (+) 1/

5716 Area W1, W2: Wing - Flap and flap vanes Inspect hinge brackets for security, freedom from cracks and signs of corrosion. Inspect bearings for satisfactory condition and adequate lubrication. Alias1:57-5-15, 57-5-16 (ACCESS: Refer to relevant NM echnique.), 15-Sep-21, 3,19 (+) 5723 Area W1, W2: Wing - Detail Inspection of Aileron Horn Balance Weight Alias1:57-5-17 (ACCESS: Aileron horn balance weight cover removed) (NOE: Applicable to airplanes without BC Winglets.) 3-Aug-21 [15-Sep-21] 5726 Area W1, W2: Wing - Inspection of Wing Leading Edge Alias1:57-1- (ACCESS: KS panels removed) (NOE: SRM 57-1- Page 21) 3-Aug-21 [15-Sep-21] 5727 Area W1, W2: Wing - Detail Inspection of Wing Internal Structure Forward of the Center Spar Including the Front and Center Spars from Ribs to, and Between and Including the Front and Rear Spars from Rib to the Wing ip Alias1:2-1- (ACCESS: Wing leading edge, Front & Rear spar access panels) (NOE: AMM 2-1- Page 71), 15-Sep-21, 3,19 (+) 5727 Area W1, W2: Wing - Removal and inspect Fuel System non-return valves in Inner and Outer Wings Alias1:2-2-32 (NOE: AMM 2-2-32 Page 1), 15-Sep-21, 3,19 (+) 572 Area W1, W2: Wing - Inspection of Aileron At Outboard Hinge Casting Alias1:27-1-31 (NOE: Applicable to airplanes without BC Winglets Ref. AMM 27-1-31 Page 61), 15-Sep-21, 3,19 (+) 216 Air Conditioning - Inspect Water Separator For Satisfactory Condition 2-Sep-21 21 A/F Alias1:21-1-95-61 (ol. Adjustment: -39.2 ) (NOE: AMM 21-1-95 Page 61) 1,992 31 (+) 217 Air Conditioning - Inspect Water Separator Water Drain, Water Drain Pipeline, HP Line o Water Injector Nozzle and Water Injector Nozzle Are Free From Blockages And Obstructions 2-Sep-21 21 A/F Alias1:21-1-95-61 (ol. Adjustment: -39.2 ) (NOE: AMM 21-1-95 Page 61, AMM 21-1-7 Page 21, 21-1-95 Page 1) 1,992 31 (+) 5771 Minor Inspections - Hour Detailed Walk-Around Inspection AFMS Part 1 3-Oct-21 (ol. Adjustment: -3.2 ) -1/+ 1,997 36 (+) 11/

3 Do any hour lubrication requirements for Area F1, refer to Part 7 - LUBRICAION. A/F (ol. Adjustment: -3.2 ) AFMS Part 1, AFMS Part 7-1/+ 1,997 3-Oct-21 36 (+) Do any hour lubrication requirements for Area 1, refer to Part 7 - LUBRICAION. AFMS Part 1, AFMS Part 7 3-Oct-21 A/F (ol. Adjustment: -3.2 ) -1/+ 1,997 36 (+) 7 Do any hour lubrication requirements for Area W1/W2, refer to Part 7 - LUBRICAION. AFMS Part 1, AFMS Part 7 3-Oct-21 A/F (ol. Adjustment: -3.2 ) -1/+ 1,997 36 (+) 7--9 R3 Equipment/furnishings - Equipment/furnishings - improper disposal of smoking materials in lavatory waste receptacles Mandatory 3-Oct-21 2 Eff: 2-Mar-2 (AVG MAN HRS: 3) 6-May-215 997 61 1, 1,997 36 Fire Protection - External baggage unit (EBU) Fire Extinguisher Cartridge (If installed) AFMS Part 9 26 A/F 133-5 New NSN Manufactured Date 3-Nov-2 7-Mar-213 16 26 6 3-Nov-21 11. Months /