DETAILS OF ONGOING LINES UNDER TRANSMISSION CENTRAL

Similar documents
DETAILS OF ONGOING LINES IN TRANSMISSION SOUTH

DETAILS OF ONGOING LINES UNDER TRANSMISSION WEST S Tend. Length Est. cost

Annexure. Technical Details Package 1

RFP Corrigendum No. 01

Sl.No. ECONOMIC ACTIVITY Saharanpur Muzaffarnagar Shamli Bijnor Moradabad Sambhal

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

Bangladesh s Power Sector : At a Glance

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

THE PROTEAN AND POC-MAST DESIGN

SunZia Southwest Transmission Project

Agenda for discussions in the 39 th meeting of the STU Coordination Committee to be held under the chairmanship of ProSecretary (MPP& Power)

Traffic, Toll & Financial Studies THE PURVANCHAL EXPRESSWAY

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL

REPORT ON POOLING OF CENTRAL AND STATE SAMPLE DATA OF NSS 66 th ROUND (July June 2010)

welcome to the BC Hydro community open house

DISTRICT WILSE ANALYSIS OF IEM s FILED FROM TO BAREILLY PRINTING &

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

Need Assessment Document (NAD) DDUGJY

Proposed Dounreay - Mybster 275 kv / 132 kv

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE

received 1. Shyang (3 MW)- Completed 2. Tangling (5 MW)- Completed 3. Shaung (interim) (3 MW)--completed 4 Brua (Interim) (9 MW) - Completed

CRANE STATISTICS & CASE STUDIES WSHC Safety Forum May 2009

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

National Seminar on New Generation High Performance Conductors. 4 th Dec 14

MOSDORFER INDIA. Fittings and damping systems for overhead transmission lines

System Improvement Scheme(R&M) : FY

Transmission Line Survey

Wessel Bakker Business Line Director ETD BMEA DNV KEMA The Netherlands

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

Request for Proposal for Trolley Security Services

S P E C I F I C A T I O N TENDER NO. BHEL/ NR/SCT/ KOSTI /ELEC/ 836

Dairy Cum Powder Plant

ANNEXURE-I CHECK LIST FOR APPLICATION FORM

more then 80 years in the Transmission field

Line using HTLS Conductors to increase

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

SunZia Southwest Transmission Project

SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole

SUPPLY RISKS OF BIOFUELS

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

Engineers Ireland Site Visit 23 rd March 2010

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

Temporary Adjustments to Rates for Low-Income Programs.

Facilities Study for Alberta to US Available Transfer Capability

Kafr El Zayat 500/220/66kV S/S 66kV interconnection OHTL s. - Kafr El Zayat 500/220/66kV S/S Basyoon. 66/11kV S/S, 2.5Km.

OFF GRID SOLAR PV SYSTEMS

OTAHUHU-MANGERE-ROSKILL- HEPBURN ROAD 110 KV CIRCUITS

CUSTOMER/ TWIN ARROWS PROJECT

National Conference on Latest Trends in Design & Testing of Transmission Line Components

Appendix B. Summary of Changes to the Year Assessment

Model Description Vac. Max rating Pedestal Only: 36 Utility Pedestal W/O Disconnect General Duty Series:

CHAPTER 9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

15031A Safety Belt Lap Anchor Tensioner Cable

Sewa Bhawan, R. K. Puram, New Delhi As per List Enclosed-

STATE OF NEW HAMPSHIRE Inter-Department Communication

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

March th session March 16 18, 2011, Ann Arbor, USA

August 18, 2016 NWN OPUC Advice No A / UG 309 SUPPLEMENT A (UM 1766)

Indian Power System Framework

Valmont India - Utility UTILITY POLES

DISTRICT WILSE ANALYSIS OF IEM s FILED FROM TO ALIGARH 12 GENERATION OF FUEL ALIGARH 34 PROCESSING/SORTING MISC.

APPENDIX 3 EXTRACTS FROM THE NEW ZEALAND ELECTRICAL CODE OF PRACTICE FOR ELECTRICAL SAFE DISTANCES (NZECP 34:2001)

SturdiSignal Series. Low Profile LED Warning Signal Light. Specifications. Dimensions. Compliances

MERCRUISER AND MERCURY RACING (STERNDRIVE) SERVICE MANUAL INDEX

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

HELICOPTER SERVICES OUR SERVICES FOR CONSTRUCTION AND MAINTENANCE OF POWER GRIDS

Public Works Department, Capital Improvement Program Project Tracking

HVDC Systems in India

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

EUROPEAN ENERGY MASTER CLASS

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

SHARP HOUSE REGD. SHARP INDUSTRY

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/02/2004

EBPL WE TURN DREAMS INTO REALITY VENTURES PVT. LTD. FORMERLY KNOWN AS ESKAY BUILDWORKS PVT. LTD.

DL Shah Quality Award

Goldwind Americas. Construction Kickoff: Landowner Presentation. Construction Kickoff Presentation April 26th 2017

(A) CIVIL: Sl. No Name of the work Tendered Cost (In lakhs) 1 Gooty-Pullampet patch doubling No.RVNL/ SC/ GY-PMT/ Agt/ 104 dated 22.8.

Transmission Charging Methodologies Forum & CUSC Issues Steering Group. 13 th September 2017

Crop Heat Units for Corn and Other Warm-Season Crops in Ontario

Rate of Change of Frequency Project Quarterly Report for Q2 2017

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR

Green Line LRT: Beltline Segment Update April 19, 2017

File E47705 Vol. 7 Sec. 9 Page 1 Issued: and Report Revised:

CREATIVE BUS SALES, INC. REPRESENTING MOBILITY VENTURES, LLC

SHARP HEALTH PLAN POLICY AND PROCEDURE Product Line (check all that apply):

Transcription:

DETAILS OF ONGOING LINES UNDER TRANSMISSION CENTRAL 1 400 kv s/s Gonda (PPP I) 220 kv dc Gonda400- Gonda220 DC interconnector 13.45 11.17 Trading Engineers 13.45 03/46 0/46 0/13.45 11.6 1. Stubs & Templates delivered at site. 2. 03 nos. FDN gang to be deployed shortly. The is 31.03.16. 2 1 400kV Hardoi Road(Lucknow) 400kV Hardoi Road(Lucknow) S/s- 220kV Hardoi Road DC Interconnector 220 kv s/s Tanda (RNNSAS) 220 kv DC Sohawal(400) -Tanda 9.25 7.4 18.07.14 22.07.14 26.07.14 5.18 Unitech Comp 0/35 0/35 0/9.25 10 113.24 72.47 PNC 16.09.10 15.09.11 Comp 336/ 217/ 12/ 113.24 69.3 profile submitted for approval.the complition is 22.06.16. FDN, ROW at 10 locs loc no- 11,12,23,29,157,183,190,248, 249,250 Er ROW at loc no 145, Str ROW at loc no.-92, crop compensation cases paid. The is 31.10.15. 132 kv sc Tanda220- Tanda132 11.8 2.42 Aster 06.04.11 05.04.12 Comp 50/54 45/54 7.92/ 11.8 86.6 As per local representative ROW at loc 8/0 & 6/1 for Erection and at loc 8/0 to 13 for Stringing work and EE, ETD, Faizabad to meet DM today, 01 no Erection gang working at site at loc 12 & 13 WIP, 01 no Stringing gang working at Tanda Gantry & Dead End Tower WIP, Stringing work at loc 3-4 completed, Foundation work could not be started due to standing sugarcane & paddy crop. Foundation work likely to start by next week. The complition 12.10.15. 2 220 kv s/s Nighasan (RNNSAS)

220 kv sc Sitapur- Nighasan 110 55 15.19 SEW 23.03.10 22.09.11 Comp 335/336 317/ 336 81.92/ 110 92.4 Row in Foundation at loc no. 84, under court case. River xing work to be taken up after receeding of water.s/s Ready.The proposed date of complition 31.12.15. 220 kv sc Shahjahanpur- Nighasan 121 60.5 SEW 23.03.10 22.09.11 Comp 368/369 358/ 369 104.18/ 121 95.9 ROW at 1location -32/2, matter in court,river xing work to be taken up after receeding of water..s/s Ready.The complition 31.12.15. LILO of 132 kv Lakhimpur-Pallia line @ Nighasan 1.15 0.32 Aravali 06.04.11 05.01.12 WIP 04/8 0/8 0/1.15 18.5 No gang working at site since last one month,in the review meeting dt 23.09.15 firm assured to start the work earliest. The proposed date of complition 30.09.15 132 kv sc Nighasan- Dhaurahra 23.4 7.25 PNC 28.04.10 27.04.11 Comp 75/75 75/75 21/ 23.4 97.4 The work is held up due to crossing of LILO of Lakhimpur- Palia at Nighasan being constructed by M/s Aravali who have started the work. The is 31.10.15. 132 kv sc Nanpara- Dhaurahra 50.94 15.79 Aravali 06.04.11 05.04.12 Comp 139/153 89/153 0/50.94 64.4 Soil investigation report submitted, Rly proposal submitted, Pile fdn to be built on River crossing, No gang working at site since last one month, in the review meeting dt 23.09.15 firm assured to start the work earliest. The complition 28.02.16 132 kv sc Nighasan- Gola 50.11 15.54 Aravali 06.04.11 05.04.12 Comp 90/168 41/168 0/50.11 48.3 No gang working at site since last one month, in the review meeting dt 23.09.15 firm assured to start the work earliest. The 31.03.16

3 220 kv s/s Kanpur Road(GIS) LILO of 22o kv DC Sarojini Nagar (400kV)- Unnao Line at 220 kv GIS Kanpur Road 5 REC-047-2011- 4811 (7153.7) Turn Key UPRNN 2.10.11 70 2 Km cable laying work completed out of 5 Kms. 4 220 kv s/s Bahraich 220 kv dc Gonda400- Bahraich 132 kv dc Bahraich220- Nanpara 74.29 24.61 09.07.08 03.02.09 Varrsana 04.02.14 03.02.15 Comp 40.58 13.44 09.07.08 03.02.09 2009-3058 224/ 234 148/ 234 0/74.29 66.6 ECI 15.02.14 14.02.15 Comp 21/130 0/130 0/40.58 20 Erection WIP at loc 94 & 12, Fdn WIP at loc 109. The 29.02.16. Fondation WIP. The proposed date of complition 31.03.16. 132 kv LILO Gonda- Bahraich @ 220Kv Bahraich 17.56 3.67 09.07.08 03.02.09 2009-3058 ECI 15.02.14 14.02.15 Comp 22/58 0/58 0/17.56 35.5 Re-survey done between location 50-60, profile submitted in the division not approved so for. The 31.12.15. 5 220 kv s/s Kursi Road (RNN III) 220 kv dc Lko PGCIL(400)-Kursi Rd 12.89 8.12 Hythro/ 23.12.11 23.12.12 Comp 66/66 13/66 0/12.89 58.9 Erection work in progress, 01 no Erection gang working at site..the 31.12.15. 6 220 kv s/s Pilibhit 220 kv sc Baikunthpur (Bareilly)(400) - Pilibhit (on dc tower) 7 220kV S/s Barabanki 220 kv DC Sohawal(400) PGCIL - Barabanki(220) Line at Barabanki S/s 1 132 kv s/s Jalalpur 58 20.62 21.5.12 18.7.12 12.12.12 Accord 03.07.16 0/180 0/180 0/58 69 45 18.07.14 22.07.14 26.07.14 31.5 Unitech Comp 8/225 0/225 0/69 10 Route alignment approved, Profile submitted, under checking, firm debared for a period of one year. Fdn WIP at 2 loc. The proposed date of complition is 22.12.16

132 kv sc Kadipur- Jalalpur 46.4 8.82 Aster 24.12.11 23.12.12 comp 60/151 0/151 0/46.4 39.9 Work to be taken after Tanda- Tanda line.the complition 31.03.16. 2 132 kv s/s Bhinga 132 kv sc Nanpara- Bhinga 50.05 9.51 Aster 06.04.11 05.04.12 Comp 79/165 33/165 0/50.05 46 Firm has submitted work schedule to complete the line by Feb, 2016, 03 no Foundation gang working Fdn at loc-91,92,93 &158. WIP. The complition 28.02.16. 3 132 kv s/s Utraula(Dept) 132 kv sc Dumariaganj- Utraula 39.95 12.38 PNC 09.11.10 31.07.11 Comp 108/114 107/ 114 32/ 39.95 92.5 FdnWIP,Fdn ROW at Loc-32 shall be resolved by month end, under court case, anchor tower excavation work will start on 15.10.15. The complition is 31.10.15. 4 132 kv s/s Nindura 132 kv SC Kursi Road LKO(220)- Piparsand(Nindura) 5 132 kv S/S Bikapur 26.49 8.21 Hythro/ 23.12.11 23.12.12 Comp 79/103 18/103 0/26.49 52.7 Tower material reached at site.work to start shortly.the 15.01.16. 132 kv sc Bikapur- Sohawal 23.15 4.74 Aster 06.04.11 05.04.12 Comp 0/89 0/89 0/23.15 0 Survey Work complited and to be submitted to concerned divison by month end, S/s ready & charged by LILO of Sultanpur- Darshan nagar. The proposed date of complition 31.03.16. 6 132 kv S/S Shahabad (RNN) 132 kv sc Shahjahanpur- Shahabad 51.18 15.86 PNC 28.04.10 27.04.11 Comp 135/135 131/ 135 33.50/ 51.18 90.8 Er & stringing work under progress, 01 no. gang for each activity is deployed, Er ROW at 05 locs:- loc no.1,2,3,4 & 5 Str ROW at 4 locs:- loc no. 47,52,53& 65. 7 132 kv s/s Baghauli 132 kv LILO Hardoi- Shahabad@ Baghauli 22.5 8.78 Aravali/ 15.10.11 14.10.12 Comp 72/72 33/72 0/ 22.50 64.2 Erection work under progress, 01 no. gang working at site.

8 9 132 kv s/s Biswan (TKSAS) 132 kv 2 Ph. 220 Kv S/s Sitapur-Hempur Rly TSS 132 kv s/s Laharpur (TK NKG) 132 kv SC Lakhimpur- Laharpur CM 24.99 7.7 RS INFRA 20.07.12 19.07.13 Comp 93/93 93/93 32.23 9.99 Hythro/ 24.99/ 24.99 100 23.12.11 23.12.12 Comp 86/95 27/95 0/ 32.23 58.3 Line completed gantry at Rly end not ready. Approval of 1no. of rly xing is awaited. No work at present.the 23.12.15. 10 132 kv s/s Goshaisinghpur (Dept) 132 kv sc Tanda220- Goshaisghpr 29.4 5.95 Aster 06.04.11 05.04.12 Comp 94/99 76/99 0/29.4 69.1 Work to be taken up shortly & 1 stringing gang to be deployed by month end. 11 132 kv s/s Tilhar LILO of Shahanjahanpur- Badau at Tilhar 8.76 3.42 Aravali/ Comp 19/30 0/30 0/ 8.76 45.8 Survey work under progress.the 31.12.15. 12 132 kv s/s Chakalbanshi (Dept) 132 kv sc Sonik- Chakalvanshi 313 29.75 9.22 04.09.08 03.09.09 Comp 98/104 90/104 29.07/ 29.75 95.3 2 rly xing one already approved & one under approval.2 loc forest clearence required, on line NOC applied to forest department for approval.the proposed date for the complition is 31.10.15. 13 132 kv Neri (Sitapur) 132 kv LILO of Sitapur- Shahjahanpur@Neri 14 132 kv s/s Bandaa 4 1.95 06.07.12 18.07.12 12.12.12 2012-6596 1.75 Local 12th Plan

132 kv SC Puwanyan - Bandaa 20 6.202 Aravali Land finalized, no work yet started, in the review meeting dt 23.09.15 firm assured to start the work earliest. The proposed date of complition is 31.03.2016. 133 kv SC Gola - Bandaa 45 13.96 Aravali Land finalized, no work yet started, in the review meeting dt 23.09.15 firm assured to start the work earliest. The proposed date of complition is 31.03.2016. 15 132 kv s/s Haidargarh 16 132 kv LILO of sc jagdishpur-haidergarh Sugar Mill @ Haidergarh 132 kv dc Sultanpur Rd. Lko (400)- Haidergarh 132 kv s/s Mahmudabad 20 6.59 30.4.11 18.7.12 30 9.89 30.4.12 18.7.12 2012-6631 05.93 2012-6631 08.90 Accord 03.07.16 0/62 0/62 0/20 Accord 03.07.16 0/93 0/93 0/30 Route survey completed, profile approved, no gang present at site, firm debared for a period of one year. On hold,firm debared for a period of one year. 132 kv sc (on dc towers) Sidhauli- Mahmudabad 32 19.87 6.7.12 18.7.12 12.12.12 Accord 03.07.16 0/99 0/99 0/32 Route survey completed, profile approved, no gang present at site, firm debared for a period of one year. 132 kv bay @ Sidhauli 17 132KV Sareni S/s 132KV Dalmau(Raebareilly)- Sareni 132KV Bighapur (Unnao)-Sareni 18 132 kv s/s Bisalpur 132 kv sc Pilibhit- Bisalpur 30 10.05 13.02.14 10.05.14 Accord 03.07.16 0/93 0/93 0/30 40 13.34 13.02.14 10.05.14 Accord 03.07.16 0/124 0/124 0/40 35 8.03 09.07.08 Accord 03.07.16 0/109 0/109 0/35 Route survey defective re-route survey in progress, firm debared for a period of one year. Route survey defective re-route survey in progress, firm debared for a period of one year. Profile approved, 01 excuation done after that no gang at site, firm debared for a period of one year.

132 kv sc Barreily II- Bisalpur 4*132kv bays 132 kv sc Aonala- Bisauli 19 132 kv s/s Alapur 132 kv sc New Tanda(Akbarpur 220KV) -Alapur 132 kv sc Koilsa (Azamgarh) -Alapur 20 132 kv S/s Colonelganj 132kV DC Gonda (400) - Colonelganj Line at 132kV S/s Colonelganj 21 132 kv S/s Salon 132kV DC Amawan (Raebareilly) - Salon Line at 132kV S/s Salon 132 kv S/s 22 Begampur(Sohrwa) LILO of Cons 132kV SC Bahraich(220kV) - Nanpara Line at 220kV S/s Begampur 132KV Maurawan 23 (Unnao) S/s 132KV Bighapur- Maurawan 24 132 kv s/s Jalalabad 40 9.17 09.07.08 Accord 03.07.16 0/124 0/124 0/40 25 8.33 Archon/ EMC 4.03.15/31.07.15 30.06.16 35 8.03 21.11.11 18.7.12 Accord 03.07.16 0/109 0/109 0/35 15 3.44 21.11.11 18.7.12 Accord 0/47 0/47 0/15 30.36 8.76 18.07.14 22.07.14 26.07.14 Trading Engineers 30.36 0/101 0/101 0/30.36 10 40.84 21 18.07.14 22.07.14 26.07.14 14.7 Unitech Comp 0/149 0/149 0/40.84 10 0.4 4.6 18.07.14 22.07.14 26.07.14 3.22 Unitech Comp 0/3 0/3 0/0.4 10 2x20 35 11.72 10.12.13 10.05.14 Route survey in progress,firm debared for a period of one year. Route survey to start form 01.11.15. The competion is 30.06.16 Due to wrong survey re-survey started by firm,firm debared for a period of one year. On hold,firm debared for a period of one year. 1. Stubs & Templates delivered at site. 2. 03 nos. FDN gang to be deployed shortly. The is 30.04.16. Profile approved on 18.09.15, work will start shortly.the is 22.09.16. Only 3 tower required in this line. The proposed date of complition is 22.06.16.

LILO of 132 kv Shahjanpur- Usawan line @ Jalalabad 18 7.57 21.11.11 18.7.12 2012-6591 6.81 Accord 03.07.16 0/56 0/56 0/18 On hold,firm debared for a period of one year. 1 220 kv dc Roza-Dohna 108.07 74.52 SEW 23.03.10 / 19.10.10 22.09.111 8.04.11 Comp 340/340 340/ 340 107.87/ 108.07 100 Line completed OPGW work under progress. 2 220 kv dc Dohna-CB ganj sec 24 12 SEW 23.03.11 22.03.12 Comp 92/92 82/92 14.55/ 24 88 Rly xing approval pending for loc 26-27, Crop compensation cases pending, work stop at loc. 61 &25 due to crop compensation not paid. 3 132 kv sc SGPGI- Utrathiya Rly Line 304 10.62 2.09 Pioneer Apr-08 Oct-08 Comp 44/44 32/44 5/ 10.44 81.2 ROW at 11 loc(14-21,24,42 & 43) 9 loc at kali pashim & 2 loc at SGPGI), matter being taken up at higher level with Distt admin. Held up. 4 132 kv sc 2ph Ramsanehighat- Budwal 313 44.27 13.72 Unitech 20.1.08 20.01.09 Comp 139/146 139/ 146 39.48/ 44.27 95.1 Letter written by EE to DM,Joint survey with Rly. done on 18.08.15, meeting was held with Rly & estimate of cable has been sent to Railways 5 132 kv dc Shyam Fert- Shahjahanpur 15.3 Kribhco Comp 68/68 68/68 15.31/ 15.31 Work being carried out by M/S Kribhco Shyam Fertilizers themselves. 6 132 kv Maqsoodpur Sugar Mill- Shahajanpr220 350 46.05 20.09 Hythro 31.12.10 30.06.11 Comp 138/139 127/ 139 13.67/ 46.05 80.5 Notice has been surve to M/s Hythro & SE, ETC Bareilly taking action to get the work done through a debitable agency. 7 132kV Loc-12 of Maqsoodpur - Shahjahanpur (220kV) Line - Shahjahanpur (132kV) 8.62 7.56 Hythro 8.62 30/33 28/33 0/8.62 69.7 Notice has been surve to M/s Hythro & SE, ETC Bareilly taking action to get the work done through a debitable agency. 8 LILO of 132 kv Sonik(unnao) - Bighapur @ Maurawan S/s 22.69 4.74 Varrsana 03.09.14 02.09.15 Comp 74/78 1/78 0/22.69 40 Fdn-casting in progress at loc no 14 B, Er under progress at loc 19 A, 20 C+0 (material shifted). The Target date of completion 15.11.15

9 220 Kv Hardoi rd.-132 kv Hanuman setu (GIS) U/G Cable 107.8 14815. 87 (In Lac) 11.11.11 REC-047-2011- 5719 UPRNN 88 New site for S/s identified but couldn't handed over yet. The completion is 31.12.15. 10 11 i) ii) iii) iv) v) 220 KV dc Sohawal (220 KV)- Muzzafrapur,Faizabad( 400 KV PGCIL) Replacement of HTLS conductor & other works of following SC lines:- 132kv Chinhat- Gomtinagar SC line 132kv Chinhat- Barabanki SC line 132kv Hardoi Rd.-NKN SC line 132kv Gonda-Bahriach SC line 132kv Dohna- Bareilly(I) SC line 30 21.99 10.09.12 11.12.12 ECI 15.04.15 14.04.16 1/82 0/82 0/30 10 13.9 29.08.14 Apar 14.08.15 13.08.16 NA NA 19.05 29.08.14 Apar 14.08.15 13.08.16 NA NA 10.05 50.5 29.08.14 Apar 14.08.15 13.08.16 NA NA 65 29.08.14 Apar 14.08.15 13.08.16 NA NA 21 29.08.14 Apar 14.08.15 13.08.16 NA NA Foundation WIP, firm to immediately take action for starting erection work. The propsed date of complition 31.03.16.