actiin4085 fr / a This notice must be given to the end user GEARLESS XA2 A.C. Drive for lifts Installation and maintenance

Similar documents
3946 en / a. This manual is to be given to. the end user. HPM x44. A.C. motor. Installation and maintenance

PV4 - PIV6. Submersible multistage centrifugal electro-pumps. Installation and maintenance. This manual is to be given to the end user

Installation and maintenance guide D.C. MOTORS. Reference: 5702 en / a

BAH series Use and Maintenance Manual

Monocellular centrifugal electro-pumps

INSTALLATION MANUAL FOR EVO BRAKES

DYNACTAIR 200 to MAINTENANCE

Hollister-Whitney Elevator Corporation

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Installation and maintenance guide LSK. D.C. motors. Reference: 5703 en / a

Electrically Released Brakes ERS VAR10 SZ 5000/5000

SERVO MOTORS BRUSHLESS SERVO MOTORS OPERATING INSTRUCTIONS 2016

Electrically Released Brakes ERS VAR11-01 FT = 4100 N


Maximum operating temperature for standard motors = 110 C. Shut down temperature in case of a malfunction = 115 C.

Characteristics of model T-Mec brake

Sisu S-Cam Drum Brakes

VALIADIS S.A. HELLENIC MOTORS

Butterfly valves Figure 56 Installation & Maintenance Instructions

GEARLESS Z4 - Z20 A.C.

ROM Series. Keeping the World Flowing. Installation Manual. Valve Actuators

2.- HANDLING OF VALVES BEFORE ASSEMBLY 3.- FITTING THE VALVE TO THE REST OF THE ASSEMBLY 5.- PERIODICAL INSPECTION OF THE VALVE AND MAINTENANCE

When installing the screwed end, socket weld & flanged end valves the following respective procedures shall be followed for better performance.

OVERLOAD CLUTCHES FOR INDEX DRIVES

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

Fig.01 Fig.02 Fig.03. Disassembly & Reassembly Instructions SBV-HP - Page 3

VECTRIX VX-2 SERVICE MANUAL. Version 1.0/May 2011 VECTRIX, LLC

COMPABLOC. Cb Cb Cb 1504 Installation and maintenance. These instructions should be given to the end user GN

Heavy duty slurry pumps

Assembly instructions. Veranda sunblind VZ510. art.nr

Temperature Sensor Series

BROOKS STAIRLIFTS SUPERGLIDE 120

Maintenance Information

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

Characteristics of model K brake

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

IMPORTANT WARRANTY & INSTALLATION INSTRUCTIONS ATTACHED

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

R231 A.V.R. Installation and maintenance R 231. This manual is to be given to. the end user. Armature 6- Field. Slow-blow fuse 250V 8 A

INSTALLATION AND USER INSTRUCTIONS

MOUNTING & MAINTENANCE INSTRUCTIONS FOR

D58 Series Brake Instructions

Z TECHNICAL INSTRUCTIONS

John Deere. MODEL: 2140 Volume 1 of 3 JD-S-TM4373

GT-200 GATE VALVES PN16, Screwed end

DELPHI THREE PHASE MOTORS

s_enn Exterior Stainless Steel Shading System by Draper

Split Body Valves with Bellows Seal Series Globe Valves Series Angle Valves Series Way-Valves

SACHS Clutches The Intelligent Choice for the Long Haul

D40C HINGE # x Support Plate x M8 Bolt 8 x M8 Washer 6 x M6 20mm Bolts 6 x M6 Washers 19 x Screws

ROM Series. Established Leaders in Flow Control. Installation Manual. Valve Actuators

Rheometer Calibration Fixture Instruction Manual Model 280 & 286

BUTTERFLY VALVE WITH WELDED ENDS INSTALLATION AND MAINTENANCE MANUAL

ACTO 400 to MAINTENANCE

INSTRUCTION MANUAL. CAT Place Table Top Centrifuge

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS

SERIES PC INSTRUCTION AND OPERATION MANUAL

Instructions for INSTALLATION -- OPERATION -- MAINTENANCE of the SELAS AIR/GAS BLENDER VALVE. (for PROPANE/AIR, BUTANE/AIR AND OTHER BLENDS)

Maintenance and Repair

1992 Clutch. Eclipse, Expo/Expo LRV, Galant, Mirage, Precis, 3000GT

SERVICE MANUAL L130B / L4130 Series Logstacker Drive Axle With Bolt-On Stub End Retainer

ACTAIR 400 to MAINTENANCE

TYPE 2 poles 4 poles 6 poles 8 poles 2 / 4 poles 4 / 8 poles 2 / 8 poles 4 / 16 poles

SERVO MOTORS BRUSHLESS SERVO MOTORS ATEX ZONE 2-22 OPERATING INSTRUCTIONS 2016

INSTRUCTION MANUAL ASI 24 AND ASI 40 AIRLESS GUN STAINLESS STEEL MODEL

Bowl feeder WV401-1 / Translation of operating and installation instructions

CPLS Drip-proof 3-phase induction motors

Parking brake Mechanical brake acting on rear wheels

GEARLESS Z6 - Z20 A.C.

26 - COOLING SYSTEM CONTENTS ENGINE COOLING - DESCRIPTION... 3 ENGINE COOLING - OPERATION... 9 COOLING SYSTEM FAULTS... 1

DIGITAL RCD(ELCB) TESTER

SHORT-STOP. Electronic Motor Brake Type G. Instructions and Setup Manual

Installation and Operating Instruction for Brake Caliper HW 150 HFA and HW 180 HFA E e

VSI, LLC SERIES 2100 RESILIENT SEATED BUTTERFLY VALVES INSTALLATION, OPERATION AND MAINTENANCE MANUAL

General Repairs Tests Tools Parts. Minors Bearing support Torque module Valving - ALL. Page 2 Version A 31-JUL-2017 Poclain Hydraulics, 2017 B42192K

INSTALLATION MANUAL. Instructions, precautions, suggestions for installing and servicing resin transformers in full compliance with safety rules

This manual is to be given to. the end user P.M.G. / ALTERNATORS. Installation and maintenance

DEUBLIN. DEUBLIN Unions H57 H67 H87

DEUBLIN. Installation Instructions DEUBLIN Unions H57 H67 H87

Electromagnetic single disc clutches E210 and E220

Standard Valves Series Globe Valves Series Angle Valves Series Way-Valves

Clean the fuel screens.

No.LV31JE To prevent accidents arising from the misuse of this instrument, please ensure the operator receives this manual.

DYNAFLUID 2000 STEAM & WATER MIXING VALVE INSTALLATION & OPERATING MANUAL

Installation, Operation and Maintenance Manual SCP/SFP SELF PRIMING PUMPS

INSTRUCTIONS FOR MAINTENANCE AND USE KITCHEN EXTRACTOR HOOD ZRW 50/60

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

SuperTrac. Axle. Service & Maintenance. Manual

Type Operating Instructions. Bedienungsanleitung Manuel utilisateur

Recommended Installation Procedure (11 DEC 09) ATech Timing Belt Tensioner (979847/901) VW 1.6/2.0L L4 EA189 CR Engine

High Vacuum Diaphragm-Type Dry Vacuum Pump

THREE PHASE AND SINGLE PHASE ASYNCHRONOUS ELECTRIC MOTORS OPERATION AND MAINTENANCE BOOKLET Rev

26 Series Stainless Steel 2-way Ball Valves

CSO / CP PUMPS Vertical Spindle Type Installation, Operation and Maintenance Manual

HexPro Series Low Profile Wrenches

Maintenance Manual 3-INCH INTERNAL VALVE F660 SERIES

INSTALLATION, OPERATION AND CARE OF INTEGRAL HORSEPOWER INDUCTION MOTORS ( FRAMES) NAVY A-C MOTORS

1. SPECIFICATION. Altitude of motor installation. Information: Resistance and temperature specifications of the PTC thermistor / posistor/.

470 Frame Synchronous AC Permanent Magnet Gearless Motors

Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual

Transcription:

actiin This notice must be given to the end user Installation and maintenance

SUMMARY 1 -DELIVERY... 3 2 -STORAGE... 4 2.1 -Storage facility... 4 2.2 -Extended storage (> 3 months)... 4 3 -ENVIRONMENT... 4 4 - PUTTING INTO SERVICE... 4 4.1 -INSTALLATION... 4 4.1.1 -Cleaning...5 4.1.2 -Mechanincal installation...5 4.2 -Cabling... 5 4.3 -Start up... 7 5 -MAINTENANCE/SERVICING... 7 5.1 -After one month of running... 7 5.2 -Once a year... 7 6 -BRAKE, ENCODER AND MICRO-SWITCH ADJUSTMENT PROCEDURE... 7 6.1 -Airgap adjustment tolerance (non-supplied brakes)... 7 6.1.1 -Brake airgap control...7 6.1.2 -Brake airgap adjustment...7 6.1.2.1 - Tools needed...7 6.1.2.2 - Brake view...7 6.1.2.3 - Adjusting with a lunula...8 6.1.2.4 - Adjusting without a lunula...9 6.1.2.5 - Verification of airgap adjustment (supplied brakes)...9 6.2 -Adjusting the encoder... 9 6.3 -Micro-switch control and adjustment... 9 6.3.1 -Control...9 6.3.2 -Adjustment...9 6.3.2.1 - Tool needed...9 6.3.2.2 - Adjusting the first micro-switch...9 7 -BRAKE, ENCODER AND MICRO-SWITCH REPLACEMENT... 10 7.1 -Encoder replacement procedure... 10 7.1.1 -If HEIDENHAIN encoder, dismantling procedures below...10 7.1.2 -If DANHER encoder, dismantling procedures below...10 7.1.3 -Reassembling the HEIDENHAIN encoder...10 7.1.4 -Reassembling the DANAHER encoder...10 7.1.5 -Adjusting the encoder (see 6.2)...10 7.2 -Brake replacement procedure... 11 7.2.1 -Removing the encoder (see 7.1)...11 7.2.2 -Removing the old brakes...11 7.2.3 -Fitting the brakes...11 7.3 -Replacing the micro-switches... 11 7.3.1 -Tools needed...11 7.3.2 -Removing the old micro-switch...11 7.3.3 -Fitting the new micro-switch...12 7.3.4 -Fitting the new cables for the micro-switches...12 8 -ORDERING REPLACEMENT PARTS... 13 2

In order to obtain full satisfaction from the motor you have just acquired, it is indispensable to respect the following instructions IMPORTANT : Contact with rotating or electrically live parts may cause injuries. Do not touch the frame of a running motor, it s temperature can reach high levels. REMINDER: The installation, servicing and maintenance must only be carried out by qualified staff. The non respect or missapplication of information in the given manual absolves the manufacturer of his responsability. The product is under guarantee provided that it has not been partially or totally dismantled without assistance from (or its approved representative) during the guarantee period. CAUTION: Make sure the cabin is not moving before intervening on motor or brakes. 1 - RECEPTION Controls: - assure conformity between the name-plate and contractual specifications, upon receipt of the machine. - proceed with inspection on delivery. In cases of damage through transport, make the usual reservations with the transporter. 3

2 - STORAGE 2.1 - Storage Facility This area must be dry, protected from weather, from cold (temperature lower than -15 C), from frequent temperature changes (to avoid condensation), from vibrations, from dust and corrosive gases. In case of vibrations in the warehouse, it is recommended that the drive pulley is turned at least twice a month (free the brakes by the manual unblocking system or energise the brakes in order to turn the pulley). The drive pulley grooves are, under certain transport conditions, protected by a special varnish which must be left in place during storage. 2.2 - Extended storage (> 3 months) Enclose the machine in a sealed waterproof envelope with a dehydrator bag inside corresponding to the volume to protect and the degree of humidity. 3 - ENVIRONMENT The nominal characteristics are established for operation in a normalized environment (cf. IEC 600034-5): - altidude less than or equal to 1000 m, - maximum humidity rate: 95%, - temperatures between 0 and 40 C. De-rating may be required if particular conditions are indicated at time of order of the material. 4 - PUTTING INTO SERVICE BEFORE INSTALLATION If storage has lasted several months, it is essential to check: - interior cleanliness and absence of condensation; - disc brake cleanliness (no rust or grease particules); - good insulation between the motor phase and earth (minimum 100MΩ under a continuous voltage of 500 V for 60 seconds) after disconnecting all of the electronic circuits if needed. Drying with an internal heat source - Test to be made with brakes open. - Connect the motor windings V1 and W1 in parallel to U1. - note the restistance U and V/W. - Supply a low-voltage direct current (in order to obtain 10% of the nominal current calculated using winding resistances), increase the voltage until the current reaches 50% of the nominal current - Maintain supply for 4 hours, the motor temperature will gradually rise. CAUTION: When put under voltage the pulley will move slightly ( angular displacement of the rotor in relation to the stator). Connection chart (refer to figures 1 and 2 of paragraph 4.2 Cabling) Motor* Brake U1 + V1 / W1 1-3 *Green/yellow connected to the stator 4.1 - INSTALLATION The installation must be in conformity to the motor characteristics indicated on the rating plate (see 1). It must intergrate the electrical safety. Verify that the moving equipment (slings...) are adapted to the weight of the machine. Use the attachment points provided on the machine. Check that the cables are well positioned in order to avoid deterioration. Ensure that necessary mechanical protection is in place to avoid persons working on the machine being caught or trapped by the pulley or cables. The motor should be installed to allow cooling air (not too humid, free of dust, vapours and corrosive gasses) to circulate without clogging. WARNING: do not apply the megohmeter to the heat detector terminals to avoid damage. If the level is not reached, dry with an external or internal heater. Drying with external heat source - place the motor in an oven at 70 C for at least 24 hours until the correct insulation is obtained. (100MΩ) - Make sure the temperature is raised gradually in order to remove condensation - after drying at ambient temperature, during the cooling phase make regular checks on the insulation level, which will tend to drop then raise. 4

Non contractual lifting diagram Cable protector 4 nuts for motor mounting - Check that the cables are well adapted to the pulley. - When the cables are installed, adjust the variation between the cables and the protection then block the protectors. CAUTION: There is a high risk of jamming between the cables and the pully. 4.2 - Cabling 4.1.1 - Cleaning Fig. 1: Motor lifting - Release the brakes with the manual unblocking system or energise the brake if there is no manual unblocking. - Remove the protection varnish from the pulley grooves (if present). - Shielding of the cables connected to earth and cable outputs by the cable gland. CAUTION: Do not use abrasive materials, only an alcohol soaked cloth. Be careful not to put alcohol or grease on the brake disc. WARNING: only use alcohol in a well ventilated area. 4.1.2 - Mechanical installation - The GEARLESS machine must be installed on a vibration free frame and must be secured with the M16 nuts and washers. Nuts are only to be tightened when the cables, the cabin, the counterweights, and the drive pulley are perfectly aligned. Before installing the cables, check that the drive pulley can turn freely by hand when the brakes are open. Blindages des câbles à la masse Sheilded sensor cable Sorties des câbles par presse étoupes Sheilded cable supply for the motor (stator) Fig. 1 - Motor 5

The brakes micro-switches must be «NF» standard Fig. 4 - Brake and internal micro-switch connection Put in series by pre-insulated red connector Sheilded cables for the brakes and micro-switches Connector type MAT-N-LOCK male ref 350809-1 (AMP) Fig. 2 - Micro-switch (brake) - Connect the motor using the adequate section cables (cables and terminals are dimensioned according to the current: see chart below). Thoroughly check the nut tightness on the terminals. (Bad tightening may cause destruction to the connections through heat: see later picture). Nominal I (A) per phase Min. cable section (mm 2 ) 9,5 12 16 25 34 40 46 60 70 96 1,5 1,5 2,5 4 6 10 10 16 16 25 CAUTION: It is the users responsability to make the connections in accordance with the legislation and regulations of the country where it shall be used. This is particularly important for, cable size, fuse size and type, earth or mass connections, turning off the power supply, the correction of faulty insulation and the protection against overcurrents. This chart is for information only, and under no circumstances substitutes for the standards in effect. The recommended sections are determined using singlewire cable with a maximum length of 10m, beyond which line drops need to be taken into account due to its length. Key: 1: Brown - 2: Red L1 U C1 C2 W2 U2 V2 L3 W V L2 Fig. 3 - Internal motor connection 6

- Connect the power cables to the terminals U1, V1, W1, in conformity with IEC 600034-1 (see 4.2). - Connect the temperature sensor to the variator. - Connect the motors stator to earth (see 4.2). - Connect the brakes to the micro-switches. - Connect the encoder. 4.3 - Start up Check that the electrical drives are well connected to earth before doing the first operation. Start up the machine and check the following points: - all electrical fixations and connections are correctly tightened. After start up, check: - noice, - vibrations, - action of switches/buttons, - also check the current and the voltage on the machine while operating at rated load. 5 - MAINTENANCE/SERVICING 5.1 - After 1 month of operating - Check the tightness of bolts or electrical connections. - Check the vibrations. Check for abnormal connections. - Remove grease traces (if any) from the brake discs. - Make sure that the brake noise level is less than 60dBA. If a higher noise level is reported, please inform - If a brake wear check is necessary: check that the brake airgap measures between 0,25 mm and 0,3 mm according to the control procedure described in paragraph 6. Note/ this measure will be used as reference. 5.2 - Once a year - Make sure that the brake noise level is inferior to 6dBA. If higher, adjust according to paragraph 6. - If a brake wear check is necessary, check that the airgap is less than 0,3 mm. If higher: check that the motor doesn t start with the brake closed, otherwise contact. 6 - ADJUSTMENT PROCEDURE FOR BRAKES, ENCODERS AND MICRO- SWITCHES 6.1 - Adjustment of airgap clearance (non-supplied brakes) 6.1.1 - Brake clearance control - Measure the airgap with a set of feeler gauges at the two indicated places (between the framework and the brake box) see fig. 4 from 6.1.2.3. - The brake is correctly adjusted, if the airgap is between 0,25 and 0,3 mm (factory setting). 6.1.2 - Brake airgap adjustment 6.1.2.1 - Tools needed - A set of feeler gauges: 0,3 mm, 0,25 mm and 0,06 mm. - Male hexagon offset spanner (2 mm): DIN 911 (extended version: L=90). - Small flat screwdriver. - Crosshead screwdriver for M3 screw. - Flat spanner for hexnuts (24 mm). - Flat or offset spanner for hex nuts (18 mm). - Torque spanner for hex nuts (18 mm) : 30-60 N.m available. - Pocket torch. 6.1.2.2 - View of Brake Front brake Micro-switch Rear brake Encoder Nuts 7

The dimensions on the picture are not validated. The encoder is not represented. Bracer (front brake) Moving part or disc O ring seal Stud Nut: 60 N.m Rear brake block Adapter Front brake block Encoder position Airgap: 0,3 mm (when the windings are energised) Cross-sectional view of the two brakes - Turn the spanner anti-clockwise to the encoder in order to reduce the airgap. O ring seal Lunula Nut: 60 N.m 6.1.2.3 - Adjusting with a lunula - Remove the joint ring with a flat screwdriver. Do not remove completely as indicated in the picture. - Screw and unscrew the bracer until a 0,3 mm gauge can be inserted, but not two gauges together (0,31). Insert the gauges between the moving part of the brake and the brake block adjacent to the bracer (see fig 3 lunula). - Adjust in the same way the two other bracers of the same brake. Then adjust the second brake. - Reposition the O ring seal by pressing with the fingers. Airgap measurement positions Brake block Encoder Fig. 3 - Lunula Check if you have a lunula on the brake block to remove the O ring seal. If so, use only 6.1.2.3. if there isn t a lunula, use only 6.1.2.4. O ring seal Fig. 4 8

6.1.2.4 - Adjusting without a lunula - Unscrew (but not fully) the rear brake nuts until the O ring seal can be removed. - Remove the O ring seal with the aid of a flat screwdriver. Do not remove completely as indicated on fig 4. - Initially tighten the 3 nuts on the rear brake to a torque of 30Nm. - Then tighten the 3 nuts on the rear brake to a torque of 60Nm. - Screw and unscrew the bracer until a 0,3 mm gauge can be inserted 0,3 mm, but not the two other gauges together (0,31 mm). Insert the gauges between the moving part of the brake and the brake block ajacent to the bracer. See fig 3 and 4. - Adjust in the same way the two other bracers of the same brake. Then adjust the second brake in the same way - Reposition by pressing the O ring seal with fingers. - Tighten the bolts on the rear brake to a torque of 60 N.m 6.1.2.5 - Control of brake airgap (supplied brakes) - Energise the brakes. - Check the noise level of each brake (no slapping) and that the pulley turns freely with the brakes open. - If there is too much noice, readjust the brakes with a 0,20 mm gauge. - After this action, check without fail the micro-switches adjustement. 6.2 - Adjusting the encoder Fig. 1 6.3.2.2 - Adjusting the first micro-switch Secure the load before any action on the brakes; Only adjust the second micro-switch if the first has been adjusted. - Connect the pilot lamp to the two wires on the micro-switch. The lamp should light. (use fig 1). If it doesn t unscrew each adjustment screw until it does (see fig3). - Unscrew with one turn, only one adjustment screw and its lock nut (see fig2). - Slowly screw the adjustment screw until the light goes out. Unscrew to 60 once the light has gone out. - Hold the adjustment screw in position with a flat spanner while tightening the lock nut. - Only if the first micro-switch has been ajusted, adjust the second in the same way. - Connect the brake feed connector. 60 - Connect the brake supply and encoder connectors. - Adjust the encoder to fit the new encoder. 6.3 - Control and adjustment of the micro-switches 6.3.1 - Control - Each brake unit is equipped with a micro-switch. - The micro-switches are closed if the brakes are closed (active). - The micro-switches are wired in series. - Control the micro-switches using an ohmmeter. - Control successively each micro-switch after having short circuited the others. The control is done by operating the brake several times (opening/closing) to be carried out without fail on at least 3 equidistant points during a full rotation of the brake disc. 6.3.2 - Adjustment 6.3.2.1 - Tools needed - 2 flat spanners for hex nuts (8 mm) - A pilot lamp for adjusting the micro-switches. - Adaptable points on the pilot lamp in order to be able to plug into the back of the connector. See fig 1. Make sure that the bolt head has the same orientation before and after tightening. Fig. 2 Brake unit Serial number Micro switch Lock nut Unscrew one turn before removing the micro-switch Adjustment bolt Fig. 3 9

7 - REPLACING ENCODERS BRAKES AND MICRO-SWITCHES Tools needed - Male hexagon offset spanner (2 mm): DIN 911 (extended version: L=90). - Male hexagon offset spanner (4, 5 and 6 mm) : DIN 911 (unextended). - Crosshead screwdriver for M3 screw. - Flat head screwdriver for M6 screw. - Flat or offset spanner for hex nuts (18 mm). - Torque spanner for hex nuts (18 mm) : 30-60 N.m. - Loctite 8150 grease or equivalent. - Pocket lamp. - Brake thread Omnifit 100M or equivalent. - Kit to be acquired through retailer. 7.1 - Encoder change procedure Secure the load before any operation on the motor. Make sure that no torque is applied to the rotor - Unplug the encoder. - Unplug the brake connector(s). - Check to see if you have a DANAHER encoder (fixed to the brake with a metal plate) or a HEIDENHAIN encoder (screwed into the brake hole). 7.1.1 - If HEIDENHAIN encoder dismantling procedure as below - Unscrew (3 turns) the CHC (M2) screw inside the brake hole (between the brake and the encoder). Use the lamp to find. Heidenhain encoder Fig. 1 Removing the HEIDENHAIN encoder: - Unscrew (2 turns) the CHC (M2) screw inside the brake hole (between the brake and the encoder). Use lamp to find. - Unscrew the plastic screw on the top of the encoder. Then unscrew the bolt inside using a male hexagon offset spanner (4 mm). - Place the M6 screw instead of the M5 screw which has just been removed. - Remove the encoder and the M6 screw inside. 7.1.2 - If DANAHER encoder dismantling procedures below - Unscrew the 2 crosshead screws on the top of the encoder (keep them). Danaher encoder (2 crosshead screws) Fig. 2 Removing the DANAHER encoder: - Unscrew the steel plate fixing the encoder to the brake. - Unscrew the 3 crosshead screws on the top of the encoder (keep them). - Remove the encoder hood (keep it). - Loosen the bolt inside the encoder (male offset spanner 4 mm). - In place of the M5 screw which has just been removed, place the M6 screw. Remove the encoder and unscrew the M6 screw inside - Unscrew the 3 hex nuts on the rear brake. - Remove the rear brake. - Remove the front brake disc. - Remove the front brake. - Remove the front brake disc. 7.1.3 - Reassembling the HEIDENHAIN encoder - Place the M5 screw inside the encoder (without putting the encoder in place). - Put a drop of Omnifit on the M5 screw thread. - Screw the encoder to the rotor. - Screw the plastic screw on the top of the encoder. - Screw the M2 screw inside the brake hole (between the encoder and the brake). Use the pocket lamp to find. 7.1.4 - Reassembling the DANAHER encoder - Place the M5 screw inside the encoder. - Put a drop of Omnifit on the M5 screw thread. - Screw the encoder to the rotor. - Fix encoder hood. - Screw the fixation plate to the encoder. - Screw the fixation plate with the brake. - Plug the brake and encoder connectors. - Auto calibrate the new position of the encoder on the speed variator. 7.1.5 - Adjusting the encoder (see 6.2) 10

7.2 - Brake changing procedure 7.2.1 - To remove the encoder (see 7.1) 7.2.2 - Removing the old brakes Secure the load before any operation on the motor. Make sure that no torque is applied to the rotor! - Unplug the encoders connector. - Unplug the brakes connector(s). - Check if you have a DANAHER encoder (fixed to the brake with a metal plate) or a HEIDENHAIN encoder (screwed into the brake hole). 7.2.3 - Refitting new brakes CAUTION: Do not touch or put any grease or oil on the brake lining! Use gloves or wash hands if needed. Do not mix rear and front brakes and discs. - Put a little grease on the rotor splines. - Put the front brake disc on the splines making sure they are correctly positioned (see below). - Insert the front brake on the studs respecting the direction (the 2 micro-switches must be alined and on the top). - Put in place and tighten the nuts (18 mm): 30 N.m. - Check that the bracers are well postioned (see below). If not, loosen the 3 nuts and repeat the above step. Counterbalance the weight of the brakes on the studs to improve bearer positionning. Motor direction Bracer inserted in the brake O ring seal under pressure - If the bracers are correctly positioned, tighten the 3 nuts (18 mm) to a torque of: 60 N.m. - Put the back brake disc on the bracers making sure they are well positioned (see below). Micro-switch on the top Machined part of the brake - Put the back brake disc on the bracers making sure they are well positioned (see below). 7.3 - Replacing the micro-contacts 7.3.1 - Tools needed - Male hexagon offset spanner: DIN 911, 1,5 mm. - A wire cutter to remove sleeving and free the wires. - Brake thread Omnifit 100M or equivalent. - 2 flat spanners for hex nuts (8 mm). - A pilot lamp for adjusting the micro-switches. - A crimper. - 2 Colson rings or equivalent: 3,5*140 (for each microswitch). - 2 protection sleeves: 30 cm long; interior diameter between 8 and 10 mm. - Kit to be acquired through Motors. 7.3.2 - Remove the old micro-switches Do not remove two micro-switch at the same time! Secure the weight before any operation on the brakes. - Cut the micro-switch wires at 20 cm. - Unscrew one turn the adjustment bolt on the micro-switch. - Unscrew and remove the micro-switch. 11

7.3.3 - Putting into place the micro-switch - Put a drop of Omnifit on both of the micro-switch fixing screw threads. - Tighten the micro-switch bolts to a low torque (30 N.m). - Connect the pilot lamp on both of the micro-switch wires. - Slowly tighten the adjustment bolt until the light goes out. Unscrew to 60 after the light has gone out (see below). - Hold the adjustment bolt in position with a flat spanner while tightening the lock nut. 60 wire colour: red 250 mm Brake micro-switch front or rear, normally closed Brake unit 30 N.m Serial number Wire colour: black 300 mm Micro switch Make sure that the bolt head has the same orientation before and after tightening. Fig. 1 7.3.4 - Placing the new cables for the microswitches - Cut and free the wires coming from the connector as indicated on fig 2. - Insert the sleeving around the wires coming from the connector. - Cut and free the micro-switch wires (see fig 1). - Connect the connector wires with those from the microswitch using two cufs and a crimper. - Fix the new sleeve around the cufs and wires using two Colson rings or equivalent. Lock nut Unscrew one turn before removing micro-switch Fig. 2 Adjustment bolt BEFORE INTERVENING NEVER CUT THE WINDING WIRES! Old sleeve Cut here 20 cm New sleeve Connector side Cuf 50mm ~10mm Micro-switch side Rings Fig. 1 12

8 - ORDERING OF REPLACEMENT PARTS For the after-sales service, always provide the following elements with replacement parts orders: - motor type and serial number, and for each part: - part designation and (or) parts number, - quantity ordered. For immediate identification, please indicate the file reference used at order (plan or manual number). Details of the type and serial number can be found on the motors rating plate. Parts designation: 1-2 : Brake ring and nut 7 - Key 12 - Micro-switches 3 - Pulley 8 - Front bearings 13 - O ring seal 4 - Stator ring 9 - Brake 14 - Rotor 5 - Stator 10 - Axle encoder 15 - Motor bearing 6 - Front bearings 11 - Encoder (2 types possible) 16 - Brake bearing 13

NOTES 14

MOTEURS 16015 ANGOULÊME CEDEX - FRANCE 338 567 258 RCS ANGOULÊME S.A. au capital de 62 779 000 www.leroy-somer.com