Confederation Line West Alignment Improvement. September 21, 2016

Similar documents
Confederation Line West Queensway Terrace North. May 27, 2017

O-Train Light Rail Transit Stage 2 Look Ahead

Ottawa LRT Stage 2. McKellar Park Information Session

Bayshore Station to Moodie Drive LRT Extension Environmental Assessment Studies. Public Meeting 22 March 2017

CONFEDERATION LINE EAST SEGMENT

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Mississauga Bus Rapid Transit Preliminary Design Project

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Key Transfer Stations - Technical Memo

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS

Recommended Vision for the Downtown Rapid Transit Network

Document 4 - Budget Adjustments Processed Under Delegated Authority

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour

Letter EL652 City of Mercer Island. Page 1. No comments n/a

NEWSLETTER CONSTRUCTION PROGRESS IN THIS ISSUE:

METRO Orange Line BRT American Boulevard Station Options

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Attachment 5 Eglinton West LRT Planning and Technical Update

Stittsville OC Transpo Services

Scarborough Transit Planning

Construction Staging Area 4 Avenue Road

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL

West Broadway Reconstruction/LRT Design. March 19, 2015

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)

TORONTO TRANSIT COMMISSION REPORT NO.

5. OPPORTUNITIES AND NEXT STEPS

TRANSFORMING THE WAY OUR REGION MOVES

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

WELCOME TO OUR PUBLIC OPEN HOUSE Eglinton Crosstown Light Rail Transit (LRT)

Transit City Etobicoke - Finch West LRT

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

TORONTO TRANSIT COMMISSION REPORT NO.

Bayshore Station to Moodie Drive LRT Extension Environmental Assessment Studies. Advisory Committee Meeting June 2017

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

NEWSLETTER CONSTRUCTION PROGRESS IN THIS ISSUE:

Phasing of TMP Transit Network

Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

Sound Transit East Link: Bus/LRT System Integration Study

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Rail alignment and benefits (rab) study

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

West Broadway Transit Study. Community Advisory Committee September 17, 2015

CPG is pleased to report the following accomplishments this quarter:

STH 60 Northern Reliever Route Feasibility Study Report

Tunney s Pasture Station Bus Loop and Lay-up Area Design

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Business Advisory Committee. July 7, 2015

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

Corridor Management Committee. March 7, 2012

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

Business Advisory Committee. November 3, 2015

HIGHWAY 28 FUNCTIONAL DESIGN

THE WAY WE MOVE LRT FOR EVERYONE

Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental considerations)

O-Train Confederation Line Stage 1

North Shore Alternatives Analysis. May 2012

Scarborough Subway Extension. Stakeholder Advisory Meeting February 28, 2017

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE

Tunney s Pasture to Dominion Station Traffic and Transit Detours. April 4, 2017 C. Wheeler/ C. Swail

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Project Description

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Project Information. Highway 2 /Gaetz Avenue Interchange. Highway 2, Gaetz Avenue and Taylor Drive Interchange Improvements

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

Welcome to Open House #5 Scarborough Rapid Transit

Citizens Committee for Facilities

City of Bellevue East Link Light Rail B7/C9T to NE 2nd Portal (B7 Revised) Alternative RP03 Interim Analysis Report

RECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE

METRO Light Rail Update

Committee Report. Transportation Committee. Business Item No

Rail alignment and benefits (rab) study

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

I-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013

C LINE: LONG-TERM GLENWOOD REALIGNMENT STUDY

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Exposition Light Rail Transit Project

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

SEPULVEDA PASS CORRIDOR

The Engineering Department recommends Council receive this report for information.

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Community Advisory Committee. October 5, 2015

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

4.0 TIER 2 ALTERNATIVES

D2 - CBD Second Alignment

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

4.2 Series Station Option Description

Clean Harbors Canada, Inc.

FREQUENTLY ASKED QUESTIONS

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Transcription:

Confederation Line West Alignment Improvement September 21, 2016

Agenda Background Lincoln Fields Station and alignment improvement LRT alignment, west of Lincoln Fields to Queensview, including: Pedestrian bridge replacement at Woodroffe Elevated LRT structure to grade separate tracks to Bayshore and Baseline LRT tunnel alignment at Connaught Avenue Queensview Station and pedestrian bridge Closure of Queensway Station Connectivity Next Steps 2

Background Spring 2016, design modifications were recommended along Confederation Line West (at Cleary Station)and Confederation Line East (Blair to Montreal stations) The modifications were included in the respective Confederation Line Environmental Assessments (EAs) Preliminary engineering design work has been ongoing and staff identified additional improvements along Confederation Line West: Alignment and station shift at Lincoln Fields 3

Confederation Line West West of Lincoln Fields 4

Lincoln Fields Improved Alignment 5

Lincoln Fields Station Improved Concept 6

LRT Alignment West of Lincoln Fields 7

Pedestrian Bridge Replacement Alignment cannot avoid the existing east piers of the pedestrian bridge at Woodroffe High School The bridge will be demolished and replaced with a new bridge over the LRT alignment Construction staging of new bridge and demolition of existing bridge is being analyzed Impacts on connectivity during bridge construction will be minimized to the extent possible, including coordination with Woodroffe High School New bridge span to be coordinated with new permanent pathway connections Connectivity to Lincoln Fields Station and throughout the Pinecrest Creek corridor 8

LRT Elevated Alignment at Bayshore/Baseline Split West of Lincoln Fields, the alignment splits to Bayshore Station and Baseline Station At the split, the tracks must be grade separated to avoid trains from one terminal delaying trains from the other end of the line By aligning the tracks to Bayshore over the southbound tracks to Baseline (with Baseline tracks remaining at grade): The existing Transitway to Iris may remain open during construction Multi-use pathways can be maintained under the elevated split structure Visual impact of bridge/berm can be minimized 9

LRT Elevated Alignment at Bayshore/Baseline Split 5m 3m 10

LRT Elevated Alignment at Bayshore/Baseline Split 11

LRT Elevated Alignment Traffic Operations during Construction 12

LRT Tunnel Alignment At Connaught Avenue Rapid transit alignment has been protected by City for decades Length of tunnel roof sections is approximately 170 metres each, separated by a 40 metre open air vent With an open air vent, mechanical ventilation is unlikely to be required Tracks rise to grade in an open cut with retaining walls at both ends of the tunnel 13

LRT Tunnel Alignment Under Connaught Avenue 14

LRT Tunnel Alignment Under Connaught Avenue 15

LRT Tunnel Alignment Under Connaught Avenue 16

LRT Tunnel Alignment Under Connaught Avenue 17

LRT Tunnel Alignment Under Connaught Avenue 18

LRT Tunnel Alignment Property Impacts Three City properties, currently under lease, will be required for construction: 999, 1003 and 1007 Connaught Avenue A small portion of two properties will be required for a subsurface utility easement: 2504/2505 Hanlon Avenue Mobilization sites for construction staging will also be required adjacent to the Connaught tunnel and the Pinecrest Creek bridge Construction areas are largely outside of the paved area of OC Transpo Queensview garage 19

LRT Tunnel Alignment Property Impacts 20

Preliminary Noise and Vibration Analysis Ambient noise levels will be impacted by LRT operations at the following locations: Pinecrest Creek Bridge Elevated LRT structure (bridge) at the Bayshore/Baseline split Connaught Tunnel (at grade through a short section of the park) Noise impacts from LRT operations are being analyzed Ambient noise levels are currently impacted by: Highway 417 and Transitway operations OC Transpo garage on Queensview Preliminary vibration analysis has been completed Resilient track fasteners will mitigate to acceptable standards Track bed system will be confirmed by successful bidder Floating slabs are also a possibility 21

Vibration Mitigation Measures Resilient Fasteners 22

Vibration Mitigation Measures Resilient Fasteners Floating Slab 23

Queensview Station LEON S IKEA 24

Queensview Station 25

Forecasted Ridership Station Total Boardings and Alightings (2031, AM Peak Hour) New Orchard 636 Lincoln Fields 2,521 Queensview 540* Pinecrest 640 *Queensview Station is busier than 11 other Stage 2 stations Ridership forecast takes into account the new pedestrian bridge over Highway 417 26

27 Connectivity

Next Steps Upcoming opportunities for public comment: Environmental Assessment process Notice of Completion (September 30, 2016) Staff report outlining recommended design improvements: Finance and Economic Development Committee (Fall 2016) City Council (Fall 2016) 28

Questions? 29

Alternate LRT Elevated Alignment at Bayshore/Baseline Split 30

Alternate LRT Elevated Alignment at Bayshore/Baseline Split 31

Conflict with Pinecrest Creek Culvert 32

Lincoln Fields Station Improved Concept Platform Configuration 33