PROJECT PERIODIC REPORT

Similar documents
De-orbiting technology developments at Surrey

Dr. Chris Dudfield. Chief Technology Officer Intelligent Energy. Sponsors

Thinking Outside the Cube

Fuel Cell Application in a New Configured Aircraft PUBLISHABLE REPORT

Routine Scheduled Space Access For Secondary Payloads

Name: Space Exploration PBL

Development of a Self-latching Hold-down RElease Kinematic (SHREK)

Automobile Body, Chassis, Occupant and Pedestrian Safety, and Structures Track

Rocket Activity Advanced High- Power Paper Rockets

AMSAT-NA FOX Satellite Program

Baseline Concepts of the Kayser-Threde Team

MODELING SUSPENSION DAMPER MODULES USING LS-DYNA

SOLAR ARRAY ROOT HINGE BASED ON SHAPE MEMORY ALLOY (SMA) ACTUATOR

Consumers, Vehicles and Energy Integration (CVEI) project

NEW DEPLOYABLE SOLAR PANEL ARRAY FOR 1U NANOSATELLITES

CHAPTER 1. Introduction and Literature Review

Hybrid Self-deployable Tubular CFRP Booms for Deployable Membrane

7. PRELIMINARY DESIGN OF A SINGLE AISLE MEDIUM RANGE AIRCRAFT

Bi-Axial Solar Array Drive Mechanism: Design, Build and Environmental Testing

SEMA Technology Redundancy Advantages

OMOTENASHI. (Outstanding MOon exploration TEchnologies demonstrated by NAno Semi-Hard Impactor)

Palamede, more than a microsatellite. Workshop on University Micro Satellites in Italy Rome, July 27, 2005

Fuel Cells and Hydrogen 2 Joint Undertaking (FCH 2 JU) Frequently Asked Questions

Publishable Executive Summary (M1-M48)

Understanding design patent practice through the Jaguar Land Rover case

PEM Fuel Cells Manufacturing - Stack

White paper: Pneumatics or electrics important criteria when choosing technology

HYSYS System Components for Hybridized Fuel Cell Vehicles

AWIATOR Project Perspectives:

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

ECSE-2100 Fields and Waves I Spring Project 1 Beakman s Motor

BALL BEARING TESTS TO EVALUATE DUROID REPLACEMENTS

Cygnus Payload Accommodations: Supporting ISS Utilization

NASA Glenn Research Center Intelligent Power System Control Development for Deep Space Exploration

The Falcon 1 Flight 3 - Jumpstart Mission Integration Summary and Flight Results. AIAA/USU Conference on Small Satellites, 2008 Paper SSC08-IX-6

E/ECE/324/Rev.1/Add.57/Rev.2/Amend.4 E/ECE/TRANS/505/Rev.1/Add.57/Rev.2/Amend.4

Skid against Curb simulation using Abaqus/Explicit

Dual Spacecraft System

Safety Assessment for secondary payloads launched by Japanese Expendable Launch Vehicle

EXPERIMENTAL VERIFICATION OF INDUCED VOLTAGE SELF- EXCITATION OF A SWITCHED RELUCTANCE GENERATOR

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

The DoD Space Test Program Standard Interface Vehicle (ESPA) Class Program

Thank you for the opportunity to

actsheet Car-Sharing

Economic and Social Council

Coupled Aero-Structural Modelling and Optimisation of Deployable Mars Aero-Decelerators

APPLICATION OF STAR RATINGS

Advanced Vehicle Performance by Replacing Conventional Vehicle Wheel with a Carbon Fiber Reinforcement Composite Wheel

Modular Reconfigurable Spacecraft Small Rocket/Spacecraft Technology Platform SMART

Evolving Bump Chip Carrier

DEMCOPEM- 2MW Demonstration of a combined heat and power 2 MWe PEM fuel cell generator and integration into an existing chlorine production plant

Bosko Rasuo University of Belgrade, Faculty of Mechanical Engineering, Aeronautical Department, Belgrade 35, Serbia

Capabilities Summary and Approach to Rideshare for 20 th Annual Small Payload Rideshare Symposium NASA Ames Research Center June 12-14, 2018

Cibola Flight Experiment

Hydrogen & Fuel cells From current reality to 2025 and beyond

LPT6510 Pulse-tube Cooler for K applications

Newsletter November This month CFS10. Engine. Body. Welcome CFS10 p.1 CFS10 West p.4 What now? p.5 Interested? p.5

13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation. Pascal Medal Head Of Certification Experts Department EASA

Energy Storage: A UK Perspective

NASA - USLI Presentation 1/23/2013. University of Minnesota: USLI CDR 1

HDV CO2 emission certification 1 st meeting of the Editing board

Notice of Proposed Amendment Regular update of CS-25

Innovative Small Launcher

COMMISSION REGULATION (EU) / of XXX

Using ABAQUS in tire development process

High Speed, Low Weight Momentum/reaction Wheels. Larry Wilhide, Valley Forge Composite Tech, Inc. P.O. Box 344 Carlisle, PA (717)

The Solar Zone at the UA Tech Park Phase II Expansion

IALA Guideline No The Reporting of Results of e-navigation Testbeds. Edition 1. December 2013

Formation Flying Experiments on the Orion-Emerald Mission. Introduction

Small Scale Cooler: Extending Space Developed Technology into Adjacent Markets

A NOVEL IN-FLIGHT SPACE BATTERY HEALTH ASSESSMENT SYSTEM Brandon Buergler (1), François Bausier (1)

Pre-normative research on resistance to mechanical impact of composite overwrapped pressure vessels. Dr. Fabien Nony CEA

Economic and Social Council

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

Offshore Application of the Flywheel Energy Storage. Final report

Sandwich nozzle hot test on Vulcain 2 engine.

AMBR* Engine for Science Missions

National Conference on Latest Trends in Design & Testing of Transmission Line Components

Novel automotive construction techniques

Centerwide System Level Procedure

A First Principles-based Li-Ion Battery Performance and Life Prediction Model Based on Single Particle Model Equations

The Common Spacecraft Bus and Lunar Commercialization

Reentry Demonstration Plan of Flare-type Membrane Aeroshell for Atmospheric Entry Vehicle using a Sounding Rocket

#14. Evaluation of Regulation 1071/2009 and 1072/ General survey COMPLETE 1 / 6. PAGE 1: Background

Design Reliability Comparison for SpaceX Falcon Vehicles

EFFICIENT URBAN LIGHT VEHICLES.

HYLIFT-DEMO DELIVERABLE 8.4

13917/18 CB/AP/add 1 ECOMP.3.A

Propeller Blade Bearings for Aircraft Open Rotor Engine

SABRE FOR HYPERSONIC & SPACE ACCESS PLATFORMS

External Aerodynamics: Lift of airship created only by buoyancy which doesn t need lift generating surface like an airfoil or a wing

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

Seventh Framework Programme THEME: AAT Breakthrough and emerging technologies Call: FP7-AAT-2012-RTD-L0 AGEN

EMS ELONGATION MEASUREMENT SYSTEM. Strain measurement system for wind turbines optimizing the control & condition monitoring

CONTACT: Rasto Brezny Executive Director Manufacturers of Emission Controls Association 2200 Wilson Boulevard Suite 310 Arlington, VA Tel.

The European Lunar Lander Mission

Final Administrative Decision

ESF on Fire Protection Proposed ESF on Fire Protection Engine attachment points applicable to Piston Engines EASA

Ian Jones, TWI Ltd ITMA 2015, Milan

Transcription:

PROJECT PERIODIC REPORT Grant Agreement number: 284474 Project acronym: DEPLOYTECH Project title: Large Deployable Technologies for Space Funding Scheme: FP7-SPACE-2011-1 Collaborative Project Date of latest version of Annex I against which the assessment will be made: Periodic report: 1 st x 2 nd 3 rd 4 th Period covered: from January 2012 to June 2013 Name, title and organisation of the scientific representative of the project's coordinator 1 : Prof. Vaios Lappas Surrey Space Centre Faculty of Engineering and Physical Sciences University of Surrey Guildford, GU2 7XH, United Kingdom Tel: +44 (0)1483683412 Fax: E-mail: v.lappas@surrey.ac.uk Project website 2 address: www.deploytech.eu 1 Usually the contact person of the coordinator as specified in Art. 8.1. of the Grant Agreement. 2 The home page of the website should contain the generic European flag and the FP7 logo which are available in electronic format at the Europa website (logo of the European flag: http://europa.eu/abc/symbols/emblem/index_en.htm logo of the 7th FP: http://ec.europa.eu/research/fp7/index_en.cfm?pg=logos). The area of activity of the project should also be mentioned.

Declaration by the scientific representative of the project coordinator I, as scientific representative of the coordinator of this project and in line with the obligations as stated in Article II.2.3 of the Grant Agreement declare that: The attached periodic report represents an accurate description of the work carried out in this project for this reporting period; The project (tick as appropriate) 3 : has fully achieved its objectives and technical goals for the period; has achieved most of its objectives and technical goals for the period with relatively minor deviations. has failed to achieve critical objectives and/or is not at all on schedule. The public website, if applicable is up to date is not up to date To my best knowledge, the financial statements which are being submitted as part of this report are in line with the actual work carried out and are consistent with the report on the resources used for the project (section 3.4) and if applicable with the certificate on financial statement. All beneficiaries, in particular non-profit public bodies, secondary and higher education establishments, research organisations and SMEs, have declared to have verified their legal status. Any changes have been reported under section 3.2.3 (Project Management) in accordance with Article II.3.f of the Grant Agreement. Name of scientific representative of the Coordinator:..... Date:...30.../...8.../...13... For most of the projects, the signature of this declaration could be done directly via the IT reporting tool through an adapted IT mechanism and in that case, no signed paper form needs to be sent 3 If either of these boxes below is ticked, the report should reflect these and any remedial actions taken. 2

3.1 Publishable summary DEPLOYTECH is a three part project whose primary focus is the increase in Technology Readiness Level (TRL) of promising deployable space technologies. The three technologies concerned are: Inflatable structural components for satellites in the micro-nano satellite categories; Bistable Reeled Composite (BRC) deployable booms (with special reference to solar array applications) for mid-large sized satellites; Closed-section lenticular carbon fibre deployable booms for solar sails. 3.1.1 InflateSail The test platform for the inflatable structure being developed is a 3U CubeSat called InflateSail. It is already earmarked for launch with QB50 (a multi-cubesat launch to an altitude of approcimately 320 km). InflateSail is a drag deorbiting sail, and consists of a 10 m 2 gossamer drag sail connected to the satellite body by a 90 cm long inflatable rigidisable boom. The sail is sufficiently large to cause the satellite to deorbit significantly faster than it otherwise would have. Figure 1: InflateSail in its deployed configuration InflateSail will deploy by first inflating and rigidising its laminate boom, and then deploying its drag sail. The purpose of the inflatable booms is to separate the sail from the host satellite body, reducing the likelihood of any interaction between the sail and the host satellite s appendages, and also increasing the aerodynamic stability of the satellite-sail system. Placing the drag sail sufficiently far aft of the system centre of mass causes the system to align with the incoming air flow, much like the feathers of an arrow stabilise it during flight. This prevents the sail from aligning itself edge-on to the flow, and maintains a large component of the drag sail normal vector aligned with the flow. InflateSail will not only demonstrate the use of inflatable structural components, but also the use of a special type of open section bistable boom for solar/drag sails (see Figure 3). This type of boom and its deployer are quite mature concepts, being derived largely from a heritage project at SSC. 3

The sail material will be double metallised Mylar, less than 10 µm thick. For longer missions a Kapton or CP1 sail may be required, but Mylar is perfectly sufficient for the mission length proposed at present. The sail will be wrapped around a central spindle during launch (see Figure 2). Boom deployment mechanism Sail storage spindle Boom deployer motor stored in sail storage shaft Origami-folded laminate boom Inflated and rigidised laminate boom Hinged lid open Deployment rail guides 2U of CubeSat for sail and inflatable components 1U of CubeSat is reserved for bus + avionics Figure 2: InflateSail payload shown in the stowed (left) and deployed (right) configurations. The coiled booms and sail have been omitted in order to show the workings of the mechanisms. Figure 3: The four quadrant sail on InflateSail will be supported by four open section bistable carbon fibre booms. The special construction method of the booms means they coil naturally at different radii along their length (central image), preventing instabilities from appearing, and allowing the booms to be stowed for launch without the need for restrain mechanisms. 4

The inflatable skin on InflateSail s deployable boom is made of a special laminate of Mylar/Kapton and aluminium (see Figure 4). The use of metal polymer laminates as a rigidisable inflatable skin was pioneered during NASA s Project Echo, but it is yet to be demonstrated at a small scale as a structural component. Figure 4: The special construction of the inflatable skin (metal/polymer/metal laminate) allows it to be rigidised : to maintain its deployed shape without the aid of inflation gas. The initial inflation process causes the origami folded laminate boom to deploy, and the laminate skin to stretch slightly beyond the metal layers yield point. Once the inflation gas has escaped into space, the boom will retain its shape indefinitely. The inflation system for InflateSail consists of two Cool Gas Generators (CGGs) designed by TNO and built by CGG Technologies. Each CGG will be capable of producing 3.9 g of pure nitrogen gas. CGGs are a natural choice for inflatable deorbiting structures because of their demonstrated longevity in space. Two CGGs are being included to create a semi-redundant system. The successful firing of a single CGG will produce enough gas to deploy the inflatable boom (allowing sail deployment), while the successful firing of both CGGs is required to cause rigidisation to occur. Figure 5: Location of CGGs in inflation system The work related to InflateSail performed in the first period of DEPLOYTECH includes: Extensive review of relevant existing deployable technologies; Overall concept and system design; 5

Selection and extensive experimental verification of rigidisation technique; Thermal analysis of deployed laminate structure; Sail and inflatable folding pattern selection; Worst-case dynamic loads on system during deployment; Sizing and material selection for all components; Orbital dynamic simulation for selected geometry; Design of inflation system. The Engineering Model (EM) is currently under construction, and will be ready for testing in late September. Qualification will begin in early 2014, and a flight model will be ready for delivery by late 2014. It is hoped that InflateSail will demonstrate the first successful deployment of an inflatable from a CubeSat, and the first use of a structural inflatable of this kind. The inflatable boom will weigh between 30-60 g per metre, representing a clear advantage as a telescopic deployment system. 6

3.1.2 Roll-up Solar Array The project aims to produce a generic and highly scalable design for the deployment of solar arrays arrays of photo-voltaic cells used to provide electrical power in most mid to large scale satellite designs. This is aimed primarily at using the new generation of flexible solar cells, which offer significant weight and space savings as they consist of thin flexible films that can be coiled for storage but the potential to use the same design to deploy more orthodox rigid solar cells will be explored in principle. The design uses a pair of bi-stable carbon fibre booms, deployed side by side with the solar cells stretched between them. This bi-stable boom technology, which is proprietary to RolaTube Technology Ltd, is also being used in a somewhat different configuration in the InflateSail project that also forms part of the Deploytech programme. Figure 6: Solar Array Deployed Discussions held with Astrium, Surrey Satellite and the Cambridge University Deployable Structures Group gave rise to a preliminary design that focussed on two areas: Removal of what was perceived as the principle weakness of slit deployable tubes; an absence of torsional rigidity An assessment of and selection of the simplest, most reliable method to drive the boom deployment As is sometimes the case, novel design and analysis have come together to make it clear that the first of these concerns, torsional rigidity, can in fact be designed around, in turn further simplifying the mechanism and removing a potential point of failure. This was far from clear until well into the programme and significant work has been done on the production and design of slit tubes that have good torsional rigidity, even though these will not be used in the final Array. Torsionally rigid bi-stable booms 7

The most significant problem encountered in using slit tubes as deployable booms is their lack of torsional rigidity. There have been attempts made to design methods of overcoming this problem dating back to the mid 1960 s but all involve either compromising the structure or increasing the complexity of a device whose main attraction is its utter simplicity and consequent reliability. RolaTube has designed a variant that avoids this by linking the slit with a secondary membrane, designed in such a way as to coil alongside the slit tube without problems and to deploy such as to increase the torsional rigidity by up to 80 times over a simple slit tube with the same material base and dimensions. Believing a stable solar array would probably need this stability, a programme was successfully carried through to design a method of manufacture for these booms, in itself a significant engineering challenge. Figure 7: Torsionally stiff slit-tube type bi-stable composite boom The pictures above show the result. The thin membrane linking the opposing sides of the slit boom are attached at hinge points, along lines normal to the centre line of the slit. When opened, this lifts to bridge the gap. By engineering the materials such as to have a low axial modulus, yet good torsional coupling, the result avoids almost all the torsional instability of a slit tubular boom. Although improvements in the array design led to this approach not being used, the work remains valid and significant interest has been shown by Astrium in using these devices in future satellite projects. Drive mechanism assessment and design There are a number of options available for the extension of bi-stable booms. Elastic extension and the use of electric motors are the most common methods but elastic extension requires some form of braking and motors add significantly to weight and complexity. A third method was examined, using an inflatable bladder to extend a boom that has no tendency to elastically self-deploy. This allows the booms to be permanently and rigidly mounted at the root and gives highly controllable deployment, allowing the use of flight proven compressed gas systems with very high 8

reliability ratings as the power source and reducing the number of components and hence points of failure to a minimum. Analysis of Array Structure A critical role in the final design has been played by the results of analysis of twin booms, if hardcoupled by cross struts, to exhibit only minimal dependence for their rigidity on the local torsional stiffness of each tube. This result, confirmed by testing, led to an effort to design an array that could use such hard-linked cross-members. Success in designing such a linkage led to the current design, using simple bi-stable booms, without the torsional stiffness modification. Final Array Design Figure 8: Abaqus analysis output from series leading to re-design of base structure The mechanical design is now complete. The array consists of two parallel bi-stable carbon booms, the ends on the outside of the booms when coiled are hard mounted to a frame that supports them structurally and provides a gas feed manifold to the thin membrane bladders that are coiled interstitially with the booms. Figure 9: EM Solar Array Stowed 9

The first deployment tests have now been successfully completed, although the Kapton membrane that will be used to simulate the solar cells has not yet been fitted. Video of the deployment is expected to be made available on the DeployTech website in early September Figure 10: EM Solar Array deployed The array will be completed and testing started in full by early September 2013. The flight grade carbon/peek composite for the QM has been procured and is expected to arrive in the UK at the end of September. Testing of the EM will continue through to October and will run alongside further FEA analysis to cross correlate performance with analytical predictions. Final detailed design of the QM will commence in December 2013 and it is anticipated that construction will be completed by May 2014. It is hoped that this work will provide satellite designers with a novel method of providing cost-effective solar arrays that are lighter, more compact and simpler and thus more reliable than the current designs. Figure 11: Concept of EM Solar Array deployed 10

3.1.3 DLR Booms for GOSSAMER 2 The design of boom (see Figure 12) and boom deployment mechanisms (see Figure 13) of Gossamer-1 has been adapted to the DEPLOYTECH relevant Gossamer-2 size. The booms will be manufactured from shells of 0.12mm thick 0/90 plain weave CFRP stripes. The CFRP is a 94g/m² material made from T700 fibre and the cyanate ester resin LTM123 matrix from ACG/UMECO with 55% fibre volume content. The specific mass of the booms will be about 60 to 70 gram per meter. The boom deployment mechanism will be made out of CFRP/Alu-Honeycomb sandwich panels. The functionality will be identical to the Gossamer-1 engineering model (see Figure 14): A metallic belt is co-coiled with the boom on the passively braked hub inside the mechanism. The boom can be deployed in a very controllable manner, by coiling the free end of the belt with a winch mechanism. Figure 12: Comparison of Gossamer-2 (left) and Gossamer-1 (right) boom cross section Figure 13: Longitudinal section through the Gossamer-2 (left) and Gossamer-1 (right) boom deployment mechanisms 11

Figure 14: Exemplary photograph of the Gossamer-1 boom and boom deployment mechanism EM The adaption of the concepts to Gossamer-2 dimensions is mainly finished. Currently, the efforts are focussed on the finalisation of the detailed design of the engineering model. 12

3.1.4 Project Website The website is at http://www.deploytech.eu and includes content for interested parties at a range of technical levels. In its updated form, this appears as follows: In the updated version of the website, the following sections now appear: Home Page Mission. A brief overview, goals and advantages of the Deploytech mission Partners. Presentation of the Partners of the project. Background. Historical References and technological background regarding solar and drag sailing and Inflatable Spacecrafts Science & Technology. Scientific Information on folding techniques regarding sails and inflatable structures. News & Dissemination (publications and conferences) Contact Furthermore, website compatibility and optimization has been further improved. We have set up a Content Management System (CMS) for easier and more independent editing of the content of the website. Web content includes text and embedded graphics, photos, video, audio, and code (e.g., for applications) that displays content or interacts with the user Through a secure web platform the administrators of the site can have access to changing and adding content on the website without the need of technical knowledge or direct access to the servers files. In that way content will be updated with ease and more regularly. More Sections to be added in the future: 13

Media, including Videos of related projects and Progress photos and illustrations Articles on Science and technology Launch Information date and description Mission status (during flight) Conference proceedings DEPLOYTECH will produce developments in several areas, including structures, Gossamer deployables, small satellites, European satellites, attitude control, solar sailing, and space debris mitigation. These are discussed in the project website, and also in Section 3.2.3 below. 14