Femtogrid Controller Box (Vestas VTC ) Installation Manual. Application:

Similar documents
Wind Power Optimizer. Installation Manual

Inverter / Charger Accessory for Steca Solarix PLI Phase / Parallel Kit. Installation and operating instructions Z01 17.

Invertek. Battery Management Control System DC-SW-140 & DC-SW-140C DC-SW-70 & DC-SW-70C USER MANUAL

AC THOR or AC ELWA -E

MICROINVERTER ANALYSIS

Commercial 1000VDC String Inverter XGI Installation and Operation Guide Models: XGI XGI

MANUAL D250SA SMARTPASS 120. Input Solar panel Earth Connection

Duke Energy Carolinas North Carolina Interconnection Request Checklist

POWER YOUR TELECOM SITE WITH CAT HYBRID POWER FOR TELECOM APPLICATIONS

NET METERING ENROLLMENT APPLICATION REFERENCE GUIDE

HIGH PENETRATION RENEWABLE HYBRID POWER SYSTEMS TO MEET OFF-GRID COMMUNITY AND INDUSTRIAL ENERGY NEEDS

off-grid Solutions Security of supply Basics: Off-grid energy supply

Charge up at Work! Intelligent E-Mobility Solutions for Companies

Parts. WindyNation s 40 to 120 AMP Diversion Charge Controller Wiring Diagram (copyright 2009) 40 AMP Relay. Enclosure Charge Controller

Technology of Estimating Short Circuit Current and Ground Fault for Direct Current Distribution Systems

Operator s Manual: Solar Charging Station

My Reserve 500 Install Guide

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

MAX310 BEESMART SOLAR MICRO INVERTER TYPE 260. Apparent Power Control (APC) SOLAR PV MODULES UP TO 310 W peak

Workshop on Grid Integration of Variable Renewable Energy: Part 1

User manual for. Exalto windshield wiper Type 223 BD 12/24 Volt

A.Arun 1, M.Porkodi 2 1 PG student, 2 Associate Professor. Department of Electrical Engineering, Sona College of Technology, Salem, India

Tendering Public Charging Infrastructure for Electric Vehicles

RSDCOM. Installation and Operation Guide. Commercial Rapid Shutdown Combiner. DOCR Published March 2017 Revision C English

Exalto windshield wiper

Kythnos Island 20 Years Experience of System Technology for Renewable Energies

SolarEdge. Distributed Solar Power Harvesting Systems. Company Presentation SolarEdge

Chapter 8 Production of Power from Heat

SolarEdge System Overview

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Microinverter - The new PV technology upgrade

Compact Energy Storage Module. Modular Systems, EPDS. Product overview

Recommended Tools: Phillips Screwdriver, Flat Blade Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver,

User manual for Exalto windshield wiper Type 223 BS 12/24 Volt

Microgrid Enabling resilient and cost effective access to power

Power Conversion System The Best Technology for your photovoltaic and storage system

Exalt windshield wiper

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

icon Solar Battery Charge Controller for Home UPS

Concept of matching technical parameters of power supply module and plasma generation module. Design, construction and test results.

SolarEdge Solution - Making PV Panels Smarter GGS. Greener Gas Scotland Renewables & Heating

BMS-3923 Battery Monitoring System

USER MANUAL GEBRUIKSAANWIJZING GEBRAUCHSANWEISUNG SKYLLA 24/100 3-PHASE CE

RESERVOIR SOLUTIONS. GE Power. Flexible, modular Energy Storage Solutions unlocking value across the electricity network

Lithium-Ion Battery Business

Aurora Wind Interface Box

Anakata New Generation Wind turbines 400W-1400W

Solar PV General Introduction Guide for Electricians

Stationary Energy Storage Solutions 3. Stationary Energy Storage Solutions

Charging of HOPPECKE OPzV solar.power battery in Solar Applications

BSI USERS MANUAL. Art.nr

SolarMill SM1-1P, SM1-2P, SM2-3P, SM2-5P, SM2-6P. User manual. Draft. SM1 - Product shown may vary slightly from specific model shipped

Manual. BlueSolar Grid Inverter 1500 / / / / / 230

UPSPro Backup Power System

Alfen Connect TM Grid Automation

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK.

Exalto windshield wiper type 235 KK-HD 12/24 Volt

Wind Power Inverter WINDY BOY 5000A/6000A

The microinverter The latest in solar technology

Components for your PV Solar Electric System

MEET THE COST AND CARBON CHALLENGE

24 hours BATTERY COOLING WITH DC COMPRESSORS WHITEPAPER NIDEC GLOBAL APPLIANCE.

Mini-Grid PV Installations

ABB solar inverters Product portfolio

Recommended Tools: Phillips Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver, Flat Blade Screwdriver

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

OASIS-UM-01. User Manual. Inverter/Charger Oasis 6000 Rev 1.0. Oasis 6000 Series MAY 2012 ISSUE 01

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A

SMA Utility Power System

Decentralized Battery Energy Management for Stand-Alone PV- Battery Systems

Disconnect Combiner Box Installation Manual

Future Electronic Power Distribution Systems A contemplative view

ADF. Restoring the perfect wave

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Get More When Shopping for Solar

A combined future. Microgrids with renewable power integration

User manual for Exalto windshield wiper Type 233 BD 12/24 Volt. Cat.no /32/35/40/45/50 (12 Volt) Cat.no /32/35/40/45/50 (24 Volt)

Eco PX BROCHURE JUNHO 2013

PSO project EaseWind Enhanced ancillary services from Wind Power Plants. Anca D. Hansen DTU Wind Energy

Advanced Alternative Energy Solutions HSS. Hybrid Storage Solution HYBRID ALTERNATIVE ENERGY STORAGE COMBINED WITH INTELLIGENT CONTROLS

DC Nanogrids Igor Cvetkovic

Figure 1 I-V characteristics of PV cells. Meenakshi Dixit, Dr. A. A. Shinde IJSRE Volume 3 Issue 12 December 2015 Page 4687

2012 DFW Solar Home Tour October 6, 2012 Reference Solar PV

INSTALLATION MANUAL CRYSTALLINE SOLAR MODULES

Residential SolarEdge StorEdge

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

Micro-Inverter. Corporate and Product Presentation. AEconversion GmbH & Co. KG. Micro vs. String. Product Details. USPs. Market Overview.

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

Interactive Whiteboard. User Guide. Before operating the unit, please read this manual thoroughly, and retain it for future reference

Safe, reliable, long lasting Lithium Iron Phosphate battery. Next generation capture and release technology. Increased efficiency for greater savings

Siemens Hybrid Power Solutions. Technical and Financial Simulation Tools for High Penetration Hybrid Power Systems, Bangkok June 2015

FW-IOB-T-120/208VAC Input/Output/Bypass Assembly. Installation Instructions

SMT. Installation and Operation Manual. Model:SMT WITH MPPT TECHNOLOGY

Arial Regular 25pt. Learn Solar Installation From the Pros!

Net Metering Program

UPS-ST12xx UPSPro Backup Power System

Mobility. Energy. Anytime. Anywhere.

ILED Dorado. User Manual

Evaluation of HALUS Power systems

Transcription:

Femtogrid Controller Box (Vestas VTC 25-002) Installation Manual Application: Femtogrid Solar and/or Wind Optimizers in combination with DC Grid òr AC Grid combined with non-femtogrid inverter(s) Doc vestas-im Rev 1.0 May 2016 Page 1 of 16

Content 1. Explanation of the used symbols...3 2. Introduction...4 General...4 User group for this document...4 Femtogrid s solution for solar or wind installations...4 3. Safety instructions...5 Installing Femtogrid systems...5 First time powering on of the Controller Box...5 Dangerous voltages inside the system components...5 Femtogrid DC bus safety warnings...5 4. Application schematics...6 Stand alone + DC Grid (solar)...6 Master / Slave + DC Grid (solar)...7 Master / Master + DC Grid (solar)...7 Stand alone + AC Grid (solar)...8 Master / Slave + AC Grid (solar)...8 Master / Master + AC Grid (solar)...9 Stand alone + AC Grid (solar + wind)...9 5. Main features installer process... 11 6. Mechanical installation of the Controller Box... 12 Check the product for damage... 12 Dimensions... 12 7. LED indication and hidden switch... 13 8. Technical Specifications... 14 9. Practical hints... 15 10. Company information... 16 Doc vestas-im Rev 1.0 May 2016 Page 2 of 16

1. Explanation of the used symbols For optimal use of this document we will start with the explanation of the symbols appearing in this User Manual of the Vestas VTC 25-002. This symbol indicates a symbol. This symbol indicates a remark that if ignored makes commissioning more difficult. This symbol indicates a warning that if ignored may result in damage to components or possible danger for persons. Read these passages carefully. Doc vestas-im Rev 1.0 May 2016 Page 3 of 16

2. Introduction General Thank you for purchasing this Femtogrid product and by doing so helping to make this earth greener by adding a solar and/or wind installation to our planet. Your solar or wind installation supplies energy directly suitable for a DC or an AC grid which in turn helps reducing CO2 emission and stimulates us in our quest to switch from conventional fossil energy sources to renewable energy sources. User group for this document This product has to be installed by authorized installers. It is also necessary that the installer complies with the rules of the local grid administrator. It is strongly recommended that the installer reads this user manual carefully and keeps in mind all the safety measures, the technical connecting rules of the local grid administrator, and every other applicable rule. Femtogrid s solution for solar or wind installations (when using a stand-alone application of a DC grid or a stand-alone application of an AC grid together with a non-femtogrid inverter): Femtogrid s smart solution enhances performance, safety, reliabillity and utilization of solar and wind installations and is based on 4 (DC grid) or 5 (AC grid) component groups: PO310 Solar Optimizer (for each solar panel) or PO2500-UW002 Wind Optimizer (together with Safety Box) for a wind turbine (for example Anakata A018) Non-Femtogrid Inverter(s) when connecting to an AC grid VTC 25-002 Vestas Controller Box DC cables (Optional) Monitoring (wireless monitoring system) which consists of a Monitoring Box and a Monitoring Portal Together with the solar panels (and/or the wind turbine), the fastening material, and the installation itself our system is a turnkey solution that through its innovative features has important benefits in comparison to traditionally built solar installations with the use of string architecture. An example of an implementation on site is shown here. Doc vestas-im Rev 1.0 May 2016 Page 4 of 16

3. Safety instructions Installing Femtogrid systems The installation of the 5 component groups (PO310 Solar Power Optimizers and/or PO2500-UW002 Wind Optimizer(s), non-femtogrid inverter(s), VTC 25-002 Controller Box, DC cables and Monitoring Box) have to be done by authorized installers in agreement with the local and national rules (the regulations applying in the Netherlands are stated in NEN1010). Switching on of the Controller Box Do not connect the VTC 25-002 Vestas Controller Box to the power (230V AC of 400V DC) before all PO310 Power Optimizers (along with their solar panels) are connected in parallel and/or the PO2500-UW002 Wind Optimizer (together with the Safety Box) is connected. Voltages up to 400V can be present on the DC Grid. Do not touch the inside of the connectors. High voltages inside the system components Do not open the PO310 Solar Power Optimizers, the PO2500-UW002 Wind Optimizer(s), the non-femtogrid inverter(s) or the VTC 25-002 Controller Box. This is not necessary for the installation. In case of necessity it may only be done by authorized engineers. In some installations it is necessary to configure beforehand the VTC 25-002 Vestas Controller Box in Slave mode (at switched off local supply) by placement of the supplied jumpers. Only in that exceptional case it is necessary to open the Controller Box. Femtogrid DC bus safety warnings If the Safety connection of the VTC 25-002 Vestas Controller Box(s) is disconnected all the power of the connected devices to the DC bus is switched off. In case the cables or the connectors are damaged there is a possibility to get an electrical shock. Place an endcap(s) on the non-used T-connector(s) of the DC bus cable. Otherwise penetrating water can cause your solar and/or wind installation to malfunction. Doc vestas-im Rev 1.0 May 2016 Page 5 of 16

4. Application schematics Femtogrid systems use in the special case a Vestas Controller Box is needed (as in the case of an AC grid combined with non-femtogrid inverters or in the case of a DC grid without the use of inverters) 5 component groups to enhance performance, safety, reliability and utilization of solar and wind installations: PO310 Solar Optimizer (for each solar panel) and/or PO2500-UW002 Wind Optimizer (combined with Safety Box) for a wind turbine, non-femtogrid inverter(s) if connected to an AC grid, VTC 25-002 Vestas Controller Box, DC cables and (optional) Monitoring. Examples of some possible installations are shown here: Connecting example 1: Stand alone + DC grid (max 32 optimizers) Doc vestas-im Rev 1.0 May 2016 Page 6 of 16

Connecting example 2: Master / Slave + DC grid (max 64 optimizers) Connecting example 3: Master / Master + DC grid (max 2 x 32 optimizers) Doc vestas-im Rev 1.0 May 2016 Page 7 of 16

Connecting example 4: Stand alone + AC grid (max 32 optimizers) Connecting example 5: Master / Slave + AC grid (max 64 optimizers) Doc vestas-im Rev 1.0 May 2016 Page 8 of 16

Connecting example 6: Master / Master + AC grid (max 2 x 32 optimizers) Connecting example 7: Stand alone + AC grid (1 wind and max 24 solar optimizers) Doc vestas-im Rev 1.0 May 2016 Page 9 of 16

All PO310 Power Optimizers are connected in parallel by using the special Femtogrid DC cables in order to build our unique and patented 400 V DC parallel bus system. The cables have the appearance of standard solar cables but have some extra features in addition to a larger copper area. For starters the Femtogrid DC cable has 3 wires: in addition to the + (red) and the - (blue) there is an integrated 0 (black) safety wire that supplies the Safety (48 V DC) output of the Vestas Controller Box (Master) to all the Solar and Wind Optimizers. Disconnecting this supply which is coming out of the Controller Box ensures that the DC side of your solar and/or wind installation (the DC bus) is being switched off. Any additional Vestas Controller Boxes (Slaves) are supplied with the Slave signal (which is also 48 V DC but controlled by the Master Vestas) via separate cables. The Femtogrid DC cables constitute the parallel network, which is one of the distinguishing features of the Femtogrid system. This parallel network eliminates the negative effect of partial shade, the differences between modules and suboptimal orientation which can generate up to 30% more solar energy. It also ensures a higher level of security and reliability and makes it possible to easily replace those parts of the solar installation that do not work properly and finally makes the total installation easily expandable. All PO310 Solar Power Optimizers, Wind Power Optimizers and the Monitoring Box made by Femtogrid have ZigBee low power wireless communication possibilities. After the first commissioning of a solar and/or wind installation a wireless ZigBee network is being set up that makes it possible to pass through production data to the My Femtogrid portal. This monitoring of the installation enables the end user, the installer and Femtogrid to maximize both the uptime and the lifetime of the complete installation. The passing through of production data will have no influence on the electrical power generation of the solar or wind installation. For further details on how to set up a ZigBee network see the installation manual of the Monitoring Box or the manual of the Power Optimizers. Doc vestas-im Rev 1.0 May 2016 Page 10 of 16

5. Main features of the installation process This Vestas Controller Box is used only as a (necessary) complement for systems using Femtogrid solar and/or wind optimizers in case Femtogrid inverter(s) are not being used. These Femtogrid inverters normally supply the Safety power for the other (Femtogrid) components which now has to be supplied by the Controller Box (see also the application schematics in chapter 4 for examples). Before connecting the total system all the recommendations that are given in the installation manuals of these basic system components have to be implemented (placing and connection of the optimizers, inverter(s), cabling, etc). The Vestas Controller Box has no ZigBee functionality built in and therefore there is no need or possibility to log into a network. An example of the layout of an enclosure which holds several Vestas Controller Boxes intended for a large system is depicted in the following chapter 6. Doc vestas-im Rev 1.0 May 2016 Page 11 of 16

6. Mechanical installation of the Controller Box Check the product for damage Check if your Vestas Controller Box is undamaged. In case of damage contact your distributor. Dimensions The length, width and height of the Box are 157 x 90 x 58 mm, see following figure. The Vestas is intended to be placed on a DIN-rail in a closed housing. A configuration example of such an enclosure with indication of the needed connecting material is shown here. Doc vestas-im Rev 1.0 May 2016 Page 12 of 16

7. LED indication and hidden switch Here we only briefly discuss normal operation mode as is visible directly after powering on the Controller Box (configured as Master = default, meaning that both internal jumpers are not placed). Initially the 48V Safety output voltage is being switched on and if after a short period of time the expected sensor input signals have become available (among others from the 400V DC bus but also from internal signals of the Vestas itself) and have the right values than this output voltage remains present, which is visible from the green output LED that switches on (the yellow processor LED switches on simultaneously with the green one). The red indication LED stays off during default mode of operation. See for the other functions of the Vestas and the indications of the LED s and the use of the hidden switch and the jumpers the separate user manual of the Vestas Controller Box VTC 25-002. Doc vestas-im Rev 1.0 May 2016 Page 13 of 16

8. Technical specifications The technical specifications of the Vestas Controller Box are stated in the accompanying Vestas VTC 25-002 Datasheet. Doc vestas-im Rev 1.0 May 2016 Page 14 of 16

9. Practical hints To be added later. Doc vestas-im Rev 1.0 May 2016 Page 15 of 16

10. Company information Femtogrid Energy Solutions BV Ooswteinderweg 127C 1432 AH Aalsmeer The Netherlands +31 (0)85 0444 004 info@femtogrid.com www.femtogrid.com Doc vestas-im Rev 1.0 May 2016 Page 16 of 16